3-IFB Specs New Operations Center Renovations-General.pdf
PDF 20 MB Posted
- Attached to
- New Operations Center Renovations - General
- Solicitation number
- 2023-600-101-5 (2026-035)
- Issued by
- Allegheny County, Pennsylvania
About this file
Summary: Invitation for Bids for New Operations Center Renovations - General Contract
This is a comprehensive bidding and contract documentation package issued by the Pittsburgh Water and Sewer Authority for phased construction at their Operations Center under a multi-prime contracting structure. The General Contract scope encompasses site work, subgrade preparation, utilities coordination, layout and staking, temporary fencing, mine grouting and geopier installation, work related to net zero-ready passive house goals, project coordination across trades, permitting, bonding, and management of scheduling and scope coordination with other prime contractors (Electrical, HVAC, and Plumbing). The mandatory pre-bid meeting is scheduled for March 11, 2026, at 1:00 p.m., followed by a site walk, with vendor questions due by March 17, 2026, at 4:00 p.m., and sealed bids due on March 24, 2026, at 4:00 p.m. The contract includes specific milestones with Phase 1 completion due at 110 calendar days from Notice to Proceed, Phase 2 at 153 days, Substantial Completion at 153 days, and Final Completion at 169 days. Liquidated damages are assessed at $1,000 per day for failure to meet Substantial Completion, final completion, and milestone deadlines.
The contract is structured on a stipulated lump-sum price basis with fixed pricing throughout the contract term, excluding economic price adjustments. The bid security is set at 10 percent of the maximum bid price, and a performance bond and payment bond are required, each in an amount equal to or exceeding the Contract Price. The Authority's Supplier Diversity Program goals require 10 to 25 percent participation from certified Minority Business Enterprises, Women Business Enterprises, Disadvantaged Business Enterprises, Small Business Enterprises, Veteran Business Enterprises, Disability-Owned Business Enterprises, and LGBTQ Business Enterprises, with all bids requiring supporting documentation and good faith effort waivers if goals cannot be met. The contract includes prevailing wage requirements as determined by Pennsylvania's Prevailing Wage Act, comprehensive safety and environmental compliance plans, and an experience modification rating requirement of lower than 1.15. All submittals, including schedules, shop drawings, and payment applications, must be provided electronically through the Owner's project management system (e-Builder), and all payments are to be made via Automated Clearing House electronic transfer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS FOR
NEW OPERATIONS CENTER RENOVATIONS
PROJECT NO. 2023-600-101-5 - GENERAL
FEBRUARY 2026
THIS PAGE INTENTIONALLY LEFT BLANK
THE PITTSBURGH WATER AND SEWER AUTHORITY
Project No. 2023-600-101-5 - GENERAL
FEBRUARY 2026 Table of Contents
Version2025.10
00010 - 1
DOCUMENT 00010
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 00 – BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF
THE CONTRACT
Professional Engineer / Architect Signatory Page
Advertisement
C-200 Instructions to Bidders for Construction Contracts
C-451 Qualifications Statement
C-410 Bid Form
C-520 Agreement
C-700 General Conditions
C-800 Supplementary Conditions – Modifications to General Conditions
C-940 Construction Change Authorization
Supplier Diversity Program
Wage Rate Determination Schedule
Performance Bond
Bid Bond
Labor and Material Bond
Conflict of Interest Compliance Statement
Statement of Affiliation
DIVISION 01 - GENERAL REQUIREMENTS
01045 Environmental Compliance and Conduct
01100 Summary
01200 Price and Payment Procedures
Prevailing Wage Requirements
01250 Substitution Procedures
01300 Administrative Requirements
01321 Construction Progress Schedule
01330 Submittal Procedures
01350 Health and Safety
01400 Quality Requirements
01500 Temporary Facilities and Controls
01530 Environmental Controls and Management
01600 Product Requirements
01730 Execution
01741 Construction Waste Management and Disposal
01730 Closeout Procedures
01782 Operation and Maintenance Data
01783 Project Record Documents
DIVISION 02 – SITE CONSTRUCTION
02410 Demolition
00010 - 2
DIVISION 03 – CONCRETE
02466 Helical Foundation Piles
03100 Concrete Forming and Accessories
03200 Concrete Reinforcing
33000 Cast-In-Place Concrete
03930 Concrete Floor Flash Patching
03931 Miscellaneous Cast-In-Place Concrete
DIVISION 04 – MASONRY
04051 Masonry Mortaring and Grouting
04200 Unit Masonry
04272 Cavity Wall Unit Masonry
DIVISION 05 – METALS
05120 Structural Steel Framing
05210 Steel Joist Framing
05400 Cold-Formed Metal Framing
05500 Metal Fabrications
05510 Metal Stairs
05521 Pipe and Tube Railings
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06105 Miscellaneous Rough Carpentry
06402 Architectural Wood Casework
06416 Countertops
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07180 Traffic Coatings
07413 Insulated Metal Wall Panels
07620 Sheet Metal Flashing and Trim
07842 Firestopping
07920 Joint Sealants
DIVISION 08 - OPENINGS
08067 Door Hardware Schedule
08110 Hollow Metal Doors and Frames
08211 Flush Wood Doors
08311 Access Doors and Panels
08331 Overhead Coiling Doors
08411 Aluminum-Faced Storefronts
08450 All Glass Entrances
08585 Pass Windows
08710 Door Hardware
08800 Glazing
DIVISION 09 - FINISHES
09056 Common Work Results for Floor Preparation
09250 Gypsum Board Assemblies
00010 - 3
09310 Tiling
09512 Acoustical Ceilings
09650 Resilient Flooring
09661 Static Control Resilient Flooring
09681 Tile Carpeting
09720 Wall Coverings
09911 Exterior Painting
09912 Interior Painting
09973 Concrete Floor Sealer
DIVISION 10 - SPECIALTIES
10101 Visual Display Settings
10155 Phenolic Toilet Compartments
10159 Stainless Steel Toilet Compartments
10411 Emergency Key Cabinets
10431 Panel Signage
10505 Metal Lockers
10520 Fire Protection Specialties
10605 Wire Mesh Partitions
10655 Glazed Demountable Partitions
10801 Toilet, Bath, and Laundry Accessories
DIVISION 11 - EQUIPMENT
11190 Miscellaneous Equipment
11451 Residential Appliances
11614 Curtain Panel Assemblies
DIVISION 12 - FURNISHINGS
12494 Window Shades
DIVISION 13 – FIRE SUPRESSION
13901 Common Work Results for Fire Suppression
13902 Common Motor Requirement for Fire Suppression Equipment
13903 General - Duty Valves for Water Based Fire Suppression Piping
13904 Identification for Fire Suppression Piping and Equipment
13905 Fire Suppression Sprinkler Systems
DIVISION 14 – CONVEYING EQUIPEMENT (NOT USED)
DIVISION 15 – PLUMBING AND HEATING, VENTILATION AND AIR CONDITIONING (HVAC)
15401 Common Work Results for Plumbing
15402 Common Motor Requirement for Plumbing Equipment
15403 Expansion Fittings and Loops for Plumbing Piping
15404 Sleeves and Sleeve Seals for Plumbing Piping
15405 Meters and Gauges for Plumbing Piping
15406 General -Duty Valves for Plumbing Piping
15407 Hangers and Supports for Plumbing Piping and Equipment
15408 Identification for Plumbing Piping and Equipment
00010 - 4
15409 Plumbing Piping and Equipment Insulation
15410 Plumbing Piping
15411 Plumbing Piping Specialties
15412 Domestic Water Pumps
15413 Sanitary Waster Piping Specialties
15414 Sanitary Waste Interceptors
15415 General - Service Compressed Air Systems
15416 Plumbing Equipment
15417 Plumbing Fixtures
15418 Emergency Plumbing Fixtures
15501 Fuel Fired Unit Heaters
15701 Common Work Results for HVAC
15702 Common Motor Requirements for HVAC Equipment
15703 Sleeves and Sleeve Seals for HVAC Piping
15704 Hangers and Supports for HVAC Piping and Equipment
15706 Identification for HVAC Piping and Equipment
15708 Duct Insulation
15709 HVAC Piping and Equipment Insulation
15710 Hydronic Piping
15711 Packaged Air to Air Energy Recovery Units
15712 Packaged Rooftop Air Conditioning Units
15713 Dedicated Outdoor Air Units
15714 Split System Air Conditioning, Heat Pumps, and Furnaces
15715 Unit Heaters and Convectors
15801 HVAC Ducts
15802 Air Duct Accessories
15803 HVAC Fans
15804 Air Outlets and Inlets
15805 Air Terminal Units
15901 Instrumentation and Control Devices for HVAC
15902 Direct Digital Control System for HVAC
15903 Vibration Controls for HVAC
15950 Testing, Adjusting, and Balancing for HVAC
DIVISION 16 - ELECTRICAL
13701 Access Control
13702 Fire Detection and Alarm
16051 Common Work Results for Electrical
16052 Electrical Demolition
16054 Low Voltage Electrical Power Conductors and Cables
16055 Grounding and Bonding for Electrical Systems
16056 Hangers and Supports for Electrical Systems
16057 Conduit for Electrical Systems
16058 Boxes for Electrical Systems
16059 Identification for Electrical Systems
16060 Power System Studies
16100 Wiring Connections
16402 Low Voltage Transformers
00010 - 5
16404 Panelboards
16405 Wiring Devices
16406 Enclosed Switches
16407 Variable Frequency Motor Controllers
16501 Lighting Control Devices
16502 Interior Lighting
16503 Exterior Lighting
16701 Hangers and Supports for Communication Systems
16702 Conduit for Communications Systems
16703 Communications Equipment Room Fittings
16704 Structured Cabling
ATTACHMENTS
ATTACHMENT A – PITTSBURGH WATER AND SEWER AUTHORITY POLICIES
ATTACHMENT B – ENVIRONMENTAL COVENANT FOR 1080 RIVER AVENUE
ATTACHMENT C – CITY OF PITTSBURGH DOMI RIGHT-OF-WAY PROCEDURES MANUAL
END OF SECTION
00010 - 6
DIVISION 00 – BIDDING REQUIREMENTS, CONTRACT FORMS, AND
CONDITIONS OF THE CONTRACT
New Operations Center Renovation Architect No. 247406.02 Owner No. 2023-600-101-5/6/7/8
CONSTRUCTION DOCUMENTS
SEALS PAGE
00010 - 1
DOCUMENT 00010
1.1 DESIGN PROFESSIONALS OF RECORD
Architect: Jeffery Wetzel - Divisions 01-14
Structural Engineer: Nathaniel Babyak - Divisions 02, 03, 04 and 05
Mechanical / Plumbing / Fire Suppression Engineer: Elliott Burdwood - Divisions 13 and 15
New Operations Center Renovation Architect No. 247406.02 Owner No. 2023-600-101-5/6/7/8
CONSTRUCTION DOCUMENTS
00010 - 2
Electrical Engineer: Alex Clarkson – Division 16
END OF DOCUMENT 00010
The Pittsburgh Water and Sewer Authority
Advertisement
Invitation for Bids (IFB) New Operations Center Renovations
Project No. 2023-600-101-5 - General
Mandatory Pre-Bid Meeting Date: March 11, 2026 at 1:00 p.m., 1200 Penn Ave. Pittsburgh PA 15222 followed by a site walk at 1260 River Ave. Pittsburgh PA 15212
Vendor Questions Due Date: March 17, 2026 by 4:00 p.m.
Bid Due Date: March 24, 2026 at 4:00 p.m.
Pittsburgh Water is requesting bids for phased construction at their Operations Center under a multi-prime bid consisting of General, Electrical, HVAC, and Plumbing contracts. The General Contract scope of work includes but is not necessarily limited to: site work, subgrade preparation, utilities on the site, and utilities up to the building; layout and staking; installation of temporary fencing; utility coordination;
mine grouting and geopier installation; work related to net zero ready passive house goals; project coordination as it involves other trades; obtaining permits; securing bonds as required by Owner;
coordination with other prime contractors including managing the scheduling of construction activities of the prime contractors; and management of scope of work impacted by other prime contractors.
Further information regarding this IFB can be viewed and downloaded at:
https://pgh2o.bonfirehub.com/opportunities/223851
EJCDC® C-200, Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
FEBRUARY 2026
Version 2025.10
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the controlling Laws and Regulations.
INSTRUCTIONS TO BIDDERS
FOR CONSTRUCTION CONTRACTS
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
Version 2025.10
Copyright © 2013:
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
The copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.
NOTE: EJCDC publications may be purchased at www.ejcdc.org, or from any of the sponsoring organizations above.
http://www.nspe.org/ http://www.acec.org/ http://www.asce.org/ http://www.ejcdc.org/
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
FEBRUARY 2026
Version 2025.10
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page
ARTICLE 1 – Defined Terms
ARTICLE 2 – Copies of Bidding Documents
ARTICLE 3 – Qualifications of Bidders
ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
ARTICLE 5 – Bidder’s Representations
ARTICLE 6 – Pre-Bid Conference
ARTICLE 7 – Interpretations and Addenda
ARTICLE 8 – Bid Security
ARTICLE 9 – Contract Times
ARTICLE 10 – Liquidated Damages
ARTICLE 11 – Substitute and “Or-Equal” Items
ARTICLE 12 – Subcontractors, Suppliers, and Others
ARTICLE 13 – Preparation of Bid
ARTICLE 14 – Basis of Bid
ARTICLE 15 – Submittal of Bid
ARTICLE 16 – Modification and Withdrawal of Bid
ARTICLE 17 – Opening of Bids
ARTICLE 18 – Bids to Remain Subject to Acceptance
ARTICLE 19 – Evaluation of Bids and Award of Contract
ARTICLE 20 – Bonds and Insurance
ARTICLE 21 – Signing of Agreement
ARTICLE 22 – Sales and Use Taxes
ARTICLE 23 – Protest of Award
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
FEBRUARY 2026
Version 2025.10
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Procurement Office – The office from which the Bidding Documents are to be issued.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Procurement Office in the number and format stated in the advertisement or invitation to bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within ten (10) days of Owner’s request, Bidder shall submit written evidence establishing its qualifications as follows:
A. Evidence of Bidder’s authority to do business in the state where the Project is located.
B. Bidder’s state or other contractor license number, if applicable.
C. Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others.”
D. Other required information regarding qualifications:
1. Listings of equipment owned and equipment to be rented by Bidder that would be used in performing the Contract;
2. Identification of Bidder’s facility or facilities that would be used in performing the Contract;
3. Five examples of Bidder’s experience in performing contracts similar in type, scope, and value over the last five (5) years;
4. Five (5) references from sources knowledgeable about Bidder’s performance on similar contracts;
5. A recent audited financial statement;
6. A complete list of ongoing projects including present commitments of proposed management and on-site supervision;
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5
FEBRUARY 2026
Version 2025.10
7. Bidder’s Experience Modification Rating calculated by the Pennsylvania Compensation Rating Bureau for the last three (3) years;
8. Notices of Violations or Administrative Orders issued to Bidder or any of its owners, directors, or officers;
9. Any accidents at job sites that were reported to federal, state, county or local health and safety officials involving the Bidder;
10. Bidder’s workplace safety ratings;
11. A resume for the individuals who would serve as Bidder’s Project Manager and resident superintendent, if the Contract were awarded to Bidder; and
12. Bidder’s Dun & Bradstreet D-U-N-S® Number.
E. Other documentation supporting Bidder’s qualifications, not exceeding five (5) pages.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications. However, Owner may rely on the completeness of the Bidder’s submission, and is not required to conduct an investigation into the Bidder’s qualifications or responsibility.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
3.05 Supplier Diversity Program (SDP)- MBE/WBE/DBE/SBE/VBE/SDVBE/DOBE/LGBTQBE Solicitation and Commitment
A. Supplier Diversity Participation - The Authority’s current goal for Minority Business Enterprise (“MBE”), Women Business Enterprise (“WBE”), Disadvantaged Small Business Enterprise (“DBE”), Small Business Enterprises (“SBE”), Veteran Business Enterprise (“VBE”)/Service Disabled-Veteran Business Enterprises (“SDVBE”), Disability-Owned Business Enterprise (“DOBE”) and LGBTQ Business Enterprise (“LGBTQBE”) participation is between ten percent (10%) to twenty-five percent (25%) of the total dollar value of the Authority’s contracts. All Bids for such contracts must be accompanied by Exhibit II- MBE/WBE/DBE/SBE/VBE/SDVBE/DOBE/LGBTQBE Solicitation and Commitment Statement, demonstrating a good faith effort to meet said goals, or a detailing of why the MBE/WBE/DBE/SBE/VBE/SDVBE/DOBE/LGBTQBE participation goals could not be met. In addition, all required letters of commitment and copies of current certifications shall be submitted with the Bid
B. MBE/WBE/DBE/SBE/VBE/SDVBE/DOBE/LGBTQBE Utilization Report: In entering into a Contract with Owner, the Contractor agrees to submit detailed MBE/WBE/DBE/SBE/VBE/SDVBE/DOBE/LGBTQBE Utilization Reports no later than ten (10) days following each progress payment and final payment. The report shall include but not be limited to: Project number; Project title; Contractor’s name; Contract Price; Contract Times; Contractor Pay Application (CPA) number and period; current CPA amount, total
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6
FEBRUARY 2026
Version 2025.10 amount of Contract Price paid to date; MBE/WBE/DBE/SBE/VBE/SDVBE/DOBE/LGBTQBE company name and status as MBE, WBE, DBE, SBE, VBE/SDVBE, and/or DOBE; role of MBE/WBE/DBE/SBE/VBE/SDVBE as Subcontractor, Supplier, or other; and amount paid to date to the MBE,WBE, DBE, SBE, VBE/SDVBE, and/or DOBE/LGBTQBE.
3.06 Bidder will be required to have a 3-year average EMR lower than 1.15 (without rounding).
Failure to obtain such rating will disqualify Bidder receiving an award of the Contract.
3.07 Bidder will provide Owner with a statement of affiliation. The statement of affiliation shall include:
A. A description of any contractual or business relationship with the City of Pittsburgh or Owner within the past three years; and
B. An identification of the Bidder’s principals, owners, partners, or shareholders, or if the Bidder is a public corporation, the officers, members of the board of directors and shareholders holding more than three percent of the corporate stock.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site (or respective sites) is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, utilities, rights of way, are to be obtained and paid for by Contractor as a part of the cost of the work.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. Those reports known to Owner, if any, of explorations and tests of subsurface conditions at or adjacent to the Site.
b. Those drawings known to Owner, if any, of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. Reports and drawings known to Owner, if any, relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in any such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request electronically at no cost. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7
FEBRUARY 2026
Version 2025.10 any interpretation or conclusion that the Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
4. Geotechnical Baseline Report: The Bidding Documents may contain a Geotechnical Baseline Report (GBR). The GBR describes certain select subsurface conditions that are anticipated to be encountered by Contractor during construction in specified locations (“Baseline Conditions”). The GBR is a Contract Document. Excavation is unclassified and the contractor owns, as a part of the cost of the work, excavation to the elevations shown on the Contract Documents. Any additional excavation requested by the Owner or Engineer will be paid for by either unit price if established in the bid form or through a formal change order.
The Baseline Conditions in the GBR are intended to reduce uncertainty and the degree of contingency in submitted Bids. However, Bidders cannot rely solely on the Baseline Conditions. Bids should be based on a comprehensive approach that includes an independent review and analysis of the GBR, all other Contract Documents, Technical Data, other available information, site visits by Bidders and observable surface conditions. Not all potential subsurface conditions are baselined.
Nothing in the GBR is intended to relieve Bidders of the responsibility to make their own determinations regarding construction costs, bidding strategies, and Bid prices, nor of the responsibility to select and be responsible for the means, methods, techniques, sequences, and procedures of construction, and for safety precautions and programs incident thereto.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8
FEBRUARY 2026
Version 2025.10
B. Bidder is not required to but may at its expense if approved in advance by the Owner conduct subsurface testing, or investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
4.06 Scope of Work:
A. Bidders should understand that contracts for necessary repair, maintenance, and minor extension to Owner’s existing facilities cannot be accurately estimated or planned in advance, and may be of an emergency nature. The Owner shall determine the repair, maintenance, replacement, or minor extension Work to be carried out under the Contract, and shall direct same, and a Bidder agrees to accept such decisions as final and binding.
4.07 Location of Work:
A. Where the Project is for maintenance and repair or other Work on non-site specific, existing facilities of Owner, Bidders should understand that the amount or the location of the Work cannot be accurately predicted or described. Bidders must assume that Work may be required anywhere in Owner’s service area and should bid accordingly.
4.08 Quantities:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9
FEBRUARY 2026
Version 2025.10
A. Any quantities shown as “Estimated Annual Quantities” are merely projections based on available historic data. Owner does not represent or warrant that the quantities purchased will correspond with those estimated, but reserves the right to purchase its requirements, which may be amounts either lesser or greater than the Estimated Annual Quantities. Unless otherwise explicitly stated in the Bidding Documents, there are no maximum or minimum limits placed upon the services or goods that the Successful Bidder is to provide, and any estimated annual quantities shall not be binding upon Owner.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. Examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. Where applicable to the scope of Work, visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. Become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. Carefully study any and all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. As applicable to the scope of Work, consider the information known to Bidder itself;
information commonly known to contractors doing business in the locality of the Site;
information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. Agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. Become aware of the general nature of any work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 10
FEBRUARY 2026
Version 2025.10
H. Promptly give Construction Manager and Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
J. Agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents;
K. Agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that it is not currently debarred by Owner, the City of Pittsburgh, the Commonwealth of Pennsylvania, the federal government, or any state or local government or governmental agency or authority.
L. The Bidder acknowledges that it has received the Owner’s Code of Ethics, Code of Conduct, No Discrimination/No Harassment/No Retaliation Policy, and Whistleblower Policy and shall fully obey and comply with the Owner’s Code of Ethics, Code of Conduct, No Discrimination/No Harassment/No Retaliation Policy, and Whistleblower Policy.
M. Bidder covenants and represents that neither it, nor any officer or principal of its firm, has, or shall acquire any investment, income, business entity, interest in real property, or other interest, directly or indirectly, which would conflict in any manner with the interests of the Owner, hinder Bidder’s performance under this Agreement, or be affected in any manner or degree by performance of the Work hereunder.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A pre-Bid conference will be held only if specifically required by the Bidding Documents. The conference will the held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the Project. The Procurement Office will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. If the invitation or advertisement states that the pre-bid meeting is mandatory, then the failure to attend or to sign the attendance register at such a mandatory conference shall disqualify the Bidder on the Contract without any further notice from Owner or Engineer.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer the Procurement Office in writing. Interpretations or clarifications considered necessary by the Procurement Office in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding and become part of the bidding documents
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 11
FEBRUARY 2026
Version 2025.10 and contract. Oral and other interpretations or clarifications will be without legal effect and are not a binding part of the bidding documents or contract.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
7.03 All communication of any nature with respect to this IFB shall be addressed through the Euna Procurement Portal. Prospective firms and their staff are prohibited from communicating with Owner officials, staff, members of Owner Board of Directors regarding this IFB. Such contact is prohibited from the time the IFB is released until the selection results are publicly announced.
Violation of this provision may lead to disqualification of the firm’s submittal for consideration.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10%) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and
6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within fifteen (15) days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner for 90 days after the Bid opening or until Notice to Proceed is issued to the successful Bidder, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven (7) days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which milestones are achieved and the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a specified Contract Milestone, Substantial Completion, or final completion of the Work in accordance with the Progress Schedule or Contract Times, are set forth in the Agreement.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 12
FEBRUARY 2026
Version 2025.10
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Owner or Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder to the Procurement Office at least fifteen (15) days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder.
Bidder is responsible to clearly and specifically demonstrate that the product being offered is an acceptable equal or substitute and to provide sufficient descriptive literature, catalog cuts, and technical data to enable Engineer and Owner to determine if the product offered meets the requirements of the Bidding Documents. Engineer’s and Owner’s decision of approval or disapproval of a proposed item will be final. If Owner approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
12.03 All Bidders shall with the Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the Work.
Any firm or individual that would be a sub-contractor or supplier of service shall be searched on the Federal SAM system (http://www.sam.gov). The apparent Successful Bidder shall submit a paper copy of all SAM search results and certifications. The apparent Successful Bidder shall not knowingly utilize a firm or individual listed on SAM as debarred, suspended, proposed for debarment or otherwise ineligible.
Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity as set forth in C-451 Qualification Statement. If Owner, Construction Manager or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute.
12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, https://linkprotect.cudasvc.com/url?a=http%3a%2f%2fwww.sam.gov&c=E,1,GJSbtVs270DpC4cEFLHkZ6_NS9UJm5XckSNVu3arubBUJ6Ecv7ax_X7IgNt8yF_GFGL-xb7H-_KxSZR4QgQVhNRHfcP6zsLtvG4XxtPXUxap0mGyuh0R&typo=1
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 13
FEBRUARY 2026
Version 2025.10 or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
C. Failure to use the Bid Form, failure to complete the Bid Form as required, or unauthorized modifications or additions to the Bid Form may be cause for rejection of the Bid as non-responsive. Owner may, in its sole discretion, reject any or all Bids with these deficiencies.
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
13.02.1 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown.
13.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
13.04 A Bid by an individual shall show the Bidder’s name and official address.
13.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
13.06 All names shall be printed in ink below the signatures.
13.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be provided by the bidder.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 14
FEBRUARY 2026
Version 2025.10
13.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s contractor license number, if any, shall also be shown on the Bid Form.
13.10 Bidders operating a business under a fictitious name are required to submit the Bid and execute the Agreement in the name of the entity trading and doing business as the fictitious name. A Successful Bidder operating under a fictitious name is required to present Owner with evidence of registration of such name in accordance with Laws and Regulations prior to execution of the Agreement.
13.11 No Bidder shall offer more than one (1) Bid for each Contract or price for each item. If a Bidder submits more than one (1) Bid for each Contract or price for any item, none of the Bidder’s Bids will be considered for award.
ARTICLE 14 – BASIS OF BID
14.01 Lump Sum
A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form.
14.02 Allowances
A. For allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
14.03 Pricing:
A. Unless an economic price adjustment is specifically stated in and/or permitted by the Bidding Documents, the Contract is for fixed prices, and Owner will not allow for the escalation of prices during the Contract term. Such statements as “interest charges applied on accounts thirty (30) days or older” or “prices subject to revision” are considered escalation clauses. Except where specifically permitted, Bids shall not contain any information implying that the Bidder’s prices are not firm through the duration of the Contract, and any reference in documents submitted with the Bid that indicates that the prices are not firm may be cause for rejection of the Bid in its entirety.
B. Prices should be stated in units of quantity as specified in the Solicitation. Bid prices shall be for complete installation or delivery ready for the Authority’s use, and shall include all applicable shipping, freight, and installation charges.
C. Bidders shall supply with their Bid copies of catalogue cut sheets and price lists as required by the Bidding Documents. When price lists are required with a Bid, price lists are submitted for the sole purpose of providing an audit reference for the various items on the price list and the manufacturer’s price for each item. Unless otherwise specifically stated in the Bidding Documents, prices shall remain firm for the duration of the Contract, regardless of any pricing changes by the manufacturer. Any reference to any terms and conditions that
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 15
FEBRUARY 2026
Version 2025.10 may appear on any price list, such as F.O.B. shipping point or prices subject to change, will not be part of any Contract with successful Bidder(s) and will be disregarded by Owner.
ARTICLE 15 – SUBMITTAL OF BID
15.01 A Bid shall be received no later than the date and time prescribed in Euna Procurement and shall be accompanied by bid security and other required documents. Bids will be received electronically via the Euna Procurement Portal.
Bids shall not be accepted in person, by U.S. Mail, by private courier service, via oral or e-mail communication, telephone or fax transmission.
Bids must be submitted in the format described in this IFB. To be considered, the bid must respond to all requirements in the IFB. The contents of this IFB shall become part of any contract(s) entered into as a result of this IFB.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
16.04 A Bidder that is permitted to withdraw a Bid may not supply any material or labor to, or perform any subcontract or other work for, the Successful Bidder; nor may the withdrawing Bidder otherwise benefit, directly or indirectly, from the performance of the Project for which the withdrawn Bid was submitted. Reasonable grounds for supposing that any Bidder is interested in more than one Bid for the same item or Contract will be considered sufficient cause for rejection of all Bids in which the Bidder is interested. Persons colluding in the submission of Bids in violation of this Paragraph shall be barred from any and all Owner contracts until formally reinstated by Owner.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place so indicated in the advertisement or in the invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 16
FEBRUARY 2026
Version 2025.10
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any Bid and/or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
19.02 If Owner awards the contract for the Work to one or multiple Bidders, such award shall be to the responsible Bidder or Bidders submitting the lowest responsive Bid or Bids (as applicable).
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may…