2-26-014 RPS Washington ES Improvements FINAL CDs Project Manual 26 11-19 (1).pdf
PDF 16 MB Posted
- Solicitation number
- #121026 - 1A
- Issued by
- Olmsted County, Minnesota
About this file
This file is a Project Manual for Washington Elementary School Improvements, a capital construction project undertaken by Rochester Public Schools (ISD #535) in Minnesota. The overall project encompasses replacement of approximately 20,043 square feet of low-slope roofing, replacement of exterior window systems with new insulated storefront systems, installation of new lockers and floor finishes, and chiller replacement. The work is divided into multiple trade packages solicited separately: Trade Package 1A addresses general trades and is the subject of this manual; Trade Package 22A covers mechanical systems; Trade Package 7A addresses roofing on a best-value basis; and Trade Package 8B covers aluminum systems and glazing on a best-value basis. The District is soliciting sealed bids through its eProcurement platform, Euna Procurement, with award to be made to the lowest responsive, responsible bidder. The project is managed by Knutson Construction Services as Construction Manager, with CRW Architecture + Design Group serving as Architect. Minnesota prevailing wage requirements apply to all work.
The Project Manual establishes the detailed scope, specifications, and requirements for bidding and contract performance. Pricing terms and specific bid due dates are determined through the District's eProcurement platform. No specific set-asides are indicated in the available documentation. The project is funded through Rochester Public Schools' capital improvement budget. All bidders must comply with Minnesota prevailing wage standards as a condition of contract award and performance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .