3- Experience_Questionaire.doc
DOC document 52 KB Posted
- Solicitation number
- 1240LU25Q0041
- Issued by
-
Department of Agriculture Forest Service
About this file
The document is an Experience Questionnaire form for a federal contract related to fence reconstruction on the Beaverhead-Deerlodge National Forest. The form requires contractors to provide detailed information about their organizational capacity, including minimum and maximum number of employees, equipment availability, and progress rates. Section 10 requests a listing of principal individuals' experience, with details on their current positions, years of experience, and the magnitude and type of work they have performed.
The questionnaire is part of a solicitation (1240LU25Q0041) issued by the Department of Agriculture Forest Service for a disaster relief fence reconstruction project. The contract scope involves removing and reconstructing 4-wire fencing, including specific pay items for mobilization, wire post and stay removal/replacement, brace removal/replacement, and gate installation (14ft swing gate and 12ft wire gate). The Forest Service will provide fence materials, and the contractor is responsible for furnishing labor, equipment, tools, transportation, and supplies necessary to complete the project successfully.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Example Fence Segment Condition Pictures.pdf | ||
| Questions and Answers.pdf | ||
| 5- Big hollow disaster fence location.pdf | ||
| 5 Big hollow disaster fence location.docx | DOCX document | |
| 1- Plans signed.pdf | ||
| 2- Fence Schematic.pdf | ||
| 0- NRE Construction RFQ 20250611.pdf | ||
| 4- WD MT20250075 07182025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9. Organization and work that will be available for this project:
a. (1) Minimum number of employees:__________ and a (2) Maximum number of employees:__________
b. Are employees regularly on your payroll? _____ Yes _____ No
c. Specify equipment available for this contract:_______________________________________________
d. Estimate rate of progress below (such as 2.0 acres/man/day):
(1) Minimum progress rate: __________ and (2) Maximum progress rate: __________
10. List below the experience of the principal individuals of your business:
| Individual’s Name |
| Present Position |
| Years of Exp. |
| Magnitude and Type of Work |
11. Remarks—Specify Box Numbers (Attach sheets if extra space is needed to fully answer any above questions):
CERTIFICATION
I certify that all of the statements made by me are complete and correct to the best of my knowledge and that any persons named as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.
12a.Certifying Official’s Name and Title
| 12b. Signature (Sign in Ink) |
| 13. Date |
File details come from the government source that posted it. Updated .