This document is a Delivery Schedule for FCI Manchester's Food Service Department, specifically for dairy products. The requirement involves weekly deliveries of dairy products from October 1, 2025, through December 31, 2025. Deliveries must occur between 7:30 am and 2:00 pm EST, excluding federal holidays, with the Food Services administration contacting the vendor weekly to specify required quantities.

The document outlines strict delivery and quality requirements, including palletized deliveries, specific temperature ranges for different food types (34-41 degrees F for non-frozen perishables, 0 degrees F for frozen foods), and mandatory Kosher symbol markings for religious diet items. Vendors must contact the Food Service Warehouse prior to delivery for approval, and failure to meet delivery schedules or product specifications can result in product refusal, mandatory replacement, and potential negative impacts on future contract awards. Receipt of delivery may be conditional for up to three days to allow for examination and testing.

View the file

Other files

File Type Posted
1. QUOTE COVER SHEET DAIRY FY26 2ND QTR.pdf PDF
0. POST TO SAM.GOV DAIRY FY26 1ST QTR.docx DOCX document
FY26 2ND QTR BID REPORT DAIRY.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FCI Manchester Delivery Schedule– Requirement: Dairy products

Delivery Schedule: Weekly

FCI Manchester Food Service Department requires weekly delivery of dairy products.

The period of performance will be October 1, 2025, through December 31, 2025.

Please specify the delivery schedule on solicitation. Deliveries must be made between the hours of 7:30 am and 2:00 pm EST. Federal holiday deliveries will not be accepted.

The quantities listed in the solicitation and any subsequent award are estimated maximum throughout the quarter.

The ordering procedures are as such. Weekly, the local food services administration will contact you to notify you of the quantities required to be delivered to the Food Services warehouse for the upcoming week. The notification of the authorized individuals to order will be identified at the time of the award.

Upon Award, the Food Service Warehouse must be contacted prior to delivery for approval or adjustments in delivery schedule. Delivery schedules will be strictly enforced. Failure to deliver within the established time frame will be considered as nonconformance to the terms of the contract.

• All items will be closely inspected.

• All deliveries must be palletized.

• All non-frozen, perishable foods must be delivered between 34 degrees F and 41 degrees

F.

• All canned goods must be delivered above 34 degrees F and not frozen.

• All frozen foods must be delivered at 0 degrees F or below. Any product that indicates prior thawing will be refused.

• All certified religious diet items must be marked with the Kosher Symbol on individual packages, or the item will be refused.

• Receipt of delivery may be conditional for a period of three (3) days in order to allow for adequate examination and testing.

• Some items may require thawing and cooking to determine specifications compliance.

• Items that fail to meet specifications will be refused.

• If the product is not accepted, in accordance with FAR 52.212-4 (a), “The

Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price.”

• Items which are conditionally received, and found to be unacceptable, must be picked up at the vendors' expense within two (2) weeks of noncompliance notification.

• If the product is not picked up within two (2) weeks, it will be disposed of by warehouse staff.

Items must meet specifications as indicated on the solicitation and award.

All items will be closely inspected prior to acceptance.

See FAR 52.212-4 (a) Inspection and Acceptance.

https://www.acquisition.gov/far/52.212-4?searchTerms=52.212-4 https://www.acquisition.gov/far/52.212-4?searchTerms=52.212-4

Contractor failure to meet delivery schedules without an excusable delay and/or failure to conform to contract specifications will negatively affect the contractor's history of past performance. Past performance information may be used by the Government to make future award decisions and/or may result in a finding that the quoter is not responsible for the award of future requirements.

File details come from the government source that posted it. Updated .