PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UOI |
| Unit Price |
| Total Price |
| 0001 |
| Mobilization (Upper FR 51 and Tevis Cup Trail junction) |
| 1 |
| EA |
| 0002 |
| Upper steel pipe rail barrier (fabrication + installation) |
| 600 |
| LF |
| 0003 |
| Steel equestrian access gate (fabrication + installation) |
| 1 |
| EA |
| 0004 |
| Steel width limiter gate (installation + installation) |
| 1 |
| EA |
| 0005 |
| Steel bulletin board frame (fabrication + installation) |
| 1 |
| EA |
B.1 SCHEDULE OF ITEMS – OPTION 1
| Item |
| Construction Items |
| Qty |
| UOI |
| Unit Price |
| Total Price |
| 0001 |
| Mobilization (Lower FR 51 and Talbot Creek Trail begins) |
| 1 |
| EA |
| 0002 |
| Steel equestrian access gate (fabrication + installation) |
| 1 |
| EA |
| 0003 |
| Upper additional steel pipe rail barrier fence (fabrication + installation) |
| 445 |
| LF |
| OPTION 1 TOTAL: |
| ___________ |
| BASE + OPTION 1 TOTAL: |
| ___________ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |
| POC & Title: |