This engineering plan document supports a sealed bid opportunity issued by Schuylkill County for the CDBG Borough of McAdoo Hancock Street Phase III Drainage Project. The project involves installation of a new storm sewer system on Hancock Street in McAdoo, Pennsylvania, including approximately 353 linear feet of 30-inch smooth-lined corrugated plastic pipe (SLCPP), two Type C inlets with 4x4 box configurations, and associated roadway and sidewalk restoration work. The base bid and one alternate bid structure allows bidders to propose options for the scope of work. Sealed bids are due online via the PennBid Program by 9:00 AM on Tuesday, April 21st, 2026, with public bid opening to follow. A non-mandatory pre-bid meeting is scheduled for April 14th, 2026, at 10:00 AM at the project site adjacent to 318 S. Hancock Street. The project will be awarded to one contractor at a later date following the Commissioners Board Meeting. All bidding documents are available at no cost through http://PennBid.bonfirehub.com.
Bidders must submit a bid bond equal to 10 percent of the total bid amount, with the County of Schuylkill named as obligee. The successful contractor must furnish Performance and Payment Bonds each in the amount of 100 percent of the Contract Price with an approved corporate surety. The project is funded through the Community Development Block Grant (CDBG) program administered by Schuylkill County. Work must comply with PennDOT Publication 408 specifications, PENNDOT standards RC-45M and RC-46M for roadway construction, and all applicable federal, state, and local regulations including ADA accessibility guidelines. The contractor is responsible for utility coordination, erosion and sediment control measures, traffic control during construction, and daily trench backfill. Existing utilities including water lines, sanitary sewers, storm sewers, electrical lines, and telecommunications are identified on the plans, with the contractor bearing full responsibility for locating and protecting all underground utilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P E
N
N S Y L V
A
N
I A
C O
M
M O
NW EALT
H
O
F
REGISTERED
PROFESSIONAL
ENGINEER
No. PE094320
CRAIG A. PEZAK
32083.03 Y:\Pennsylvania\32000S\32083.03_McAdoo_Hancock_Pha_3\Eng_Docs\Drainage\01_Cover.dgn (Default)cpezak 03\25\2026 08:11:08
1 5
32083.03GENERAL NOTES2
SCHUYLKILL COUNTY CDBG PROGRAM
Schuylkill County Commissioners N
- Real Estate / Engineering Director
- Controller
- Commissioner
- Commissioner
- Chairman
3 PLAN SHEET
Schuylkill County, Pennsylvania
PROJECT LOCATION
- Secretary/Treasurer
- Mayor
- Member
- Member
- Member
- Member
- Member
- Vice President
- Council President
SCALE: NONE
Drawing Index
Drawing No. Title
1 COVER SHEET
PROJECT
DRAWING NO.
OF
Lisa Mahall, PE
Sharyn Yackenchick
Gary J. Hess
Barron L. Hetherington
Larry J. Padora, Jr.
HANCOCK STREET DRAINAGE - PHASE III
LOCATION MAP
ESPC DETAIL SHEET
Borough of McAdoo
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
No. 053112-E
MICHAEL ANTHONY CERA
PREPARED BY:
PROJECT MANAGER DATE
570-914-9031
Wilkes-Barre, PA 18705
Suite 402
670 S. River Street
BOROUGH OF MCADOO
MARCH 2026
CONSTRUCTION DETAIL SHEET
is strictly prohibited, except by written permission of this firm.
Benesch. Use, reuse, reproduction or modification of this plan or design information, or any part thereof, Copyright 2026, of Benesch. All rights reserved. This plan and design content is the property of
Diane Minneci
Bernard Vilcheck
Jessica Herness
Alberta Bumbulsky
Joe Madochick
Barry Lutz
John Shigo
Mary Labert
William Slovik
03/25/2026
GENERAL NOTES
x
WATER VALVEWV
EXISTING DITCH OR SWALE
EXISTING WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING FENCE
EXISTING STORM SEWER LINE
CORRUGATED METAL PIPE
DUCTILE IRON PIPE
CAST IRON PIPE
POLYVINYL CHLORIDE PIPE
TYP TYPICAL
CONCRETE
EXISTING TELEPHONE LINE
FH FIRE HYDRANT
EXISTING PETROLEUM PIPELINE
EXISTING TREE
EXISTING TREE/BRUSH LINE
EXISTING GROUND ELEVATION
EXISTING GUY WIRE
EXISTING MAILBOX
EXISTING SIGN
EXISTING SIGN AND POSTS
EXISTING POST/LAMP POST/BOLLARD
CLEANOUTCO
MH MANHOLE
EXISTING MANHOLE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
EXISTING WELL
EXISTING WATER METER
CONC
PVC
CIP
DIP
CMP
EXISTING INLET
OC OPEN CUT
4" W
E
CTV
T
P
540.3
CO
WV
WM
S
WELL
LEGEND
LEGAL RIGHT-OF-WAY
ABBREVIATIONS
WS
EXISTING UTILITY POLE
EXISTING LIGHT STANDARD
BM BENCH MARK
CP CONTROL POINT
EXISTING WATER SERVICE LINE
FH
BIT BITUMINOUS
DWY DRIVEWAY
SLCPP
LT LIGHT
PROPOSED STORM SEWER
VCP VITRIFIED CLAY PIPE
PLASTIC PIPE
SMOOTH LINED CORRUGATED
CS
TRAFFIC CONTROL
INLET, TYPE AS NOTED
CONSTRUCTION LIMITS
GENERAL NOTES GENERAL NOTES (CONT.)
1-800-242-1776
PENNSYLVANIA ONE CALL SYSTEM, INC.
STOP-CALL BEFORE YOU DIG!
AT WWW.PAONECALL.ORG
COORDINATE YOUR PROJECTS VIA COORDINATE PA
PENNSYLVANIA ONE CALL SYSTEM SERIAL NUMBER
20260790640
START OF EXCAVATION.
THAN 10 BUSINESS DAYS PRIOR TO THE
THAN 3 BUSINESS DAYS NOR MORE
DIAL 8-1-1 OR 1-800-242-1776 NOT LESS
EXIST THROUGHOUT THE PROJECT AREA.
CONTRACTOR SHALL BE MADE AWARE THAT LOW LYING OVERHEAD UTILITY LINES (POWER, TELEPHONE, CABLE TV, ETC.)
THEIR REPRESENTATIVES.
LOCATION OF THE UNDERGROUND UTILITIES IS ON THE CONTRACTOR AND NOT ON THE PROJECT OWNER, BENESCH, OR
THE RISK OF FINANCIAL LOSS RESULTING FROM MISIDENTIFICATION, MISLOCATION OR MISUNDERSTANDING OF THE
THE CONTRACTOR AT THE PROJECT SITE.
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED BY THE CONTRACTOR AND SHALL BE FIELD VERIFIED BY
UNNECESSARY CONFLICTS THEREWITH.
EXACT LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION OR DEMOLITION AND (3) TO AVOID ALL
WITHOUT RELIANCE ON THESE PLANS: (1) TO CONTACT ALL UTILITY OWNERS INDEPENDENTLY, (2) TO DETERMINE THE
GUARANTEED TO BE COMPLETE OR ACCURATE. CONTRACTOR IS RESPONSIBLE AT ITS SOLE COST AND EXPENSE AND
OTHER FEATURE OF UNDERGROUND UTILITIES IS FOR GENERAL INFORMATION AND GUIDANCE ONLY, AND IS NOT
NOTE: INFORMATION ON THESE PLANS CONCERNING THE CONDITIONS, DIMENSIONS, DEPTH, SIZE, LOCATION OR ANY
DRAWINGS.
THE PLANS. NO FIELD EXCAVATION HAS BEEN PERFORMED. AVAILABLE SURFACE INFORMATION IS INDICATED ON THE
OR STRUCTURES SHOWN ON THE PLANS, OR THAT ALL UNDERGROUND INSTALLATION OR STRUCTURES ARE SHOWN ON
WARRANT OR ASSURE EITHER THE ACCURACY OF THE LOCATION OF THE PRESENT UNDERGROUND UTILITY INSTALLATION
BEEN PROVIDED TO BENESCH FROM THE UTILITIES LISTED ABOVE. BENESCH DOES NOT GUARANTEE, REPRESENT, WARNING! EXISTING UTILITIES, AS SHOWN ON THESE DRAWINGS, ARE IN ACCORDANCE WITH INFORMATION THAT HAS tsteward@ugi.com
CONTACT: TIMOTHY STEWARD
BETHLEHEM, PA 18017
2121 CITY LINE ROAD
UGI UTILITIES INC
robert.trently@secv.com
CONTACT: ROBERT TRENTLY
HAZLE TOWNSHIP, PA 18202
PO BOX R
380 MAPLEWOOD DRIVE
SERVICE ELECTRIC CABLEVISION INC
mkoshmieder@outlook.com
CONTACT: MICHAEL KOSHMIEDER
McADOO, PA 18237
8 E. MARKET ST
KLINE TOWNSHIP MUNICPAL AUTHORITY
LIST OF UTILITIES:
PURPLE - NON-POTABLE WATER, IRRIGATION OR SLURRY LINES
WHITE - PROPOSED EXCAVATION
GREEN - SEWERS AND DRAIN LINES
BLUE - POTABLE WATER
ORANGE - COMMUNICATION, ALARM OR SIGNAL LINES, CABLES OR CONDUIT
YELLOW - GAS, OIL, STEAM, PETROLEUM OR GASEOUS MATERIALS
RED - ELECTRIC POWER LINES, CABLES, CONDUIT AND LIGHTING CODES
WITH UNIFORM COLOR CODES. KNOW THEM!
ACT NO. 287 OF 1974 AS AMENDED STANDARDIZES THE COLOR-MARKING OF UNDERGROUND UTILITIES IN ACCORDANCE
SERIAL NO.: 20242392512
THIS PROJECT HAS A SERIAL NUMBER REGISTERED WITH THE ONE CALL SYSTEM, INC. USE IT!
PENNSYLVANIA.
WHEN ENGAGED IN THE DESIGN PHASE. THESE REQUIREMENTS APPLY ANYWHERE IN THE COMMONWEALTH OF
187 REQUIRES DESIGNERS TO GIVE NO LESS THAN 10 WORKING DAYS NOR MORE THAN 90 WORKING DAYS NOTICE
BORE, DIG, DITCH, DRILL, DRIVE-IN, GRADE, PLOW-IN, PULL-IN, RIP, SCRAPE, TRENCH, TUNNEL OR DEMOLISH. ACT NO.
CONTRACTORS WHO ARE ABOUT TO MOVE EARTH (WITH OR WITHOUT EXPLOSIVES), ANCHOR, AUGER, BACKFILL, BLAST, LESS THAN 3 WORKING DAYS NOTICE NOR MORE THAN 10 WORKING DAYS NOTICE FROM EXCAVATORS/DEMOLITION
PENNSYLVANIA ACT NO. 287 OF 1974 AS AMENDED, THE UNDERGROUND UTILITY LINE PROTECTION LAW, REQUIRES NO
OVERHEAD UTILITIES AS NECESSARY.
CONTRACTOR IS RESPONSIBLE TO COORDINATE, PROTECT AND MAINTAIN ACCEPTABLE DISTANCE OR DE-ENERGIZE ALL EXISTING
THAT THE DAMAGE HAS OCCURRED.
THE CONTRACTOR SHALL REPAIR DAMAGED SEWER LATERALS AND/OR WATER SERVICE LINES WITHIN THE SAME WORKING DAY
ALL SHORING FOR TRENCHES WILL BE IN ACCORDANCE WITH OSHA STANDARDS.
"EROSION AND SEDIMENTATION CONTROL MANUAL".
PHASES OF CONSTRUCTION. SEE SEDIMENT AND EROSION CONTROL NOTES AND DETAILS. ALL CONTROLS SHALL CONFORM TO
ALL REQUIRED SOIL EROSION AND SEDIMENTATION CONTROLS SHALL BE PROVIDED, INSTALLED AND MAINTAINED DURING ALL
RIGHT-OF-WAY FOR BOROUGH ROADWAYS AND ALLEYS ARE RECORDED FROM COUNTY TAX MAPS AND ARE APPROXIMATE.
BY THE ENGINEER PRIOR TO ANY WORK.
APPROXIMATE EXCEPT WHERE SPECIFICALLY SHOWN. CHANGES TO LIMIT OF WORK BY THE CONTRACTOR MUST BE APPROVED
MATCH PROPOSED PAVING ELEVATION TO EXISTING PAVING ELEVATIONS WHEREVER THEY ADJOIN. LIMIT OF WORK SHOWN IS
ALL UTILITY EXCAVATIONS SHALL BE KEPT DRY AT ALL TIMES.
ELEVATIONS SHOWN ARE BASED ON NAVD88.
(COMBINED GRID FACTOR = 0.99989664).
HORIZONTAL COORDINATES AND ALL BEARINGS BASED ON PENNSYLVANIA STATE PLANE COORDINATE NAD831 (CORS 96)
SPECIFICATIONS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL STAKEOUTS BASED ON THE CONTRACT DRAWINGS AND
OVERNIGHT.
CONTRACTOR SHALL BACKFILL TRENCH ON A DAILY BASIS. UNDER NO CIRCUMSTANCES SHALL A TRENCH REMAIN OPEN
RECOMMENDATIONS.
JOINT DEFLECTION AND PIPE DEFLECTION SHALL NOT EXCEED MAXIMUM ALLOWABLE AS PER MANUFACTURERS'
NON-WORKING HOURS.
SHALL USE PROPER EXCAVATION SUPPORT SYSTEMS, BACKFILL, COVER, OR FENCE TO PROTECT EXCAVATION AREAS DURING
THIS PROJECT IS SUBJECT TO INSPECTION BY THE ENGINEER AND APPLICABLE CODE ENFORCEMENT AGENCIES. CONTRACTOR
THE OWNER RESERVES THE RIGHT TO ELIMINATE ANY OR ALL OF THIS WORK.
PUBLICATION 408 IN ITS LATEST REVISION.
PENNDOT SPECIFICATIONS SHALL MEAN COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
PIPING DURING CONSTRUCTION TO PREVENT DAMAGE TO PIPES AND APPURTENANCES.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THERE IS SUFFICIENT COVER ON EXISTING AND PROPOSED
ENGINEER.
PLAN LOCATIONS AND DIMENSIONS SHALL BE STRICTLY ADHERED TO UNLESS OTHERWISE DIRECTED BY THE OWNER OR THE
GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN.
RESPONSIBILITY TO VERIFY AND ALLOW FOR THEIR LOCATIONS AND PROVIDE FOR THEIR PROTECTION. THE OWNER DOES NOT
EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE BEST AVAILABLE INFORMATION. IT SHALL BE THE CONTRACTOR'S
THE CONTRACTOR SHALL COORDINATE ALL WORK WITH UTILITY COMPANIES INVOLVED.
CONDITION AS DIRECTED BY THE ENGINEER AT NO ADDITIONAL COST TO THE OWNER.
ALL AREAS DISTURBED OUTSIDE THE LIMITS OF CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THEIR ORIGINAL
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR.
SITE. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS AND PAY THE REQUIRED FEE.
THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS APPLICABLE TO CONSTRUCTION OF THIS
OWNER.
ANY DAMAGE DURING INSTALLATION MUST BE REPAIRED BY THE CONTRACTOR AT NO COST TO PROPERTY
PROPERTY OWNER SHALL BE SUBMITTED TO THE ENGINEER.
OWNER PRIOR TO WORKING/OCCUPYING AREA BEYOND THE RIGHT-OF-WAY. WRITTEN PERMISSION FROM THE
THE CONTRACTOR SHALL PROVIDE 14 DAYS NOTICE AND RECEIVE APPROVAL FROM THE ENGINEER OR THE
STRUCTURES, SHRUBS, UTILITIES OR OTHER IMPROVEMENTS. CONDITIONS MAY REQUIRE MANUAL EXCAVATION.
THE CONTRACTOR SHALL OPERATE IN SUCH A MANNER AND/OR TAKE SUCH PRECAUTIONS TO PROTECT
PUBLIC OR PRIVATE STRUCTURES AND/OR IMPROVEMENTS MAY LIMIT OR REDUCE THIS CORRIDOR.
EXCAVATION EQUIPMENT AND SURFACE DISTURBANCE SHALL BE LIMITED TO PUBLIC RIGHT-OF-WAY.
EXISTING OVERHEAD TV CABLE LINE
EXISTING OVERHEAD ELECTRIC LINE
EXISTING WATER CURB STOP
EXISTING SEWER CLEANOUT
TWO LANES OF TRAFFIC MUST BE PROVIDED DURING NONWORKING HOURS.
8. MUTCD (CURRENT EDITION)
7. PENNDOT PUBLICATION 408
6. PENNDOT PUBLICATION 236M
5. PENNDOT PUBLICATION 213 (PATA FIGURES 101-A, 102, 107, 201-A & 202-A)
4. PENNDOT PUBLICATION 212
3. PENNDOT PUBLICATION 111M
2. PENNDOT PUBLICATION 72M
1. PENNDOT PUBLICATION 35
THE METHODS INDICATED ON THESE DRAWINGS AND THE FOLLOWING:
TRAFFIC DURING HOURS OF CONSTRUCTION AND AT ALL OTHER TIMES CONSISTENT WITH
FURNISH, ERECT, PLACE AND MAINTAIN TRAFFIC CONTROL SIGNS AND DEVICES. MAINTAIN
debbie_king@cableps.com
CONTACT: DEBBIE KING
MIDLOTHIANM VA 23112
P.O. BOX 4816
CABLE PROTECTION SERVICES INC.
dlhaupt@pplweb.com
CONTACT: DOUG HAUPT
PAXINOS, PA 17860
437 BLUE CHURCH RD
PPL ELECTRIC UTILITIES CORP.
dminneci@ptd.net
CONTACT: JOSEPH MADOCHICK
McADOO, PA 18237
23 N. HANCOCK ST
McADOO BOROUGH
PUBLIC RIGHT-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG), AND THE ADA ACCESSIBILITY GUIDELINES (ADAAG).
CONSTRUCT ALL PROPOSED PEDESTRIAN FACILITIES ON THESE PLANS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT, RC-75M FEBRUARY 10, 2026
RC-73M FEBRUARY 10, 2026
RC-72M FEBRUARY 10, 2026
RC-70M FEBRUARY 10, 2026
RC-67M FEBRUARY 10, 2026
RC-64M FEBRUARY 10, 2026
RC-46M FEBRUARY 10, 2026
RC-45M FEBRUARY 10, 2026
RC-30M FEBRUARY 10, 2026
DETAILS, OTHER THAN THOSE INDICATED, ARE ON THE FOLLOWING STANDARD DRAWINGS:
MATERIAL CERTIFICATIONS MUST BE PROVIDED.
- LATEST PENNDOT ADOPTED EDITION
12. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
11. PENNSYLVANIA CODE TITLE 67, CHAPTERS 441 AND 459
10. PENNDOT PUBLICATION 236M
9. PENNDOT PUBLICATION 13M
8. PENNDOT PUBLICATION 111M
7. PENNDOT PUBLICATION 70M
6. PENNDOT PUBLICATION 213 (67 PA CODE, CHAPTER 212)
5. PENNDOT PUBLICATION 282
4. PENNDOT PUBLICATIONS 148 AND 149
3. PENNDOT PUBLICATION 72M
2. PENNDOT PUBLICATIONS 34, 35, 41, AND 42
1. PENNDOT PUBLICATION 408 SPECIFICATIONS
ALL WORK IS TO BE BUILT IN ACCORDANCE WITH:
HANCOCK STREET DRAINAGE - PHASE III
SCHUYLKILL COUNTY CDBG PROGRAM
Sheet No.:Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.:
32083.03 cpezak 03\25\2026 08:11:29 Y:\Pennsylvania\32000S\32083.03_McAdoo_Hancock_Pha_3\Eng_Docs\Drainage\02_GenNotes.dgn (Default)
ETC CAP 32083.03 OFMAC
BOROUGH OF MCADOO
Borough of McAdoo, Schuylkill County, Pennsylvania
570-914-9031
Wilkes-Barre, PA 18705
Suite 402
670 S. River Street
03/2026 reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
No. PE094320
CRAIG A. PEZAK
WVCS
W
WVCS
WVCS
WVCS
WVCS
WVCS
WVCS
CONC WALK
CONC WALK
BIT WALK
STOP
CO
STEPS STEPS
DRIVE
BIT
CO
CO
CO CO CO CO
MH
BOS=1738.00'
TOP=1746.18'
STORM MH
BOS=1735.59'
TOP=1746.09'
SAN MH
C D
A B
WV
WV
WV
WM
BIT LOT BIT LOT
STOP/STREET
NO PARKING
HC PARKING
BOS=1743.51'
TOP=1753.01'
SAN MH
STOP
STOP
FH
BIT CURB
CONC CURB
BROKEN
S57465
PPL 48480
PPL 6761 S57491
PPL 48484
FENCE
CHAINLINK
PPL 48478-S57485 B
I
T
D R I
V E
W A
Y
B
I
V E
W A
Y
B
I
V E
W A
Y
B
I
V E
W A
Y
CONC WALK
CONC WALK
BIT OVERLAID
CONC CURB
BROKEN
41755
BIT LOT
1750175
#2
CP
#1
CP
CS
CSCSCS
CS
CSCSCO CO CS CS CS CSCS
WALK
CONC
48482-S57477
PPL
GRASS
FENCE
CHAINLINK
WALK
CONC
FENCE
CHAINLINK S
P P
L
M
N R
E
S
R E
E T
W
R E
E
A
A M
R E
E T
S HANCOCK STREET
STREET
WALK
CONC
STREET
STOP/
TOP=1753.39
STORM MH
18" SLCPP
INV=1740.39'
TOP=1745.79'
EXISTING INLET A
36" SLCPP
INV(E)=1740.35'
18" SLCPP
INV(S)=1740.30'
36" SLCPP
INV(W)=1740.30'
TOP=1745.80'
EXISTING INLET B
18" SLCPP
INV=1740.95'
TOP=1746.20'
EXISTING INLET C
36" SLCPP
INV(S)=1740.92'
36" SLCPP
INV(NW)=1740.72'
TOP=1746.22'
EXISTING INLET D
CO
15 16 17 18 19 20
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
No. PE094320
CRAIG A. PEZAK
N
DRAINAGE DATA TABLE
CONTROL DATA BENCHMARK DATA
25+00.00
15+00.00
575634.55
574642.69
2453527.11
2453399.76 N 7°19'00" E
UU
LEGEND
(COMBINED GRID FACTOR = 0.99989664)
BASED ON PENNSYLVANIA STATE PLANE COORDINATE NAD831 (CORS 96)
ONLY AND DO NOT IMPLY A PRECISION BEYOND TWO (2) PLACES.
FOUR (4) PLACE COORDINATES ARE USED FOR COMPUTATIONAL PURPOSES
STATION
COORDINATES
BEARINGPOINT
NORTH EAST
POE
POB
3 TO 8 PERCENT SLOPES
BUCHANAN EXTERMELY STONEY LOAM,
URBANLAND - UDULTS COMPLEX
SOIL TYPES:
SUMMARY OF PROJECT COORDINATES
PLAN
SCALE IN FEET
NOTES:
- PROPOSED STORM PIPE (SIZE & TYPE AS INDICATED)
- PROPOSED INLET
- LIMIT OF DISTURBANCE
BxB
BxB
PIPE TABLE
(TYP)
AND BICYCLE SAFE GRATE
TYPE C INLET WITH 4X4 BOX
- PROPOSED ROADWAY RESTORATION
BM 100
ELEV 1745.72'
E 2453488.3400
N 575171.7040
CP #2 - MAG NAIL
ELEV 1756.58'
E 2453377.7340
N 574618.2750
CP #1 - MAG NAIL
ELEV: 1748.46'
STA 19+70, OFFSET 19.53' RT
BOLT OF FIRE HYDRANT
AND HANCOCK STREET ON TOP OF
SE CORNER ADAMS STREET
BM 100:
50'
20' 50'
P1IN1 IN2 P2
- PROPOSED CONCRETE SIDEWALK & CURB RESTORATION
- PROPOSED MILL AND OVERLAY
LENGTH: 295'
SLOPE: 2.31%
SIZE: 30" SLCPP
P2:
LENGTH: 58'
SLOPE: 2.09%
SIZE: 30" SLCPP
P1 (ALTERNATE BID NO. 1):
L
C P
P
L
C P
P
UU
UU
BxB
WITH OWNER (KTMA) AND/OR THEIR ENGINEER.
10. CONTRACTOR IS TO COORDINATE ANY WORK ON OR NEAR THE WATER SERVICE LINE
THE DETAILS.
9. EROSION AND SEDIMENT POLLUTION CONTROL MEASURES ARE TO BE UTILIZED AS PER
MAINTAINED DURING ROADWAY RESTORATION.
8. GRADE OF THE EXISTING ADA PARKING SPACE WITHIN THE PROJECT LIMITS IS TO BE
APPROVED BY THE ENGINEER.
7. SIDEWALK IS TO BE REPLACED UP TO THE NEAREST JOINT WITH LOCATIONS TO BE
REVEAL AREAS. ALL EXISTING PROPERTY DRAINS ARE TO REMAIN.
6. THE CONTRACTOR IS TO NOT BLOCK EXISTING PROPERTY DRAINS WITHIN THE CURB
COORDINATION IS THE RESPONSIBILITY OF THE CONTRACTOR.
5. SEWER LATERALS ARE NOT ANTICIPATED TO BE IMPACTED. ANY IMPACT AND
SHOP DRAWING REVIEW PRIOR TO INLET FABRICATION.
C INLET. LOCATION TO BE REVIEWED AND APPROVED BY THE ENGINEER AS PART OF
4. LOCATE STORM SEWER PIPE AT FURTHEST EXTENT POSSIBLE FROM CURB WITHIN TYPE
ADDITIONAL COST TO THE BOROUGH.
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR IN-KIND AT NO
ORDER TO NOT DAMAGE EXISTING CURB. ANY DAMAGE TO EXISTING CURB OR SIDEWALK
3. CONTRACTOR TO STABILIZE CURB IN AREAS OF PROPOSED ROADWAY RESTORATION IN
PROPERTY OWNER.
CONTRACTOR WILL BE REPLACED AT NO ADDITIONAL COST TO THE BOROUGH OR
NOT BE DISTURBED. ANY DISTURBED TREES WITHIN THE PROJECT LIMITS BY THE
TREES WITHIN THE PROJECT AREA AND IN THE SIDEWALK LIMITS ARE TO REMAIN AND
2. THE CONTRACTOR IS TO TRIM TREE BRANCHES FOR CONSTRUCTION ACTIVITIES. ALL
OF DATA: SCHUYLKILL COUNTY G.I.S. (2022)
1. PROPERTY LINES ARE APPROXIMATE AND FOR INFORMATIONAL PURPOSES ONLY. SOURCE
INV OUT (N) = 1747.98
INV IN (S) = 1748.18
TG = 1752.38
TYPE 4 BOX
TYPE C INLET
OFFSET: 18.46' RT (FRONT FACE OF CURB)
STA: 16+58.05
IN2:
INV OUT (N) = 1749.39
TG = 1753.60
TYPE 4 BOX
TYPE C INLET
OFFSET: 19.11' RT (FRONT FACE OF CURB)
STA: 15+96.11
IN1 (ALTERNATE BID NO. 1):
HANCOCK STREET DRAINAGE - PHASE III
SCHUYLKILL COUNTY CDBG PROGRAM
Sheet No.:Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.:
32083.03 cpezak 03\25\2026 08:11:31 Y:\Pennsylvania\32000S\32083.03_McAdoo_Hancock_Pha_3\Eng_Docs\Drainage\03_Plan.dgn (Default)
ETC CAP 32083.03 OFMAC
BOROUGH OF MCADOO
Borough of McAdoo, Schuylkill County, Pennsylvania
570-914-9031
Wilkes-Barre, PA 18705
Suite 402
670 S. River Street
03/2026 reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
B I
T U
M I
N O
U
A D
W A
Y
(BITUMINOUS ROADWAY)
D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
D W
E L
L I
N G
B I
T U
M I
N O
U
A D
W A
Y
CONSTRUCTION �
SOIL BOUNDARY LINE
NON-SHRINK GROUT.
PENETRATION TO BE SEALED WITH
NECESSARY FOR NEW PIPE PENETRATION.
KNOCK-OUT OR CORE DRILL AS
UTILIZE EXISTING INLET BOX
CONNECT INTO EXISTING INLET,
STORM SEWER PIPE (TYP)
30" THERMOPLASTIC (SLCPP)
(TYP)
(INCIDENTAL TO MOBILIZATION)
CONSTRUCTION AS NEEDED
TEMPORARY SUPPORT POLE DURING OF ROAD
FROM EDGE OF PARKING LANE TO EDGE
TO BE GRADUALLY RECESSED FOR ACCESS
DRIVEWAY ADJUSTMENT - ASPHALT CURB
TYPICAL SIDEWALK SECTION
MIN. 4" 2A SUBBASE (COMPACTED)
N.T.S.
1/2" PREMOLDED EXPANSION MATERIAL AT
CURB
SIDEWALK ABUTS
MATERIAL WHERE
1/2" EXPANSION
MATERIAL AT 20'-0" MAXIMUM
1/2" PREMOLDED EXPANSION
AT CENTERLINE OF SIDEWALK,
SCORE JOINTS AT 5'-0" OC OR
6" SUBBASE (2A)
1'-0" 1'-0"
IN BOROUGH ROADWAY
TYPICAL TRENCH RESTORATION DETAIL FOR OPEN CUT
PAVEMENT
ROADWAY
EXISTING
TO 97% PROCTOR DENSITY
2A STONE - COMPACT
4" CONCRETE SIDEWALK
6" SUBBASE (2A)
O.D.
1'-0"1'-0"
SAW CUT (TYP.)
COMPACTED SUBGRADE
ALL JOINTS
SEALANT
LINE MARKER
BURIED UTILITY
TO 97% PROCTOR DENSITY
2A STONE - COMPACT
N.T.S.
STORM LINE
COMPACT SUBGRADE TO 97% PROCTOR DENSITY
SCORED JOINTS AT 5'-0" O.C.
20'-0" MAXIMUM
SCORE JOINT (TYP.)
4" 2A SUBBASE (COMPACTED)
COMPACT SUBGRADE TO 97% PROCTOR DENSITY
TYPE C INLET
NOTES:
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH PENNDOT PUBLICATION
408, SECTION 605 AND STANDARDS FOR ROADWAY CONSTRUCTION, RC-45M
& 46M. CONTRACTOR SHALL VERIFY INLET BOX SIZING BASED ON PIPE SIZES
AND ALIGNMENT PRIOR TO ORDERING PRECAST STRUCTURES.
2. NO PIPES SHALL ENTER INLET BOX AT CORNER.
3. PLACE CONTINUOUS GROUT AROUND PIPE PRIOR TO BACKFILLING. (TYP.)
4. SEE PLAN FOR INLET AND BOX TYPE.
5. PROVIDE STEPS IN ALL INLET BOXES OVER 5 FEET IN DEPTH.
CONSTRUCTION DETAILS
EX. ROADWAY
1.5" DEPTH
MILLION ESALS, 9.5 MM MIX, SRL-L,
WEARING COURSE, PG 64S-22, <0.3
SUPERPAVE ASHPALT MIXTURE DESIGN,
1.5" DEPTH
MILLION ESALS, 9.5 MM MIX, SRL-L,
WEARING COURSE, PG 64S-22, <0.3
SUPERPAVE ASHPALT MIXTURE DESIGN,
CURB
EXISTING SIDEWALK
EXISTING
EXISTING WATER MAIN
EXISTING CURB BOX
EXISTING CURB & SIDEWALK
EXISTING ROADWAY
EXISTING CURB STOP
BLOCK
CONCRETE
EXISTING
TO HOME
SERVICE
EXISTING
EXISTING CORPORATION STOP
OF NEW STORM PIPE.
INSTALL PIPE INSULATION ON LATERAL AT AREA
CONFLICT WITH NEW STORM PIPE.
BEND COPPER LINE AS NEEDED TO AVOID
SERVICE LINE FROM CORP. STOP TO CURB STOP.
PROPOSED 3/4" TYPE K COPPER
N.T.S.
25.0 MM MIX 4" DEPTH
PG 64S-22, <0.3 MILLION ESALS,
DESIGN, BASE COURSE,
SUPERPAVE ASPHALT MIXTURE
(RC-64M)
CONC CURB
CURB REVEAL
MATCH EXISTING
TRANSITION TO EXISTING GRADE.
3. PLACE COMPACTED 2A STONE BACKING AT ENDS OF NEW SIDEWALK TO
CONCRETE OR OTHER RIDGID SURFACES OR STRUCTURES.
2. PLACE 1/2" EXPANSION MATERIAL AT ALL LOCATIONS ABUTTING EXISTING
ENGINEER PRIOR TO CONSTRUCTION OF SIDEWALK.
SIDEWALK AREAS THAT DO NOT MEET THIS RANGE SHALL BE REPORTED TO THE
1. SIDEWALK SHALL SLOPE 0.5% MINIMUM AND 2% MAXIMUM TOWARD CURB. ANY
NOTES:
PROPOSED 30" STORM PIPE
+/- 10'
M
IN
(SEE RC-45M)
DOWEL BARS
MIN. (TYP.)
1'-0"
INLET BOX
THICKNESS
1'-0" MIN.
COARSE AGGREGATE
COMPACTED NO. 2A
IS INCIDENTAL TO THE INLET BOX.
COST OF NO. 2A COARSE AGGREGATE
NOTE:
INLET BOX SUBBASE PREPARATION DETAIL
N.T.S.
N.T.S.
(STRUCTURAL STEEL SHOWN)
BICYCLE SAFE GRATE
SEE RC-45M FOR DETAILS
RING WHEN REQUIRED.
GRADE ADJUSTMENT
TOP UNIT
TYPE C CONCRETE
WATER SERVICE LINE ADJUSTMENT DETAIL
RESTORATION PAY LIMIT (7'-0")
25.0 MM MIX 4" DEPTH
PGS 64S-22, <0.3 MILLION ESALS,
DESIGN, BASE COURSE,
SUPERPAVE ASPHALT MIXTURE
4" CLASS A MODIFIED OR CLASS AAA CONCRETE
M
IN
DISRUPTION.
HOMEOWNER AND ADVANCED NOTICE IS REQUIRED FOR ANY WATER
ADJUSTMENT IS TO BE COORDINATED BY THE CONTRACTOR WITH THE
2. ANY DISRUPTION TO PROPERTY OWNER SERVICE FROM WATER LATERAL
MUNICIPAL AUTHORITY PRIOR TO WORK COMMENCING.
EXISTING WATER SERVICE LINE TO BE COORDINATED WITH KLINE TOWNSHIP
McADOO BOROUGH AND HOMEOWNERS. ALL WORK RELATING TO THE
CONTRACTOR TO COORDINATE WITH KLINE TOWNSHIP MUNICIPAL AUTHORITY,
SERVICE LINE, BEND LATERAL AS NEEDED TO RESLOVE CONFLICT.
AND EXISTING CURB STOP TO SHUT-OFF LATERAL. INSTALL NEW COPPER
PIPE OCCURS, CONTRACTOR TO EXPOSE EXISTING WATER MAIN CORP. STOP
1. IF CONFLICT WITH EXISTING WATER SERVICE LINE AND PROPOSED STORM
NOTE:
TYPE 4
B
B
OUTSIDE FACE (TYP.)
48"| MAX.
(OUTSIDE DIAMETER)
PIPE OPENING
MAX.
4'-0"
MIN. TYP.
6"
M A
X
TYPE 4 INLET BOX
HANCOCK STREET DRAINAGE - PHASE III
SCHUYLKILL COUNTY CDBG PROGRAM
Sheet No.:Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.:
32083.03 cpezak 03\25\2026 08:11:33 Y:\Pennsylvania\32000S\32083.03_McAdoo_Hancock_Pha_3\Eng_Docs\Drainage\04_Constr Det.dgn (Default)
ETC CAP 32083.03 OFMAC
BOROUGH OF MCADOO
Borough of McAdoo, Schuylkill County, Pennsylvania
570-914-9031
Wilkes-Barre, PA 18705
Suite 402
670 S. River Street
03/2026 reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
ESPC DETAILS
FILTER BAG INLET PROTECTION
NTS
ISOMETRIC VIEW
TYPE M INSTALLATION DETAIL
TYPE C INSTALLATION DETAIL
RUBBER BLOCK
2" x 2" x 3/4"
(1/4" NYLON ROPE)
EXPANSION RESTRAINT
RUBBER BLOCK
2" x 2" x 3/4"
(1/4" NYLON ROPE)
EXPANSION RESTRAINT
FROM INLET
REMOVAL
FOR BAG
1" REBAR
INLET GRATE
4'
LENGTH
WI
DTH OR FILTER TUBE
SANDBAG, FILTER LOG, COMPOST SOCK
6. DO NOT USE ON MAJOR PAVED ROADWAYS WHERE PONDING MAY CAUSE TRAFFIC HAZARDS.
ACCORDING TO THE PLAN NOTES.
REPAIRS SHALL BE INITIATED IMMEDIATELY AFTER THE INSPECTION. DISPOSE OF ACCUMULATED SEDIMENT AS WELL AS ALL USED BAGS
DAMAGED OR CLOGGED BAGS SHALL BE REPLACED. A SUPPLY SHALL BE MAINTAINED ON SITE FOR REPLACEMENT OF BAGS. ALL NEEDED
REPLACED WHEN HALF FULL OR WHEN FLOW CAPACITY HAS BEEN REDUCED SO AS TO CAUSE FLOODING OR BYPASSING OF THE INLET.
5. INLET FILTER BAGS SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH RUNOFF EVENT. BAGS SHALL BE EMPTIED AND RINSED OR
SIEVE.
MINIMUM TRAPEZOIDALTEAR STRENGTH OF 50 LBS. FILTER BAGS SHALL BE CAPABLE OF TRAPPING ALL PARTICLES NOT PASSING A NO. 40
4. AT A MINIMUM, THE FABRIC SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF 120 LBS, A MINIMUM BURST STRENGTH OF 200 PSI, AND A
PAVED. SIX INCH MINIMUM HEIGHT ASPHALT BERM SHALL BE MAINTAINED UNTIL ROADWAY SURFACE RECEIVES FINAL COAT.
3. ROLLED EARTHEN BERM SHALL BE MAINTAINED UNTIL ROADWAY IS STONED. ROAD SUBBASE BERM SHALL BE MAINTAINED UNTIL ROADWAY IS
INSTALLATIONS.
2. INLET PROTECTION SHALL NOT BE REQUIRED FOR INLET TRIBUTARY TO SEDIMENT BASIN OR TRAP. BERMS SHALL BE REQUIRED FOR ALL
1. MAXIMUM DRAINAGE AREA = 1/2 ACRE.
NOTES:
CONCRETE WASHOUT ALTERNATIVES
COMPOST SOCK WASHOUT
SELF-INSTALLED WASHOUT
COMPOST SOCK WASHOUT - SECTION VIEW
EROSION CONTROL POLICIES
STORMWATER PIPE CONSTRUCTION SEQUENCE
TRENCH EXCAVATION GENERAL NOTES
SIDE OF THE TRENCH.
3. THE CONTRACTOR SHALL PLACE EXCAVATED TRENCH SPOIL ON THE UPSLOPE
AND MULCHED WITHIN THE NEXT TWO CALENDAR DAYS.
CONTROL MEASURES/FACILITIES WILL BE INSTALLED, AND THE AREAS SEEDED
GRADED TO FINAL CONTOURS, APPROPRIATE TEMPORARY EROSION AND SEDIMENT
2. IF THE DAILY BACKFILLING IS DELAYED, THE DISTURBED AREA WILL BE
BE DONE AT THE END OF EACH WEEK.
WILL BE INSTALLED. SEEDING AND MULCHING OF ALL DISTURBED AREAS WILL
TEMPORARY EROSION AND SEDIMENT POLLUTION CONTROL MEASURES/FACILITIES
DISTURBED AREA WILL BE GRADED TO FINAL CONTOURS AND APPROPRIATE
1. ON THE DAY FOLLOWING PIPE PLACEMENT AND TRENCH BACKFILLING, THE
SOCK MAY BE STACKED ONTO DOUBLE 24" DIAMETER SOCKS IN PYRAMIDAL CONFIGURATION FOR ADDED HEIGHT.
COMPOST SOCKS MAY BE STACKED AND STAKED SO AS TO FORM A TRIANGULAR CROSS SECTION. 18-INCH DIAMETER FILTER
PLASTIC LINERS SHOULD BE REPLACED WITH EACH CLEANING OF THE WASHOUT FACILITY.
ACCUMULATED MATERIALS SHOULD BE REMOVED WHEN THEY REACH 75% CAPACITY.
INSPECT WASHOUT FACILITIES DAILY. DEACTIVATE AND REPAIR OR REPLACE DAMAGE OR LEAKING WASHOUTS IMMEDIATELY.
THE CLEANOUT LEVEL.
WATERTIGHT, AND APPROPRIATELY SIZED. ACCUMULATED MATERIALS MUST BE PROPERLY DISPOSED OF WHEN THEY REACH
THAT THE CONTAINERS ARE INTENDED BY THE MANUFACTURER FOR USE AS CONCRETE WASHOUT BMPS, THAT THEY ARE
PREFABRICATED WASHOUT CONTAINERS MAY BE USED AS A SUITABLE ALTERNATIVE. CARE SHOULD BE TAKEN TO ENSURE
NOTES:
EXCAVATION AREA, 7" DEEP)
DURING CONSTRUCTION (I.E. 100 GALLONS REQUIRED = 5' X 5'
USE MULTIPLES OF ABOVE DIMENSIONS FOR VOLUMES REQUIRED
GALLONS TO WASH THE HOPPER OF ONE CONCRETE TRUCK.
PROVIDE 7 GALLONS TO WASH ONE TRUCK CHUTE. PROVIDE 50
NOTES:
EXCAVATED WASHOUT
WASHOUT WATER INTO
DIRECT CONCRETE
FILTER RING
WASHOUT WATER INTO
DIRECT CONCRETE
FILTER RING
ON UPSLOPE SIDE OF
SOCK 4' MIN OVERLAP
24" COMPOST FILTER
MIN 10-MIL THICKNESS
PLASTIC SHEETING
FILTER RING HEIGHT
WATER IS 50% OF
CONCRETE WASHOUT
MAXIMUM DEPTH OF
SPACED 5' ON CENTERS
2"X2"X36" WOOD STAKES
MIN 10-MIL THICKNESS
PLASTIC SHEETING
FILTER SOCK
24" COMPOST
EXCAVATION DEPTH
ON CENTERS
STAKES SPACED 5'
2"X2"X36" WOOD
EXCAVATION DIMENSIONS
GALLONS
10'
10'
5'
5'
LENGTH
10'
10'
5'
5'
WIDTH
0.80"
0.10"
3.20"
0.50"
DEPTH
NTS
NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THE SITE.
PENNSYLVANIA CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE CONTRACTOR SHALL
AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25
THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS
RECYCLING
INSTALLED WILL BE REQUIRED.
CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE
REMULCHING, AND RENETTING, MUST BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENT
MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL
PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL BMPS
UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE MAINTAINED
INSPECTIONS.
AVAILABLE TO THE INSPECTOR-IN-CHARGE COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE
INCLUDE INSPECTIONS OF ALL BMP FACILITIES. THE OPERATOR WILL MAINTAIN AND MAKE
ARE IMPLEMENTED, OPERATED, AND MAINTAINED PROPERLY AND COMPLETELY. MAINTENANCE SHALL
UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE OPERATOR SHALL ASSURE THAT THE BMPS
BMPS TO ELIMINATE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
ACCELERATED EROSION AND OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE
IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
IN TOPSOIL STOCKPILES.
SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED
SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP
MAINTENANCE
STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN.
SLOPES 3:1 AND STEEPER.
MULCH WITH MULCH CONTROL NETTING OR EROSION CONTROL BLANKETS MUST BE INSTALLED ON ALL
HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER ACRE.
ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS.
FINISHED GRADE OR WHICH WILL NOT BE REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN
TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT
WHICH WILL BE REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE
APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND
AREAS DISTURBED BY THE ACTIVITIES. DURING NON-GERMINATING PERIODS, MULCH MUST BE
IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR SHALL STABILIZE ANY
TEMPORARY AND PERMANENT STABILIZATION
AT ALL TIMES.
A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT SITE
WATER RESOURCES, CHAPTER 102, EROSION CONTROL.
ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, APPENDIX 64, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF
THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE
PUMPED WATER FILTER BAG DISCHARGING OVER NON-DISTURBED AREAS.
ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A
STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER.
GENERAL NOTES
WITH INSTRUCTIONS OF THE COUNTY CONSERVATION DISTRICT:
BE REQUIRED TO CONFORM WITH THE FOLLOWING AS APPLICABLE AND IN ACCORDANCE
OF PENNSYLVANIA TO CONTROL EROSION, THE CONTRACTOR SHALL, AT HIS EXPENSE,
IN ACCORDANCE WITH THE CURRENT POLICIES AND PRACTICES IN THE COMMONWEALTH
FILTER BAG
FILTER BAG
WELL VEGETATED, GRASSY AREA
DISCHARGE HOSE
PUMP
INTAKE HOSE
CLAMPS
(RECOMMENDED)
HEAVY DUTY LIFTING STRAPS
INTAKE HOSE
PUMP
CLAMPS
DISCHARGE HOSE
WELL VEGETATED, GRASSY AREA
PLAN VIEW
ELEVATION VIEW
PUMPED WATER FILTER BAG
NTS
MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE
WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN
AOS% RETAINED
UV RESISTANCE
MULLEN BURST
PUNCTURE
GRAB TENSILE
AVG WIDE WIDTH STRENGTH
PROPERTY
ASTM-D-4751
ASTM-D-4355
ASTM-D-3786
ASTM-D-4833
ASTM-D-4632
ASTM-D-4884
TEST METHOD
80 SIEVE
70%
350 PSI
110 LB
205 LB
60 LB/IN
MINIMUM STANDARD
CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL
SCREENED.
BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR ½ THE MAXIMUM SPECIFIED
RECOMMENDED FOR THIS PURPOSE.
SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER
AREA IS NOT AVAILABLE.
WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY
BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST
STEEPNESS.
AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE
GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE
STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES
UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER
STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO
REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE
FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE
PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME ½
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL
7.
6.
5.
4.
3.
2.
1.
NOTES:
SLIDING AND OTHER MOVEMENTS.
SUFFICIENT TO RESIST ACCELERATED EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST
70% PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY
AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM
BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS MUST BE STABILIZED IMMEDIATELY. AN
12.AFTER FINAL SITE STABILZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST
11.PERFORM FINAL GRADING AND/OR ROADWAY RESTORATION AND STABILIZE.
USED AS A TEMPORARY COVER MEASURE.
10.BACKFILL TRENCH AND PLACE TEMPORARY ROADWAY OR SEEDING AS NECESSARY. MULCHING MAY ALSO BE
MUST BE BACKFILLED WITHIN THE SAME WORKING DAY.
9.PLACE DRAINAGE IMPROVEMENTS. OPEN EXCAVATIONS ARE NOT PERMITTED WITHIN THE ROADWAY AND
8. PLACE AGGREGATE BEDDING IN COMPACTED 6" LIFTS.
SHOULD BE VERIFIED PRIOR TO PIPE PLACEMENT TO ENSURE ADEQUATE SLOPE AND COVER.
ENCOUNTERED, THE TRENCH SHALL BE CARRIED 6" BELOW THE PIPE AND BEDDING EXTENDED. CONFLICTS
7. EXCAVATE TRENCH STARTING FROM THE DOWNSTREAM END AND WORK UPSTREAM. WHERE ROCK IS
REVEALED/BROKEN EDGES SHALL BE CUT OUT AND SQUARED.
6. PAVEMENT CUTS SHALL BE IN A NEAT AND UNIFORM FASHION FORMING STRAIGHT LINES.
DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMPS.
5. EROSION AND SEDIMENT BMPS MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE
LOCATIONS.
NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM, INC. AT 1-800-242-1776 FOR BURIED UTILITIES
4. AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE OPERATOR SHALL
MUST COORDINATE CHANGES WITH THE ENGINEER.
3. BEFORE INITIATING ANY REVISIONS TO THE EROSION AND SEDIMENT CONTROL PLAN, THE OPERATOR
LOCATIONS.
AND MAINTAINED FOR ALL SOIL AND/OR ROCK SPOIL AND BORROW AREAS, REGARDLESS OF THEIR
2. THE OPERATOR SHALL ASSURE THAT THE EROSION AND SEDIMENT CONTROL PLAN IS BEING IMPLEMENTED
COMPLETELY IMPLEMENTED.
1. THE OPERATOR SHALL ASSURE THAT THE EROSION AND SEDIMENT CONTROL PLAN IS PROPERLY AND
SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE.
EACH STAGE SHALL BE COMPLETED BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE.
HANCOCK STREET DRAINAGE - PHASE III
SCHUYLKILL COUNTY CDBG PROGRAM
Sheet No.:Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.:
32083.03 cpezak 03\25\2026 08:11:35 Y:\Pennsylvania\32000S\32083.03_McAdoo_Hancock_Pha_3\Eng_Docs\Drainage\05_ES Det.dgn (Default)
ETC CAP 32083.03 OFMAC
BOROUGH OF MCADOO
Borough of McAdoo, Schuylkill County, Pennsylvania
570-914-9031
Wilkes-Barre, PA 18705
Suite 402
670 S. River Street
03/2026 reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
| 01_Cover |
| 02_GenNotes |
| 03_Plan |
| 04_Constr Det |
| 05_ES Det |
File details come from the government source that posted it. Updated .