3-RFP 25-013 Network Cabling Services HUB INSTRUCTIONS and FORMS Rev 2025.pdf
PDF 236 KB Posted
- Attached to
- Network Cabling Services
- Solicitation number
- RFP#25-013
- Issued by
- Tarrant County, Texas
About this file
This document is a Historically Underutilized Business (HUB) Instructions for Bidders package from Tarrant County College District (TCCD) for a Network Cabling project (RFP#25-013). The document outlines TCCD's HUB Program requirements for contracts, specifically stating that for contracts of $50,000.00 or more, bidders must comply with HUB participation goals. The state of Texas HUB goals vary by procurement category, ranging from 21.1% for construction and commodities to 32.9% for special trade services, with the professional services category at 23.7%.
Bidders are required to submit three key documents with their bid: a HUB Affidavit Statement, a HUB Utilization Form, and a Good Faith Effort Form. Failure to submit these documents with the bid will result in the bid being considered non-responsive. The HUB program aims to ensure full and equitable participation of HUB firms in procurement, with bidders having two compliance options: either meet or exceed the stated HUB goal or provide documentation of good faith efforts to do so. All HUB firms must be certified by an approved agency (such as NCTRCA) before contract award, and bidders agree to potential audits of their subcontractor work and documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
If the total dollar value of the contract is $50,000.00 or more, the HUB goals are applicable. If the total dollar value of the contract is less than $50,000.00, the HUB goals are not applicable.
TCCD HUB INSTRUCTIONS FOR BIDDERS
APPLICATION OF POLICY
POLICY STATEMENT
It is the policy of the TCCD to ensure the full and equitable participation by HUB firms in the procurement of all goods and services to TCCD on a contractual basis. The objective of the Policy is to make a Good-Faith-Effort to use HUB firms to a level comparable to the availability of qualified HUB firms based on the State of Texas HUB availability study.
HUB Goal TCCD HUB goal on this project will be determined by the State of Texas HUB goals based on the procurement categories.(e.g. construction 21.1%, special trade 32.9%, professional services 23.7%, commodities 21.1%, other services 26.0%).
COMPLIANCE TO BID SPECIFICATIONS
For TCCD contracts of $50,000.00 or more, bidders are asked to comply with the intent of the TCCD’s HUB Program by either of the following:
1. Meet or exceed the above stated minimum HUB goal as determined by State of Texas procurement categories above; or
2. Good Faith Effort documentation.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications.
1. HUB Affidavit Statement:
2. HUB Utilization Form:
received with the bid documents on bid opening date.
received with the bid documents on bid opening date.
3. Good Faith Effort Form: received with the bid documents on bid opening date.
2 Affidavit Statement
FAILURE TO SUBMIT THIS COMPLETED AFFIDAVIT STATEMENT WITH THE BID
AT TIME OF BID OPENING WILL RESULT IN THIS BID BEING CONSIDERED NON-
RESPONSIVE TO SPECIFICATIONS.
(PAGE 1 OF 1)
TCCD HUB SPECIFICATIONS FORM
HUB AFFIDAVIT STATEMENT
Project Name: Network Cabling
Project No.: RFP#25-013 TCCD 23.7 % :
The undersigned bidder hereby certifies that they will comply with TCCD’s HUB Program and the specifications of this bid in the following manner:
[Check all applicable categories]
1. THE HUB PARTICIPATION WILL MEET OR EXCEED THE STATED
%, WILL COMPLETE THE HUB UTILIZATION FORM.
2. THE HUB PARTICIPATION WILL BE LESS THAN THE STATED
%, WILL COMPLETE THE UTILIZATION FORM
AND GOOD FAITH EFFORT FORM.
3. NO HUB PARTICIPATION,WILL COMPLETE GOOD FAITH EFFORT FORM.
Authorized Signature Printed Signature
Title Contact Name and Title (if different)
Company Name Contact Telephone Number(s)
Address Fax Number
City/State/Zip Code Date
3 HUB Utilization Form -
(*) Acceptable certifying agencies please specify: (NCTRCA) North Central Texas Regional Certification Agency;State of Texas HUB; DFW-MSDC;
(**) Only first and second tier acceptable
(PAGE 1 OF 2)
TCCD HUB UTILIZATION FORM
PRIME COMPANY NAME BID DATE
Accessible Document Remediation
PROJECT NAME PROJECT NUMBER
TCCD’S HUB GOAL: % HUB PERCENTAGE ACHIEVED: %
The undersigned bidder agrees to enter into a formal agreement with the HUB firms for work listed in this schedule, conditioned upon execution of a contract with TCCD. The willful misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered nonresponsive to specifications.
Company Name, Contact Name, Address, Telephone No. HUB
Cert. (*) Agency
Scope Of Work
Specify Tier (**)
Dollar Amount
THIS FORM MUST BE RECEIVED WITH THE BID DOCUMENTS ON BID OPENING DATE.
(PAGE 2 OF 2)
TCCD HUB UTILIZATION FORM
Company Name, Contact Name, Address, Telephone No. HUB
Cert. (*) Agency
Scope of Work
Specify Tier (**)
Dollar Amount
The bidder further agrees to provide, directly to TCCD upon request, complete and accurate information regarding actual work performed by all Subcontrac-tors, including HUB subcontractors submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records, and files held by their company that will substantiate the actual work performed by the HUB on this contract, by an authorized officer or employee of TCCD.
All HUB firms MUST BE CERTIFIED BEFORE CONTRACT AWARD.
Authorized Signature Company Name
Title Date
HUB Utilization Form
| TCCD HUB INSTRUCTIONS FOR BIDDERS |
| TCCD HUB SPECIFICATIONS FORM |
| THIS FORM MUST BE RECEIVED WITH THE BID DOCUMENTS ON BID OPENING DATE. |
| The bidder further agrees to provide, directly to TCCD upon request, complete and accurate information regarding actual work performed by all Subcontrac- tors, including HUB subcontractors submitted with this bid. The bidder also agrees to allow an au... |
File details come from the government source that posted it. Updated .