3-New Albany Sewer Map 1992 Record Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
This file consists of original record drawings for the New Albany Borough sewer system dated 1992, provided as reference documentation for the New Wastewater Treatment Facility project in Pennsylvania. The drawings are explicitly marked for reference only and are not to be used for construction purposes. The document includes 23 pages of sewer maps and system diagrams, with particular attention to the Wastewater Treatment Plant (WWTP) site plan, flow diagrams, and identification of existing manholes that will serve as tie-in points for the new infrastructure. The drawings provide historical context and existing system configuration relevant to the proposed 0.04 million gallon per day (mgd) package wastewater treatment facility project.
The record drawings serve as supporting documentation for the New Albany Borough's wastewater treatment facility modernization effort. These historical blueprints establish the baseline infrastructure and system layout from 1992, which informs the design and construction planning for the new treatment plant that will include headworks, screening equipment, extended aeration concrete tanks, UV disinfection systems, electrical service upgrades, process control buildings, and demolition of the existing treatment plant. The drawings are essential reference material for contractors and engineers to understand the existing system interconnections and spatial relationships before implementing the comprehensive facility replacement and upgrade project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Original record drawings for reference only. Not to be used for construction.
| Page 1 |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 |
| Page 11 |
| Page 12 |
| Page 13 |
| Page 14 |
| Page 15 |
| Page 16 |
| Page 17 |
| WWTP Site Plan |
| Page 19 |
| Page 20 |
| Page 21 |
| Page 22 |
| Page 23 |
| Flow Diagram |
| Manhole that we are tying in to |
File details come from the government source that posted it. Updated .