3-Pond 2026.xlsx
XLSX spreadsheet 8 KB Posted
- Attached to
- Data Cable RFP - Pond Elementary
- Solicitation number
- 26-13101
- Issued by
- Missouri
About this file
This file is a technical specification document for the Data Cable RFP issued by Rockwood School District in Missouri, detailing the infrastructure requirements for Pond Elementary School. The project involves the installation of Cat6a copper data drops, Intermediate Distribution Frame (IDF) racks and cabinets, and a fiber campus backbone across multiple school buildings. The specifications identify three primary IDF locations: IDF B in Room 7, the Main Distribution Frame (MDF) in Room 22, and IDF C in the Library. The document outlines 38 classrooms requiring 177 total data drops, with drops distributed between IDF B (rooms 1-8) and MDF (rooms 9-37). Additionally, the project includes specific copper data requirements for ancillary spaces including the gymnasium (with office, stage, storage, and access point locations), library storage, cafeteria (line and desk areas with access point), and office spaces, totaling 25 additional specified drops across these areas with precise placement requirements noted for each location.
The file provides detailed technical specifications for bidding purposes but does not include pricing information, contract terms, response deadlines, set-asides, or award dates. No funding source, budget amount, or financial terms are specified in this document. The spreadsheet serves as a planning and inventory tool to ensure bidders understand the scope of work and exact quantities required for the infrastructure installation project at Pond Elementary School.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-26-13101 Addendum 1.pdf | ||
| 2-Appendix A - Parts List - E-Rate 2026.xlsx | XLSX spreadsheet | |
| 6-26-13101 Addendum 1.pdf | ||
| 5-Appendix B.pdf | ||
| 1-Acknowledgement Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Pond Location
| Data Closet | 2 IDF | |
| MDF (Rm22) | Head End | |
| IDF B (Rm7) | 6 SM | |
| IDF C (Library) | 6 SM | No New Copper Data in this IDF |
| Appendix B; Classroom (38) DATA (152) | 38 | 177 | |||
| Room # | Feet | Drops | AP | FxSwitch | |
| 1 | IDF B | 4 | |||
| 2 | IDF B | 4 | |||
| 3 | IDF B | 4 | |||
| 4 | IDF B | 4 | |||
| 5 | IDF B | 4 | |||
| 6 | IDF B | 4 | |||
| 7 | IDF B | 4 | |||
| 8 | IDF B | 4 | |||
| 9 | MDF | 4 | |||
| 10 | MDF | 4 | |||
| 11 | MDF | 4 | |||
| 12 | MDF | 4 | |||
| 13 | MDF | 4 | |||
| 14 | MDF | 4 | |||
| 15 | MDF | 4 | |||
| 16 | MDF | 4 | |||
| 17 | MDF | 4 | |||
| 18 | MDF | 4 | |||
| 19 | MDF | 4 | |||
| 20 | MDF | 4 | |||
| 21 | MDF | 4 | |||
| 22 | MDF | 4 | |||
| 23 | MDF | 4 | |||
| 24 | MDF | 4 | |||
| 25 (Tv/Media) | MDF | 4 | |||
| 26 | MDF | 4 | |||
| 27 | MDF | 4 | |||
| 28 | MDF | 4 | |||
| 29 | MDF | 4 | |||
| 30 | MDF | 4 | |||
| 31 | MDF | 4 | |||
| 32 | MDF | 4 | |||
| 33 | MDF | 4 | |||
| 34 | MDF | 4 | |||
| 35 | MDF | 4 | |||
| 36 | MDF | 4 | |||
| 37 | MDF | 4 | |||
| Library | MDF | 4 |
| Appendix C; Specific Copper Data Drops | 25 | |
| Gym Office | 3 | 2 in office one on stage |
| Gym Stage | 2 | Near AV Rack |
| Gym Storage | 2 | AP |
| GYM | 2 | AP Near Strobe/Door |
| Library Storage | 4 | In Data Rack |
| Cafe Line | 2 | Near Serivin Line |
| Cafe Desk | 2 | In Kitchen Area |
| Cafe AP | 2 | Wall Mount |
| Office | 2 | Near TV (Under Desk) |
| Office Copy Room | 4 | 2 Near Phone 2 Near Copier |
File details come from the government source that posted it. Updated .