3-Reeves Co Sr Center Renovations-SPECS FINAL.pdf
PDF 9 MB Posted
- Attached to
- SENIOR CENTER RENOVATIONS
- Solicitation number
- ITB-26-013
- Issued by
- Polk County, Texas
About this file
This is a specifications document for the Reeves County Senior Center Renovations project located at 505 South Park Street, Pecos, Texas 79772. The project involves an expansion of approximately 2,044 gross square feet added to the existing 7,856 gross square foot building, resulting in a total combined building area of approximately 9,900 gross square feet. The scope of work includes expansion of the existing commercial kitchen with supporting walk-in cooler, walk-in freezer, and pantry facilities, as well as renovation and expansion of the adjacent senior activity hall. Construction materials and methods encompass selective demolition of existing interior elements, cast-in-place concrete work including slab-on-grade and grade beams, wood stud framing with pre-engineered wood roof trusses, thermal and rigid insulation, exterior insulation and finish system (EIFS) over weather-barrier-wrapped plywood, membrane roofing with metal coping, hollow metal doors and frames, aluminum-framed entrances and windows, suspended acoustical ceilings, ceramic tile finishes, gypsum board partitions, resilient flooring, painting, and architectural provisions for owner-furnished food service equipment. The building is Type V-B construction with approximately 226 occupants and is classified with Group A-3 (Assembly) occupancy for the activity hall and Group B (Business) for the kitchen areas.
The specifications document, prepared by Burns Architecture, LLC with structural engineering by Frank W. Neal & Associates, Inc., MEP engineering by Bryan Parks & Associates, Inc., and food service consulting by W. Steve Welborn, establishes comprehensive quality assurance, administrative, and execution requirements for all construction trades. Key administrative provisions include monthly progress meetings, detailed submittal procedures with 15-calendar-day review periods, testing laboratory services at owner expense for initial testing with contractor responsibility for re-testing of non-conforming work, and extensive quality control requirements including mock-ups and field samples. The document specifies allowances totaling $10,500 for hardware ($500 per door leaf for four leaves), ceramic tile matching existing kitchen tile, and parking stripe/site accessibility work. Contractor responsibilities include maintaining detailed construction schedules, coordinating with the Construction Manager, providing qualified personnel, ensuring compliance with ACI standards for concrete work and TPI standards for truss fabrication, and completing final cleaning and closeout procedures including one-year warranty letters and operating/maintenance instruction for all equipment prior to project completion and owner occupancy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Addendum 1.pdf | ||
| 2-2026 0630-RCSCC-CD100-Package.pdf | ||
| 1-26-013 Senior Center Renovation Bid Packet.pdf | ||
| 5-Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REEVES COUNTY
SENIOR CENTER
RENOVATIONS
505 SOUTH PARK STREET
PECOS, TX 79772
Burns Architecture, LLC
JOB NO.: RCSCR
DATE: 6/30/2026
Architect Construction Manager
6/30/2026
PROJECT DIRECTORY 000102
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 1 OF 2
SECTION 000102
PROJECT DIRECTORY
REEVES COUNTY SENIOR CENTER RENOVATIONS
PECOS, TEXAS
COUNTY JUDGE LEO HUNG
COUNTY COMMISSIONERS
PRECINCT 1 LOUISE MOORE
PRECINCT 2 ISRAEL CAMPOS
PRECINCT 3 PAUL HINOJOS
ARCHITECT:
Burns Architecture, LLC
PO Box 2639
Galveston, TX 77553
Principal: Kenneth C. Burns, AIA
Phone: (817) 247-6640
Email: kburns@burns3.com
STRUCTURAL ENGINEER:
Frank W. Neal & Associates, Inc.
1015 W. Broadway
Fort Worth, Texas 76104
Principal: Frank W. Neal, P.E.
Phone: (817) 332-1944
Fax: (817) 336-8620
Email: fneal@fwna-eng.com
MEP ENGINEER:
Bryan Parks & Associates, Inc.
4400 Buffalo Gap Road, Suite 0800
Abilene, Texas 79606
Principal: Richard Bryan, P.E.
Phone: (325) 232-6035
Fax: (325) 232-7551
Email: richard@bpa-engineering.com
PROJECT DIRECTORY 000102
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 2 OF 2
FOOD SERVICE CONSULTANT:
W. Steve Welborn, FCSI
Kitchen Design Consultant
150 Oak Trail
Mabank, Texas 75156
Phone: (903) 451-2343
Email: wsw7grp@netzero.com
CONSTRUCTION MANAGER:
PM:
Phone:
Email:
TABLE OF CONTENTS 000103
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 1 OF 3
SECTION 000103
TABLE OF CONTENTS FOR
DIVISION 00 – INTRODUCTORY INFORMATION, PROPOSAL BIDDING
REQUIREMENTS, AND CONTRACT REQUIREMENTS
Section 000102 .........................Project Directory
Section 000103 .........................Table of Contents
DIVISION 1 – GENERAL REQUIREMENTS
Section 011000 .........................Project Description
Section 012100 .........................Allowances
Section 013100 .........................Administrative Requirements
Section 013300 .........................Submittals and Substitutions
Section 014100 .........................Testing Laboratory Services
Section 014500 .........................Quality Control
Section 015650 .........................Cleaning
Section 017700 .........................Contract Closeout
DIVISION 2 – EXISTING CONDITIONS
Section 024119 .........................Selective Demolition
DIVISION 3 – CONCRETE
Section 031000 .........................Concrete Formwork
Section 032000 .........................Concrete Reinforcement
Section 033000 .........................Cast-in-Place Concrete
DIVISION 4 – MASONRY
None this project
DIVISION 5 – METALS
Section 055000 .........................Metal Fabrications
DIVISION 6 – WOOD AND PLASTIC
Section 061000 .........................Rough Carpentry
Section 061600 .........................Thermal Sheathing
Section 061753 .........................Plate Connected Wood Trusses
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 2 OF 3
Section 064100 .........................Architectural Woodwork
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
Section 072100 .........................Building Insulation
Section 072413 .........................Exterior Insulation and Finish System
Section 072500 .........................Weather Barrier
Section 075400 .........................Single-Ply Membrane (PVC) Roofing
Section 076200 .........................Flashing and Sheet Metal
Section 079200 .........................Joint Sealants
Section 079500 .........................Expansion Control
DIVISION 8 – DOORS AND WINDOWS
Section 081113 .........................Standard Hollow Metal Doors and Frames
Section 084113 .........................Aluminum Framed Entrances and Storefronts
Section 087100 .........................Standard Door Finish Hardware
Section 088000 .........................Standard Glazing
DIVISION 9 – FINISHES
Section 092116 .........................Cement Backer Board
Section 092900 .........................Drywall
Section 093013 .........................Ceramic Tile Work
Section 095123 .........................Suspended Panel Ceilings
Section 096519 .........................Resilient Tile Flooring and Base
Section 099123 .........................Painting
DIVISION 10 – SPECIALTIES
Section 102600 .........................Corner Guards
Section 102800 .........................Toilet Room Accessories
DIVISION 11 – EQUIPMENT
Section 114000 .........................Food Service Equipment
DIVISION 12 – FURNISHINGS
None this project
DIVISION 13 – SPECIAL CONSTRUCTION
None this project
DIVISION 14 – CONVEYING SYSTEM
None this project.
DIVISIONS 20 - 23 – MECHANICAL
Section 200100 .........................Common Plumbing & HVAC Requirements
Section 200513 .........................Motors
Section 200529 .........................Supports and Sleeves
Section 200548 .........................Vibration Isolation
Section 200719 .........................Piping Insulation
Section 220000 .........................Basic Plumbing Requirements
Section 222023 .........................Natural Gas Piping
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 3 OF 3
Section 230000 .........................Basic Heating Ventilation and Air Conditioning Systems
Requirements
Section 230593 .........................Testing, Adjusting, and Balancing for HVAC
Section 230713 .........................Ductwork Insulation
DIVISION 26 & 27– ELECTRICAL
Section 260000 .........................Basic Electrical Requirements
Section 260573 .........................Overcurrent Protective Device Coordination Study
Section 262817 .........................Motor & Circuit Disconnects
Section 262914 .........................Motor Starters
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
None this project
DIVISION 31 - EARTHWORK
Section 312000 .........................Fill and Backfill
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
PROJECT DESCRIPTION 011000
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 1 OF 1
SECTION 011000
PROJECT DESCRIPTION
PECOS, TEXAS
The Reeves County Senior Center Renovations project is an expansion of and renovation to the existing Reeves County Senior Center located at 505 South Park Street, Pecos, Texas, 79772.
The project expands the existing commercial kitchen and adds supporting walk-in cooler, walk-in freezer, and pantry, and renovates and expands the adjacent senior activity hall. The expansion consists of an approximately 2,044 gross-square-foot addition to the existing 7,856 gross-square-foot building, for a total combined gross building area of approximately 9,900 gross square feet.
The building is Type V-B construction (combustible, unprotected, non-sprinklered) with a nonseparated mixed occupancy. The most restrictive occupancy for allowable area is Group A-3
(Assembly), with Group B (Business) areas including the kitchen. The expanded commercial kitchen is strictly under 2,500 square feet and is dedicated to a meal-service program that prepares meals for off-site community distribution. The existing and expanded hall operates as an A-3 community space used by seniors for recreational activities, including incidental lounge and activity seating. The total building occupant load is approximately 226 occupants, and an automatic sprinkler system is not required for this facility based on the fire area and occupant-load thresholds of the applicable code.
Construction materials and work required include, but are not limited to: selective demolition of existing interior walls, doors, finishes, sidewalk, and associated mechanical, electrical, and plumbing; cast-in-place concrete slab-on-grade, concrete grade beams and footings, a recessed concrete floor pit, and concrete flatwork; wood stud framing and pre-engineered wood roof trusses with plywood roof decking; thermal batt and rigid (polyisocyanurate) sheathing insulation; an exterior insulation and finish system (E.I.F.S.) over weather-barrier-wrapped plywood sheathing; a parapet-edged membrane roof system with metal coping cap, overflow scuppers, and pre-finished metal gutters and downspouts; standard hollow metal doors and frames; aluminum-framed entrances, storefront, and aluminum windows; standard door finish hardware; standard glazing including tinted insulated glass units; suspended acoustical lay-in ceilings; cement backer board and waterproofing at wet areas; ceramic tile flooring, base, and wall finishes; gypsum board partitions and finishes; resilient base; painting; corner guards; toilet room accessories; and architectural provisions for owner- and consultant-furnished food service equipment, including the walk-in cooler and walk-in freezer. Mechanical, electrical, and plumbing systems are provided under the consulting engineers' documents.
The site work includes new and modified concrete sidewalks and accessible ramps, parking area modifications and striping, all as shown on the civil documents.
The project address is 505 South Park Street, Pecos, Texas 79772.
END OF SECTION
ALLOWANCES 012100
SECTION 012100
ALLOWANCES
PART 1 GENERAL
1.1. ALLOWANCE FOR PRODUCTS
A. Purchase products under each Allowance as directed by Architect.
B. Include the following amounts in bid, for materials and installation, for inclusion in contract sum:
1. Hardware: Allow $500 (Five Hundred Dollars) per door leaf (4 leaves on schedule). (Specification Section 081113) Specific doors scheduled under
Specification Section 083463 shall not be included in this allowance.
2. Ceramic Tile: Refer to Section 093013 Ceramic Tile for allowances. Note: Match the existing kitchen tile as closely as possible.
3. Parking Stripe/Site Accessibility: Allow $10,000 (Ten Thousand Dollars).
C. Amount of the Allowance includes:
1. Net cost of product.
D. In addition to amount of allowance, include in the base bid, for inclusion in base contract sum, cost for all other expenses required to obtain and complete the installation.
1.2. SELECTION OF PRODUCTS
A. Architect shall:
1. Consult with Construction Manager (CM) in considerations of products and supplies.
2. Make selection, designate products to be used.
3. Notify Contractor, in writing, designating:
a. Product model and finish
b. Accessories and attachments
c. Approved Supplier
B. CM will:
1. Assist Architect in determining qualified suppliers.
2. Obtain proposals from suppliers.
3. Make recommendations for consideration by Architect.
4. Notify Architect of any effect anticipated by selection of product or supplier under consideration on:
a. Construction schedule
b. Contract sum
5. On notice of approval, enter Purchase Agreement with designated supplier.
1.3. DELIVERY
A. CM's responsibility:
1. Arrange for delivery and unloading.
ALLOWANCES 012100
2. Promptly inspect products for damage or defects.
3. Submit claims for transportation damage.
1.4. ADJUSTMENT OF COSTS
A. Do not exceed allowances without Architect's approval and Owner’s authorization.
B. Should actual approved purchase cost be more or less than specified amount of allowance, contract sum will be adjusted by change order equal to amount of differences.
ADMINISTRATIVE REQUIREMENTS 013100
SECTION 013100
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1. SECTION INCLUDES
A. Progress meetings
B. Construction progress schedule
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1. PROGRESS MEETINGS
A. Construction Manager (CM) shall schedule and administer meetings throughout progress of the Work on a monthly basis.
B. CM shall make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.
C. Attendance Required: CM, Contractors and Suppliers, Owner, Architect, as appropriate to agenda topics for each meeting.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions.
4. Identification of problems which impede planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes, Owner progress schedule and coordination.
11. Other business relating to Work.
E. Record minutes and distribute copies within five days after meeting to participants, with one copy to Architect, Owner, participants, and those affected by decisions made.
3.2. CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days for Work, with a general outline for remainder of
Work.
ADMINISTRATIVE REQUIREMENTS 013100
B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 10 days after joint review, submit complete schedule.
E. Submit updated schedule at each monthly progress meeting.
SUBMITTALS AND SUBSTITUTIONS 013300
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 1 OF 5
SECTION 013300
SUBMITTALS AND SUBSTITUTIONS
PART 1 GENERAL
1.1. DESCRIPTION
A. Work included: Make submittals required by the Contract Documents, and revise and resubmit as necessary to establish compliance with the specified requirements.
B. Related Work
1. Individual requirements for submittals also may be described in other pertinent
Sections of this Project Manual.
C. Work not included:
1. Unrequired submittals will not be reviewed by the Architect.
2. The CM may require contractors to provide drawings, setting diagrams, and similar information to help coordinate the work; but such data shall remain between the CM and contractors and will not be reviewed by the Architect.
1.2. QUALITY ASSURANCE
A. Coordination of submittals:
1. Prior to each submittal, carefully review and coordinate all aspects of each item being submitted.
2. Verify that each item and the submittal for it conform in all respects with the specified requirements.
3. By affixing the CM Signature to each submittal, certify that this coordination has been performed.
B. Substitutions:
1. The Contract is based on the standards of quality established in the Contract
Documents. Substitutions will be considered only when approved by the
Architect at time of bidding. Acceptance of the contractor's bid does not constitute automatic approval of the proposed substitution. No additional monies will be paid to the contractor when proposed substitutes are not approved, and the original item or product specified is required to be installed.
2. Do not substitute materials, equipment, or methods unless such substitution has been specifically approved in writing for this work by the Architect.
3. In the event a contractor, sub-contractor, supplier, installer, and/or vendor intends to provide and/or install materials other than specified, he/she may do so provided the substitution complies with the contract document’s requirements in each and all respects.
C. "Or equal":
1. Where the phrase "or equal," occurs in the contract documents, the bidder may propose equal products. The burden rests upon the bidder to confirm products are
Equal. Architect will not review and provide written approval to bidder. Should
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 2 OF 5
any product be proposed that proves to not be Equal, bidder shall provide an equal product at no additional cost to Owner.
1.3. SUBMITTALS
A. Make submittals of Shop Drawings, Samples, substitution requests, and other items in accordance with the provisions of this Section. Provide all long lead items to Architect within 20 days after Notice to Proceed.
PART 2 PRODUCTS
2.1. SHOP DRAWINGS
A. Scale and measurements: Make Shop Drawings accurately to a scale sufficiently large enough to show all pertinent aspects of the item or items and its method of connection to the work.
B. Drawing and Data Submittals:
1. Submit one (1) set electronically. Contractor shall establish a system of tracking and handling submittals electronically.
2. If drawings cannot be submitted electronically, submit two (2) complete sets; 1 set will be retained by the Architect, 1 set will be returned to the CM.
C. Review comments of the Architect will be shown on the shop drawings when it is returned to the CM. The CM may make and distribute such copies as are required for his purposes.
2.2. MANUFACTURER'S LITERATURE
A. Where contents of submitted literature from manufacturers include data not pertinent to the submittal, clearly show, which portions of the contents is being submitted for review.
B. Submit the number of copies, which are required to be returned plus, one copy which will be retained by the Architect and an additional copy when consultants are included.
2.3. SAMPLES
A. Provide Sample or Samples identical to the precise article proposed to be provided.
Identify as described under "Identification of Submittals" below.
B. Number of Samples required:
1. Unless otherwise specified, submit actual samples in the quantity, which is required to be returned, plus two, which will be retained by the Architect.
2. By pre-arrangement in specific cases, a single Sample may be submitted for review and, when approved, be installed in the work at a location agreed upon by the Architect.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 3 OF 5
2.4. COLORS AND PATTERNS
A. Unless the precise color and pattern is specifically called out in the Contract Documents, and whenever a choice of color or pattern is available in the specified products, submit accurate color samples and pattern charts to the Architect for selection. Photocopies of color charts or samples printed from the manufacturer’s website are not acceptable.
PART 3 EXECUTION
3.1. IDENTIFICATION OF SUBMITTALS
A. Consecutively number all submittals.
1. When material is resubmitted for any reason, transmit under a new letter of transmittal and with a new transmittal number.
2. On re-submittals, cite the original submittal number for reference.
B. Accompany each submittal with a letter of transmittal showing all information required for identification and checking.
C. On at least the first page of each submittal, and elsewhere as required for positive identification, show the submittal number, specification section, and drawing in which the item was included.
D. Maintain an accurate submittal log for the duration of the work, showing current status of all submittals at all times. Make the submittal log available to the Architect for his review at each monthly meeting.
3.2. GROUPING OF SUBMITTALS
A. Unless otherwise specified, make submittals in groups containing all associated items to assure that information is available for checking each item when it is received.
1. Partial submittals may be rejected as not complying with the provisions of the
Contract and of this section.
2. Submit in one package, physical samples of all materials requiring a color selection. No color selections will be made until all color samples requiring selection have been submitted.
3. Color selections for exterior and interior may be submitted as two distinct groupings.
3.3. TIMING OF SUBMITTALS
A. Make submittals far enough in advance of scheduled dates for installation to provide time required for reviews, for securing necessary approvals, for possible revisions and re-submittals, and for placing orders and securing delivery.
B. In scheduling, allow at least fifteen (15) calendar days for review by the Architect and
Architect’s consultants following his receipt of the submittal.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 4 OF 5
3.4. ARCHITECT'S/ARCHITECT’S CONSULTANT’S REVIEW
A. Review by the Architect or Architect’s Consultant’s does not relieve the sub-contractor from responsibility for errors, which may exist in the submitted data.
B. Revisions:
1. Make revisions required by the Architect or Architect’s Consultants.
2. Make only those revisions directed or approved by the Architect or Architect’s
Consultants.
3.5. COORDINATION DRAWINGS
A. Provide information required by Project Coordinator for preparation of coordination drawings.
B. Review drawings prior to submission to Architect.
3.6. SUBMITTALS FOR REVIEW
A. Submit the following for individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Architect for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.
C. Samples will be reviewed only for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL
PROCEDURES article below and for record documents purposes described in Division
1.
3.7. SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer’s instructions.
6. Manufacturer’s field report.
7. Other types indicated.
B. Submit for Architect’s knowledge as contract administrator or for Owner. No action will be taken.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 5 OF 5
3.8. SUBMITTALS FOR PROJECT CLOSEOUT
A. When the following are specified in individual sections, submit them at project closeout:
1. Project record documents.
2. Operation and Maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
B. Submit for Owner’s benefit during and after project completion.
C. Submit two copies of project close out documents.
TESTING LABORATORY SERVICES 014100
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 1 OF 4
SECTION 014100
TESTING LABORATORY SERVICES
PART 1 GENERAL
1.1. DESCRIPTION
A. Work included:
1. Cooperate with the Owner's selected testing agency and all others responsible for construction materials testing and inspecting the work.
B. Related work:
1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications.
2. Requirements for testing may be described in various Sections of these
Specifications.
3. Where no testing requirements are described, but the Owner decides that testing is required, the Owner may require such testing to be performed under current pertinent standards for testing. Payment for such testing will be made as described in this Section.
C. Work not included:
1. Selection of testing laboratory: The Owner will select a prequalified independent testing laboratory.
2. Payment for initial testing: The Owner will pay for all initial services of the testing laboratory as further described in Article 2.1 of this Section.
1.2. QUALITY ASSURANCE
A. The testing laboratory will be qualified to the Owner's approval.
B. Testing, when required, will be in accordance with all pertinent codes and regulations and with selected standards of the American Society for Testing and Materials.
1.3. PRODUCT HANDLING
A. Comply with pertinent provisions of Division 1.
B. Promptly process and distribute required copies of test reports and related instructions to assure necessary retesting and replacement of materials with the least possible delay in progress of the work.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 2 OF 4
PART 2 PRODUCTS
2.1. PAYMENT FOR TESTING
A. Initial services:
1. The Owner will pay for initial testing services specified and/or requested by the
Owner Contract Documents.
2. When initial tests indicate non-compliance with the Contract Documents, subsequent tests associated with that non-compliance shall be performed by the same testing agency at no additional cost to the Owner. CM will assess cost for non-conforming tests or re-testing at cost to the responsible subcontractor or supplier of the work in question.
2.2. CODE COMPLIANCE TESTING
A. Inspections and tests required by codes or ordinance, or by a plan approval authority, and which are made by a legally constituted authority, other than construction materials testing and special testing required by the plans and specifications, shall be the responsibility of and shall be paid for by the CM and or subcontractors, unless otherwise provided for in the Contract Documents.
2.3. CONTRACTOR'S CONVENIENCE TESTING
A. Inspecting and testing performed exclusively for the Contractor's convenience shall be the sole responsibility and expense of the Contractor.
2.4. SPECIFIC TESTS, INSPECTIONS AND METHODS REQUIRED
A. Testing of Earthwork
1. Select Fill: Perform tests on proposed select fill material prior to use to determine compliance with specified requirements.
2. Establish moisture density relationship for soil type.
3. Sub-Grade Density testing:
a. Establish moisture-density relationship for soil type.
b. Perform field in-place density relationship as follows:
1) Building subgrade: One test for each 2,500 sq. ft. or fraction thereof, per lift.
4. Testing of Select Fill in place:
a. Perform field in-place density test:
1) One test for each 2,500 sq. ft. or fraction thereof, per lift.
B. Control and Testing of Concrete:
1. Mix Design, Trial Mixes and Advance Tests:
a. Design concrete mixes for each type concrete specified in accordance with
ACI 318.
b. For each concrete mix type required, make 2 trial mixes using aggregate proposed.
c. Make advance tests of trial mixes with proposed materials. Test four cylinders in accordance with ASTM C-39 (2 at 7 days and 2 at 28 days).
Do not place concrete on project until laboratory reports and breaks on
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 3 OF 4
confirmation cylinders indicate that proposed mixes will develop required strength.
d. Check mix designs and revise if necessary wherever changes are made in aggregates or in surface water content of aggregate or workability or concrete. Slump shall be minimum to produce workable mix. Laboratory will prescribe maximum quantity of water.
2. Test Cylinders: During the process of Work, make test cylinders for each different mix placed in any one day. For every concrete placement of 100 cubic yards or fraction thereof over 10 cubic yards, make three compression test cylinders of samples taken during pour. Test cylinders in accordance with ASTM
C-39 (1 at 7 days and 2 at 28 days). Make additional sets of cylinders for concrete placements from 100 yards to 200 yards and third set of pours exceeding
200 yards.
3. Slump Tests: Make slump tests on each load of concrete placed on this project.
Laboratory shall immediately inform contractor when slum exceeds limits specified.
C. Special Structural Testing Requirements:
1. Perform tests as required by code and indicated on the structural drawings.
PART 3 EXECUTION
3.1. COOPERATION WITH TESTING LABORATORY
A. Representatives of the testing laboratory shall have access to the work at all times and at all locations where the work is in progress. Provide facilities for such access to enable the laboratory to perform its functions properly.
3.2. TAKING SPECIMENS
A. All specimens and samples for testing, unless otherwise provided for in the Contract
Documents, shall be taken by the testing personnel. All sampling equipment and personnel will be provided by the testing laboratory. All deliveries of specimens and samples to the testing laboratory will be performed by the testing laboratory.
3.3. SCHEDULES FOR TESTING
A. Establishing schedule:
1. By advance discussion with the testing laboratory selected by the Owner, determine the time required for the laboratory to perform its tests and to issue each of its findings.
2. Provide all required time within the construction schedule.
B. Revising schedule: When changes of construction schedule are necessary during construction, coordinate all such changes with the testing laboratory as required.
C. Adherence to schedule: When the testing laboratory is ready to test according to the established schedule, but is prevented from testing or taking specimens due to
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 4 OF 4
incompleteness of the work, all extra charges for testing attributable to the delay will be back-charged to the Contractor and shall not be borne by the Owner.
QUALITY CONTROL 014500
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 1 OF 6
SECTION 014500
QUALITY CONTROL
PART 1 GENERAL
1.1. SUMMARY
A. Related Documents: Provisions established in General and Supplementary Conditions of the Contract, Division 1 General Requirements, and the Drawings are collectively applicable to this Section.
B. Section Includes:
1. Quality control of products and workmanship.
2. Manufacturer's instructions.
3. Manufacturer's certificates and field services.
4. Mockups.
5. Field samples.
6. Owner provided testing laboratory services.
7. Selection and payment.
8. Laboratory responsibilities.
9. Laboratory reports.
10. Limits on testing laboratory authority.
11. Contractor responsibilities.
12. Schedule of inspections and tests.
1.2. DESCRIPTION
A. Maintain quality control over supervision, subcontractors, suppliers, manufacturers, products, services, workmanship, and site conditions, to produce Work in accordance with Contract Documents.
1.3. DEFINITIONS
A. Field Samples: Partial installation of selected materials installed at project site for
Owner's Representative's review and approval of visual features and workmanship.
B. Mock-ups: Full size assemblies that incorporate several materials or elements of construction erected for Owner's Representative's review and approval of visual features and workmanship. Mock-ups represent quality of materials and workmanship required for Work.
1.4. PERFORMANCE REQUIREMENTS
A. Workmanship:
1. Comply with industry standards of the region except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.
2. Provide suitably qualified personnel to produce Work of specified quality.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 2 OF 6
3. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, and racking.
4. Provide finishes to match approved samples.
B. Manufacturer's Instructions:
1. Require compliance with instructions in full detail, including each step in sequence. Do not omit preparatory steps or installation procedures unless specifically modified or exempted by Contract Documents.
2. Maintain one complete set of instructions at Project Site during installation and until completion.
3. Should instruction conflict with Contract Documents, request clarification from
Owner's Representative before proceeding.
C. Manufacturer's Certificates:
1. When required in individual Specifications section, submit manufacturer's certificate, in duplicate, certifying that products meet or exceed specified requirements, executed by responsible officer.
D. Manufacturer's Field Services and Reports:
1. Submit reports in accordance in accordance with Section 013300.
2. Submit qualifications of field observer 30 days in advance of required observations; observer is subject to approval of Owner's Representative.
3. When specified in individual Specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces, quality of workmanship, and conditions of installation as applicable, and to initiate instructions when necessary.
4. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturer's written instructions.
5. Submit reports within 7 days of observation. Distribute copies to Owner's
Representative, Project site file, subcontractor, and other entities requiring information.
6. Provide one additional copy of reports for record documents file; refer to Section
017839.
1.5. QUALITY ASSURANCE
A. Supervise performance of Work in such manner and by such means to ensure that Work, whether completed or in progress, will not be subjected to harmful, dangerous, damaging, or otherwise deleterious exposure during construction period.
B. Ensure that persons performing Work are qualified to produce workmanship of specified quality.
C. Monitor quality control over products, suppliers, manufacturers, services, site conditions, and workmanship to ensure Work complies with Contract Documents.
D. Comply with specified reference standards as minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 3 OF 6
1.6. EXAMINATION OF CONDITIONS
A. Examine substrates and conditions under which Work is to be performed. Do not commence work over unsatisfactory conditions detrimental to proper and timely execution of Work.
B. Do not proceed with Work until unsatisfactory conditions have been corrected.
C. Commencement of installation constitutes acceptance of conditions and cost of any corrective measures are responsibility of Contractor.
1.7. MOCKUPS
A. General:
1. Use materials, fabrication and installation methods identical with those indicated for Work. Simulate actual construction conditions as accurately as possible.
2. Provide mock-ups required by individual Specification sections and of the building exterior showing its various components.
3. Approval:
a. Obtain Owner's Representative's written approval for each mock-up.
b. Do not start production of materials for final Project site erection until
Project Manager's approval of mock-ups has been obtained.
c. Approved mock-ups will serve as standard of quality and workmanship of
Work; maintain mock-ups until completion of relevant Work.
4. Upon completion of relevant Work or when directed by Owner's Representative, demolish and remove mock-ups.
B. Visual Mock-up
1. Provide full-scale mock-up for review of Owner's Representative.
2. Unless specified or directed otherwise, erect visual mock-ups at Project site at location acceptable to Owner's Representative.
3. Obtain Owner's Representative approval of visual mock-up prior to fabrication and construction of test mock-up.
1.8. FIELD SAMPLES
A. General:
1. Provide field samples at site required by individual Specification sections.
2. Erect at location acceptable to Owner's Representative; perform Work in accordance with applicable Specification sections.
3. Construct complete, including Work of related trades required in finished Work.
4. Make adjustments necessary to obtain approval from Owner's Representative. Do not proceed with further work until sample installation has been approved by
Owner's Representative.
5. Approved samples will serve as standard of quality and workmanship of Work;
maintain samples until completion of relevant Work.
6. Upon completion of Work or when directed by Owner's Representative, demolish field samples and remove from site, unless accepted by Owner's Representative as part of completed Work.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 4 OF 6
1.9. TESTING LABORATORY SERVICES
A. General:
1. Where terms "Laboratory", "Inspector", "Inspection Laboratory", "Laboratory", or
"Testing Laboratory" are used, they mean and refer to officially designated and accredited testing laboratory.
2. Provide testing laboratory with one set of Contract Documents and relevant approved submittals.
B. Selection and Payment:
1. Owner will employ services of an independent testing laboratory to perform specified inspection and testing.
2. Employment of testing laboratory in no way relieves obligation to perform Work in accordance with requirements of Contract Documents. Contractor will pay testing required by local authorities having jurisdiction.
C. Testing Laboratories Responsibilities:
1. Cooperate with Owner's Representative and Contractor.
2. Comply with requirements of ANSI/ASTM E 329 and ANSI/ASTM D 3740.
3. Maintain a fulltime registered Engineer on staff to review services.
4. Authorized to operate in State where project is located.
5. Calibrate testing equipment once each year with devices of an accuracy traceable to either NBS Standards or accepted values of natural physical constants.
6. Test samples of mixes submitted by Contractor.
7. Provide qualified personnel at site. Cooperate with Contractor and Owner's
Representative in performance of services.
8. Perform specified inspection, sampling, and testing of products in accordance with specified standards and technical sections of these Specifications.
9. Ascertain compliance of materials and mixes with requirements of Contract
Documents.
10. Promptly notify Owner's Representative and Contractor of observed irregularities or non-conformance of Work or products.
11. Perform additional inspections and tests required by Owner's Representative.
12. Attend Pre-construction Conference.
D. Laboratory Reports:
1. After each inspection and test, promptly submit copies of laboratory report directly to Owner's Representative, applicable consultant, and Contractor.
2. Include: Date issued, project title and number, name of inspector, date and time of sampling or inspection, identification of product and Specifications section, location in the Project, type of inspection or test, date of test, results of tests, and conformance with Contract Documents.
3. When requested by Owner's Representative, provide interpretation of test results.
E. Limits on Testing Laboratory Authority:
1. May not release, revoke, relax, alter, or enlarge on requirements of Contract
Documents.
2. May not approve or accept any portion of the Work.
3. May not assume any duties of Contractor.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 5 OF 6
4. Has no authority to stop Work.
1.10. CONTRACTOR RESPONSIBILITIES
A. Deliver to laboratory at designated location adequate samples of materials proposed to be used which require testing, together with proposed mix designs.
B. Cooperate with laboratory personnel, and provide access to Work and to manufacturer's facilities.
C. Provide incidental labor and facilities to provide access to work to be tested, to obtain and handle samples at the site or at source of products to be tested, to facilitate tests and inspections, and for storage and curing of test samples.
D. Notify laboratory of material sources and furnish necessary quantities of representative samples of materials proposed for use, which are required to be tested.
E. Notify Owner's Representative and laboratory 24 hours prior to expected time for operations requiring inspection and testing services.
F. Advise laboratory in a timely fashion to complete required inspection and testing prior to subsequent work being performed.
G. Pay for subsequent re-testing of products or systems found to be defective or otherwise not in accordance with specification requirements. Remove rejected products and replace with products of specified quality.
H. Furnish copies of product tests or mill test reports as specified or required.
I. Furnish incidental labor and facilities:
1. To provide access to Work to be tested.
2. To obtain and handle samples at Project site or at source of product to be tested.
3. To facilitate inspections and tests.
4. For storage and curing of test samples.
J. Notify Owner's Representative and laboratory 48 hours prior to expected time for operations requiring inspection and testing services.
K. When inspections or tests can not be performed after proper notification and at no fault of laboratory, reimbursement costs for laboratory expenses incurred will be charged to
Contractor by deducting charges from Contract Sum.
1.11. SUBMITTALS
A. Provide submittals in accordance with Section 013300.
B. Laboratory Reports:
1. Include with each report:
a. Date issued.
b. Project title and number.
REEVES COUNTY SENIOR CENTER RENOVATIONS PAGE 6 OF 6
c. Testing laboratory name, address, and telephone number.
d. Record of temperature and weather conditions.
e. Names of individuals making tests and inspections. Name and signature of person submitting report.
f. Dates, times, and locations of sampling, testing, and inspection.
g. Identification of specification section and products.
h. Location in Project.
i. Type of inspection or test.
j. Reference standards used for test.
k. Name of material suppliers.
l. Results of tests and interpretation of test results.
m. Professional opinion of whether tested and inspected Work complies with
Contract Documents.
n. Certified Statement signed and sealed by testing laboratory attesting to accuracy of testing results.
o. Number pages.
2. Submit test reports within 2 weeks of test date.
3. After each inspection and test, promptly submit copies of written reports in electronic format to the following:
a. Owner's Representative
b. Applicable Consultant
c. Code Officials: where applicable
d. Contractor
4. When requested by Owner's Representative, provide interpretation of test results and suggested remedies.
1.12. FAILURES AND RETESTING
A. When initial inspections and tests indicate Work does not comply with Contract
Documents, subsequent testing will be performed by same Testing Agency and will be done at Contractor's expense and deducted from Contract Sum.
B. Removal and replacement of Work necessitated by such non-compliance of Contract
Documents shall be at Contractor's expense.
PART 2 PRODUCTS – Not Used
PART 3 EXECUTION – Not Used
CLEANING 015650
SECTION 015650
CLEANING
PART 1 GENERAL
1.1. DESCRIPTION
A. Work included: Throughout the construction period, maintain building and site in a standard of cleanliness as described in this Section.
B. Related work:
1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications.
2. In addition to standards described in this Section, comply with requirements for cleaning as described in pertinent other Sections of these Specifications.
1.2. QUALITY ASSURANCE
A. Conduct daily inspection, and more often if necessary, to verify that requirements for cleanliness are being met.
B. In addition to the standards described in this Section, comply with pertinent requirements of governmental agencies having jurisdiction.
PART 2 PRODUCTS
2.1. CLEANING MATERIALS AND EQUIPMENT
A. Provide required personnel, equipment, and materials needed to maintain the specified standard of cleanliness.
2.2. COMPATIBILITY
A. Use only the cleaning materials and equipment which are compatible with the surface being cleaned, as recommended by the manufacturer of the material.
PART 3 EXECUTION
3.1. PROGRESS CLEANING
A. General:
1. Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.
2. Do not allow accumulation of scrap, debris, waste material, and other items not required for construction of this work.
3. At least once each week, and more often if necessary, completely remove all scrap, debris, and waste material from the job site. CM will coordinate and plan clean-up of all trades present on the job-site. Each trade will be responsible for the clean-up of their own construction debris to a central location on the project site.
4. Provide adequate storage for all items awaiting removal from the job site, observing the requirements for fire protection and protection of the ecology.
B. Site:
1. Daily, and more often if necessary, inspect the site and pick up all scrap, debris, and waste material. Remove such items to the place designated for their storage.
2. Weekly, and more often if necessary, inspect all arrangements of materials stored on the site. Restack, tidy, or otherwise service arrangements to meet the requirements of subparagraph 3.1-A-1 above.
3. Maintain the site in a neat and orderly condition at all times.
4. Control temporary drainage erosion as required.
5. Do not allow debris to be placed or blown onto any neighboring property.
6. Do not allow pumped water to be drained onto any neighboring property.
C. Structures:
1. Weekly, and more often if necessary, inspect the structures and pick up all scrap, debris, and waste material. Remove such items to the place designated for their storage.
2. Weekly, and more often if necessary, sweep interior spaces clean.
a. "Clean”, for the purpose of this subparagraph, shall be interpreted as meaning free from dust and other material capable of being removed by use of reasonable effort and a hand-held broom.
3. As required preparatory to installation of succeeding materials, clean the structures or pertinent portions thereof to the degree of cleanliness recommended by the manufacturer of the succeeding material, using equipment and materials required to achieve the necessary cleanliness.
4. Following the installation of finish floor material, clean the finish floor daily (and more often if necessary) at all times while work is being performed in the space in which finish materials are installed.
a. "Clean”, for the purpose of this subparagraph shall be interpreted as meaning free from foreign material which, in the opinion of the Architect, may be injurious to the finish floor material.
b. Finish materials shall be protected from remaining work when occurring in heavy traffic areas.
3.2. FINAL CLEANING
A. "Clean”, for the purpose of this Article, and except as may be specifically provided otherwise, shall be interpreted as meaning the level of cleanliness generally provided by skilled cleaners using commercial quality building maintenance equipment and materials.
B. Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris, and waste. Conduct final progress cleaning as described in
Article 3.1 above.
C. Site:
1. Unless otherwise specifically directed by the Architect, broom clean paved areas on the site and public paved areas adjacent to the site.
2. Completely remove resultant debris.
D. Structures:
1. Exterior:
a. Visually inspect exterior surfaces and remove all traces of soil, waste materials, smudges, and other foreign matter.
b. Remove all traces of splashed materials from adjacent surfaces.
c. If necessary to achieve a uniform degree of cleanliness, hose down the exterior of the structure.
d. In the event of stubborn stains not removable with water, the Architect may require light sandblasting or other cleaning at no additional cost to the
Owner.
2. Interior:
a. Visually inspect interior surfaces and remove all traces of soil, waste materials, smudges, and other foreign matter.
b. Remove all traces of splashed material from adjacent surfaces.
c. Remove paint drippings, spots, stains, and dirt from finished surfaces.
3. Glass: Clean inside and outside.
4. Polished surfaces: To surfaces requiring routine application of buffed polish, apply the polish recommended by the manufacturer of the material being polished.
5. Sealed Concrete: Apply 1 coat wax, polish, and buff.
E. Schedule final cleaning as approved by the Architect to enable the Owner to accept a completely clean work.
F. Pest Control: Engage an experienced exterminator to make a final inspection, and rid the
Project of rodents, insects, and other pests.
G. Removal of Protection: Remove temporary protection and facilities installed for protection of the Work during construction.
H. Compliance: Comply with regulations of authorities having jurisdiction and safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on the Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from the site and dispose of in a lawful manner.
1. Where extra materials of value remaining after completion of associated Work have become the Owner's property, arrange for disposition of these materials as directed.
3.3. CLEANING DURING OWNER'S OCCUPANCY
A. Should the Owner occupy the work or any portion thereof prior to its completion by the
CM and acceptance by the Owner, responsibilities for interim and final cleaning shall be as determined by the Architect.
CONTRACT CLOSEOUT 017700
SECTION 017700
CONTRACT CLOSEOUT
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies administrative and procedural requirements for project closeout, including but not limited to:
1. Inspection procedures
2. Project record document submittal
3. Operating and maintenance manual submittal
4. Submittal of warranties
5. Final cleaning
B. Related Work: Work related to this section that is described in other sections include but is not limited to the following:
1. Specification Section 015650 – Cleaning.
2. Closeout requirements for specific construction activities are included in the appropriate Sections in Divisions-2 through -44.
1.2 SUBSTANTIAL COMPLETION
A. Substantial completion is achieved when the authority having jurisdiction has completed its inspection and issued a Certificate of Occupancy, and the Architect of Record has certified to the Owner that the building may be occupied.”
B. Preliminary Procedures: Before requesting inspection for certification of Substantial
Completion, complete the following. List exceptions in the request.
1. In the Application for Payment that coincides with, or first follows, the date
Substantial Completion is claimed, show 100 percent completion for the portion of the Work claimed as substantially complete. Include supporting documentation for completion as indicated in these Contract Documents and a statement showing an accounting of changes to the Contract Sum.
2. If 100 percent completion cannot be shown, include a list of incomplete items, the value of incomplete construction, and reasons the Work is not complete.
3. Advise Owner of pending insurance change-over requirements.
4. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications, and similar documents.
5. Obtain and submit releases enabling the Owner unrestricted use of the Work and access to services and utilities; include occupancy permits, operating certificates, and similar releases.
6. Submit record drawings, maintenance manuals, final project photographs, damage or settlement survey, property survey, and similar final record information.
7. Deliver tools, spare parts, extra stock, and similar items.
8. Make final change-over of permanent locks and transmit keys to the Owner.
Advise the Owner's personnel of change-over in security provisions.
9. Complete start-up testing of systems, and instruction of the Owner's operating and maintenance personnel. Discontinue or change over and remove temporary facilities from the site, along with construction tools, mock-ups, and similar elements.
10.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .