2-New Albany Borough - New Wastewater Treatament Facility Plans.pdf
PDF 118 MB Posted
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
This document consists of technical plans and specifications for the New Albany Borough in Pennsylvania's proposed new wastewater treatment facility project. The project involves the design and construction of a new 0.04 million gallons per day (mgd) package wastewater treatment plant, serving as a replacement for the existing treatment infrastructure. The scope of work encompasses comprehensive facility components including headworks and screening systems, extended aeration treatment concrete tanks with associated equipment, UV disinfection systems, blower installations, yard piping, new electrical service with duct banks, a new process control building, a new headworks building, a new UV disinfection building, and demolition of the existing treatment plant and electrical infrastructure. All associated appurtenances and site work necessary to achieve full operational capability are included in the project scope.
The plans establish the technical framework and engineering specifications required for bidders to prepare accurate proposals for design and construction services. The document provides detailed drawings, equipment specifications, and construction methodologies that contractors must follow to meet the Borough's requirements for upgrading its wastewater treatment capacity and compliance standards. Bidders should review these comprehensive plans to understand the full extent of work, site conditions, and technical requirements before submitting proposals for this critical municipal infrastructure project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .