1. Statement of Work.pdf

PDF 91 KB Posted

Attached to
127EAW22R0026 - GCW Metal Barriers
Solicitation number
127EAW22R0026
Issued by

View the file

Other files

File Type Posted
Single Pipe Rail Spec.pdf PDF
RFI Official Responses.pdf PDF
RFI Official Responses.pdf PDF
A00001 - RFIs and Time Extension.pdf PDF
Double Rail Spec.pdf PDF
7. RFI Form.docx DOCX document
127EAW22R0026 - GCW Metal Barriers.pdf PDF
5. Tech Barriers Document.pdf PDF
2. Fire Plan.pdf PDF
6. Davis-Bacon Act WD # CA20220007.pdf PDF
3. Schedule.docx DOCX document
4. Drawings and Maps.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C – Construction

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Scope of Contract

This contract is for the mobilization, fabrication, and installation of 600 ft steel rail barrier fencing

(with an additional line item adding 445 ft), one steel equestrian access gate (fabrication and installation), one steel width limiter gate (fabrication and installation), and one steel bulletin board frame (fabrication and installation) at Upper 51 and Tevis Cup Trail junction.

Note: Some bedrock may exist sub-grade at Upper 51 Saddle and may add difficulty during excavation needs.

This contract is for the mobilization, fabrication, and installation of one steel equestrian access gate

(optional line item) at Lower FR 51 and Talbot Creek Trail.

Note: No bedrock noted at Lower 51.

The goal of this project is to construct a steel rail barrier fence in several locations to restrict motorized access into federally designated Granite Chief Wilderness along the Tevis Cup Trail but also allow non-motorized access into Granite Chief Wilderness. Project will also provide width limiter gates to allow motorized use on non-wilderness segment of the Tevis Cup Trail. Maps provided show the overall plan at Upper and Lower 51 Project Sites.

Project Location

This project is located within the Tahoe National Forest in Placer County, California. There are two project locations (Upper and Lower 51 Road).

• Upper 51 Road/Tevis Cup junction Project Site is located on Forest Road 51, outside of “The

Cedars”, California. The Upper 51 Road is accessed most directly from County Road 6001

“Soda Springs Road” and best accessed from the town of Soda Springs California.

39°13'26.1"N 120°21'12.6"W

• Lower 51 Road/Talbot Creek Trail junction Project Site is located on Forest Road 51, northeast from French Meadows Reservoir. The Lower 51 Road is accessed most directly from Forest

Road 96 “Mosquito Ridge Road” and best accessed from the town of Foresthill CA. 39°12'

8.8"N 120°22' 19.8"W

• NOTE- The Upper and Lower 51 Roads do not connect to each other, best access is noted above.

NOTE: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. (See Section L, 52.236-27, SITE VISIT.)

Estimated Start Date

June 30th, 2022

Performance Period

• 50 Calendar days (these days shall be actual “boots on the ground” and not lead times for material or submittals.

• Project must be accomplished by December 31, 2023.

• As project sites are in high fire prone areas, extreme caution must be used during implementation, Contractor shall not implement any welding when Project Activity

Levels are higher than PAL D.

• Performance period is broad ranging as to allow Spring and Fall implementation during optimal soil moisture and low fire danger.

Restrictions

• Project sites are difficult to access between early December through middle of June due to remoteness of sites and snow.

• Contractor shall not implement any welding when Project Activity Levels are higher than PAL D.

Contractor must begin work within 10 days of the effective date of the Notice to Proceed. See Section

F for additional information.

Restrictions on Work

1. Contract shall be implemented when Fire danger is minimal risk. Contractor shall not implement any welding when Project Activity Levels are higher than PAL D.

2. Work hours are limited to non-holiday week days, Monday – Friday, 07:30 – 19:00

3. In accordance with the fire plan, if included in Section J.

4. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.

5. Several permitted events travel through this Upper 51 site throughout the summer, no work shall occur on Jun 24 and July 16, 2022 as the project site is a small area.

Worker's Compensation Insurance

The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.

Camping and Housing (see also Section H, Camping Permit Compliance)

Dispersed camping will be permitted at Upper 51 saddle during implementation. Camping at Talbot campground will be permitted during Lower 51 implementation. Contractor [ ] will [X] will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit. An occupancy use permit will be submitted by the Contractor during their camping needs

Maps

INCLUDED WITH DRAWINGS

Drawings and Specifications

Project Drawings: The following drawings are part of this solicitation:

1. Overview Drawing of Upper 51 Site (where installation of items will occur)

2. Overview Drawing of Lower 51 Site (where installation of items will occur)

3. Steel Bulletin Board

4. Steel Double Rail

5. Forest Road Closure Gate with Equestrian Accessibility

6. Width Limiter Gate

Specifications:

[X] Construction Standard Institute (CSI) specifications

These specifications are physically incorporated in the solicitation.

[ ] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

FP-04 (US Customary Units)

This document is incorporated by reference and is available on the web in either MS Word or Acrobat (https://flh.fhwa.dot.gov/resources/specs/)

It is also available as a wire-bound book that can be purchased from the US Government Printing

Office:

Superintendent of Documents

U.S. Government Printing Office

Internet: bookstore.gpo.gov

Phone: (toll free) 866.512.1800

Fax: 202.512.2250

Mail: Stop SSOP, Washington, DC 20402-0001

Stock Number: 050-001-00341-4 (U.S. Customary)

Special Project Specifications are physically incorporated within this solicitation, beginning on the next page.

https://flh.fhwa.dot.gov/resources/specs/ http://bookstore.gpo.gov/

File details come from the government source that posted it. Updated .