Summary

This is a Project Manual and Bidding Documents package for the Maintenance Garage Pole Building Replacement Project issued by East Allen Township in Northampton County, Pennsylvania, prepared by Hanover Engineering Associates, Inc. The project encompasses three separate contracts: Contract 1 - Building and Site Work, Contract 2 - Electrical Components, and Contract 3 - Mechanical Components. The Work includes demolition of the existing maintenance garage, construction of a new pole building structure with associated site improvements, electrical infrastructure, and mechanical systems. Contract 1 base bid work items include mobilization/demobilization, rock construction entrance, erosion control measures, building footers/foundation/slab, building structure, asphalt pavement (approximately 1,665 square yards of aggregate stone subbase, base course, and wearing course), stormwater management facilities (oil/water separator and holding tank), landscape grading with seeding, and contingency items for rock excavation, extra earth excavation, aggregate material, and concrete. Alternative bid items include removal and installation of fencing and concrete curing compound. Sealed proposals must be submitted online via PennBid by 1:00 p.m. prevailing time on Monday, July 20, 2026, with public opening to follow immediately at Hanover Engineering Associates, Inc., 252 Brodhead Road, Suite 100, Bethlehem, PA 18017-8944. A non-mandatory pre-bid conference is scheduled for July 7, 2026 at 11:00 a.m. at the Township Maintenance Garage located at 7347 Driftwood Road, Northampton, PA. Final questions are due by 4:00 p.m. on July 13, 2026, with a final addendum to be issued by 4:00 p.m. on July 15, 2026 if required. The Work is anticipated to commence in August 2026, with substantial completion required within 90 days and final completion within 120 days of the Notice to Proceed.

Each proposal must be accompanied by a Bid Bond in the amount of 10 percent of the Base Bid and shall remain effective for 60 calendar days from the Bid opening date. Bidders must submit bids on all items listed on the respective Bid Form for each contract they pursue. The Contract price is subject to unit price adjustments based on actual quantities provided, and liquidated damages are assessed at $1,845.00 per day for failure to achieve Substantial Completion and Final Completion within the specified contract times. The successful Bidder must execute the Agreement and provide required Performance and Payment Bonds, each in the amount of 100 percent of the contract price, along with certificates of insurance within 15 days of receiving the Notice of Award. This Project is subject to the Pennsylvania Prevailing Wage Act, the Public Works Employment Verification Act (requiring EVP system verification of employee eligibility), and prevailing wage rate requirements. All bidders must submit Non-Collusion Affidavits, Statements of Bidder Qualifications, Certifications of Non-Segregated Facilities, and acknowledge compliance with Nondiscrimination and Sexual Harassment provisions as a condition of bid acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

MAINTENANCE GARAGE POLE BUILDING

REPLACEMENT

CONTRACT 1 – BUILDING AND SITE WORK

CONTRACT 2 – ELECTRICAL COMPONENTS

CONTRACT 3 – MECHANICAL COMPONENTS

EAST ALLEN TOWNSHIP

NORTHAMPTON COUNTY, PENNSYLVANIA

JUNE 24, 2026

Prepared for:

East Allen Township 5344 Nor-Bath Boulevard Northampton, PA 18067

Prepared by:

252 Brodhead Road Suite 100 Bethlehem, PA 18017 Phone: 610.691.5644 Fax: 610.691.6968 HanoverEng.com

Hanover Project EA24-28(A)

Maintenance Garage Pole Building ReplacementEast Allen Township Contract 1 – Building and Site Work Project No.: EA24-28(A) Contract 2 – Electrical Components Contract 3 – Mechanical Components

Hanover Engineering Associates, Inc. 00 01 10-1 Table of Contents

DOCUMENT 00 01 10

TABLE OF CONTENTS

INTRODUCTORY INFORMATION

DOCUMENT TITLE

00 01 01 Title Page

00 01 10 Table of Contents

00 01 50 List of Drawings

BIDDING REQUIREMENTS

DOCUMENT TITLE

00 10 00 Invitation to Bid

00 21 13 Instructions to Bidders

00 41 00 Bid Form – Contract 1

00 41 00 Bid Form – Contract 2

00 41 00 Bid Form – Contract 3

00 42 00 Non-Collusion Affidavit of Prime Bidder

00 42 10 Statement of Bidder's Qualifications

00 42 20 Certification of Non-Segregated Facilities

00 43 13 Bid Bond

00 45 36 Nondiscrimination / Sexual Harassment Clause

CONTRACT FORMS AND CONDITIONS OF THE CONTRACT DOCUMENTS

DOCUMENT TITLE

00 51 00 Notice of Award

00 52 15 Agreement

00 53 00 Stipulation Against Liens

00 55 00 Notice to Proceed

00 61 13.13 Performance Bond

00 61 13.16 Payment Bond

00 61 50 Maintenance Bond

00 62 00 Worker’s Compensation Affidavit

00 62 10 CDL Program - Statement of Compliance

Hanover Engineering Associates, Inc. 00 01 10-2 Table of Contents

DOCUMENT TITLE

00 62 20 Non-Collusion Affidavit of Subcontractors

00 62 26 Public Works Employment Verification Form

00 62 70 Consent of Surety to Final Payment

00 72 15 General Conditions

00 73 00 Supplementary Conditions

00 85 00 Prevailing Wage Rates

GENERAL SPECIFICATIONS

DOCUMENT TITLE

01 01 50 General Conduct of Work

01 02 20 Laboratory Testing Allowances

01 04 00 Coordination

01 11 00 Summary of Work

01 20 00 Price and Payment Procedures

01 22 00 Payment Items – Contract 1

01 22 00 Payment Items – Contract 2

01 22 00 Payment Items – Contract 3

01 30 00 Administrative Requirements

01 33 00 Submittals

01 40 00 Quality Requirements

01 50 00 Temporary Facilities

01 55 26 Traffic Control

01 57 00 Erosion and Sediment Control

01 60 00 Product Requirements

01 70 00 Execution and Closeout Requirements

TECHNICAL SPECIFICATIONS

DOCUMENT TITLE

03 10 00 Concrete Formwork

03 20 00 Concrete Reinforcement

03 30 00 Cast-In-Place Concrete

Hanover Engineering Associates, Inc. 00 01 10-3 Table of Contents

DOCUMENT TITLE

03 40 00 Precast Concrete

03 55 00 Slab Epoxy Coating

06 10 00 Rough Carpentry

06 11 10 Framing and Sheathing

06 17 53 Pre-Fabricated Wood Trusses

06 20 00 Finish Carpentry

07 21 00 Insulation

07 60 00 Flashing and Sheet-Metal

07 61 10 Metal Standing Seam Roofing

08 11 19 Steel Doors and Frames

08 71 00 Door Hardware

09 90 00 Painting

13 00 00 Wood Pole Building

31 00 00 Earthwork

31 01 00 Restoration

31 05 00 Removal and Demolition of Existing Facilities

31 05 13a Soils for Earthwork

31 05 13b Clean Fill Certification

31 05 16 Aggregates for Earthwork

31 10 00 Site Clearing

31 20 10 Compacting Earth Materials

31 22 10 Fine Grading, Soil Preparation and Seeding

31 22 13 Rough Grading

31 22 18 Landscape Grading

31 23 16 Excavation

31 23 16.13 Trenching

31 23 16.13 Trench Excavation and Backfill

31 23 17 Rock Removal

31 23 19 Dewatering

31 40 00 Sinkhole Remedial Procedures

Hanover Engineering Associates, Inc. 00 01 10-4 Table of Contents

32 12 16 Asphalt Pavement

32 31 13 Chain Link Fences and Gates

32 92 19 Seeding and Soil Supplements

APPENDIX

A. Grant of Right-of-Way, prepared by PPL Electric Utilities, dated May 4, 2026.

END OF DOCUMENT

Maintenance Garage Pole Building Replacement East Allen Township

Hanover Engineering Associates, Inc. 00 01 50-1 List of Drawings

DOCUMENT 00 01 50

LIST OF DRAWINGS

1. Maintenance Garage Pole Building Replacement Plans, Sheets 1 through 5 of 5, dated June 24, 2026, prepared by Hanover Engineering Associates, Inc.

2. Maintenance Garage Pole Building Plan & Elevations, Sheets 1 through 4 of 4, dated June 24, 2026, prepared by Hanover Engineering Associates, Inc.

END OF DOCUMENT

Hanover Engineering Associates, Inc. 00 10 00-1 Invitation to Bid

DOCUMENT 00 10 00

INVITATION TO BID

Sealed Proposals for the Maintenance Garage Pole Building Replacement Project will be received online via the PennBid Program by East Allen Township, Northampton County until 1:00 p.m.

prevailing time on Monday, July 20, 2026. At that time, proposals will be publicly opened via PennBid at the Township Engineer’s Office, Hanover Engineering Associates, Inc., 252 Brodhead Road, Suite 100, Bethlehem, PA 18017-8944.

A non-mandatory Pre-bid conference will be held on July 7, 2026 at 11:00 a.m. at the Township Maintenance Garage located at 7347 Driftwood Road, Northampton, PA. All prospective bidders are encouraged to attend. Final questions are due no later than 4:00 p.m. July 13, 2026. A final addendum will be issued by 4:00 p.m. on July 15, 2026, if required.

The Work will include, but will not necessarily be limited to, providing all equipment, materials, labor and services for the Maintenance Garage Pole Building Replacement Project as further described in the Contract Documents and Plans.

Contracts to be awarded include Contract 1 – Building and Site Work; Contract 2 – Electrical Components; and Contract 3 – Mechanical Components.

Complete sets of the Bidding Documents, including Contract forms, Specifications and Drawings, will be available from the project page at https://pennbid.bonfirehub.com.

Each proposal shall be accompanied by a Bid Bond in the required form, certified check, bank cashier’s check, or other security acceptable, to the Owner in the amount of 10% of the total Base Bid. Bids will be effective for 60 calendar days from the Bid opening date except as permitted by law and may not be withdrawn during this period. Bidders must Bid on all items listed on the Bid Form for their respective Contract.

This Project is subject to the Pennsylvania Prevailing Wage Act conditions. The Contractor shall include these requirements in all subcontracts for the project. Specific requirements for bidding are described in the Bidding Documents.

The project is subject to the provisions of the Public Works Employment Verification Act, and Non-Discrimination and Equal Employment Opportunity regulations.

East Allen Township reserves the right at its option to waive any informalities, irregularities, defects, errors, or omissions in any or all of Bids and to accept or reject any or all parts of the Bids which in its judgment is in the best interest of the Township.

East Allen Township Manager https://pennbid.bonfirehub.com/

Hanover Engineering Associates, Inc. 00 21 13-1 Instructions to Bidders PB

DOCUMENT 00 21 13

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

Page Number Article 1. DEFINED TERMS 2

Article 2. COPIES OF BIDDING DOCUMENTS 2

Article 3. QUALIFICATIONS OF BIDDERS 2

Article 4. EXAMINATION OF CONTRACT DOCUMENTS, OTHER RELATED DATA AND SITE 3

Article 5. PRE-BID CONFERENCE 6

Article 6 SITE AND OTHER AREAS 6

Article 7. INTERPRETATIONS AND ADDENDA 6

Article 8. BID SECURITY 6

Article 9. CONTRACT TIME 6

Article 10. LIQUIDATED DAMAGES 7

Article 11. SUBSTITUTE OR AND "OR-EQUIVALENT" ITEMS 7

Article 12. SUBCONTRACTORS, SUPPLIERS AND OTHERS 7

Article 13. BID FORM 8

Article 14. BASIS OF BID; EVALUATION OF BIDS 8

Article 15. SUBMITTAL OF BIDS 9

Article 16. MODIFICATION AND WITHDRAWAL OF BIDS 9

Article 17. OPENING OF BIDS 9

Article 18. BIDS TO REMAIN SUBJECT TO ACCEPTANCE 9

Article 19. AWARD OF CONTRACT 10

Article 20. CONTRACT SECURITY AND INSURANCE 11

Article 21. SIGNING OF AGREEMENT 11

Article 22. SALES AND USE TAX 11

Article 23. RETAINAGE 11

Article 24. NON-COLLUSION 11

Article 25. PUBLIC WORKS EMPLOYMENT VERIFICATION 11

Hanover Engineering Associates, Inc. 00 21 13-2 Instructions to Bidders PB

INSTRUCTIONS TO BIDDERS

Article 1. DEFINED TERMS

1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instruction to Bidders have the meanings indicated below which are applicable to both singular and plural thereof:

A. "Bidder" - The individual or entity who submits a Bid directly to OWNER as distinct from a sub-bidder, who submits a Bid to a Bidder.

B. "Issuing Office" - the office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.

C. "Successful Bidder" - the lowest, qualified, responsible and responsive Bidder to whom OWNER, on the basis of OWNER'S evaluation as hereinafter provided, makes an award.

D. "Bidding Documents" - includes the Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents, including all Addenda issued prior to receipt of Bids.

E. PennBid Program – Online Electronic Procurement program (https://pennbid.bonfirehub.com) containing all Bidding Documents and where sealed bids and proposals must be submitted.

Article 2. COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents are available on the Documents tab within PennBid.

2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor ENGINEER assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 OWNER and ENGINEER in making Bidding Documents available on the above terms do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.

Article 3. QUALIFICATIONS OF BIDDERS

3.01 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit, within five (5) days following the OWNER'S request, all that information as OWNER requires in determining the successful Bidder. Consideration will be given to, but will not be limited to, the following conditions.

Whether the Bidder:

1. Maintains a permanent place of business;

https://pennbid.bonfirehub.com/

Hanover Engineering Associates, Inc. 00 21 13-3 Instructions to Bidders PB

2. Has adequate equipment to do the Work properly and expeditiously;

3. Has suitable financial status to meet obligations incident to the Work;

4. Has had experience on projects of similar character and magnitude;

5. Has qualification to do business in the state where the project is located; and,

6. Is PennDOT pre-qualified if required in the Invitation to Bid.

3.02 The ENGINEER may require the Bidder to furnish written evidence of the foregoing.

3.03 No Bid will be accepted from anyone who is in arrears to the OWNER upon debt or contract, or who is a defaulter on surety or otherwise upon any obligations, or whose work heretofore has been unsatisfactory or dilatory.

Article 4. EXAMINATION OF CONTRACT DOCUMENTS, OTHER RELATED DATA

AND SITE

4.01 Subsurface and Physical Conditions

The Supplementary Conditions identify:

Those reports of explorations and tests of subsurface conditions at or contiguous to the site that the ENGINEER has used in preparing the Bidding Documents.

Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the site (except underground facilities) that the ENGINEER has used in preparing the Bidding Documents.

Copies of reports and drawings referenced in paragraph 4.01 will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which Bidder is entitled to rely as provided in paragraph 5.03 of the General Conditions has been identified and established in paragraph 5.03 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any technical data or any other data, interpretations, opinions or information contained in such reports or shown or indicated on such drawings.

4.02 Underground Facilities

Information and data shown or indicated in the Bidding Documents with respect to existing underground facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such underground facilities, including OWNER or others.

Hanover Engineering Associates, Inc. 00 21 13-4 Instructions to Bidders PB

4.03 Hazardous Environmental Conditions

The Supplementary Conditions identify those reports and drawings relating to a hazardous environmental condition identified at the site, if any, that ENGINEER has used in preparing the Bidding Documents.

Copies of reports and drawings referenced in paragraph 4.01 will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which Bidder is entitled to rely as provided in paragraph 5.06 of the General Conditions has been identified and established in paragraph 5.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any technical data or any other data, interpretations, opinions or information contained in such reports or shown or indicated on such drawings.

4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and underground facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 5.03, 5.04, and 5.05 of the General Conditions.

Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to an hazardous environmental condition at the site, if any, and possible changes in the Contract Documents due to any hazardous environmental conditions uncovered or revealed at the site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 5.06 of the General Conditions.

4.05 Due to property conditions, Bidder will not be allowed to conduct additional examinations, investigations, explorations, tests and studies.

4.06 Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the site by OWNER or others (such as utilities and other prime contractors) that relates to the Work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination prior to or copies of Contract Documents (other than portions thereof related to price) for such other work.

4.07 It is the responsibility of each Bidder before submitting a Bid:

A. To thoroughly examine the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to below);

B. To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work;

To become familiar with and satisfy Bidder as to all federal, state and local laws and regulations that may affect cost, progress or performance of the Work.

Carefully study all reports of exploration and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or

Hanover Engineering Associates, Inc. 00 21 13-5 Instructions to Bidders PB subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplementary Conditions as provided in paragraph 5.03 of the General Conditions, and carefully study all reports and drawings of a hazardous environmental condition, if any, at the site which have been identified in the Supplementary Conditions as provided in paragraph 5.06 of the General Conditions.

Obtain and carefully study (or assume responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the site, which may affect cost, progress or performance of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs thereof.

Agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

Become aware of the general nature of the work to be performed by OWNER and others at the site that relates to the Work as indicated in the Bidding Documents.

Correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

Promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder.

Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.

4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Contract Documents and the written resolutions thereof by the ENGINEER is acceptable to Bidder, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

4.09 The provisions of paragraphs 4.01 through 4.08 do not apply to asbestos, polychlorinated biphenyls (PCBs), petroleum, hazardous waste or radioactive material covered by paragraph 5.06 of the General Conditions.

Hanover Engineering Associates, Inc. 00 21 13-6 Instructions to Bidders PB

Article 5. PRE-BID CONFERENCE

5.01 A pre-bid conference, if stated in the Invitation to Bid, will be held at the date and time noted in the Invitation to Bid. Representatives of OWNER and ENGINEER will be present to discuss the project. Bidders are recommended to attend and participate in any such conference.

ENGINEER will transmit all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

Article 6 SITE AND OTHER AREAS

6.01 The lands upon which Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.

Article 7. INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Contract Documents are to be submitted in writing via PennBid’s Questions tab. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda, electronically posted within PennBid’s Documents tab, and all parties recorded as having received the Bidding Documents will be notified via email. Questions must be submitted by the Question cutoff date and time as indicated in PennBid’s Questions tab. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or ENGINEER.

Article 8. BID SECURITY

8.01 Each Bid must be accompanied by Bid Security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price, unless otherwise modified in the Invitation to Bid, and in the form of a certified or bank check or a Bid Bond issued by a surety company meeting the requirements of paragraphs 6.01 and 6.02 of the General Conditions.

8.02 The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required Contract security within 15 calendar days after the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom the OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of Agreement or the sixtieth day after the Bid opening, whereupon Bid Security furnished by such Bidders will be returned provided, however, that if the

Hanover Engineering Associates, Inc. 00 21 13-7 Instructions to Bidders PB award of the Contract is delayed by required approval of another governmental agency, the sale of bonds, or the award of a grant, the OWNER may retain Bid securities until 120 days after the date of Bid opening.

8.03 Bid Security with Bids which are not competitive will be returned within seven (7) calendar days after the Bid opening.

8.04 Bid securities that are forfeited will be paid to the OWNER as liquidated damages.

Article 9. CONTRACT TIME

9.01 The numbers of days within which, or the dates by which, the Work is to be substantially completed and also completed and ready for final payment (the Contract time) are set forth in the Bid Form and the Agreement. Bidder shall refer to Bid Form (00 41 00), Section 6.01 for anticipated start date for project.

Article 10. LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, are set forth in the Agreement and Supplementary Conditions.

Article 11. SUBSTITUTE OR AND "OR-EQUIVALENT" ITEMS

11.01 The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or approved equivalent" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or approved equivalent" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the effective date of the Agreement.

The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in paragraphs 7.04 and 7.05 of the General Conditions and may be supplemented in the General Requirements.

Article 12. SUBCONTRACTORS, SUPPLIERS AND OTHERS

12.01 If the Supplementary Conditions require the identity of certain subcontractors, suppliers, individuals or entities to be submitted to OWNER in advance of specified date prior to the effective date of the Agreement, the apparent successful Bidder, and any other Bidder so requested, shall within five (5) days after Bid opening, submit to OWNER a list of all such subcontractors, suppliers, individuals or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualifications for each such subcontractor, supplier, individual or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed subcontractor, supplier, individual or entity, OWNER may, before Notice of Award is given request apparent successful Bidder to submit a substitute.

Hanover Engineering Associates, Inc. 00 21 13-8 Instructions to Bidders PB

12.02 If successful Bidder declines to make any substitutions, OWNER may award the Contract to the next lowest Bidder that proposes to use acceptable subcontractors, suppliers, individuals or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any subcontractor, supplier, individual or entity so listed and against which OWNER or ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in paragraph 7.06 of the General Conditions.

12.03 CONTRACTOR shall not be required to employ any subcontractor, supplier, individual or entity against whom the CONTRACTOR has reasonable objection.

Article 13. BID FORM

13.01 The Bid Form is included within PennBid’s Bid tab.

13.02 All blanks containing an asterisk (*) on the Bid Form must be completed.

13.03 Bids by corporations must be executed in the corporate name by the president or vice president, or other corporate officer with authority to submit bids on behalf of their company.

13.04 Bids by partnerships must be executed in the partnership and submitted by person with authority to submit bids on behalf of their company.

13.05 A Bid by a limited liability company shall be executed in the name of the firm and submitted by person with authority to submit bids on behalf of their company.

13.06 A Bid by an individual shall show the Bidder(s) name.

13.07 A Bid by a joint venture shall be executed by and submitted by person with authority to submit bids on behalf of the joint venture.

13.08 The Bid shall contain an acknowledgment of receipt by all Addenda, the numbers of which must be filled in on the Bid Form.

13.10 The address and telephone number for communications regarding the Bid must be shown.

13.11 The Bid shall contain evidence of the Bidder(s) authority and qualification as an out of state corporation to do business in the state where the project is located or covenant to obtain such qualification prior to award of the Contract.

Article 14. BASIS OF BID; EVALUATION OF BIDS

14.01 Lump Sum

A. Bidders shall submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents, if applicable, as provided for in the Bid Form. The price for each alternate will be the amount changed from the base Bid if OWNER selects the alternate. In the

Hanover Engineering Associates, Inc. 00 21 13-9 Instructions to Bidders PB evaluation of Bids, alternates will be applied in the same order as listed in the Bid Form.

14.01 Unit Price

Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid Form.

The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price bid for the item. The final quantities and Contract price will be determined in accordance with paragraph 13.03 of the General Conditions.

14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in paragraph 13.02 of the General Conditions.

14.03 Bid prices will be compared after adjusting for differences in time designated by Bidders for substantial completion. The adjusting amount will be determined at the rate set forth in the Contract Documents for liquidated damages for failing to achieve substantial completion for each day before or after the desired date appearing in Article 9.

Article 15. SUBMITTAL OF BIDS

15.01 Bids shall be submitted online via PennBid by the date and time indicated in the Invitation to Bid, and shall include an electronic copy of the Bid Security.

Article 16. MODIFICATION AND WITHDRAWAL OF BIDS

16.01 Bids may be modified or withdrawn via PennBid at any time prior to the bid due date and time.

16.02 OWNER will not consider, for any reason, any claim by the Bidder of any mistakes or omission in the Bid. Negligence of the Bidder in preparing the Bid shall not confer, or be deemed to confer, any right of the Bidder to withdraw such Bid after the time has passed, as fixed in the Invitation to Bid, for receiving Bids, except as permitted by law.

Article 17. OPENING OF BIDS

17.01 Bids will be opened as indicated in the Invitation to Bid.

Article 18. BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, unless indicated otherwise in the Invitation to Bid; but OWNER may, in its sole discretion, release any Bid and return the Bid Security prior to that date, provided, however, that if the award of the Contract is delayed by required approval of financing, the sale of bonds, or the award of a grant, all Bids will remain subject to acceptance for 120 days after the day of the Bid opening.

Hanover Engineering Associates, Inc. 00 21 13-10 Instructions to Bidders PB

Article 19. AWARD OF CONTRACT

19.01 OWNER reserves the right to reject any and all Bids, including without limitation the rights to reject any or all non-conforming, non-responsive, unbalanced or unconditional Bids and to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. OWNER also reserves the right to waive all defects, irregularities, errors, mistakes and informalities as authorized by law, and to negotiate Contract terms with the successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.

19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause of disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.

19.03 In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

19.04 OWNER may consider the qualifications and experience of subcontractors, suppliers and other persons and organizations proposed for those portions of the Work as to which the identity of subcontractors, suppliers and other persons and organizations must be submitted as provided in the Supplementary Conditions. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantee of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice to Award.

19.05 OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of the Bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to OWNER'S satisfaction within the prescribed time.

19.06 If the Contract is to be awarded, it will be awarded to the lowest Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interests of the project.

19.07 If the Contract is to be awarded, OWNER will give the successful Bidder a Notice of Award within 60 calendar days or as otherwise stipulated in the Invitation to Bid, after the day of the Bid opening.

Hanover Engineering Associates, Inc. 00 21 13-11 Instructions to Bidders PB

Article 20. CONTRACT SECURITY AND INSURANCE

20.01 Article 6.01 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth OWNER'S requirements as to Performance and Payment Bonds, each in an amount of 100 percent (100%) of the contract price, and insurances. When the successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the required Performance and Payment Bonds.

Article 21. SIGNING OF AGREEMENT

21.01 When OWNER gives a Notice of Award to the successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement. Within 15 days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and certificates of insurance to OWNER with the required bonds. Thereafter, OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of Drawings with appropriate identification.

Article 22. SALES AND USE TAX

22.01 OWNER may be exempt from certain sales and use taxes

Article 23. RETAINAGE

23.01 Provisions concerning retainage and CONTRACTOR'S rights to deposit securities in lieu of retainage are set forth in the Agreement and the Supplementary Conditions.

Article 24. NON-COLLUSION

24.01 Upon request by OWNER, all Bidders may be required to complete a Non- Collusion Affidavit. This affidavit may be required on all projects involving public funding as provided in Section 7 of the Pennsylvania Anti-Bid-Rigging Act. The Non-Collusion Affidavit, if required, must be submitted with the Bid.

Article 25. EMPLOYMENT VERIFICATION ACT

25.01 The Bidder’s attention is directed to the Public Works Employment Verification Act of November 3, 2022, P.L. 2048, No. 141, 71 P.S., Section 656.1-656.11, which requires that public works contractors and every subcontractor performing work under a public works contract shall utilize the United States Department of Homeland Security EVP system to verify the employment eligibility of each new employee hired after January 1, 2013. As a precondition to the award of a contract for public work, a public works contractor shall submit a completed EVP Form to the public body that is bidding and awarding the public work contract. During a public works contract, a new employee hired by a public works contractor, regardless of whether he will be working onsite or offsite of a public work or otherwise, shall be verified within five (5) business days of his start date.

Subcontracts between a public works contractor and its subcontractors are required to contain notification of the applicability of the act, information regarding the use of EVP and

Hanover Engineering Associates, Inc. 00 21 13-12 Instructions to Bidders PB reference to the Department's web site at www.dgs.state.pa.us to obtain a copy of the Form. Prior to beginning either onsite or offsite work on a public works project, every subcontractor shall submit a completed EVP Form to the contracting public body. During a public works contract, a new employee hired by a public works subcontractor, regardless of whether he will be working onsite or offsite of a public work or otherwise, shall be verified within 5 business days of his start date.

Subcontracts between a subcontractor and its subcontractors are required to contain notification of the applicability of the act, information regarding the use of EVP and reference to the Department's web site at www.dgs.state.pa.us to obtain a copy of the Form.

The Public Works Employment Verification Act shall apply to the contract. The successful bidder must provide a completed Public Works Employment Verification Act when the bidder returns the signed Contract and other required Contract Documents.

http://www.dgs.state.pa.us/ http://www.dgs.state.pa.us/

Hanover Engineering Associates, Inc. 00 41 00-1 Bid Form

DOCUMENT 00 41 00

BID FORM

Project Identification:

Project No.:

Name of Owner:

Name of Bidder:

1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid price and within the Bid times indicated in this Bid and in accordance with all other terms and conditions of the Contract Document.

2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 60 days after the day of Bid opening or for such longer period of time that Bidder may agree to in writing upon request of OWNER.

Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the bidding requirements within 15 days after the date of the OWNER’S Notice of Award.

3.01 In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

A. Bidder has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged:

Addendum No. Addendum Date

B. Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplementary Conditions as provided in paragraph 5.03 of the Standard General Conditions, and (2) reports and drawings of a hazardous environmental condition, if any, which has been identified in

Hanover Engineering Associates, Inc. 00 41 00-2 Bid Form the Supplementary Conditions as provided in paragraph 5.06 of the Standard General Conditions.

E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which may relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incidental thereto.

F. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents.

G. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.

H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and Drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.

I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to Bidder.

J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformance with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

5.01 Bidder will complete the Work in accordance with the Contract Documents, for the Bid Items described in Section 01 22 00 of the Contract Documents, for the following price(s):

Hanover Engineering Associates, Inc. 00 41 00-3 Bid Form

CONTRACT 1 BASE BID UNIT PRICE WORK ITEMS:

Item No.

Description Unit

Est

Qty

Unit Price

Total

Price

1-1 Mobilization and Demobilization LS 1

TO BE

COMPLETED

ON

PENNBID

1-2 Rock Construction Entrance EA 1

1-3 12” Compost Filter Sock LF 80

1-4 18” Compost Filter Sock LF 90

1-5 Concrete Washout EA 1

1-6 Building Footers, Foundation, and Slab LS 1

1-7 Building Structure LS 1

1-8 4” 2A Aggregate Stone Subbase SY 1665

1-9 3” Superpave 25.0 mm Base Course SY 1665

1-10 1.5” Superpave 9.5 mm Wearing Course SY 1665

1-11 Grade Swale, Topsoil, Seeding, and Mulching LS 1

1-12 Oil/Water Separator EA 1

1-13 Holding Tank EA 1

1-14* Rock Excavation CY 10

1-15* Extra Earth Excavation CY 10

1-16* Extra 2A Aggregate Material TON 10

1-17* Extra Class A Concrete CY 10

* Contingency Items are included in the Base Bid with assumed quantities and will be used in determining the low bid for the project.

Description Unit

Est

Qty

Unit

Price

Total

Price

*Add Alternative 1: Removed Existing Fence

TO BE

COMPLETED

ON PENNBID

2-1 Remove Existing Fence LS 1

*Add Alternative 2: Install Proposed Fence and Gates

3-1 8-Feet High Chain Link Fence LF 425

3-2 6-Feet Wide Swing Fence Gate EA 1

3-3 Double 8-Feet Wide (16-Feet total) Swing Fence Gate EA 1

Hanover Engineering Associates, Inc. 00 41 00-4 Bid Form

No.

Description Unit

Est

Qty

Unit

Price

Total

Price

3-4 16’ Electronic Sliding Fence Gate EA 1

3-5 12’ Manual Sliding Fence Gate EA 1

*Add Alternative 3: Concrete Curing and Sealing Compound

4-1 Concrete Curing and Sealing Compound LS 1

* Based on Bid Prices received, the Owner may or may not choose to include Add

Alternates 1, 2 and/or 3 in the Award of the Contract.

5.02 Unit prices have been computed in accordance with paragraph 13.03.B of the Standard General Conditions.

5.03 Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for unit price Bid items will be based on actual quantities provided, as determined in the Contract Documents.

6.01 Bidder agrees that the Work will commence at the time the Notice to Proceed is issued by the Township. Work is anticipated to commence in August 2026 and be substantially completed by November 2026 (90 days) and ready for final payment by December 2026 (120 days), unless otherwise directed by the Owner, and in accordance with paragraph 15.06 of the General Conditions.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.

7.01 The following documents are attached to and made a condition of this Bid:

A. Required Bid Security (10% of the BASE BID) in the form of

B. Non-Collusion Affidavit (Document 00 42 00)

C. Statement of Bidder Qualifications (Document 00 42 10)

D. Certification of Non-Segregated Facilities (Document 00 42 20)

E. Non-Discrimination/Sexual Harassment Clause (Document 00 45 36)

8.01 The terms used in this Bid are defined in the Instructions to Bidders, Standard General Conditions and Supplementary Conditions.

9.01 Communications concerning this Bid shall be addressed to the address of Bidder indicated below or the following address:

SUBMITTED on , 20___.

Hanover Engineering Associates, Inc. 00 41 00-5 Bid Form

If Bidder is:

An Individual

By: (SEAL) (Individual's Name) doing business as

Business Address:

Phone No.: ( ) Fax No.: ( )

Email: _____________________________

A Partnership *

(Name of Partnership) Witness:

By:

Partner

By:

Partner

By:

Partner *All Partners must execute this Bid

Address of Partnership Bidder:

Contact Person:

Hanover Engineering Associates, Inc. 00 41 00-6 Bid Form

A Corporation

(Name of Corporation)

ATTEST:

By: By:

(Assistant) Secretary (Vice) President

[CORPORATE SEAL]

(or, if appropriate)

**By:

(Authorized Representative)

** Attach appropriate corporate resolution evidencing authority to execute the Bid on behalf of the corporation.

Address of Corporation Bidder:

Hanover Engineering Associates, Inc. 00 41 00-7 Bid Form

A Joint Venture

(Name)

(Address)

Address for Receipt of Official Communications:

(Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.)

Project No.:

Work as specified or indicated in the Contract Documents for the Bid price and within the Bid times indicated in this Bid and in accordance with all other terms and conditions of the Contract Document.

2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 60 days after the day of Bid opening or for such longer period of time that Bidder may agree to in writing upon request of OWNER.

Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the bidding requirements within 15 days after the date of the OWNER’S Notice of Award.

3.01 In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

C. Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplementary Conditions as

Conditions.

E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which may relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incidental thereto.

F. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents.

G. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.

H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and Drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.

I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to Bidder.

J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformance with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

CONTRACT 2 BASE BID UNIT PRICE WORK ITEMS:

Description

Unit Estimated

Quantity

Unit Price

Total

Price

1-1 Mobilization and Demobilization LS 1 TO BE

COMPLETED

ON

PENNBID

1-2 Electrical Facilities/Equipment LS 1

1-3 Conduit for PPL Service LF 90

Quantity

Unit Price

Total

Price

*Add Alternative 1: Slide Gate Operator

TO BE

COMPLETED

ON

PENNBID 2-1 Slide Gate Operator LS 1

* Based on Bid Prices received, the Owner may or may not choose to include Add Alternate 1 in the Award of the Contract.