3-ESC Plan 10-22-2025.pdf
PDF 4 MB Posted
- Attached to
- Sherrod Hill Road Bridge Replacement
- Solicitation number
- Not on record
- Issued by
- Erie County, Pennsylvania
About this file
The document is a set of engineering design plans for the Sherrod Hill Road Bridge Replacement project located in Elk Creek Township, Erie County, prepared by Deiss & Halmi Engineering, Inc. The project involves a comprehensive bridge and erosion control plan, featuring detailed site plans, streambank protection details, cross-sections, and construction specifications. The design includes multiple technical drawings showing existing conditions, proposed site layouts, streambank protection strategies, temporary cofferdam and pump bypass configurations, and erosion control blanket installation methods.
The engineering plans demonstrate a sophisticated approach to infrastructure replacement, with specific focus on environmental preservation and erosion mitigation. Key technical elements include modified mud sill cribbing, riprap stream protection, detailed cross-sections of the streambank, and comprehensive erosion control measures. The project appears to be a carefully planned infrastructure improvement that addresses both structural replacement and environmental conservation, with meticulous attention to geological conditions, water flow management, and site-specific engineering challenges. The documents include multiple technical specifications and general notes that outline construction methodology, environmental protection strategies, and detailed implementation guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Roadway Plan 10-22-2025.pdf | ||
| 5-Bidding Documents 10-22-2025.pdf | ||
| 4-Structure Plan 5-1-2025.pdf | ||
| 1-Right-of-Way Plan 9-27-2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
ENVIRONMENTAL AND CIVIL ENGINEERING
Deiss & Halmi Engineering, Inc.
105 Meadville Street, Edinboro PA 16412 PH. 814-734-3640 Fax 814-734-3643
OHE OHE
AutoCAD SHX Text 13+00
AutoCAD SHX Text 14+00
AutoCAD SHX Text 15+00
AutoCAD SHX Text 16+00
AutoCAD SHX Text
PC16+13.17
AutoCAD SHX Text 17+00
AutoCAD SHX Text 18+00
AutoCAD SHX Text 19+00
AutoCAD SHX Text 20+00
AutoCAD SHX Text 21+00
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PT18+18.48
AutoCAD SHX Text 60 feet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text By
AutoCAD SHX Text 2140122
AutoCAD SHX Text
ELK CREEK TOWNSHIP, ERIE COUNTY
AutoCAD SHX Text 1"=30'
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SZ
AutoCAD SHX Text
%%U EXISTING CONDITIONS SITE PLAN
AutoCAD SHX Text
SHERROD HILL ROAD
AutoCAD SHX Text
12" CPP
AutoCAD SHX Text
18" CMP
AutoCAD SHX Text
BENCHMARK #1 MAG NAIL IN PAVEMENT ELEV. 1221.14
AutoCAD SHX Text
BENCHMARK #2 NAIL IN UTILITY POLE # 025470 ELEV. 1215.42
AutoCAD SHX Text
BENCHMARK #3 NAIL IN UTILITY POLE # 025434 ELEV. 1220.60
AutoCAD SHX Text
BENCHMARK #4 MAG NAIL IN PAVEMENT ELEV. 1216.65
AutoCAD SHX Text
SHERROD HILL ROAD (50' R/W)
AutoCAD SHX Text
CUSSEWAGO CREEK
AutoCAD SHX Text
BRIDGE REPLACEMENT
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text NOTES: 1. CONTOURS, STRUCTURES, ROADS AND EXISTING FEATURES PLOTTED CONTOURS, STRUCTURES, ROADS AND EXISTING FEATURES PLOTTED FROM SURVEY BY DEISS & HALMI ENGINEERING, INC. ON 1/5/2022, 5/18/2022, AND 8/2/2022. 2. ELEVATIONS REFERENCE NAVD 88. ELEVATIONS REFERENCE NAVD 88. 3. THE CONTRACTOR SHALL CALL PENNSYLVANIA ONE CALL SYSTEM, INC. THE CONTRACTOR SHALL CALL PENNSYLVANIA ONE CALL SYSTEM, INC. A MINIMUM OF 3 WORKING DAYS PRIOR TO BEGINNING WORK, TELEPHONE NUMBER 1-800-242-1776. 4. SPECIAL FLOOD HAZARD AREA BOUNDARY (PLOTTED FROM FEMA FIRM SPECIAL FLOOD HAZARD AREA BOUNDARY (PLOTTED FROM FEMA FIRM PANEL #42049C0580D, EFFECTIVE DATE FEBRUARY 19, 2014). 5. WETLANDS DELINEATED BY URBAN ENGINEERS, INC.WETLANDS DELINEATED BY URBAN ENGINEERS, INC.
AutoCAD SHX Text
OVERHEAD ELECTRIC
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text HORIZONTAL CURVE DATA PI STA 17+17.53 Δ=25°17'54" LTD=12°19'18"T=104.36' L=205.32' R=465.00' E=11.57' PC STA 16+13.17 PT STA 18+18.48
AutoCAD SHX Text St
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text
SHEET 1 OF 7
AutoCAD SHX Text
%%U SOIL CLASSIFICATIONS
AutoCAD SHX Text FrA FREDON SILT LOAM, 0%-3% SLOPES.
AutoCAD SHX Text St STANHOPE SILT LOAM.
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text
SOIL BOUNDARY
AutoCAD SHX Text FrA
AutoCAD SHX Text CaC
AutoCAD SHX Text Rhb
AutoCAD SHX Text CaC
AutoCAD SHX Text VeB
AutoCAD SHX Text CaD
AutoCAD SHX Text Rhb
AutoCAD SHX Text CaC CAMBRIDGE SILT LOAM, 8%-15% SLOPES.
AutoCAD SHX Text CaD CAMBRIDGE SILT LOAM, 15%-25% SLOPES.
AutoCAD SHX Text RhB RED HOOK SILT LOAM, 3%-8% SLOPES.
AutoCAD SHX Text VeB VENANGO SILT LOAM, 3%-8% SLOPES.
AutoCAD SHX Text
%%U LEGEND
AutoCAD SHX Text
WETLAND BOUNDARY
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
STEVEN R. HALMI
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE-055808-E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text 10/22/2025
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
ENVIRONMENTAL AND CIVIL ENGINEERING
Deiss & Halmi Engineering, Inc.
105 Meadville Street, Edinboro PA 16412 PH. 814-734-3640 Fax 814-734-3643
OHE OHE
AutoCAD SHX Text 13+00
AutoCAD SHX Text 14+00
AutoCAD SHX Text 15+00
AutoCAD SHX Text 16+00
AutoCAD SHX Text
PC16+13.17
AutoCAD SHX Text 17+00
AutoCAD SHX Text 18+00
AutoCAD SHX Text 19+00
AutoCAD SHX Text 20+00
AutoCAD SHX Text 21+00
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PT18+18.48
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text By
AutoCAD SHX Text 2140122
AutoCAD SHX Text
ELK CREEK TOWNSHIP, ERIE COUNTY
AutoCAD SHX Text 10/22/2025
AutoCAD SHX Text 1"=30'
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SZ
AutoCAD SHX Text 60 feet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
12" CPP
AutoCAD SHX Text
BENCHMARK #1 MAG NAIL IN PAVEMENT ELEV. 1221.14
AutoCAD SHX Text
BENCHMARK #2 NAIL IN UTILITY POLE # 025470 ELEV. 1215.42
AutoCAD SHX Text
BENCHMARK #3 NAIL IN UTILITY POLE # 025434 ELEV. 1220.60
AutoCAD SHX Text
BENCHMARK #4 MAG NAIL IN PAVEMENT ELEV. 1216.65
AutoCAD SHX Text
SHERROD HILL ROAD (50' R/W)
AutoCAD SHX Text
CUSSEWAGO CREEK
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text NOTES: 1. CONTOURS, STRUCTURES, ROADS AND EXISTING FEATURES PLOTTED CONTOURS, STRUCTURES, ROADS AND EXISTING FEATURES PLOTTED FROM SURVEY BY DEISS & HALMI ENGINEERING, INC. ON 1/5/2022, 5/18/2022, AND 8/2/2022. 2. ELEVATIONS REFERENCE NAVD 88. ELEVATIONS REFERENCE NAVD 88. 3. THE CONTRACTOR SHALL CALL PENNSYLVANIA ONE CALL SYSTEM, INC. THE CONTRACTOR SHALL CALL PENNSYLVANIA ONE CALL SYSTEM, INC. A MINIMUM OF 3 WORKING DAYS PRIOR TO BEGINNING WORK, TELEPHONE NUMBER 1-800-242-1776. 4. SPECIAL FLOOD HAZARD AREA BOUNDARY (PLOTTED FROM FEMA FIRM SPECIAL FLOOD HAZARD AREA BOUNDARY (PLOTTED FROM FEMA FIRM PANEL #42049C0580D, EFFECTIVE DATE FEBRUARY 19, 2014). 5. WETLANDS DELINEATED BY URBAN ENGINEERS, INC.WETLANDS DELINEATED BY URBAN ENGINEERS, INC.
AutoCAD SHX Text
OVERHEAD ELECTRIC
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
%%U LEGEND
AutoCAD SHX Text
WETLAND BOUNDARY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text HORIZONTAL CURVE DATA PI STA 17+17.53 Δ=25°17'54" LTD=12°19'18"T=104.36' L=205.32' R=465.00' E=11.57' PC STA 16+13.17 PT STA 18+18.48
AutoCAD SHX Text St
AutoCAD SHX Text
SHEET 2 OF 7
AutoCAD SHX Text
%%U SOIL CLASSIFICATIONS
AutoCAD SHX Text FrA FREDON SILT LOAM, 0%-3% SLOPES.
AutoCAD SHX Text St STANHOPE SILT LOAM.
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text
SOIL BOUNDARY
AutoCAD SHX Text FrA
AutoCAD SHX Text CaC
AutoCAD SHX Text Rhb
AutoCAD SHX Text CaC
AutoCAD SHX Text VeB
AutoCAD SHX Text CaD
AutoCAD SHX Text Rhb
AutoCAD SHX Text CaC CAMBRIDGE SILT LOAM, 8%-15% SLOPES.
AutoCAD SHX Text CaD CAMBRIDGE SILT LOAM, 15%-25% SLOPES.
AutoCAD SHX Text RhB RED HOOK SILT LOAM, 3%-8% SLOPES.
AutoCAD SHX Text VeB VENANGO SILT LOAM, 3%-8% SLOPES.
AutoCAD SHX Text
%%U PROPOSED PLAN
AutoCAD SHX Text
SHERROD HILL ROAD
AutoCAD SHX Text
BRIDGE REPLACEMENT
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LIMIT OF DISTURBANCE
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
STEVEN R. HALMI
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE-055808-E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
F
ENVIRONMENTAL AND CIVIL ENGINEERING
Deiss & Halmi Engineering, Inc.
105 Meadville Street, Edinboro PA 16412 PH. 814-734-3640 Fax 814-734-3643
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 10 feet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text By
AutoCAD SHX Text 2140122
AutoCAD SHX Text
ELK CREEK TOWNSHIP, ERIE COUNTY
AutoCAD SHX Text 1"=5'
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SZ
AutoCAD SHX Text
%%U STREAMBANK PROTECTION DETAIL
AutoCAD SHX Text NOTES: 1. STRUCTURES, ROADS AND EXISTING FEATURES PLOTTED FROM SURVEY STRUCTURES, ROADS AND EXISTING FEATURES PLOTTED FROM SURVEY BY DEISS & HALMI ENGINEERING, INC. ON 1/5/2022, 5/18/2022, AND 8/2/2022. 2. CONTOURS FROM PENNSYLVANIA SPATIAL DATA ACCESS (PASDA). CONTOURS FROM PENNSYLVANIA SPATIAL DATA ACCESS (PASDA). 3. ELEVATIONS REFERENCE NAVD 88. ELEVATIONS REFERENCE NAVD 88. 4. SOIL TYPES AND BOUNDARIES PLOTTED FROM USDA NATIONAL SOIL TYPES AND BOUNDARIES PLOTTED FROM USDA NATIONAL RESOURCES CONSERVATION SERVICE WEB SOIL SURVEY. 5. SPECIAL FLOOD HAZARD AREA BOUNDARY (PLOTTED FROM FEMA FIRM SPECIAL FLOOD HAZARD AREA BOUNDARY (PLOTTED FROM FEMA FIRM PANEL #42049C0580D, EFFECTIVE DATE FEBRUARY 19, 2014).
AutoCAD SHX Text
%%U LEGEND
AutoCAD SHX Text
SHERROD HILL ROAD (50' R/W)
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
STREAM/DITCH/EDGE OF WATER
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FLOODPLAIN ZONE A
AutoCAD SHX Text
FLOODPLAIN ZONE X
AutoCAD SHX Text
%%U SOIL CLASSIFICATIONS
AutoCAD SHX Text FrA FREDON SILT LOAM, 0%-3% SLOPES.
AutoCAD SHX Text St
AutoCAD SHX Text FrA
AutoCAD SHX Text St STANHOPE SILT LOAM.
AutoCAD SHX Text
(HYDRIC)
AutoCAD SHX Text
(HYDRIC)
AutoCAD SHX Text
SOIL BOUNDARY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET 3 OF 7
AutoCAD SHX Text
SHERROD HILL ROAD
AutoCAD SHX Text
BRIDGE REPLACEMENT
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
STEVEN R. HALMI
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE-055808-E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text 10/22/2025
AutoCAD SHX Text
AutoCAD SHX Text 11/5/2025
AutoCAD SHX Text
UPDATES TO STREAMBANK PROTECTION
SRH
105 Meadville Street, Edinboro PA 16412 PH. 814-734-3640 Fax 814-734-3643
AutoCAD SHX Text 0+00
AutoCAD SHX Text 0+10
AutoCAD SHX Text 0+20
AutoCAD SHX Text 0+30
AutoCAD SHX Text 0+40
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0+50
AutoCAD SHX Text 0+60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0+00
AutoCAD SHX Text 0+10
AutoCAD SHX Text 0+20
AutoCAD SHX Text 0+30
AutoCAD SHX Text 0+40
AutoCAD SHX Text 0+50
AutoCAD SHX Text 0+60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0+00
AutoCAD SHX Text 0+10
AutoCAD SHX Text 0+20
AutoCAD SHX Text 0+30
AutoCAD SHX Text 0+40
AutoCAD SHX Text 0+50
AutoCAD SHX Text 0+60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text By
AutoCAD SHX Text 2140122
AutoCAD SHX Text
ELK CREEK TOWNSHIP, ERIE COUNTY
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SZ
AutoCAD SHX Text
%%U STREAMBANK CROSS SECTION 1
AutoCAD SHX Text 4 feet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HORIZONTAL SCALE:
AutoCAD SHX Text 4 feet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VERTICAL SCALE:
AutoCAD SHX Text
%%U STREAMBANK CROSS SECTION 2
AutoCAD SHX Text
%%U STREAMBANK CROSS SECTION 3
AutoCAD SHX Text
%%U CROSS SECTIONS
AutoCAD SHX Text
SHEET 4 OF 7
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
STEVEN R. HALMI
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE-055808-E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text
SHERROD HILL ROAD
AutoCAD SHX Text
BRIDGE REPLACEMENT
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text 10/22/2025
AutoCAD SHX Text
AutoCAD SHX Text 11/5/2025
AutoCAD SHX Text
UPDATES TO STREAMBANK PROTECTION
105 Meadville Street, Edinboro PA 16412 PH. 814-734-3640 Fax 814-734-3643
Plan VieZ Sill LoJV TrenFKed
Into StreaPbanN
StreaP %anN
Extended Sill LoJ FaFe LoJV Sill LoJV
Note� EaFK VeFtion inFlXdeV tZo 10 Vill loJV and at leaVt tZo 20 IaFe loJV SeFtionV Fan be added or rePoved EndinJ SeFtion Fan Kave extended Vill loJ
SeFtion VieZ
Ma\ or Ma\ not XVe toS loJ
NorPal :ater Level
2 It. Rebar Rebar
StreaP %ottoP
FaFe LoJV 2-7� SloSe
StreaP %anN Graded to a 3�1 VloSe
Sill LoJV TrenFKed
Into StreaPbanN
One SeFtion
FLO:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text By
AutoCAD SHX Text 2140122
AutoCAD SHX Text
ELK CREEK TOWNSHIP, ERIE COUNTY
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SZ
AutoCAD SHX Text
%%U DETAILS
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text 3H:1V MAXIMUM SLOPE EXCEPT WHERE REQUIRED TO BE STEEPER TO MATCH BRIDGE ABUTMENT SLOPES
AutoCAD SHX Text 36"
AutoCAD SHX Text
%%U RIPRAP STREAM PROTECTION TYPICAL SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 36"
AutoCAD SHX Text 24"
AutoCAD SHX Text
TOP OF RIPRAP SLOPE SHALL MATCH EXISTING TOP OF BANK ELEVATION
AutoCAD SHX Text
WATER SURFACE
AutoCAD SHX Text CLASS 4 TYPE A GEOTEXTILE FABRIC (PLACED ON SIDES AND BOTTOM) ANCHORED PER PENNDOT STANDARD DRAWING RC-40M
AutoCAD SHX Text
HEIGHT VARIES
AutoCAD SHX Text
TOE OF PROPOSED SLOPE SHALL BE LOCATED AS SHOWN ON PLAN
AutoCAD SHX Text
TOE OF PROPOSED SLOPE SHALL BE KEYED INTO SUBSTRATE TO A DEPTH OF APPROX. 2'
AutoCAD SHX Text
%%U MODIFIED MUD SILL CRIBBING
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SHERROD HILL ROAD
AutoCAD SHX Text
BRIDGE REPLACEMENT
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text
SHEET 5 OF 7
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
STEVEN R. HALMI
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE-055808-E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text 10/22/2025
AutoCAD SHX Text
R-7 ROCK CHOKED WITH R-4 ROCK
AutoCAD SHX Text
AutoCAD SHX Text 11/5/2025
AutoCAD SHX Text
UPDATES TO STREAMBANK PROTECTION
105 Meadville Street, Edinboro PA 16412 PH. 814-734-3640 Fax 814-734-3643
S<STEM.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text By
AutoCAD SHX Text 2140122
AutoCAD SHX Text
ELK CREEK TOWNSHIP, ERIE COUNTY
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SZ
AutoCAD SHX Text
%%UDETAILS
AutoCAD SHX Text
SHERROD HILL ROAD
AutoCAD SHX Text
BRIDGE REPLACEMENT
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text
SHEET 6 OF 7
AutoCAD SHX Text
12" MIN.
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text 2"x2" WOODEN STAKES PLACED 10' O.C.
AutoCAD SHX Text
COMPOST FILTER SOCK (SIZE INDICATED ON PLAN)
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
%%U SECTION VIEW
AutoCAD SHX Text
BLOWN/PLACED FILTER MEDIA
AutoCAD SHX Text
AutoCAD SHX Text 2"x2" WOODEN STAKES PLACED 10' O.C.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROPOSED CONTOURS
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text
%%U PLAN VIEW
AutoCAD SHX Text
%%U COMPOST FILTER SOCK
AutoCAD SHX Text
ORGANIC MATTER CONTENT
AutoCAD SHX Text
ORGANIC PORTION
AutoCAD SHX Text pH
AutoCAD SHX Text
MOISTURE CONTENT
AutoCAD SHX Text
PARTICLE SIZE
AutoCAD SHX Text
SOLUBLE SALT CONCENTRATION
AutoCAD SHX Text
25%%%-100%%% (DRY WEIGHT BASIS)
AutoCAD SHX Text
FIBROUS AND ELONGATED
AutoCAD SHX Text 5.5-8.5
AutoCAD SHX Text 30%%%-60%%%
AutoCAD SHX Text
30%%%-50%%% PASS THROUGH 3/8" SIEVE
AutoCAD SHX Text
5.0 dS MAXIMUM
AutoCAD SHX Text NOTES: 1. COMPOST SHALL MEET THE FOLLOWING STANDARDS: 2. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT. 3. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS. 4. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES ½ THE ABOVE GROUND HEIGHT OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED SOCK AND DISPOSED IN THE MANNER DESCRIBED SOCK AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE THE PLAN. 5. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCK SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION. INSPECTION. INSPECTION. 6. BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE YEAR. POLYPROPYLENE SOCKS SHALL BE YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 7. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS OPEN AND THE MULCH SPREAD AS OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
AutoCAD SHX Text
2' MIN. FROM TOE OF SLOPE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
BLANKET EDGES OVERLAPPED 4” (MIN.) AND STAPLED (MIN.) AND STAPLED
AutoCAD SHX Text INSTALL BEGINNING OF ROLL IN 6” X 6” ANCHOR TRENCH, X 6” ANCHOR TRENCH, ANCHOR TRENCH, STAPLE, BACKFILL AND COMPACT SOIL
AutoCAD SHX Text
STARTING AT TOP OF SLOPE, ROLL BLANKETS IN DIRECTION OF WATER FLOW
AutoCAD SHX Text PREPARE SEED BED (INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED) PRIOR TO INSTALLATION OF BLANKET
AutoCAD SHX Text
THE BLANKET SHOULD NOT BE STRETCHED; IT MUST MAINTAIN GOOD SOIL CONTACT
AutoCAD SHX Text OVERLAP BLANKET ENDS 6” (MIN.) WITH THE (MIN.) WITH THE UPSLOPE BLANKET OVERLYING THE DOWNSLOPE BLANKET (SHINGLE STYLE). STAPLE SECURELY
AutoCAD SHX Text REFER TO MANUFACTURER'S RECOMMENDED STAPLING PATTERN FOR STEEPNESS AND LENGTH OF SLOPE BEING BLANKETED
AutoCAD SHX Text
%%U EROSION CONTROL BLANKET INSTALLATION
AutoCAD SHX Text NOTES: 1. APPLY TO ALL AREAS WITH SLOPES 3:1 OR GREATER. APPLY TO ALL AREAS WITH SLOPES 3:1 OR GREATER. 2. SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE PLAN DRAWINGS PRIOR TO INSTALLING THE BLANKET. 3. PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE. 4. SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS. SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS. 5. BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL THROUGHOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH BLANKET. 6. STAPLING OF THE BLANKET SHALL BE DONE IN ACCORDANCE WITH THE STAPLING OF THE BLANKET SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 7. BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT UNTIL PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM UNIFORM 70% COVERAGE THROUGHOUT THE BLANKETED AREA. DAMAGED OR DISPLACED BLANKETS SHALL BE RESTORED OR REPLACED WITHIN 5 CALENDAR DAYS.
AutoCAD SHX Text
FILTER BAG
AutoCAD SHX Text
DISCHARGE HOSE
AutoCAD SHX Text
CLAMPS
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
WELL VEGETATED, GRASSY AREA
AutoCAD SHX Text %%u PUMPED WATER FILTER BAG DETAIL
AutoCAD SHX Text
MAXIMUM SLOPE 5%
AutoCAD SHX Text
INTAKE HOSE WITH FLOATING INTAKE SCREEN
AutoCAD SHX Text NOTES: 1. LOW VOLUME FILTER BAGS SHALL BE MADE FROM NONWOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED “J” TYPE J” TYPE TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS MAY BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS: 2. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME ½ FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. IT IS RECOMMENDED THAT BAGS BE PLACED ON STRAPS TO FACILITATE REMOVAL. 3. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NONPOLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS. 4. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHOULD BE INSTALLED BELOW BAGS LOCATED WITHIN 50 FEET OF RECEIVING STREAM OR WHERE GRASSY AREA IS NOT AVAILABLE. A COMPOST BERM OR COMPOST FILTER SOCK SHALL BE PLACED BELOW ANY BAG DISCHARGING TO A SPECIAL PROTECTION SURFACE WATER. 5. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE. 6. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR ½ THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED. 7. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
AutoCAD SHX Text
PROPERTY
AutoCAD SHX Text
AVG. WIDE WIDTH STRENGTH
AutoCAD SHX Text
GRAB TENSILE
AutoCAD SHX Text
PUNCTURE
AutoCAD SHX Text
MULLEN BURST
AutoCAD SHX Text
UV RESISTANCE
AutoCAD SHX Text
AOS 5%%% RETAINED
AutoCAD SHX Text
TEST METHOD
AutoCAD SHX Text
ASTM D-4884
AutoCAD SHX Text
ASTM D-4632
AutoCAD SHX Text
ASTM D-4833
AutoCAD SHX Text
ASTM D-3786
AutoCAD SHX Text
ASTM D-4355
AutoCAD SHX Text
ASTM D-4751
AutoCAD SHX Text
MINIMUM STANDARD
AutoCAD SHX Text
60 LB/IN
AutoCAD SHX Text
205 LB
AutoCAD SHX Text
110 LB
AutoCAD SHX Text
350 PSI
AutoCAD SHX Text 70%%%
AutoCAD SHX Text
80 SIEVE
AutoCAD SHX Text
HEAVY DUTY LIFTING STRAPS (RECOMMENDED)
AutoCAD SHX Text
WELL VEGETATED, GRASSY AREA
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 12" COMPOST FILTER SOCK (SEE DETAIL) PLACED TO PREVENT SEDIMENT MIGRATION AWAY FROM FILTER BAG
AutoCAD SHX Text %%u ROCK CONSTRUCTION ENTRANCE DETAIL
AutoCAD SHX Text
TOTAL WIDTH
AutoCAD SHX Text
(20' MINIMUM)
AutoCAD SHX Text
OF ACCESS
AutoCAD SHX Text
10' MINIMUM
AutoCAD SHX Text
EXISTING ROADWAY
AutoCAD SHX Text
50' MINIMUM
AutoCAD SHX Text
10' MINIMUM
AutoCAD SHX Text
GEOTEXTILE
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
MINIMUM 8" AASHTO #1
AutoCAD SHX Text
EXISTING ROADWAY
AutoCAD SHX Text
%%U PROFILE
AutoCAD SHX Text
%%UPLAN VIEW
AutoCAD SHX Text NOTES: 1. TOPSOIL SHOULD BE REMOVED PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. 2. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE. 3. RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING ROCK CONSTRUCTION ENTRANCE. 4. MOUNTABLE BERM SHOULD BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED. PIPE TO BE SIZED APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED. 5. MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 50 FEET INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWER, CULVERTS, OR OTHER DRAINAGEWAYS IS NOT ACCEPTABLE.
AutoCAD SHX Text NOTE: PUMP INTAKE SHALL BE MAINTAINED A SUFFICIENT DISTANCE FROM BOTTOM TO PREVENT SEDIMENT FROM ENTERING THE
AutoCAD SHX Text
* SANDBAGS (STANDARD CONSTRUCTION DETAIL #3-15), JERSEY BARRIERS (FIGURE 3.13) OR OTHER NON-EROSIVE MATERIAL, NO EARTH FILL. DO NOT EXCAVATE A SUMP FOR THE PUMP INTAKE.
AutoCAD SHX Text ** SEE STANDARD CONSTRUCTION DETAIL # 4-14. FOR LOW GRADIENT CHANNELS, THE ROCK FILTER MAY BE REPLACED BY AN IMPERVIOUS COFFERDAM TO PREVENT BACKFLOW INTO THE WORK AREA.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
%%U TEMPORARY COFFERDAM AND PUMP BYPASS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text *** USE R-4 RIPRAP APRON OR PLYWOOD SHEET WITH SANDBAG BAFFLES TO DISSIPATE PUMPED WATER DISCHARGE.
AutoCAD SHX Text
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
STEVEN R. HALMI
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE-055808-E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
105 Meadville Street, Edinboro PA 16412 PH. 814-734-3640 Fax 814-734-3643
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text By
AutoCAD SHX Text 2140122
AutoCAD SHX Text
ELK CREEK TOWNSHIP, ERIE COUNTY
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
DRAWING NO.:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
SZ
AutoCAD SHX Text
%%UDETAILS
AutoCAD SHX Text
SHERROD HILL ROAD
AutoCAD SHX Text
BRIDGE REPLACEMENT
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text
SHEET 7 OF 7
AutoCAD SHX Text GENERAL NOTES: 1. A COPY OF THE APPROVED DRAWINGS (STAMPED SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. 2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES (INCLUDING CLEARING AND GRUBBING), THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE POST CONSTRUCTION STORMWATER MANAGEMENT PLAN PREPARER, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING. 3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES. THE SERIAL NUMBER FOR THIS PROJECT IS 20183030483. 4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY DEP PRIOR TO IMPLEMENTATION. 5. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE CONSTRUCTION SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS DOCUMENT. 6. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN. 7. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES MUST BE 2H:1V OR FLATTER. 8. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BMPS TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE OF DEP. 9. ALL BUILDING MATERIALS AND WASTES MUST BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE CHAPTER 260, §§260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE. 10. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR DEP FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED. 11. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING. 12. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS. 13. UNTIL THE SITE IS STABILIZED, ALL E&S BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL E&S BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED. 14. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION. 15. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER. 16. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. 17. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 4 INCHES PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL. 18. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES. 19. ALL FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS. 20. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS. 21. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. 22. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. 23. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD. 24. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. 25. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS. 26. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS. 27. E&S BMPS MUST REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR DEP. 28. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS. 29. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS MUST BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS SHOULD BE DONE ONLY DURING THE GERMINATING SEASON. 30. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A FINAL INSPECTION. 31. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
AutoCAD SHX Text STAGING OF EARTHMOVING ACTIVITIES AND BMP CONSTRUCTION EARTHMOVING ACTIVITIES ARE EXPECTED TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN ACTIVITIES ARE EXPECTED TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN ACTIVITIES ARE EXPECTED TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN ARE EXPECTED TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN ARE EXPECTED TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN EXPECTED TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN EXPECTED TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN TO COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN COMMENCE IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN SUMMER 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN 2026. CONSTRUCTION ACTIVITIES WILL PROCEED IN CONSTRUCTION ACTIVITIES WILL PROCEED IN CONSTRUCTION ACTIVITIES WILL PROCEED IN ACTIVITIES WILL PROCEED IN ACTIVITIES WILL PROCEED IN WILL PROCEED IN WILL PROCEED IN PROCEED IN PROCEED IN IN IN ACCORDANCE WITH THE FOLLOWING RELATIVE TIMETABLE: 1. INSTALLATION OF COMPOST FILTER SOCK DOWNGRADIENT OF CONSTRUCTION AREA INSTALLATION OF COMPOST FILTER SOCK DOWNGRADIENT OF CONSTRUCTION AREA 2. INSTALLATION OF ROCK CONSTRUCTION ENTRANCE INSTALLATION OF ROCK CONSTRUCTION ENTRANCE 3. REMOVAL OF EXISTING BRIDGE SUPERSTRUCTURE REMOVAL OF EXISTING BRIDGE SUPERSTRUCTURE 4. INSTALLATION OF COFFERDAM AND BYPASS PUMPING INSTALLATION OF COFFERDAM AND BYPASS PUMPING 5. INSTALLATION OF TEMPORARY ACCESS ROAD TO STREAM BED FROM ROCK CONSTRUCTION ENTRANCE INSTALLATION OF TEMPORARY ACCESS ROAD TO STREAM BED FROM ROCK CONSTRUCTION ENTRANCE 6. REMOVAL OF EXISTING BRIDGE ABUTMENTS AND WINGWALLS REMOVAL OF EXISTING BRIDGE ABUTMENTS AND WINGWALLS 7. EXCAVATION FOR AND INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM EXCAVATION FOR AND INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM FOR AND INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM FOR AND INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM AND INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM AND INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM INSTALLATION OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM OF FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM FOUNDATION PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM PILES, INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM INTEGRAL ABUTMENTS, WINGWALLS, RIPRAP STREAM ABUTMENTS, WINGWALLS, RIPRAP STREAM ABUTMENTS, WINGWALLS, RIPRAP STREAM WINGWALLS, RIPRAP STREAM WINGWALLS, RIPRAP STREAM RIPRAP STREAM RIPRAP STREAM STREAM STREAM PROTECTION AND ABUTMENT PROTECTION 8. GRADING OF STREAMBANK GRADING OF STREAMBANK 9. INSTALLATION OF MODIFIED MUDSILL CRIBBING INSTALLATION OF MODIFIED MUDSILL CRIBBING 10. INSTALLATION OF RIPRAP STREAMBANK PROTECTION INSTALLATION OF RIPRAP STREAMBANK PROTECTION 11. REMOVAL OF TEMPORARY ACCESS ROAD REMOVAL OF TEMPORARY ACCESS ROAD 12. REMOVAL OF BYPASS PUMP AND COFFERDAM REMOVAL OF BYPASS PUMP AND COFFERDAM 13. CONSTRUCTION OF BRIDGE SUPERSTRUCTURE AND APPROACHES CONSTRUCTION OF BRIDGE SUPERSTRUCTURE AND APPROACHES 14. FINAL SITE GRADING FINAL SITE GRADING 15. SEED AND STABILIZE ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS SEED AND STABILIZE ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS AND STABILIZE ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS AND STABILIZE ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS STABILIZE ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS STABILIZE ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS ALL DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS DISTURBED AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS AREAS. TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS TEMPORARY SEEDING SHALL BE APPLIED AT THE SAME TIME AS SEEDING SHALL BE APPLIED AT THE SAME TIME AS SEEDING SHALL BE APPLIED AT THE SAME TIME AS SHALL BE APPLIED AT THE SAME TIME AS SHALL BE APPLIED AT THE SAME TIME AS BE APPLIED AT THE SAME TIME AS BE APPLIED AT THE SAME TIME AS APPLIED AT THE SAME TIME AS APPLIED AT THE SAME TIME AS AT THE SAME TIME AS AT THE SAME TIME AS THE SAME TIME AS THE SAME TIME AS SAME TIME AS SAME TIME AS TIME AS TIME AS AS AS PERMANENT SEEDING TO QUICKLY ESTABLISH VEGETATIVE COVER ON THE SITE. 16. REMOVAL OF COMPOST FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% REMOVAL OF COMPOST FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% OF COMPOST FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% OF COMPOST FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% COMPOST FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% COMPOST FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% FILTER SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% SOCK ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% ONCE VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% VEGETATED AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% AREAS ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% ARE PERMANENTLY STABILIZED (WHEN A UNIFORM 70% PERMANENTLY STABILIZED (WHEN A UNIFORM 70% PERMANENTLY STABILIZED (WHEN A UNIFORM 70% STABILIZED (WHEN A UNIFORM 70% STABILIZED (WHEN A UNIFORM 70% (WHEN A UNIFORM 70% (WHEN A UNIFORM 70% A UNIFORM 70% A UNIFORM 70% UNIFORM 70% UNIFORM 70% 70% 70% VEGETATED COVER OF EROSION RESISTANT PERENNIAL SPECIES HAS BEEN ACHIEVED)
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
STEVEN R. HALMI
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE-055808-E
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text L
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
| Sheets and Views |
| 2140122 WORKING 2025-11-05-C400 |
| 2140122 WORKING 2025-11-05-C401 |
| 2140122 WORKING 2025-11-05-C402 |
| 2140122 WORKING 2025-11-05-C403 |
| 2140122 WORKING 2025-11-05-C404 |
| 2140122 WORKING 2025-11-05-C405 |
| 2140122 WORKING 2025-11-05-C406 |
File details come from the government source that posted it. Updated .