This is a Proposal Form for Contractor Trade Packages related to Washington Elementary School Improvements, a capital project undertaken by Rochester Public Schools (Independent School District #535) in Rochester, Minnesota. The project encompasses replacement of approximately 20,043 square feet of low-slope roofing, replacement of exterior window systems with new insulated storefront, installation of new lockers and floor finishes, and chiller replacement. Trade Package 1A addresses General Trades as defined in Section 01 13 10, with separate solicitations issued for Trade Package 22A (Mechanical), Trade Package 7A (Roofing - Best Value), and Trade Package 8B (Aluminum Systems & Glazing - Best Value). Bidders are permitted to submit bids on individual trade packages or combined bids for multiple trade packages, with sealed bids submitted through the District's eProcurement platform, Euna Procurement. The Construction Manager is Knutson Construction Services, and the Architect is CRW Architecture + Design Group. Award will be made to the lowest responsive, responsible bidder, and Minnesota prevailing wage requirements apply to the project.
Bidders must include all applicable sales and use tax in their proposals and submit a Cashier's Check, Bid Bond, or Certified Check equal to ten percent of the proposal amount as bid security. Additional required submissions include a Responsible Contractor Act Verification Form and a completed hourly rate form from Section 00 42 20. Bidders identified as apparent low bidders must submit a complete list of proposed subcontractors and suppliers within forty-eight hours of bid opening for Architect/Engineer and Owner approval, with no contracts awarded until this list is fully approved. Proposals cannot be withdrawn within thirty days without District consent. The form requires acknowledgment of receipt of any addenda to the specifications and includes provisions requiring bidders to obtain and submit signed verifications from subsequently retained subcontractors confirming compliance with Minnesota Statute 16C.285, subdivision 3, within fourteen days of retaining such subcontractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRW PROJECT #26-014 00 4210 - 1 PROPOSAL FORM
CONTRACTOR TRADE PACKAGES
Rochester Public Schools – Washington Elementary School Improvements
SECTION 00 4210
PROPOSAL FORM CONTRACTOR TRADE PACKAGES (NON-BEST VALUE)
BID FORM
**This bid form applies to the Contractor Trade Packages listed in spec sections 00 4200 excluding Best Value Trade Packages. Best Value Trade Packages submit proposals that are included in their respective sections.
BID OF:
Bidder Date
Address
Contact Phone Fax
Email Address
Address bids to:
Rochester School District Office Attn: Tanner Sorensen
3935 Highway 14 East Rochester, MN 55904
SALES TAX ACKNOWLEDGEMENT
All Trade Packages submitting a proposal with this proposal form and listed in spec section 00 42 00 are to include all applicable sales and use tax.
Sales Tax Included: YES / NO (circle one)
The undersign do hereby declare that I/we have carefully examined the site of the proposed work; as well as the Contract and Bidding Documents, and do hereby agree to furnish all material transportation, equipment, labor and supervision, tools, taxes, and other items to do all work in strict accordance with the Contract Documents for the following lump sum amounts:
BASE BID (Individual Packages)
• Contractors bidding on multiple trade packages separately must submit a separate bid form for each Trade Package.
• Indicate Trade Package Number and Title in the space for each Trade Package which bidder is submitting a bid for.
• State Base Bid in both words and figures.
• Bidders are invited to submit a combined bid for work included in multiple Trade Packages. In order to submit a combined bid, an individual bid is required per package
TRADE PACKAGE:
Bid Amount: ____________ Dollars $ ______
CRW PROJECT #26-014 00 4210 - 2 PROPOSAL FORM
COMBINED BASE BID
• Indicate Trade Package Number and Title in the space for each Trade Package which bidder is submitting a combined bid for.
• State Base Bid in both words and figures.
Combined Bid Amount: ______Dollars $
ALTERNATES
• Refer to Spec Section 01 2300 for complete description of alternates.
• Provide all costs as related to the bidding trade package(s). If no cost, indicate that in the space provided
• State bid in figures.
CRW PROJECT #26-014 00 4210 - 3 PROPOSAL FORM
Bid Bond
A Cashier's Check, Bid Bond, or Certified Check in the amount of Dollars ($ ) drawn to the order of the Treasurer, Independent School District #535 , Rochester , Minnesota is attached hereto with the understanding that if this Proposal is accepted and the undersigned refuse, fail or neglect to execute the Contract and furnish bond within ten days of the date of acceptance of this Proposal, it is fully understood and agreed between the Independent School District #535 , Rochester ,Minnesota and the undersigned that Dollars ($ ) being amount of bid security above mentioned, shall be the liquidated damages occasioned by such failure, refusal or neglect and that thereupon said School District may realize on said bid security and use the proceeds in payment of said damages, and upon the further understanding that said bid security will be promptly returned upon the rejection of this Proposal or the signing of a Contract and furnishing of the Bond.
If the Base Bid Proposal is accepted, the bidder agrees to commence work on or before ________ , __ and to substantially complete work ___ ,______ subject to the provision of the Contract, accepted Alternates, Specifications and Instructions to Bidders.
The bidder agrees that if he is the apparent low bidder, he will submit a complete list of his proposed subcontractors and suppliers within 48 hours of the bid opening to the Architect/Engineer and Owner for their approval. It is the bidders understanding that no Contracts will be awarded until this list is fully approved.
This Proposal is submitted after careful study of the plans and specifications and from a personal knowledge of the conditions both surface and subsoil, at the building site, which knowledge was obtained from the undersigned's own sources of information and not from an official or employee of Independent School District #535 , Rochester , Minnesota.
The undersigned declares that this Proposal is made without improper connection with any other person or persons making a Proposal on this same Contract, and is in all respects fair and without collusion or fraud, and the undersigned further declares that no person or persons acting in any official capacity for Independent School District #535 , Rochester , Minnesota, is directly or indirectly interested therein or in the supplies of works to which it relates or in any portion of the profits thereof.
It is understood and agreed that this Proposal cannot be withdrawn within thirty (30) days without the consent of the Independent School District #535 and that the said School District has the right to accept or reject any or all Proposals.
ADDITIONAL INCLUSIONS
The following items need to accompany this proposal form:
• Cashier’s Check, Bid Bond, or Certified Check equal to 10% of the amount of the proposal.
• Responsible Contractor Act Verification Form enclosed following bid form.
• Completed hourly rate form from section 00 42 20.
CRW PROJECT #26-014 00 4210 - 4 PROPOSAL FORM
ADDENDUM RECEIPT
The receipt of the following Addenda to the Specifications is acknowledged:
Addendum No. ________ Date
(Legal Name of Person, Firm or Corporation)
By:
By:
(Address & Phone Number
CRW PROJECT #26-014 00 4210 - 5 PROPOSAL FORM
RESPONSIBLE CONTRACTOR ACT VERIFICATION
The undersigned owner/officer of _ (“Company”) hereby certifies that it complies with each of the minimum criteria in Minn. Stat. § 16C.285, subd. 3, as of the time of the submission of its bid for the above-referenced project (“Project”).
The first-tier Subcontractors that Company intends to retain for work on the Project are:
The first-tier Subcontractors listed above have provided verification required by Minn.
Stat.§ 16C.285, subd. 3(7).
The remaining first-tier subcontractors that Company intends to retain for work on the Project have not yet been determined. Company will obtain and submit signed verifications from each of its subsequently retained subcontractors, confirming compliance with Minn. Stat. § 16C.285, subd. 3, within 14 days of retaining the subcontractors.
Dated: Company: _
By: _
Its: _
Owner/Officer
Subscribed and sworn to before me this day of , 20 .
Notary Public