This is a construction design document prepared by Mott MacDonald for the Washington State Parks and Recreation Commission detailing the Reid Harbor Moorage Facility Improvements project at Stuart Island State Park in San Juan County, Washington. The project encompasses the complete replacement of existing timber float systems, a fixed timber pier, and gangway infrastructure with new steel float systems, steel pipe piles, aluminum gangway and walkways, and a concrete abutment. Major work items include demolition and removal of timber floats, gangway, pier and piles; fabrication and installation of new steel components including 10 mooring floats (Floats A-D3), 4 island floats, dinghy floats, and associated structural steel; installation of 20 steel pipe piles with pile hoops; construction of a cast-in-place concrete abutment; and relocation of the existing pumpout float onto new steel support piles. The project design includes detailed specifications for materials, welding standards, pile installation procedures, and environmental protection measures including marine mammal and marbled murrelet monitoring requirements. Construction documents consist of 47 sheets encompassing site plans, demolition plans, detailed construction drawings for floats, platforms, gangways, steel fabrication details, and specifications for structural steel (ASTM A36, hot-dip galvanized), concrete (5,000 PSI), aluminum components, and high-density polyethylene materials.
The project specifications establish design criteria including 100 PSF live loads, 110 MPH wind design speed, 3.5-foot significant wave height, and 30-year design life for float components. Contractor responsibilities include survey control establishment, pile installation using vibratory and impact hammers with potential down-hole drilling for rock socketing, environmental monitoring, shop drawing submittals, and quality assurance through special inspection of concrete, structural steel, and pile driving work. The contractor must submit pile installation plans and drilling plans for owner approval at least 15 business days prior to commencing work and provide as-built pile location surveys upon completion. All steel fabrication requires hot-dip galvanization per ASTM A123/A153, welding per AWS D1.1/D1.2 standards, and qualified welder certification. The project requires coordination with existing conditions including protection of specified trees within critical root zones, protection of existing signage and interpretive elements for salvage and reinstallation, and relocation of a fallen tree. Material specifications include float drums per Eagle/Hendren Plastics standards, fiberglass deck grates (Fibergrate EcoGrate 62), and recycled plastic lumber rubstrips, with all components designed to meet or exceed the performance of the previous timber-framed system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-NW-C3914R Reid Harbor Mooreage Improvements-Bond Form.xlsx | XLSX spreadsheet | |
| 2-NW-C3914R Reid Harbor Mooreage Improvements-Bid Proposal Form.xlsx | XLSX spreadsheet | |
| 4-NW-3914R Reid Harbor Mooreage Improvements-Specifications Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
PROJECT LOCATION
NORTH
VICINITY MAP
APPROVED FOR CONSTRUCTION
Area Manager: AARON DAVIDSON
INDEX
date date
CA
D#
: S
5-
-Z
-2
P
RO
JE
CT
T
IT
LE
R
EI
D
HA
RB
OR
M
OO
RA
GE
F
AC
IL
IT
Y
IM
PR
OV
EM
EN
TS
DESCRIPTIONSHEET
STUART ISLAND STATE PARK
SEC-28 T-37-N R-4-W
SAN JUAN COUNTY - TAX PARCEL NUMBER #472813001000
LATITUDE: 48° 40' 32.13°N
LONGITUDE: 123° 11' 59.22°W
STUART ISLAND STATE PARK
REID HARBOR MOORAGE FACILITY IMPROVEMENTS
REGION MANAGER
WASHINGTON STATE PARKS
& RECREATION COMMISSION CAPITAL PROGRAM MANAGER
COVER SHEET
PROJECT TEAM
GENERAL NOTES 1
GENERAL NOTES 2
EXISTING SITE PLAN
DEMOLITION PLAN - OVERALL
DEMOLITION PLAN - MOORAGE FACILITY
SITE PHOTOS 1
SITE PHOTOS 2
SITE PLAN - OVERALL
SITE PLAN - MOORAGE FACILITY
SITE PLAN - UPLAND
SITE PLAN - FLOATS AND PLATFORM
SITE PLAN - ISLAND FLOATS AND PUMPOUT
PROFILE - MOORAGE FACILITY
ABUTMENT DETAILS
PLATFORM DETAILS 1
PLATFORM DETAILS 2
PLATFORM DETAILS 3
GANGWAY AND HEADFRAME DETAILS
PILE DETAILS AND SCHEDULE
HARO
STRAIT
SAN JUAN ISLAND
ORCAS
ISLAND
CANADA
UNITED STATES
STUART
ISLAND
WALDRON ISLAND
SHAW
ISLAND
MORESBY ISLAND
SIDNEY
ISLAND
SOUTH
PENDER
ISLAND
PROJECT LOCATION
STUART ISLAND STATE PARK
PROJECT LOCATION
STUART ISLAND STATE PARK
VANCOUVER ISLAND
BRITISH COLUMBIA
STRAIT OF
GEORGIA
BRITISH COLUMBIA
STRAIT OF
JUAN DE FUCA
PACIFIC OCEAN
WASHINGTON
ALI RAAD
LAURIE CONNELLY, CHAIR
SOPHIA DANENBERG HOLLY WILLIAMS
MICHAEL LATIMER
DIANA DUPUIS, DIRECTOR
SCOTT MERRIMAN ALFIE ALVARADO-RAMOS
MOORAGE FLOAT PLAN AND ELEVATION
ISLAND FLOAT PLAN AND ELEVATION
FLOAT NOTES
MOORAGE AND ISLAND FLOAT SECTIONS AND DETAILS
DINGHY FLOAT SECTIONS
TYPICAL FLOAT DETAILS
FLOAT 'A' PLAN, ELEVATION AND SECTION
FLOAT 'B' PLAN, ELEVATION AND SECTION
FLOAT 'C' PLAN, ELEVATION AND SECTION
FLOAT '1' PLAN, ELEVATION AND SECTION
FLOAT '2' PLAN, ELEVATION AND SECTION
FLOAT '3' PLAN, ELEVATION AND SECTION
FLOAT '4' PLAN, ELEVATION AND SECTION
FLOAT 'D1' PLAN, ELEVATION AND SECTION
FLOAT 'D2' PLAN, ELEVATION AND SECTION
FLOAT 'D3' PLAN, ELEVATION AND SECTION
STEEL FABRICATION WALERS 1
STEEL FABRICATION WALERS 2
STEEL FABRICATION WALERS 3
STEEL FABRICATION END PILE HOOP
STEEL FABRICATION LEDGERS
STEEL FABRICATION END CAPS
STEEL FABRICATION END CAPS 2
STEEL FABRICATION SILLS
STEEL FABRICATION COVER PLATES
HDPE FABRICATION RUBSTRIP
06/16/2025
07/08/25
PROJECT TEAM
GEOTECHNICAL ENGINEER:
FLOAT DESIGN ENGINEER:
STEVE HELVEY, LG, LEG, LHG
SENIOR ENGINEERING GEOLOGIST
TELEPHONE: (253) 831-2613
shelvey@geoengineers.com
KELLY LAFAVE, PE
PRESIDENT, SENIOR ENGINEER
TELEPHONE: (360) 466-8627
kdlafave@msn.com
GEOENGINEERS
1101 FAWCETT AVE, STE 200
TACOMA, WA 98402
www.geoengineers.com
MARINE STRUCTURES ENGINEERING, INC.
1004 COMMERCIAL AVE, STE 364
ANACORTES, WA 98221
STATE OF WASHINGTON
PARKS AND RECREATION COMMISSION
1111 ISRAEL ROAD SOUTHWEST
POST OFFICE BOX 42650
OLYMPIA, WASHINGTON 98504-2650
www.parks.wa.gov
WASHINGTON STATE PARKS AND RECREATION COMMISSION
220 N. WALNUT STREET
BURLINGTON, WASHINGTON 98233
JONATHAN GIBSON, P.E.
PROJECT REPRESENTATIVE
TELEPHONE: (360) 755-5262
Jonathan.Gibson@parks.wa.gov
OWNER:
OWNER'S REPRESENTATVE:
PROJECT ARCHITECTURAL AND ENGINEERING CONSULTANTS
PROJECT LEAD: EVAN EDGECOMB, P.E.
PRINCIPAL PROJECT ENGINEER
TELEPHONE: (425) 977-2592
Evan.Edgecomb@mottmac.com
MOTT MACDONALD
1601 5TH AVE, STE 800
SEATTLE, WA 98101
www.mottmac.com
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-PROJECT TEAM
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 2 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
PROJECT TEAM
NONE
BID SET
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-GENERAL NOTES 1
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 3 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
GENERAL NOTES 1
NONE
SURVEY INFORMATION: (APPLIES TO ALL SITE PLANS)
1. ESTABLISH SURVEY CONTROL POINTS AND DATUMS USING A LICENSED SURVEYOR AND SEND
TO OWNER FOR APPROVAL. THE SAME DATUMS AND CONTROL POINTS SHALL BE APPLICABLE TO
ALL SITES. CONTRACTOR SHALL SUBMIT SURVEY CONTROL AND DATUM INFORMATION FOR
REVIEW AND APPROVAL BY THE OWNER AT LEAST 15 BUSINESS DAYS PRIOR TO COMMENCING
WORK.
2. TOPOGRAPHIC SURVEY PROVIDED BY WASHINGTON STATE PARKS IN 2020.
3. BATHYMETRIC SURVEY PROVIDED BY DELPHIS IN 2018.
4. HORIZONTAL DATUM IN NAD83, WASHINGTON STATE PLANE, NORTH ZONE, US FT.
5. VERTICAL DATUM IN MEAN LOWER LOW WATER.
6. NO PERMANENT BENCHMARKS EXIST IN THE VICINITY.
WATER LEVELS
1. REFER TO SPECIFIC REQUIREMENTS. WATER LEVELS SHOWN ARE FOR REFERENCE ONLY AND DO
NOT INDICATE CONDITIONS DURING CONSTRUCTION.
CODES AND STANDARDS
1. ALL METHODS AND MATERIALS SHALL CONFORM TO THE IBC, AS AMENDED AND ADOPTED BY THE
LOCAL AUTHORITIES.
2. REINFORCED CONCRETE WORK SHALL CONFORM TO THE REQUIREMENTS OF "SPECIFICATIONS FOR
STRUCTURAL CONCRETE FOR BUILDINGS" (ACI 301) AND "BUILDING CODE REQUIREMENTS FOR
REINFORCED CONCRETE" (ACI 318), LATEST EDITION.
3. ALL STRUCTURAL STEEL DESIGN AND CONSTRUCTION SHALL COMPLY WITH ANSI/AISC 360.
4. ALL STRUCTURAL WELDING SHALL COMPLY WITH ALL AWS D1.1 AND 1.2.
5. REFERENCE TO ASTM AND OTHER STANDARDS SHALL MEAN THE LATEST EDITION IN EFFECT ON
THE BID DATE, UNLESS NOTED OTHERWISE IN THESE DOCUMENTS OR DESIGNATED BY THE
GOVERNING CODE.
GENERAL NOTES
1. THESE NOTES CONTAIN GENERAL INFORMATION AND ARE NOT COMPREHENSIVE. VERIFY
INFORMATION PROVIDED HERE WITH THE SPECIFICATIONS AND OTHER REFERENCED
DOCUMENTS. BRING ANY CONFLICTS TO THE ATTENTION OF WASHINGTON STATE PARKS
(OWNER) BEFORE WORK IS INITIATED. THE OWNER WILL RESOLVE ANY SUCH CONFLICT.
2. FIELD VERIFY ALL DIMENSIONS AND DETAILS PRIOR TO FABRICATION AND CONSTRUCTION.
3. ABIDE BY ALL APPLICABLE ENVIRONMENTAL PERMITTING REQUIREMENTS, WATER QUALITY
REQUIREMENTS, LOCAL ENVIRONMENTAL PROTECTION STANDARDS, PERMITTING LAWS, AND
REGULATIONS.
4. FOLLOW ALL APPLICABLE SAFETY REGULATIONS. METHODS OF DEMOLITION, CONSTRUCTION, AND ERECTION OF STRUCTURAL MATERIAL ARE THE CONTRACTOR'S RESPONSIBILITY.
5. CONFIRM EXTENT AND LOCATION OF STAGING AREAS WITH THE OWNER.
6. ALL LOCATIONS OF EXISTING FEATURES ARE APPROXIMATE AND HAVE BEEN ESTABLISHED FROM AVAILABLE RECORDS AND LIMITED FIELD INVESTIGATIONS. FIELD VERIFY EXISTING FEATURES
PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
7. PROTECT ALL EXISTING FEATURES LOCATED IN THE PROJECT AREA, INCLUDING TREES, UNLESS
SPECIFICALLY CALLED OUT TO BE REMOVED.
8. PRIOR TO ANY DEMOLITION AND EARTHWORK ACTIVITIES, VERIFY ALL EXISTING CONDITIONS, AND PROVIDE AND INSTALL ADEQUATE BMP'S TO CAPTURE ANY CONSTRUCTION DEBRIS IN
ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, AND PERMIT REQUIREMENTS.
9. REVIEW SITE CONDITIONS INCLUDING EXISTING GROUND CONDITIONS AND GRADES PRIOR TO
MOBILIZING ON SITE.
10. UNLESS EXPLICITLY NOTED OTHERWISE, THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK
SHOWN IN DRAWINGS, INCLUDING ALL LABOR, MATERIALS, TOOLS, AND EQUIPMENT.
11. FOR NOTES ON THE FLOAT CONSTRUCTION, SEE SHEET 24.
DEMOLITION
1. WHERE INDICATED ON THE PLANS, REMOVE ALL EXISTING STRUCTURES, INCLUDING
WALKWAYS, GANGWAYS, PILING, MISCELLANEOUS METALS, FLOATS, AND MISCELLANEOUS
DEBRIS, TO THE DEPTH SPECIFIED IN THESE CONTRACT DOCUMENTS, OR TO THE DEPTH AS
DIRECTED BY THE OWNER. BEFORE STARTING THE DEMOLITION WORK, SUBMIT A PLAN
SHOWING THE PROPOSED METHOD, EQUIPMENT, AND SEQUENCE FOR THE REMOVAL WORK TO
THE OWNER FOR APPROVAL. REVIEW THE CONTRACT DOCUMENTS FOR ALL SUBMITTAL
REQUIREMENTS.
2. FULLY EXTRACT PILES AS INDICATED IN THESE DRAWINGS. IF THE PILE BREAKS DURING
EXTRACTION, REMOVE THE REMAINDER OF THE PILE OR CUT IT OFF THREE FEET BELOW THE
MUDLINE.
3. EXTRACTION OF PILES SHALL CONFORM TO SPECIFICATIONS AND THE APPROPRIATE
REGULATORY PERMITS.
TIDAL WATER LEVELS (MLLW)
MEAN LOWER LOW WATER (DESIGN LOW)
MEAN HIGH WATER
MEAN HIGHER HIGH WATER
HIGH TIDE LINE / ORDINARY HIGH WATER (DESIGN HIGH)
0.00 FT
7.21 FT
7.86 FT
9.25 FT
MATERIALS AND CONSTRUCTION
1. PROVIDE ADEQUATE SHORING, BRACING, AND CUTTING OF ALL COMPONENTS AS REQUIRED
FOR SAFETY AND STRUCTURAL INTEGRITY THROUGHOUT CONSTRUCTION IN ACCORDANCE
WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS.
2. ALL REQUIRED SHOP DRAWINGS PER THE SPECIFICATIONS MUST BE SUBMITTED AND REVIEWED
PRIOR TO FABRICATION.
3. ALL STEEL SHALL BE HOT-DIPPED GALVANIZED. ALL STAINLESS STEEL SHALL BE TYPE 316.
DESIGN LOADS (FIXED STRUCTURES)
1. DESIGN LOADS AND REQUIREMENTS SHALL BE IN ACCORDANCE WITH THE CONTRACT DRAWINGS AND
THE SPECIFICATIONS.
2. DEAD LOADS:
· SELF WEIGHT OF STRUCTURES, INCLUDING APPURTENANCES AND ATTACHMENTS
3. LIVE LOADS:
· UNIFORM LOAD: 100 PSF OVER DECK SURFACE AREA
· POINT LOAD: 400 LB ACTING ON A 1 SQ FT AREA AT ANY POINT ON DECK SURFACE
4. SNOW LOADS:
· 30 PSF OVER DECK SURFACE AREA
5. WIND LOADS:
· DESIGN WIND SPEED: V = 110 MPH
· WIND IMPORTANCE FACTOR: I = 1.0 (OCCUPANCY CATEGORY ll)
· EXPOSURE CATEGORY: = D
6. SEISMIC LOADS:
· RISK CATEGORY: II
· SEISMIC IMPORTANCE FACTOR: I = 1.0
· SITE CLASS: C (UPLAND), E (IN-WATER)
· SS = 1.201
· S1 = 0.435
· R = 3
7. WAVE LOADS:
· MIN 250 LB/FT
· SIGNIFICANT WAVE HEIGHT: 3.5 FT
· PEAK PERIOD: 3.2 SECONDS
8. DEFLECTION:
· LL ONLY: L/500
· DL + LL: L/360
9. DESIGN VESSEL
THE DESIGN VESSEL FOR THE FLOATING DOCK SYSTEMS IS A 60 FOOT LONG POWER BOAT.
STEEL
1. MATERIAL SPECIFICATION MIN STRENGTH APPLICABILITY
(Fy/Fu, KSI)
CONCRETE
1. REINFORCING STEEL
A. UNLESS NOTED OTHERWISE, PROVIDE THE FOLLOWING MINIMUM CONCRETE COVER FOR
REINFORCING:
USE COVER
CAST-IN-PLACE 3"
B. LAP REINFORCING BARS IN ACCORDANCE WITH ACI 318.
C. DETAIL REINFORCING STEEL IN ACCORDANCE WITH "ACI MANUAL OF STANDARD PRACTICE FOR
DETAILING REINFORCED CONCRETE STRUCTURES", ACI 315.
2. PROVIDE A CONCRETE MIX DESIGN WITH THE FOLLOWING MINIMUM COMPRESSIVE STRENGTH AT 28
DAYS:
A. CAST-IN-PLACE CONCRETE 5,000 PSI
3. PROVIDE CONCRETE ABUTMENT WITH A BROOM-FINISHED SURFACE AND A 1/2" RADIUS ON ALL
EXPOSED CORNERS.
4. WHERE NECESSARY, PROVIDE AND INSTALL ADDITIONAL REINFORCING (STEEL STIFFENERS, BRACING, LIFTING INSERTS, ETC.) TO RESIST ERECTION AND TRANSPORTATION STRESSES. LIFTING INSERTS SHALL BE INSTALLED AT LOCATIONS WHERE THEY WILL BE HIDDEN BY CONSTRUCTION OR
OTHERWISE COVERED.
WELDING
1. CONFORM TO THE LATEST EDITION OF AWS D1.1 FOR ALL STRUCTURAL AND MISCELLANEOUS
STEEL WELDING.
2. ALL WELDERS SHALL BE CERTIFIED BY WASHINGTON ASSOCIATION OF BUILDING OFFICIALS
(WABO) OR AWS AND BE ABLE TO PRODUCE THE REQUIRED CONTINUITY RECORDS.
3. CONFORM TO THE LATEST EDITION OF AWS D1.2 FOR ALL ALUMINUM WELDING.
PILING CAPS (BIRD CAPS)
1. PROVIDE BLACK FIBERGLASS PILING BIRD CAPS FOR ALL PILES INDICATED TO RECEIVE ONE
ON THE PILE SCHEDULE.
1. THE CONTRACTOR SHALL MOBILIZE ALL REQUIRED EQUIPMENT FOR PILE INSTALLATION WORK INCLUDING A VIBRATORY HAMMER, IMPACT HAMMER, DOWN-THE-HOLE HAMMER, AND BUBBLE CURTAIN.
2. UTILIZE A TEMPLATE OR DRIVING FRAME TO MAINTAIN PROPER ALIGNMENT OF PILE DURING INSTALLATION. PILES SHALL BE INSTALLED TO ACHIEVE THE MINIMUM TIP ELEVATIONS SHOWN ON THE DRAWINGS. SELECT AN APPROPRIATE PILE DRILL AND VIBRATORY HAMMER TYPE AND SIZE, AS REQUIRED TO ACHIEVE THE PILE TIP DEPTHS AND REQUIRED LOAD CAPACITIES WITHOUT DAMAGING THE PILING, IN COMPLIANCE WITH THE RELEVANT PERMIT AND PROJECT DOCUMENTS. SUBMIT PILE LOGS WITHIN 24 HOURS OF EACH PILE INSTALLATION TO THE OWNER. MAINTAIN DRILLS AND HAMMERS IN PROPER ALIGNMENT DURING INSTALLATION OPERATIONS BY USE OF LEADS OR GUIDES ATTACHED TO THE HAMMER AND DRILL. REMOVE AND REPLACE PILES DAMAGED DURING INSTALLATION AT THE
CONTRACTOR'S EXPENSE.
3. ROCK SOCKETING MAY BE REQUIRED TO SEAT THE PILES. MOBILIZE EQUIPMENT AND PERSONNEL FOR DRILLING AND ROCK SOCKETING. SUBMIT A DRILLING AND ROCK SOCKETING PLAN TO THE OWNER AS
PART OF THE BID PACKAGE.
4. ENVIRONMENTAL PROTECTION MEASURES INCLUDING MARINE MAMMAL MONITORING AND MARBLED MURRELET MONITORING IS A REQUIREMENT OF THE PROJECT PERMITS. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE QUALIFIED ON-SITE STAFF FOR MARINE MAMMAL AND MARBLED MURRELET MONITORING. CONDUCT WORK IN ACCORDANCE WITH RELEVANT MONITORING PLANS AND DEVELOP
SUCH PLANS AS NECESSARY FOR APPROVAL BY THE OWNER.
5. DETERMINE FINAL PILE LOCATIONS TO CORRESPOND WITH THE LOCATIONS OF PILE GUIDES ON THE
FLOATS.
6. DO NOT DEMOBILIZE PILE INSTALLATION EQUIPMENT PRIOR TO OWNER AND ENGINEER ACCEPTANCE OF AS-BUILT PILE LOCATIONS AND PLUMBNESS. REMOBILIZATION DUE TO NON-CONFORMANCE IN PILE
INSTALLATION WILL BE AT THE CONTRACTOR'S EXPENSE.
7. NOTIFY OWNER A MINIMUM OF FOUR WEEKS PRIOR TO THE START OF PILE INSTALLATION.
PILE DRIVING
1. PROVIDE FINAL DESIGN OF ALL ALUMINUM STRUCTURES, INCLUDING GANGWAYS, PLATFORMS, AND WALKWAYS, IN ACCORDANCE WITH THESE DRAWINGS AND SPECIFICATIONS.
ALUMINUM STRUCTURES
A. ASTM A36: 36/58 C-, L-SHAPES, PLATE, BARS
B. ASTM A53, GR. B: 35/60 STEEL PIPE TYPE S
C. ASTM A252, GR. 3: 45/66 ALL PILES
D. ASTM A325: -/120 BOLTS
E. ASTM A500, GR. B: 42,46/58 ROUND AND RECTANGULAR HSS
F. ASTM A563: -/- NUTS
G. ASTM A572, GR. 50 50/65 HP SHAPES
H. ASTM A615, GR. 60: 60/90 REINFORCING BAR
I. ASTM A992: 50/65 W-SHAPES
J. ASTM F1554, GR. 55: 55/75 ANCHOR RODS
K. ASTM F436: -/- WASHERS
L. AWS E70XX: 57/70 STEEL WELDING ELECTRODE
2. COATINGS: HOT-DIP GALVANIZED, UNO
(REFER TO SECTION 05 05 00)
3. PILE LENGTHS: PILE CUTOFF ELEVATION -
PILETIP ELEVATION +3 FT
(MINIMUM) (REFER TO PILE
SCHEDULE ON SHEET 22 FOR
CUTOFF AND TIP ELEVATIONS)
ALUMINUM
1. MATERIAL SPECIFICATION MIN STRENGTH APPLICABILITY
(Fy/Fu, KSI)
A. 6061-T6 35/42 ALL SHAPES
UNO
B. TYPE 316 SS 30/75 FASTENERS BETWEEN ALUMINUM
COMPONENTS
1. THE CRITICAL ELEMENT REQUIRING SPECIAL INSPECTION PER IBC CHAPTER 17 ARE AS FOLLOWS:
A. CAST-IN-PLACE CONCRETE
1. REINFORCEMENT MATERIAL AND LAYOUT
2. CONCRETE PLACEMENT, PROTECTION, AND CURING
3. ANCHOR BOLT TESTING
4. CONCRETE CYLINDER TESTING
B. STRUCTURAL STEEL
1. MATERIALS SAMPLING, TESTING AND VERIFICATION
2. WELDING PROCEDURES SPECIFICATIONS
C. PILE DRIVING AND TESTING
1. PILE INSTALLATION
2. PILE DRIVING LOGS
3. PILE SPLICES
SPECIAL INSPECTION
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-GENERAL NOTES 2
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 4 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
GENERAL NOTES 2
NONE
SHEET SYMBOLS
SHEET NOTE CALLOUT
EQUALS "SEE NOTE 1"
3 PART DETAIL CALLOUT
A 36 163
A 36 163
3 PART SECTION CALLOUTS
B 3 138
B 3 138
D 6 18
C 12 43
CALLOUTS
D 6 18
3 PART SECTION TITLE
3 PART DETAIL TITLE 1
12 34
12 34
ABBREVIATIONS
ACI AMERICAN CONCRETE INSTITUTE
ADA AMERICANS WITH DISABILITIES ACT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
ALUM ALUMINUM
ASSY ASSEMBLY
B.O. BOTTOM OF
BMP BEST MANAGEMENT PRACTICES
CENTERLINE
CIP CAST-IN-PLACE
CRZ CRITICAL ROOT ZONE
CLR CLEAR
∅/DIA DIAMETER
DL DEAD LOAD
ETC. ET CETERA
EA EACH
EL ELEVATION
FT FEET
FRP FIBER REINFORCED PLASTIC
FY YIELD STRENGTH
FU ULTIMATE STRENGTH
GALV. GALVANIZED
GR GRADE
H HORIZONTAL
HDQTS HEADQUARTERS
HDPE HIGH DENSITY POLYETHYLENE
HSS HOLLOW STRUCTURAL SECTION
HTL HIGH TIDE LINE
IBC INTERNATIONAL BUILDING CODE
INC. INCORPORATED
INIT INITIAL
KSI KILOPOUND PER SQUARE INCH
L LENGTH
LB POUND
LB/FT POUND PER FOOT
LL LIVE LOAD
LOC LIMIT OF CONSTRUCTION
MAX MAXIMUM
MHW MEAN HIGH WATER
MHHW MEAN HIGHER HIGH WATER
MIN MINIMUM
MLLW MEAN LOWER LOW WATER
MPH MILES PER HOUR
NAD83 NORTH AMERICAN DATUM OF 1983
NO. NUMBER
O.C. ON CENTER
OHW ORDINARY HIGH WATER
PL PLATE
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
REQ'D REQUIRED
SS STAINLESS STEEL
STA STATION
SYM SYMMETRICAL
SQ FT SQUARE FOOT
TBM TEMPORARY BENCH MARK
T.O. TOP OF
TESC TEMPORARY EROSION AND SEDIMENT CONTROL
TYP TYPICAL
UHMW ULTRA HIGH MOLECULAR WEIGHT
UNO UNLESS NOTED OTHERWISE
V VELOCITY / VERTICAL
W WEST/WESTING
WABO WASHINGTON ASSOCIATION OF BUILDING OFFICIALS
WP# WORK POINT
W/ WITH
@ AT
' MINUTES OR FEET
" SECONDS OR INCHES
° DEGREES
% PERCENT
< LESS THAN
+/- PLUS OR MINUS
CL
BID SET
DETAIL NUMBER
CALLED FROM
SHEET NUMBER
SHOWN ON
SHEET NUMBER
SECTION LETTER
CALLED FROM
SHEET NUMBER
SHOWN ON
SHEET NUMBER
-10
-10 -1
-9
-8
-7
-6 -5 -4
-11
-12
-13
-14
-15
-3 -2 -1
-9
-8
-7 -6
-5 -4
-3 -2 -1
-11
-12-13
-14
6' TYP.
OHWMHW
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-EXISTING SITE PLAN
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 5 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
EXISTING SITE PLAN
1" = 50'
EXISTING ISLAND FLOATS
EXISTING ISLAND FLOATS EXISTING MOORAGE FACILITY
LEGEND
OHW OHW
-30 EXISTING CONTOUR
HIGH TIDE LINE (HTL)
ORDINARY HIGH WATER (OHW)
PHOTO LOCATIONS
(SEE SHEETS 8 AND 9)
50'
100'
EXISTING SITE PLAN
OHW/HTL
MHW MHW MEAN HIGH WATER (MHW)
MHW
BID SET
EBB
FLOOD
REID HARBOR
NOTES
1. PHOTO LOCATIONS AND ORIENTATIONS SHOWN
IN THIS DRAWING ARE APPROXIMATE.
EXISTING PUMPOUT
LOC
LOC
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOC
LOC
LOC
LOC
LOC
LOC
-10
-10 -1
-9
-8
-7
-6 -5 -4
-11
-12
-13
-14
-15
-3 -2 -1
-9
-8
-7 -6
-5 -4
-3 -2 -1
-11
-12-13
-14
6' TYP.
OHWMHW
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-DEMOLITION PLAN - OVERALL
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 6 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
DEMOLITION PLAN -
OVERALL
1" = 50'
EXISTING ISLAND FLOATS
(TO BE SALVAGED) AND
PILES (TO BE REMOVED
AND DISPOSED)
EXISTING ISLAND FLOATS
(TO BE SALVAGED) AND
PILES (TO BE REMOVED
AND DISPOSED)
EXISTING PUMPOUT AND PILES
(PUMPOUT TO BE PROTECTED
AND REATTACHED TO NEW PILES.
EXISTING TIMBER PILE DOLPHINS
TO BE REMOVED AND DISPOSED)
DEBRIS BOOM
LEGEND
OHW OHW
-30 EXISTING CONTOUR
HIGH TIDE LINE (HTL)
ORDINARY HIGH WATER (OHW)
50'
100'
DEBRIS BOOM, TYP.
DEBRIS BOOM, TYP.
LIMITS OF CONSTRUCTION, TYP.
LOC LIMIT OF CONSTRUCTION (LOC)
MHW MHW MEAN HIGH WATER (MHW)
BID SET
DEMOLITION PLAN
EXISTING MOORAGE FACILITY
(TO BE REMOVED AND DISPOSED),
SEE SHEET 7
OHW/HTL
MHW
NOTES
1. SALVAGED FLOATS AND GANGWAY ARE TO BE PROTECTED AND TRANSPORTED TO
THE WASHINGTON STATE PARKS AND RECREATION COMMISSION CORNET BAY
MAINTENANCE FACILITY LOCATED IN THE DECEPTION PASS STATE PARK.
2. PROJECT SITE DOES NOT HAVE DESIGNATED LAYDOWN / STAGING AREA.
COORDINATE WITH THE OWNER'S REPRESENTATIVE IF A LAYDOWN / STAGING AREA
IS DESIRED. SEE SHEET 7 FOR POTENTIAL UPLAND LAYDOWN / STAGING AREA.
EBB
FLOOD
REID HARBOR
'-0
110'-0"±
8'-
2"
6'-6"±
6'- 0"
8'-0"±
40'-0"±
5'- 0"
20'-5"±
16'-3"± 4'-8"±
4'-8"±
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
-1
-5
-4
-3
-2
-1
OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
MHW
MHW
MHW
MHW
MHW
MHW
M
HW
MHW
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-DEMOLITION PLAN - MOORAGE FACILITY
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 7 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
DEMOLITION PLAN -
MOORAGE FACILITY
1" = 10'
EXISTING TIMBER FLOATS
(TO BE REMOVED AND DISPOSED)
DEBRIS BOOM
LEGEND
EXISTING CONTOUR
HIGH TIDE LINE (HTL)
ORDINARY HIGH WATER (OHW)
OHW / HTL
EXISTING TREES
EXISTING
INFORMATION KIOSK
(TO BE PROTECTED)
EXISTING FALLEN TREE
BENCHMARKS
POINT NO. NORTHING EASTING ELEVATION (FT)
TBM1 620,043.49 1,068,661.96 +15.77'
TBM2 620,028.47 1,068,751.99 +39.52'
TBM1
TBM2
10'
20'
EXISTING TIMBER PIER
(TO BE REMOVED
AND DISPOSED)
EXISTING TIMBER FLOAT
(TO BE REMOVED AND DISPOSED)
EXISTING 5' X 33' GANGWAY
(TO BE SALVAGED)
NOTES
1. RELOCATE FALLEN TREE TO THE NORTHWEST OF THE PROJECT SITE, AS DIRECTED BY THE OWNER'S REPRESENTATIVE. TREE MAY BE CUT
UP TO AID IN THE RELOCATION PROCESS. MINIMIZE NUMBER OF CUTS TO ONLY WHAT IS NEEDED TO MOVE THE TREE.
2. PROJECT SITE DOES NOT HAVE CONFIRMED DESIGNATED LAYDOWN/STAGING AREA. LOCATION DRAWN IS PROPOSED PENDING CULTURAL
RESOURCE INVESTIGATION. COORDINATE WITH THE OWNER'S REPRESENTATIVE IF A LAYDOWN/STAGING AREA IS DESIRED.
3. AFTER DEMOLITION OF EXISTING STRUCTURE IN THE UPLAND, REMOVE EXISTING VEGETATION FROM DISTURBED SOIL, SMOOTH
DISTURBED SOIL TO BLEND WITH EXISTING GRADE, AND PLANT SALISH SEEDS FROM THE SAN JUAN COUNTY CONSERVATION LAND BANK
IN DISTURBED SOIL AREAS.
4. CONTRACTOR TO PROVIDE TESC BMP'S FOR ADDRESSING DISTURBED GROUND RELATED TO THE DEMOLITION AND ABUTMENT WORK.
5. CONTRACTOR SHALL PROTECT ALL TREES AND SHALL RECEIVE APPROVAL FROM OWNER PRIOR TO LIMBING OR IMPACTING ROOT
SYSTEMS OF ANY TREES.
6. PHOTO LOCATIONS AND ORIENTATIONS SHOWN IN THIS DRAWING ARE APPROXIMATE.
7. COORDINATE REMOVAL OF EXISTING PICNIC TABLES WITH OWNER. TABLES DETERMINED BY THE OWNER TO BE IN GOOD SHAPE SHALL
BE MOVED INTO THE UPLAND AS DIRECTED BY THE OWNER.
8. CONTRACTOR TO TAKE SALVAGED SIGNS AND REINSTALL THEM ONTO THE NEW STRUCTURE AS NOTED ON SIGN SCHEDULE. THE
CONTRACTOR IS RESPONSIBLE FOR DESIGNING, PROCURING AND INSTALLING CONNECTING HARDWARE FOR SIGNS ONTO THE NEW STRUCTURE WHERE NO DETAIL IS SHOWN. SEE SHEET 13 FOR NEW SIGN INSTALLATION LOCATIONS. SIGNS TO BE REPLACED WILL BE FURNISHED BY THE OWNER. COORDINATE WITH OWNER REGARDING SIZE OF NEW SIGNS. CONTRACTOR TO FIELD VERIFY DIMENSIONS
SALVAGED SIGNS TO BE REINSTALLED.
EXISTING MOORAGE FACILITY
DEBRIS BOOM, TYP.
LIMITS OF
CONSTRUCTION, TYP.
MHW
OHW OHW
LOC LIMIT OF CONSTRUCTION (LOC)
MHW MHW MEAN HIGH WATER (MHW)
TEMPORARY BENCHMARK (TBM)
1EXISTING FALLEN TREE
(18) EXISTING
CREOSOTE TIMBER
PILES (TO BE REMOVED
AND DISPOSED)
BID SET
EBB
FLOOD
REID HARBOR
-4
-5
-6
-7 -8
-9 -10
-11
-5
# PHOTO LOCATIONS
(SEE SHEETS 8 AND 9)
# NOTE CALLOUT
SIGN SCHEDULE
ID CONTENTS ACTION
1 "NO SWIMMING OFF DOCK" INSTALL NEW SIGNS
2 "THANK YOU FOR YOUR VISIT" SALVAGE AND REINSTALL
3 "RECREATION MOORAGE ONLY 3 NIGHT LIMIT" SALVAGE AND REINSTALL
4 BOATERS INFORMATION SALVAGE AND REINSTALL
5 "PACK IT IN / PACK IT OUT" SALVAGE AND REINSTALL
6 DOG ON LEASH PICTOGRAM SALVAGE AND REINSTALL
7 STATE PARKS SHIELD SALVAGE AND REPLACE WITH NEW SIGNS
8 "REID HARBOR" SALVAGE AND REPLACE WITH NEW SIGNS
9 "BOATERS...MOORAGE RULES" PROTECT IN PLACE
SIGN 9
(TO BE PROTECTED)
SIGN 5 AND 6
(TO BE SALVAGED
AND REINSTALLED)SIGN 2 AND 3
(TO BE SALVAGED
AND REINSTALLED)
EXISTING FALLEN TREE
SIGN 4
(TO BE SALVAGED
AND REINSTALLED)
SIGN 7 AND 8
(TO BE SALVAGED AND REPLACED)
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-SITE PHOTOS 1
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 8 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
SITE PHOTOS 1
NONE
PHOTO 1 PHOTO 2 PHOTO 3
PHOTO 5 PHOTO 6PHOTO 4
EXISTING MOORAGE FACILITY STAIRWAY AND TIMBER PIER - LOOKING SOUTHWEST
EXISTING WALKWAY - LOOKING SOUTHWEST EXISTING PUMPOUT - LOOKING SOUTHEAST ISLAND FLOATS - LOOKING SOUTHWEST
EXISTING MOORAGE FACILITY FLOATS AND GANGWAY - LOOKING NORTHWESTEXISTING UPLAND AREA - LOOKING SOUTH
EXISTING PUMPOUT
(TO BE PROTECTED AND
REATTACHED TO NEW PILES)
EXISTING BOATERS AND
MOORAGE RULES SIGN
(TO BE PROTECTED)
NOTES:
1. PHOTOS ARE PROVIDED FOR INFORMATION ONLY AND MAY NOT BE REPRESENTATIVE
OF THE EXISTING CONDITIONS DURING CONSTRUCTION.
2. SEE SHEET 5 FOR LOCATION AND BEARING OF PHOTOS SHOWN HEREIN.
EXISTING GANGWAY,
FLOATS, PIER, AND
PILES (TO BE REMOVED)
EXISTING FALLEN TREE
(TO BE RELOCATED)
EXISTING GANGWAY,
FLOATS, AND PILES
(TO BE REMOVED)
EXISTING FLOATS AND
PILES (TO BE REMOVED)
EXISTING TIMBER DOLPHINS
(TO BE REMOVED)
EXISTING ISLAND FLOAT
(TO BE SALVAGED) AND
PILES (TO BE REMOVED)
EXISTING TIMBER
WALKWAY, GANGWAY,
FLOATS, AND PILES
(TO BE REMOVED)
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-SITE PHOTOS 2
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 9 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
SITE PHOTOS 2
NONE
PHOTO 7 PHOTO 8
PHOTO 11
PHOTO 9
PHOTO 10
EXISTING PIER - LOOKING NORTHEAST EXISTING PIER - LOOKING SOUTH
EXISTING UPLAND PIER SECTION - LOOKING EAST
EXISTING UPLAND AREA AND TIMBER PIER - LOOKING SOUTHWESTEXISTING UPLAND AREA - LOOKING EAST
EXISTING BOATERS AND
MOORAGE RULES SIGN
(TO BE PROTECTED)
EXISTING DIRT PATH
NOTES:
1. PHOTOS ARE PROVIDED FOR INFORMATION ONLY AND MAY NOT BE REPRESENTATIVE
OF THE EXISTING CONDITIONS DURING CONSTRUCTION.
2. SEE SHEET 5 FOR LOCATION AND BEARING OF PHOTOS SHOWN HEREIN.
EXISTING TIMBER WALKWAY
(TO BE REMOVED)
EXISTING FALLEN TREE
(TO BE RELOCATED)
EXISTING GANGWAY, FLOATS, PIER,
AND PILES (TO BE REMOVED)
EXISTING MADRONE TREE
(TO BE PROTECTED)EXISTING DIRT PATH
EXISTING PIER
(TO BE REMOVED)
EXISTING TIMBER WALKWAY
(TO BE REMOVED)
-10
-10 -1
-9
-8
-7
-6 -5 -4
-11
-12
-13
-14
-15
-3 -2 -1
-9
-8
-7 -6
-5 -4
-3 -2 -1
-11
-12-13
-14
6' TYP.
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-SITE PLAN - OVERALL
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 10 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
SITE PLAN -
OVERALL
1" = 50'
ISLAND FLOATS
EXISTING PUMPOUT
REATTACHED TO NEW PILES
DEBRIS BOOM
LEGEND
OHW OHW
-30 EXISTING CONTOUR
HIGH TIDE LINE (HTL)
ORDINARY HIGH WATER (OHW)
50'
100'
LOC LIMIT OF CONSTRUCTION (LOC)
MHW MHW MEAN HIGH WATER (MHW)
BID SET
MOORAGE FACILITY
OHW/HTL
MHW
OVERALL PLAN
EBB
FLOOD
REID HARBOR
STUART ISLAND STATE PARK
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
-10 -10
-9
-8
-7
-6
-5
-4
-11
-12
-13
-3
-2 -1
-9
-8
-7
-6
-5
-4
-3
-2
-1
-11
-12
-13
-14
OHW
OHW OHW
OHWMHW
MHW MHW
MHW
WP1
WP3
WP4
WP5
4+
-0+05
0+00
0+50
1+00
1+50
2+00
2+
3+
3+
4+
4+
WP2
WP6
WORKING POINT TABLE WP#
POINT ID
WP1
WP2
WP3
WP4
WP5
WP6
NORTHING
620051.12
620046.58
620039.32
619863.69
619964.93
619970.30
EASTING
1068760.09
1068757.98
1068754.62
1068673.16
1068454.87
1068443.29
ELEVATION
0.0'
44.8'
44.3'
22.0'
0.0'
0.0'
STATION DESCRIPTION
START OF ALIGNMENT
UPLAND SIDE CENTER EDGE OF CONCRETE ABUTMENT
WATER SIDE CENTER EDGE OF CONCRETE ABUTMENT
CENTER OF PLATFORM B
EDGE OF FLOATS
END OF ALIGNMENT
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-SITE PLAN - MOORAGE FACILITY
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 11 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
SITE PLAN -
MOORAGE FACILITY
1" = 20'
85' X 6'
GANGWAY
PLATFORM A
WALKWAY A
PLATFORM B
EBB
FLOOD
WALKWAY B
DINGHY FLOATS
GANGWAY HEADFRAME
MOORAGE FLOATS
EXISTING CONTOUR
PIPE PILES, TYP.
LEGEND
STUART ISLAND STATE PARK
REID HARBOR
20'
40'
C
D
HIGH TIDE LINE (HTL)
ORDINARY HIGH WATER (OHW)
OHW OHW
LOC LIMIT OF CONSTRUCTION (LOC)
DEBRIS BOOM
MHW MHW MEAN HIGH WATER (MHW)
LIMITS OF
CONSTRUCTION, TYP.
BID SET
MOORAGE FACILITY SITE PLAN
A 11 15
A 11 15
B 11 15
B 11 15
SEE SHEET 13
SEE SHEET 13
10 11
SEE SHEET 12
'-1
0" 8'
-0
'-0
'-1 0"
'-0
-0+05.00
4+42.23
4+55.00
0+00.00
0+08.00
2+01.61
OHW OHW OHW
OHW
OHW
OHW OHW
MHW
CAST-IN-PLACE
CONCRETE ABUTMENT
WALKWAY A
2H:1V
FOUNDATION GRAVEL
CRITICAL ROOT
ZONE (CRZ), TYP.
PATH REALIGNMENT
(NOT IN CONTRACT),
SEE NOTE 4
BACKFILL TO MATCH
EXISTING GRADE
EXISTING 10" MADRONE TREES
(TO BE PROTECTED)
EXISTING WOOD SIGNPOST
(TO BE PROTECTED)
OHW
EXISTING PATH
(APPROXIMATE LOCATION)
EXISTING 18" FIR TREE
(TO BE PROTECTED)
EXISTING 38" FIR TREE
EXISTING 15" MADRONE TREE
EXISTING CRZ 24" FIR TREE
-0+05
0+00
0+25
0+50
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-SITE PLAN - UPLAND
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 12 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
SITE PLAN -
UPLAND
1" = 5'
UPLAND SITE PLAN
5'
10'
MHW MHW
OHW OHW
MEAN HIGH WATER (MHW)
HIGH TIDE LINE (HTL)
ORDINARY HIGH WATER (OHW)
1. CONTRACTOR SHALL VERIFY THE SLOPE AND CONDITIONS OF THE EXISTING GROUND PRIOR TO INSTALLING ABUTMENT.
2. SMOOTH OUT ALL DISTURBED SOIL AFTER DEMOLITION.
3. CLEAR AND GRUB ALL SURFACE VEGETATION AT THE ABUTMENT LOCATION PLUS AN ADDITIONAL 6 INCHES AROUND
THE ENTIRE PERIMETER OF THE ABUTMENT LOCATION.
4. NEW PATH WILL BE CONSTRUCTED BY THE OWNER. COORDINATE WORK SCHEDULE WITH THE OWNER'S
REPRESENTATIVE TO FACILITATE PATH CONSTRUCTION AFTER ABUTMENT HAS BEEN INSTALLED.
5. CONTRACTOR RESPONSIBLE FOR DESIGNING THE SHOREMOUNT ANCHORAGE TO THE ABUTMENT AND ADDING
SUPPLEMENTAL REINFORCING BARS AS REQUIRED TO ACCOMMODATE THE CONTRACTOR'S DESIGN.
6. CONTRACTOR TO PROVIDE TESC BMP'S FOR ADDRESSING DISTURBED GROUND RELATED TO THE DEMOLITION AND
ABUTMENT WORK.
7. CONTRACTOR SHALL PROTECT ALL TREES AND SHALL RECEIVE APPROVAL FROM OWNER PRIOR TO LIMBING OR
IMPACTING ROOT SYSTEMS OF ANY TREES.
NOTES
EXISTING CONTOUR
LEGEND
TBM2, SEE SHEET 7
12 16
BID SET
WP2
WP3
WP1
2+00
2+
1+00
3+
3+
4+
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-SITE PLAN - FLOATS AND PLATFORM
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 13 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
SITE PLAN -
FLOATS AND
PLATFORM
1" = 6'
GANGWAY HEADFRAME,
SEE SECTION ON SHEET 20
PLATFORM B
6'
12'
LC
DINGHY FLOATS
GANGWAY
(NOT SHOWN)
-10
-4
-11
WALKWAY AND
PLATFORM
LC
1. RETRACTABLE LADDER LOCATION. (SCANDIA)
2. LIFE RING CABINET AND PEDESTAL AND SIGN 1 LOCATION. CONTRACTOR TO DESIGN PEDESTAL AND MOUNT FOR SIGN 1.
SIGN 1 TO BE MOUNTED TO THE PEDESTAL ABOVE LIFE RING CABINET.
3. RETRACTABLE LADDER LOCATION. (PLASTIMO)
4. SIGNS 5, 6, 7, & 8 LOCATION. SIGNS TO BE MOUNTED TO CONTRACTOR DESIGNED SIGNPOST ATTACHED TO PLATFORM
GUARDRAIL. SIGN 7 (SHIELD) AND SIGN 8 ("REID HARBOR") FACING OUT OF THE PLATFORM AND AT THE TOP OF THE SIGNPOST. MOUNT SIGNS 5 & 6 FACING INWARD BELOW SIGNS 7 & 8, BUT ABOVE THE TOP OF THE GUARDRAIL.
5. SIGN 4 LOCATION. MOUNT TO GUARDRAIL FACING OUT FROM THE PLATFORM. CONTRACTOR TO DESIGN MOUNT.
6. SIGN 2 LOCATION. MOUNT CENTERED TO GANGWAY HOIST BEAM FACING EAST. CONTRACTOR TO DESIGN MOUNT.
7. SIGN 3 LOCATION. MOUNT CENTERED TO GANGWAY HOIST BEAM FACING WEST. CONTRACTOR TO DESIGN MOUNT.
NOTES
DINGHY FLOAT AND PIER PLAN
6'
BID SET
P# PLATFORM PILE (SEE SHEET 21)
P2
P4P3
P1
-5
WALKWAY A
P6
P8
P5
H1
H2
MOORAGE FLOAT, GANGWAY
AND PLATFORM B
13 17
H# HEADFRAME PILE (SEE SHEET 21)
F# FLOAT PILE (SEE SHEET 21)
MOORAGE FLOATS
6'
12'
MOORAGE FLOAT PLAN
F5 F4 F3 F2 F1
-10
-12
-10
-12
-10
-11
MOORAGE FLOAT,
GANGWAY AND PLATFORM B
LC
FIXED LADDER
-3
PLATFORM A
WALKWAY B
LEGEND
PILE HOOP, TYP.
3 3
3 1
M
AT
CH
LI
NE
SE
E
BE
LO
W
M
AT
CH
LI
NE
SE
E
AB
OV
E
WP4
WP5
WP# WORKING POINTS (SEE SHEET 11)
P7
6' TYP.
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-SITE PLAN - ISLAND FLOATS AND PUMPOUT
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 14 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
SITE PLAN -
ISLAND FLOATS
AND PUMPOUT
AS SHOWN
EBB
FLOOD
ISLAND FLOAT PLAN
REID HARBOR
10'
20'
-11
-12
-13
-14
STEEL PIPE
PILES, TYP.
EXISTING PUMPOUT PLAN
3'
6'
10 14
10 14
EXISTING PUMPOUT
(TO BE PROTECTED IN-PLACE)
F9 F10
F8
F7
F6
EXISTING CONTOUR
LEGEND
-30
F# FLOAT PILE (SEE SHEET 21)
DEBRIS BOOM
STEEL PIPE PILES, TYP.
EXISTING PILE HOOPS
(TO BE PROTECTED)
BID SET1. RETRACTABLE LADDER LOCATION (SCANDIA).
2. LIFE RING CABINET AND PEDESTAL LOCATION.
3. IF PILE HOOPS ON THE EXISTING PUMPOUT ARE NOT COMPATIBLE WITH THE NEW STEEL PILES, THEN INSTALL NEW
PILE HOOPS WITH SIMILAR STRENGTH AND CAPACITY AS THE EXISTING AND SUBMIT TO THE OWNER FOR APPROVAL.
NOTE
EL
EV
AT
IO
N, F
T (M
LL
W
EL
EV
AT
IO
N, F
T (M
LL
W
-60
-50
-40
-30
-20
-10
-60
-50
-40
-30
-20
-10
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80
WALKWAY A
HTL / OHW
EL. +9.25'
MLLW EL. 0.00'
PLATFORM A
T.O. DECK EL. +33.4'
WALKWAY B
PLATFORM B
T.O. DECK
EL. +22.5' (WP4)
PIPE PILE, TYP.
EXISTING GRADE
T.O. ABUTMENT
EL. +44.3' (WP3)
ABUTMENT
PILE TIP ELEVATION
EL. -40.0'
PILE TIP ELEVATION
EL. -50.0'
T.O. ABUTMENT
EL. +44.8' (WP2)
HTL / OHW EL. +9.25'
FIRE
MARINE
POWER ANDLIGHTING
FIRE
MARINE
POWER ANDLIGHTING
EL
EV
AT
IO
N, F
T (M
LL
W
EL
EV
AT
IO
N, F
T (M
LL
W
DISTANCE, FT
-60
-50
-40
-30
-20
-10
-60
-50
-40
-30
-20
-10
-4+80 -4+60 -4+40 -4+20 -4+00 -3+80 -3+60 -3+40 -3+20 -3+00 -2+80 -2+60 -2+40 -2+20 -2+00 -1+86
MLLW EL. 0.00'
PLATFORM B
T.O. DECK
EL. +22.5' (WP4)
GANGWAY
GANGWAY
HEADFRAME WITH
SIGNS 2 AND 3
PIPE PILE WITH
BIRD CAP, TYP.MOORAGE FLOAT
EXISTING GRADE
DINGHY FLOATS
RETRACTABLE LADDER
(OPPOSITE SIDE)
RETRACTABLE LADDER
(OPPOSITE SIDE)
LIFE RING
AND CABINET
LIFE RING AND
CABINET AND SIGN 1
2+002+20
ACCESS LADDER
HTL / OHW EL. +9.25'
(WP5)
2+402+602+803+003+203+403+603+804+004+204+404+604+80
PILE TIP ELEVATION
EL. -50.0'
FIRE
MARINE
POWER ANDLIGHTING
FIRE
MARINE
POWER ANDLIGHTING
LIFE RING
AND CABINET
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-PROFILE - MOORAGE FACILITY
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 15 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
PROFILE -
MOORAGE FACILITY
1" = 15'
15'
30'
15 20
A 11 15
ELEVATION
B 11 15
ELEVATION
15 21
1H:1V
MIN 3"
FOUNDATION
GRAVEL
APPROXIMATE EXISTING GRADE.
CONTRACTOR SHALL VERIFY EXISTING
CONDITIONS PRIOR TO INSTALLATION OF
PILES AND FABRICATION OF WALKWAYS.
2H:1V
TRANSITION PLATE
GUARDRAIL
MIN 6" EXCAVATION
5% SLOPE
BACKFILL WITH
NATIVE MATERIAL
MIN 12" THICK
CAST-IN-PLACE
CONCRETE ABUTMENT
UNWEATHERED
BEDROCK SURFACE
(UNKNOWN)
1'-6"1'-6"
ROCK ANCHOR
(DESIGNED BY
CONTRACTOR)
STEEL WALKWAY
SHOREMOUNT
(WP2)
(WP3)
1' -0
" M
IN
8'-0"
#6 @ 6" O.C. EA.
DIRECTION W/90°
HOOKS AT EA. END, TYP.
#6 @ 6" O.C. EA.
DIRECTION W/90°
HOOKS AT EA. END, TYP.
CIP CONCRETE
ABUTMENT
UNWEATHERED
BEDROCK SURFACE
(DEPTH UNKNOWN)
3" T
YP
HILTI RE-100 EPOXY ANCHOR
WITH #6 CONTINUOUS VERTICAL
BAR, 12" MIN EMBEDMENT
(DESIGNED BY CONTRACTOR)
12" DIA. CONCRETE ROCK
ANCHOR PEDESTAL
1H:1V 2H:1V
MIN 3"
FOUNDATION
GRAVEL
ALUMINUM UPLAND
GUARDRAIL, TYP.
(DESIGNED BY CONTRACTOR)
GUARDRAIL ANCHORAGE TO
CONCRETE ABUTMENT
(DESIGNED BY CONTRACTOR)
3' -6
BACKFILL WITH
NATIVE MATERIAL
VA
RI
ES
(M
AX
. 3
'-0
CONTRACTOR TO CONFIRM
SURFACE LOCATION PRIOR TO
ROCK ANCHOR INSTALLATION
C WP2 AND WP3L
8' -0
8'-0"
1'-6"
1' -6
1'
-6
1'-6"
3" T
YP
1'-0"
(6) #3
#3 SPIRAL
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-ABUTMENT DETAILS
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 16 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
ABUTMENT DETAILS
AS SHOWN
2'
4'
ELEVATION - ABUTMENT
1'
2'
SECTION - ABUTMENT
#6 BARS X 3'-0" LONG AT 8" O.C.,
FULL PEN WELD TO WT SECTION
ALUMINUM 1/4"
COVER PLATE WALKWAY
WT12X47 STEEL WALKWAY SHOREMOUNT
CAST INTO SLAB, WALKWAY MANUFACTURER
TO PROVIDE DETAIL OF LUG AND STIFFENERS
IN WT SECTION. (DESIGNED BY CONTRACTOR)
DETAIL - SHOREMOUNT
1'
2'
2'
4'
DETAIL - ABUTMENT
DETAIL - ANCHOR PEDESTAL
6"
12"
3" CL
R
M
IN
12 16
3" CL
R
M
IN
A
B
A
B
BID SET
(4) ROCK ANCHOR
PEDESTALS, TYP.
CL
WP2
WP3
-5
-4
1+00
11'-8"
CL 1'-1/8"CL
'-4
2' -0
CL
2' -0
CL
HP12X63
HP
X6
HP
X6
HP
X6
1'-1/8"
STEEL PLATE
STIFFENER, TYP.
P5 P6
P7 P8
GANGWAY LUG
AND STIFFENER
END CAP, TYP.
HP12X63
HP
X6
WP4
STA 2+00
13'-4"
'-6
2'-0" CL 2'-0"CL
1' -1
/8
1' -1
/8
HP
X6
HP12X63
HP12X63
HP12X63
HP12X63
HP
X6
CL
CL
STEEL PLATE
STIFFENER, TYP.
P1 P2
P3 P4
GANGWAY LUG AND STIFFENER
END CAP, TYP.
STA 1+00
2+00
C
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-PLATFORM DETAILS 1
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 17 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
PLATFORM
DETAILS 1
AS SHOWN
DETAIL - PLATFORM B SUPPORT FRAME
2'
4'
1. CONTRACTOR IS RESPONSIBLE FOR ENSURING WALKWAY AND GANGWAY CAN FUNCTION
AT ALL WATER ELEVATIONS, AND THAT 4" MAX OPENING IS MAINTAINED.
2. PLATFORM FRAMING TO BE PREFABRICATED IN A SHOP.
3. THE ALUMINUM TRUSS ACCESS GATE SHALL BE FABRICATED TO BE FULL HEIGHT OF THE
ADJACENT TRUSS. THE GATE SHALL BE ON A SPRING LOADED HINGE TO KEEP SHUT AND
SHALL SWING INWARD. THE GATE SHALL ALSO INCLUDE A LATCH THAT CAN BE LOCKED.
NOTES
B 17 19
A 17 19
DETAIL - PLATFORM A SUPPORT FRAME
2'
4'
4"
1' -1
/2
MAX 1/2" GAP AND 1/4"
LIP BETWEEN WALKWAY
AND PLATFORM
'-0
1/
2"
4" T
YP
A 17 18
WALKWAY B
PILE CAP, TYP.
1/
8"
2"
12'-0"
2"
4" T
YP
PLATFORM
AND WALKWAY
L
MAX 1/2" GAP AND 1/4"
LIP BETWEEN GANGWAY
AND PLATFORM
TRANSITION
PLATE ATTACHED
TO PLATFORM B
GANGWAY
GRATING
GANGWAY
GANGWAY END
RETURNS, TYP. TO FIT
INSIDE PLATFORM
DETAIL - PLATFORMS A & B
2'
4'
13 17
B 17 18
GALV. STEEL ACCESS
LADDER WELDED TO
PILE AND PILE CAP
GALV. STEEL ACCESS
LADDER WELDED TO
PILE AND PILE CAP
2'-0" WIDE ALUMINUM
TRUSS ACCESS GATE
C GANGWAY AND
PLATFORM B
L
GANGWAY HANDRAIL
EXTENSION, TYP.
WALKWAY A
GRATING
WALKWAY HANDRAIL
EXTENSION, TYP.
-4
PLATFORM A
PLATFORM A
SUPPORT FRAME
PLATFORM B
PLATFORM B
SUPPORT FRAME
TRANSITION
PLATE ATTACHED
TO WALKWAY A
TRANSITION
PLATE ATTACHED
TO WALKWAY B
TRANSITION
PLATE ATTACHED
TO WALKWAY A
BID SET
GATE SWING
STA 2+01.61
(WP 4)
C 17 18
D 17 18
SIGN POST ON TOP
OF GUARDRAIL
ALUM L4"X4"X3/8" PILE CAP BRACKET
WITH MIN 1/2" UHMW PAD, TYP.
MANUFACTURER TO PROVIDE DETAIL
STEEL PILE
PIN CONNECTION, TYP. CONSISTS OF MIN
3/4"∅ SS BOLTS IN STD HOLES, FULLY
TIGHTENED WITH NYLOCK NUTS AND SS
LOCK WASHERS; MANUFACTURER TO
PROVIDE DETAIL. UHMW ISOLATOR WASHERS
AND SLEEVES. MINIMUM 2 BOLTS AT EACH
BRACKET W/ MINIMUM 1 BRACKET ON EITHER
SIDE OF EACH BOTTOM CHORD.
UHMW PAD
ALUMINUM
WALKWAY
PIPE PILE, TYP.
ALUMINUM PLATFORMALUMINUM
WALKWAY
WALKWAY END TO EXTEND AND
SCISSOR INSIDE OF PLATFORM IN
ORDER TO MAINTAIN MAX 4" OPENING
T.O. PILE CAP
EL +33.0'
EXTEND HANDRAIL AND RETURN TO
INTERIOR OR END WEB WITH 90° ELBOW
BEAM
PILE CAP PILE CAP
WALKWAY
WALKWAY LUG;
MANUFACTURER TO
PROVIDE DETAIL
SWING LINK CONNECTION W/ UHMW ISOLATOR
WASHERS AND SLEEVES, SEE NOTE 4, TYP.;
MANUFACTURER TO PROVIDE DETAIL
FIXED TRUSS LUG WELDED TO PILE CAP;
MANUFACTURER TO PROVIDE DETAIL
TRANSITION PLATE,
MANUFACTURER TO
PROVIDE DETAIL
ALUMINUM
GANGWAY
ALUMINUM PLATFORM
T.O. PILE CAP
EL +22.0'
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-PLATFORM DETAILS 2
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 18 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
PLATFORM
DETAILS 2
AS SHOWN
2'
4'
CONTRACTOR IS RESPONSIBLE FOR ENSURING
GANGWAY CAN FUNCTION AT ALL WATER ELEVATIONS,
AND THAT 4" MAX OPENING IS MAINTAINED.
NOTE
DETAIL - SWINGLINK CONNECTION
8"
16"
1. PERFORMANCE CRITERIA:
A. GANGWAY AND WALKWAYS ARE DESIGN-BUILD BY MANUFACTURER TO MEET
TECHNICAL SPECIFICATIONS.
2. SEE SHEET 21 FOR PILE SCHEDULE.
3. GANGWAY AND ITS CONNECTIONS SHALL BE DESIGNED TO ACCOMMODATE FULL
RANGE OF MOTION BETWEEN THE DESIGN WATER LEVELS.
4. SWING LINK PIN SHALL BE STAINLESS STEEL AND SHALL BE BILLETED AS A SINGLE
PIECE. WELDED HEADS ARE NOT ALLOWED ON THE PIN. TYPICAL ALL SWING LINK PINS.
NOTES
A 17 18
ELEVATION - PLATFORM A
2'
4'
B 17 18
ELEVATION - PLATFORM B
18 19
ACCESS LADDER
SEE SECTION A ON THIS
SHEET FOR INFORMATION
NOT SHOWN.
PLATFORMPLATFORM
DETAIL - PLATFORM CONNECTION
8"
16"
BID SET
D 17 18
C 17 18
CAP
5/16
TYP
CL
1/
2" T
YP
. CHAMFER PLATE
CORNERS FOR DRAINAGE
1/2" STEEL PLATE
END CAP, BOTH ENDS
1/2" STEEL
STIFFENER
PLATE, TYP.
PIPE PILE 5/16 TYP
CAP
CL
TYP ALL
STIFFENERS5/16
5/163/4" TYP.
TOP AND
BOTTOM
BEAM
1/2" STEEL
PLATE TAB
5/16
TOP AND
BOTTOM
5/16 5/16
3 SIDES
SIDE
MHW EL. +7.21'
MHHW EL. +7.86'
HTL / OHW
EL. +9.25'
FRONT
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-PLATFORM DETAILS 3
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 19 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
PLATFORM
DETAILS 3
AS SHOWN
6"
12"
SECTION - PILE CAP (AT ENDS TYP.) ELEVATION - PLATFORM FRAME CONNNECTION
6"
12"
1. PERFORMANCE CRITERIA:
A. GANGWAY AND WALKWAYS ARE DESIGN-BUILD BY MANUFACTURER TO MEET
TECHNICAL SPECIFICATIONS.
2. SEE SHEET 21 FOR PILE SCHEDULE.
3. GANGWAY AND ITS CONNECTIONS SHALL BE DESIGNED TO ACCOMMODATE FULL RANGE
OF MOTION BETWEEN THE DESIGN WATER LEVELS.
4. SWING LINK PIN SHALL BE STAINLESS STEEL AND SHALL BE BILLETED AS A SINGLE PIECE.
WELDED HEADS ARE NOT ALLOWED ON THE PIN. TYPICAL ALL SWING LINK PINS.
5. CONTRACTOR TO PROVIDE FINAL DESIGN OF WALKWAYS, PLATFORMS, AND GANGWAY.
6. CONTRACTOR TO COORDINATE THE DESIGN BETWEEN CONNECTING STRUCTURAL
ELEMENTS TO ENSURE COMPATIBILITY DURING INSTALLATION AND OPERATION.
7. GANGWAY SHALL BE DESIGNED TO BE COMPATIBLE WITH THE FLOATS AND CONNECTED
PLATFORM BETWEEN THE DESIGN WATER LEVELS.
NOTES
A 17 19
DETAIL - ACCESS LADDER
2'
4'
'-0
6' -0
" M
AX
3' -6
/8
7"
ACCESS
LADDER
PILE
PLATFORM B
18 19
1' -0
TY
P.
1'
-0
M
AX
1'-6"
SUPPORT BRACKET, TYP.
7/8" GALV. STEEL U-BOLT
FASTENED WITH DOUBLE
NUTS, TIGHTEN U-BOLT TO
SLIP CRITICAL TORQUE
C6X13 6"X1/2" BENT
FLAT BAR
UHMW SHIM
DETAIL -SUPPORT BRACKET
1'
2'
BO
TT
OM
O
F
LA
DD
ER
T O
TO
P
OF
T
OP
R
UN
G
B 17 19
BID SET
TOP CONNECTION THRU
BOLTED INTO PLATFORM
TUBE WITH 5/8" SS BOLTS,
COORDINATE WITH
PLATFORM MANUFACTURER
BOLTING PER LADDER
MANUFACTURER
GANGWAY ROLLER GUIDE: MIN 3/8"
THICK ALUM ROLLER PLATE ON FLOAT
DECK AT EACH ROLLER, MIN 8" WIDE AND
4'-0" LONG, SECURED TO FLOAT FRAMING
IN ACCORDANCE WITH GANGWAY
MANUFACTURER'S RECOMMENDATIONS.
ALUM TRANSITION PLATE
UHMW
WEAR EDGE
EXTEND HANDRAIL AND
RETURN TO INTERIOR OR
END WEB WITH 90° ELBOW
WEB, TYP.TOP CHORD
BOTTOM CHORD
HORIZONTAL RAIL, TYP.
ROLLER END ASSEMBLY
TOP OF FLOAT
DECKING
1"X3"X3" UHMW
RUBSTRIP EA.
SIDE, TYP.
LIFTING TAB 1
UHMW
RUBSTRIP, TYP.
1" TALL
(ADA COMPLIANT)
FRP DECK
ALUM TUBE FLOOR DIAGONAL
11'-0" MIN (PLATFORM)
5'-0" MIN (GANGWAY / WALKWAY)
DE
PT
H
BA
SE
D
ON
M
AN
UF
AC
TU
RE
R
DE
SI
GN
CL
SYM.
ALUM TUBE FLOOR BEAM, TYP.
GUARDRAIL
HEADFRAME AND
GANGWAY HOIST BEAM
MOORAGE FLOAT
STEEL PIPE
PILE, TYP.
6'-0"
T.O. PILE
SEE PILE SCHEDULE
5'-0"
CL
PILE
CL
GANGWAY
STORAGE CHAIN
(OWNER PROVDED)
4'X4"X2" CHAMFERED UHMW
RUB BLOCK, MECHANICALLY
ATTACHED TO THE TOP AND
BOTTOM CHORDS CENTERED
WITH THE HEADFRAME PILE
(3) EYELET HANGERS
B.O. SUSPENDED GANGWAY
MIN EL. +16.0'LIFTING
TABS, TYP.
GANGWAY
(SHOWN IN SUSPENDED POSITION)
11'-4"
4'-2"
SIGNS 2 AND 3
" O
PE
NI
NG
ALUM TUBE
BOTTOM CHORD
ALUM TUBE WEB, TYP.
1/2"∅ ALUM HORIZONTAL
RAIL, BOTH SIDES
ALUM HANDRAIL FULL
LENGTH, BOTH SIDES, TYP.
ALUM TUBE TOP CHORD
2' -1
0"
3' -6
" M
IN
HSS 8 X 6 X 1/2
16"∅ STEEL PILE
1/2" CAP PL, EA SIDE
5/16
20"∅ X 1/2" PL
MIN 8"
BOTH SIDES
1/4
5/16TYP.
4" X 4" X 1/2" STEEL
PLATE W/ 1" Ø HOLE
TYP.
1/4
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-GANGWAY AND HEADFRAME DETAILS
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 20 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
GANGWAY AND
HEADFRAME DETAILS
AS SHOWN
DETAIL - FLOAT LANDING
2'
4'
15 20
D 11 20
SECTION - TYPICAL GANGWAY / WALKWAY / PLATFORM
1'
2'
FINAL DESIGN OF GANGWAY, WALKWAYS AND PLATFORM SHALL BE PERFORMED BY THE CONTRACTOR.
NOTE
C 11 20
SECTION - GANGWAY AND HEADFRAME
2'
4'
1. LIFTING TAB TO ACCOMMODATE FOR A 3/4" SHACKLE.
NOTE
DETAIL - TYPICAL GUARDRAIL
6"
12"
DETAIL - HEADRAME CONNECTION
6"
12"
BEDROCK
DO
W
N
TH
E
HO
LE
H
AM
M
ER
EM
BE
D
IN
TO
B
ED
RO
CK
(M
IN
0'
-0
, S
EE
N
OT
E
STEEL PIPE PILE
ROCK SOCKET
PILE CUTOFF EL.
(SEE PILE SCHEDULE)
BLACK FIBERGLASS BIRD CAP
(SEE PILE SCHEDULE)
PILE TIP EL.
(SEE PILE SCHEDULE)
MUDLINE
(ELEVATION VARIES)
TOP OF BEDROCK
(ELEVATION VARIES) VI
BR
AT
OR
Y
HA
M
M
ER
IN
ST
AL
LA
TI
ON
(D
EP
TH
V
AR
IE
S) , S
EE
N
OT
E
OVERBURDEN
OUTSIDE FLANGE CUTTING SHOE TO
WORK WITH CONTRACTOR'S MEANS
AND METHODS. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS
PILE SCHEDULE
PILE ID
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
H1
H2
P1
P2
P3
P4
P5
P6
P7
P8
PILE SIZE NORTHING
619911.78
619925.39
619938.99
619952.59
619966.20
619880.46
619868.52
619834.41
619695.78
619679.80
619902.75
619892.49
619961.66
619957.73
619952.15
619948.22
619869.93
619865.87
619861.47
619857.40
EASTING
1068581.01
1068551.67
1068522.34
1068493.01
1068463.68
1068151.82
1068201.29
1068257.92
1068943.85
1068975.79
1068605.48
1068600.72
1068713.45
1068721.92
1068709.04
1068717.51
1068670.75
1068679.49
1068666.81
1068675.56
PILE TIP
ELEVATION
(MLLW)
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-50.0'
-40.0'
-40.0'
-40.0'
-40.0'
-50.0'
-50.0'
-50.0'
-50.0'
PILE CUTOFF
ELEVATION
(MLLW)
18.0'
18.0'
18.0'
18.0'
18.0'
18.0'
18.0'
18.0'
18.0'
18.0'
30.0'
30.0'
32.0'
32.0'
32.0'
32.0'
21.0'
21.0'
21.0'
21.0'
BIRD CAP
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
PROJECT ENGINEER
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-PILE DETAILS AND SCHEDULE
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 21 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
PILE DETAILS
AND SCHEDULE
1" = 2'
1. CONTRACTOR SHALL USE A VIBRATORY HAMMER TO INSTALL THE PILE TO SPECIFIED TIP
ELEVATION. IF REFUSAL WITH VIBRATORY HAMMER IS ENCOUNTERED BEFORE REACHING THE
SPECIFIED TIP ELEVATION, UTILIZE AN IMPACT HAMMER TO PROGRESS PILE. IF REFUSAL
WITH IMPACT HAMMER IS ENCOUNTERED BEFORE TIP ELEVATION, THEN UTILIZE A DOWN
THE HOLE HAMMER AND DRILL DEEP ENOUGH TO SEAT THE PILE A MINIMUM OF 10 FEET INTO
THE HARD LAYER OR UNTIL SPECIFIED TIP ELEVATION HAS BEEN ACHIEVED. USE THE IMPACT
HAMMER AFTER DRILLING TO SEAT THE PILE INTO THE DRILLED PORTION OF SOIL.
2. PILE COORDINATES SHOWN IN THE PILE SCHEDULES ARE THE CENTER POSITION OF THE PILE.
3. SEE SECTION 316216 FOR MORE INFORMATION REGARDING PILE INSTALLATION SUCH AS PILE
DRIVING REQUIREMENTS, INSTALLATION TOLERANCES, AND A ACCEPTANCE CRITERIA.
4. FOR SOIL AND SITE CONDITIONS, SEE GEOLOGIC AND GEOTECHNICAL ENGINEERING
SERVICES REPORT "STUART ISLAND STATE PARK IMPROVEMENTS, SAN JUAN COUNTY,
WASHINGTON" DATED NOVEMBER 25, 2020 AS DEVELOPED BY GEOENGINEERS, INC.
5. ENSURE THAT BOULDERS AND OTHER OBSTRUCTIONS ON SITE DO NOT INTERFERE WITH THE
PILE DRIVING AND INSTALLATION. LOCALLY MOVE ANY SUCH OBSTRUCTIONS TO ENSURE
THAT PILES ARE INSTALLED IN THE CORRECT LOCATION AND ACHIEVE THE MINIMUM
EMBEDMENT INTO ROCK AS SHOWN ON THE DRAWINGS.
6. SURVEY AS-BUILT PILE LOCATIONS PER SECTION 010099 AND INCORPORATE PILE LOCATIONS
INTO THE FINAL FLOAT SHOP DRAWINGS TO ENSURE FLOATS AND GANGWAY FUNCTIONS
THROUGH THE FULL DESIGN WATER LEVEL RANGE WITHOUT BINDING.
NOTES
DETAIL - PILE INSTALLATION
2'
4'
Y
Y
Y
Y
Y
N
N
N
N
N
N
N
N
N
N
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
16"Ø X 1/2"
15 21
Y
Y
Y
Y
Y
EP
H1
6-
PL
AN
AC BBB
1'-4"
161'-4"
26'-0"32'-4"32'-4"32'-4"32'-4"7'-4"
32'-0"
4"
32'-0"
4"
32'-0"
4"
32'-0"
4"
32'-0"
4' -8
/2
4' -6
10'-0"
D1
16"∅ STEEL PIPE PILE
IN INTERNAL HOOP,
TYP. 5 PLACES
FLOAT-TO-FLOAT HINGE
W/ COVER PLATE,
TYP. 4 PLACES
16"∅ STEEL PIPE PILE IN
END PILE HOOP, TYP.12" CLEAT,
TYP. 40 PLACES
FLOAT DRUM BELOW,
TYP. 40 PLACES. 4000# GANGWAY (DL REACTION)
LOCATION AT MID TIDE LEVEL
100% FRP
GRATE DECK MATCH LINE
16"∅ STEEL PIPE PILE
C PILEL
FLOAT AFLOAT BFLOAT BFLOAT BFLOAT C
C PILEL C PILEL C PILEL C PILEL C PILEL
C FLOATL
C PILEL
C FLOATL
C PILEL
FLOAT D1
A
A
EP
H1
6-
PL
AN
A
1'-4"
4' -6
D3
EP
H1
6-
PL
AN
D1 D2
73'-0"
24'-0" 24'-0" 24'-0"
4" 4"
73'-0"
1'-4"
1' -6
16"∅ STEEL PIPE PILE IN
END PILE HOOP, TYP.
FREEBOARD ON THIS
FLOAT TAPERS DOWN
MATCH LINE
FLOAT DRUM BELOW,
TYP. 9 PLACES.
100% FRP GRATE DECK
C PILEL
C FLOATL
C PILEL
FLOAT D1 FLOAT D2 FLOAT D3
C PILEL
C FLOATL
A
A
A
A
DINGHY FLOAT PLAN AND ELEVATION
8'
16'
MOORAGE FLOAT PLAN AND ELEVATION
8'
16'
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 22 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
MOORAGE FLOAT
PLAN AND
ELEVATION
AS SHOWN
BID SET
S-4812-Z41-2022-MOORAGE
FLOAT PLAN AND ELEVATION
3 2
EP
H1
6-
PL
AN
1'-4" 24'-0"
4"
32'-0"
4"
32'-0"
4"
24'-0" 1'-4"
4'-6"
EPH16-PLAN
113'-0"
4' -8
/2
50'-4" 65'-4"
4' -6
16"∅ STEEL PIPE PILE
IN INTERNAL HOOP,
1 PLACE
FLOAT-TO-FLOAT HINGE
W/ COVER PLATE,
TYP. 3 PLACES
16"∅ STEEL PIPE
PILE IN END PILE
HOOP, TYP. 2 PLACES
12" CLEAT,
TYP. 32 PLACES
FLOAT DRUM BELOW,
TYP. 32 PLACES
100% FRP GRATE DECK
FLOAT 1FLOAT 2FLOAT 3FLOAT 4
C PILEL C PILEL C PILEL
C FLOATL
C PILEL
C FLOATL
C PILEL
ISLAND FLOAT PLAN AND ELEVATION
8'
16'
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-ISLAND FLOAT PLAN AND ELEVATION
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 23 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
ISLAND FLOAT
PLAN AND
ELEVATION
AS SHOWN
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
1/12/26
S-4812-Z41-2022-FLOAT NOTES
EE 1/12/26
TM 1/12/26
PY 1/12/26
EE 1/12/26
SHEET 24 OF 47
STUART ISLAND
STATE PARK
REID HARBOR
MOORAGE FACILITY
IMPROVEMENTS
FLOAT NOTES
AS SHOWN
BID SET
STRUCTURAL STEEL
1. STEEL SHAPES, BARS AND PLATES SHALL BE ASTM A36. STRUCTURAL PIPES SHALL BE ASTM A53 -
GRADE B.
WELDING
1. ALL WELDING SHALL CONFORM TO THE LATEST AWS D1.1 (STEEL) OR AWS D1.2 (ALUMINUM)
STRUCTURAL WELDING CODES AND SHALL BE PERFORMED BY AWS QUALIFIED STRUCTURAL
WELDERS USING QUALIFIED WELDING PROCEDURES. WELDER QUALIFICATIONS AND WELDING
PROCEDURES SHALL BE SUBMITTED TO OWNER FOR APPROVAL.
2. NO WELDING THROUGH GALVANIZING SHALL BE PERMITTED, ALL GALVANIZING WITHIN ONE INCH OF THE WELD SHALL BE REMOVED BY GRINDING AND REPAIRED AFTER WELDING IN ACCORDANCE
WITH THE APPROVED COATING REPAIR PROCEDURE.
3. ALL WELDS SHALL BE 100% VISUALLY INSPECTED, PRIOR TO GALVANIZING, BY AN AWS QUALIFIED WELD INSPECTOR, AT THE FABRICATOR'S OR CONTRACTOR'S EXPENSE, IN ACCORDANCE WITH THE
APPLICABLE AWS D1.1 STEEL WELDING CODE.
GALVANIZING
1. ALL MILD STEEL COMPONENTS SHALL BE HOT-DIP GALVANIZED IN STRICT ACCORDANCE WITH ASTM
A123 OR A153 AS APPLICABLE AFTER FABRICATION UNLESS NOTED OTHERWISE. FABRICATION
INCLUDES ALL PROCESSES THAT ADD OR SUBTRACT METAL, INCLUDING, BUT NOT LIMITED TO, CUTTING, GRINDING, DRILLING, PUNCHING, AND WELDING.
COATING REPAIR
1. ALL DAMAGED GALVANIZING OR GALVANIZING REMOVED FOR FIELD WELDING SHALL BE REPAIRED
IN ACCORDANCE WITH ASTM A780 USING A HOT-STICK REPAIR AND ZINC-RICH PAINT TOP COAT.
MINIMUM THICKNESS OF REPAIR COATING IS 12 MILS. REPAIR STICKS SHALL BE GALV-VIZ AS MANUFACTURED BY AMERICAN SOLDER AND FLUX OR APPROVED EQUAL AND SHALL BE MELTED AND
EVENLY WIRE BRUSHED ONTO THE ENTIRE REPAIR AREA.
B…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .