3. DRAFT - Charleston CSDC IOT Project Status Report (PSR).xlsx

XLSX spreadsheet 134 KB Posted

Attached to
Charleston Consolidated Storage Distribution Center Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

This special notice from the USACE Little Rock District provides information about an upcoming initial outfitting project solicitation for the Charleston Consolidated Storage and Distribution Center. The requirement will utilize simplified acquisition procedures under FAR Part 13 in conjunction with commercial items procedures from FAR Part 12. It will be set aside as a total small business solicitation under NAICS code 337127 with a size standard of 500 employees. The estimated contract value is between $1.5 million to $2 million. Interested parties can submit questions until August 25, 2022, with a tentative proposal due date of September 2, 2022. A site visit is scheduled for August 23, 2022. The potential base of operations goal date is January 19, 2023, and potential open for business goal date is March 19, 2023.

View the file

Other files for this federal contract opportunity

Other files attached to Charleston Consolidated Storage Distribution Center, newest first.
File Type Posted
7. DRAFT - CSDC GC Schedule 30Jun22.pdf PDF
11. DRAFT - JSN U0096 3-phase 480 VAC Powered Battery Charger For JSN U0060 Electric Forklift.pdf PDF
2. Base Access WORKSHEET V9_Dec20_ACC (002).pdf PDF
30. DRAFT - Template-DHA-FE FRCS Vendor Risk Assessment_v2.0.docx DOCX document
17. DRAFT - DHA 27 41 43 Audio Video Conferencing.pdf PDF
16. DRAFT - Checklist_Control System Factory Acceptance Test and Site Acceptance Test.pdf PDF
9. DRAFT - JB Charleston CSDC_Existing Inventory_ 23Mar22.pdf PDF
29. DRAFT - Template-DHA RMF System Enterprise and Information Security Architecture.pdf PDF
26. DRAFT - Template_DHA RMF System Authorization Boundary.pdf PDF
0. DRAFT - SOW-FY22. IOT RD_PN89902_CSDC Charleston_2022.08.05.docx DOCX document
23. DRAFT - DHA RMF Information Flow Diagram.pdf PDF
14. DRAFT - JBCHS IDEA FONSI-FONPA_A7 Signed (2).pdf PDF
33. DRAFT - Template-System Level Configuration Management Plan.doc DOC document
19. DRAFT - DHA ACAS-NESSUS Scanning Guide-CUI.pdf PDF
12. DRAFT - DHA FE Wayfinding Guidelines-Signage Standards (Draft)_01Mar22.pdf PDF
11. DRAFT - JSN U1021 Wall-MountedWireGuidanceSystemLineDriverandGuidanceControlWire-Forklift(JSN U0060).pdf PDF
5. DRAFT - Interiors_JBC CSDC - DP2 FINAL_drawings.pdf PDF
1. DRAFT - Drawings Installation Map - CSDS and ACC.pdf PDF
8. DRAFT - JB Charleston CSDC_PRCL_v.2_21Jan21.pdf PDF
20. DRAFT - DHA FRCS Baseline Categorization Memorandum-1 Oct 2020.pdf PDF
0. DRAFT FY22 IOT CSDC_Div 00_CLIN BID Schedule.xlsx XLSX spreadsheet
15. DRAFT - JB Charleston CSDC_Facility Site Approval.pdf PDF
13. DRAFT - JB Charleston CSDC_Program for Design_5Feb22.pdf PDF
Draft Solicitation_Special Notice_Charleston CSDC.pdf PDF
25. DRAFT - Template_DHA RMF Security Control Plan_Implementation Guidance.xlsx XLSX spreadsheet
31. DRAFT - Template-Inventory Report-Hardware-Software.pdf PDF
6. DRAFT - JBC CSDC - DP2 FINAL_drawings.pdf PDF
10. DRAFT - JB Charleston CSDC_DOR-Provided Final Furniture-Equipment Package_17Jan22.pdf PDF
22. DRAFT - DHA Privacy Impact Assessment PIA_Processes and Procedures.docx DOCX document
21. DRAFT - DHA MDE Categorization Memo.pdf PDF
11. DRAFT - JSN U0060 Electric Swivel Seated-Narrow-Isle 33' Vertical Swing Reach 3K Fork Lift.pdf PDF
32. DRAFT - Template-Ports-Protocols-Services Management Registry Update.xlsx XLSX spreadsheet
28. DRAFT - Template_Program of Record_DHA Info Sys Contingency Plan.docx DOCX document
2. Real ID TRI-Fold (15Sep20-V42).pdf PDF
27. DRAFT - Template_Information System_Incident Response Plan.docx DOCX document
24. DRAFTExample_IP Network External to Control System_Generic ICS Med-COI Boundary Diagram v4 (1).pdf PDF
18. DRAFT - DHA 27 52 33 Refrigerator Monitoring Systems.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAB 0 PSR SUMMARY

SCOPE
FISCAL YEARFY22
PROJECT LOCATIONSouth Carolina
APPROPRIATIONOM-IOT
INSTALLATION NAMECHARLESTON AFB
PROJECT NUMBERPN89902
SCOPING ITEMSPersonal Property Procurement, Outfitting and Transition
PROJECT DELIVERY METHOD/CONTRACTIOT Only Contract
SCOPE BY CLINCLINAWARD GSFGROWTH GSF
Transition Services000100
Personal Property FF&E LVS000200
[CLIN Name]000300
[CLIN Name]00400
[CLIN Name]00500
[CLIN Name]00600
SCHEDULECOSTS
PREDESIGN POP (AE1 ONLY)3653705COSTAWARDMODSPENDINGPOTENTIALGROWTH
DESIGNORIGINALREVISEDDAYS CHANGETransition Services$0.00$0.00$0.00$0.00ERROR:#DIV/0!
TOTAL PERIOD OF PERFORMANCE9509500Personal Property FF&E LVS$0.00$0.00$0.00$0.000%
DESIGNER OF RECORD AWARD/START[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE![CLIN Name]$0.00$0.00
DESIGNER OF RECORD 35% DESIGN

Allison Keck: NOTE: This is NOT Preaward 35% Submission provided by an AE1 on a DB/IDBIO Project; This is DOR 35% per UFC 4-510-01.

[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE![CLIN Name]$0.00$0.00
ACCEPTED DESIGN (CORRECTED 100%)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE![CLIN Name]
CONSTRUCTIONORIGINALREVISEDDAYS CHANGETOTAL$0.00$0.00$0.00$0.00ERROR:#DIV/0!
TOTAL PERIOD OF PERFORMANCE8608600AGENT AUTHORIZATIONSPAGSFFYISSUEDREVISED
CONSTRUCTION AWARD[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!SOLICIT DESIGN$0.00[Day-Mo-Yr][Day-Mo-Yr]
CONSTRUCTION START (NTP)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!AWARD DESIGN$0.00[Day-Mo-Yr][Day-Mo-Yr]
RP/RPIE CONDITIONAL ACCEPTANCE (BOD/PIS)

Allison Keck: Beneficial Occupancy Date (BOD) and Placed in Service (PIS)

[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!SOLICIT CONSTRUCTION$0.00[Day-Mo-Yr][Day-Mo-Yr]
RP/RPIE FINAL ACCEPTANCE[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!AWARD CONSTRUCTION$0.00[Day-Mo-Yr][Day-Mo-Yr]
INITIAL OUTFITTINGORIGINALREVISEDDAYS CHANGEWORK IN PLACECLINAWARD

Allison Keck: Includes Awarded Mods

Allison Keck: NOTE: This is NOT Preaward 35% Submission provided by an AE1 on a DB/IDBIO Project; This is DOR 35% per UFC 4-510-01.

EARNINGSREMAIN% COMPLETE
TOTAL PERIOD OF PERFORMANCE21221Transition Services0001$0.0$0.0$0.0ERROR:#DIV/0!
PERSONAL PROPERTY AWARD[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!Personal Property FF&E LVS0002$0.0$0.0$0.0ERROR:#DIV/0!
PERSONAL PROPERTY CONDITIONAL ACCEPT (NEW)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
PERSONAL PROPERTY FINAL ACCEPTANCE (NEW/REUSE)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE![CLIN Name]004$0.0$0.0$0.0ERROR:#DIV/0!
NOTES
The PSR is a reporting tool for all projects awarded to a DOR, DB, Builder, or IOT Contractor. NOT intended for AE1 Contracts. Some content is linked to subsequent Tabs.
SCOPEInstruction: if anyone of the three (cost, scope, scheduled) are red, then that’s what the overall color assessment should be “red”. If one red, then roll-up is red.
GEOGRAPHIC CHIEF ASSESSMENT:

Allison Keck: ADD ISSUES FOR LEADERSHIP AWARENESS

Allison Keck: Beneficial Occupancy Date (BOD) and Placed in Service (PIS)

High RiskExceeds Authorized Scope/Out of scope change; not on original PFD or PRC; requires justification and will result in time & cost delays (example" adding departments; or FFE-LVS not on original lists)
Moderate RiskIn scope change; will result in cost/time delay (includes SF changes to PFD, or quantity changes to PRC)
Low RiskIn scope change; no impact to schedule/cost
Notes:Proposed out-of-scope contract modifications require new OTFAOC Justifications. The estimated value of the proposed out-of- scope contract modification or new task/delivery order J&A shall be based on the value of the modification or new task/delivery order requirement, not cumulative contract value, except if justifications were processed within six months of contract award.
COSTSInstruction: if anyone of the three (cost, scope, scheduled) are red, then that’s what the overall color assessment should be “red”. If one red, then roll-up is red.
GEOGRAPHIC CHIEF ASSESSMENT:
High RiskExceeds 25% of the Award/Imminent change to contract; will result in additional funds
Moderate RiskExceeds 10% of Award (Contingency Amount);Pending change to contract; may result in additional funds
Low RiskUnder 5%; Administrative/no cost change to contract; zero cost impact
Notes:Programmed Amount = Contract Price Only (do not include Agent Fees and 3rd Party Costs)
Exposure = Requested/Pending Changes (Discretionary & Non-Discretionary)
Changes do not include Award Options
SCHEDULEInstruction: if anyone of the three (cost, scope, scheduled) are red, then that’s what the overall color assessment should be “red”. If one red, then roll-up is red.
GEOGRAPHIC CHIEF ASSESSMENT:
High RiskSchedule updates exceed 30-days past initial schedule date/likely to result in impact to schedule; and will result in cost growth
Moderate RiskSchedule updates exceed 30-days past initial schedule date/may impact schedule and may result in cost growth
Low RiskSchedule updates exceed 30-days past initial schedule date/impact to schedule and cost nominal
Notes:UFGS 01 32 00.10 Progress Schedules
Earnings = Progress Payments: Amount Paid to Date (RMS Guide Part 6; see "Requested CLIN earnings"
Progress payments: based on the value of acceptable work the Contractor has placed from one pay period to the next. That is, a Contractor is paid according to the percentage or quantity of work that has been satisfactorily completed, or partially completed as the case may be.
FAR 46.501Conditional Acceptance = receive "Interim" RP/RPIE/PP IBE DD Form 1354s; known as "Placed in Service"
UFC 1-300-08Final Acceptance = receive "revised" RP/RPIE/PP IBE DD Form 1354s; known as "Construction Complete"
UFC 1-300-08Contract Complete = receive "final" RP/RPIE DD Form 1354s (end of warranty phase)
PP Final Acceptance = "Open for Business"
Progress48 USC 52-.236-15: Schedules for Construction Contracts: progress chart to indicate % of work scheduled for completion by any given date
FAR 52.236-15 Schedules for Construction Contracts
PreliminaryPreliminary Project Schedule: Due within 5-days after work commences or as determined by the KO
ProgressProgress chart to indicate percentage of work schedule for completion by a given date
USACE MILESTONES (UFGS 01 32 00.10 Project Schedule)
PreliminaryPreliminary Project Schedule: due within 15-days after the NTP (only shows first 90-days of work)
InitialInitial Project Schedule: Shows entire POP; Due within 42 cal days of Construction NTP; includes Prefinal inspection and final inspections
UpdatesPeriodic Schedule Updates: Updated a minimum 1/mo.; includes prefinal inspection and final inspections
Design Schedule (DB/IDBIO) = required for each submittal; fragnet extracted from prelim, initial, updated schedule
Earnings = Progress Payments
NAVFAC MILESTONES (UFGS 01 32 17.00 20 Cost Loaded Network Analysis Schedules (NAS))
Baseline NAS: Due with 30-45 days after award (to include design)
Initial=Construction Baseline NAS: due prior to the pre-final design submittal
Look Ahead Schedule:
Updates=Monthly Network Analysis Updates
Closeout (As-Built) Schedule
Substantial Completion (1.10.1.6.6) = point in time when government considers project ready for beneficial occupancy
DD Form 1354s due 30-days prior to "Substantial Completion"
Projected Completion: the point when all contract requirements are complete and verified.
Contract Completion Date (CCD): follow projected completion
NAVFAC MILESTONES (UFGS 01 32 16.00 20 Small Project Construction Progress Schedules)
Acceptance: A standardized term used extensively throughout contract and construction governance regardless of Agent (FAR, UFCs, UFGS, and DoD Issuances).
UFC 1-300-08: Work-in-Progress (WIP) – In the context of real property construction, this represents the accumulation of costs by the construction agent that will be billed to the sponsoring entity since project inception. The billed costs are recorded in the corresponding CIP account by the sponsoring entity, but only capitalizable costs. See CIP.

&"Calibri (Body),Bold"&16&K01+028REPORT DATE: &D &"Calibri,Bold"&16&K01+029PROJECT STATUS REPORT &"Calibri (Body),Bold"&16&K01+020Radiology Repair Project_PN92565

&"Calibri Light (Headings),Regular"PROJECT SPONSOR: DEFENSE HEALTH AGENCY-FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"TEMPLATE VERSION: v.06 9 Feb 22

TAB 1 OVERVIEW

1PROJECT INFORMATIONTERMS
AREPORT DATE1-Oct-22IPROJECT NUMBERPN89902ACOAdministrative KO
BPROJECT TITLEIO-T Charleston CSDCJBUILDING NUMBERSAORArea of ResponsibilityThe region of the world in which the work is performed
CFISCAL YEARFY22KJURISDICTIONKPContracting Officer
DPROJECT LOCATIONSouth CarolinaLFACILITY TYPECORContracting Officer Representative
EAPPROPRIATIONOM-IOTMMULTI-PHASEDNoDORDesigner of RecordProfessional persons licensed, registered, certified stamps and seals construction documents
FFUNDING TYPENSCOPING ITEMSPersonal Property Procurement, Outfitting and TransitionFEFacilities EnterpriseThe name of the DHA division responsible for all DoD healthcare facilities
GWORK CLASSIFICATIONOMARKETOtherFYFiscal YearThe year the project is appropriated
HINSTALLATION NAMECHARLESTON AFBPPROJECT DELIVERY METHOD/CONTRACT TYPEIOT Only ContractGSFGross Square Feet
HHigh RiskTBD: 30-days until impact to cost/schedule
5RISK OVERVIEWIOInitial OutfittingThe act of outfitting the new/newly renovated space; funded with OM-IO dollars
LEADERSHIP ACTION REQUIREDNUMBER OF RISKS/LEVELSCHEDULE EXPOSURECOST EXPOSURELLow RiskTBD:90-days+ until impact to cost/schedule
A[No or Yes-Name & Title][No. High Risk Items]H[Total Impact to POP][$ Total Cost Exposure]MModerate RiskTBD:60-days until impact to cost/schedule
B[No or Yes-Name & Title][No. Mod Risk Items]M[Total Impact to POP][$ Total Cost Exposure]POPPeriod of PerformanceThe time it takes the Contractor and Subcontractors to perform the terms of the contract
C[No or Yes-Name & Title][No. Low Risk Items]L[Total Impact to POP][$ Total Cost Exposure]PPPersonal PropertyNon-fixed property; funded with OM-IO dollars
PMProject ManagementIndividuals responsible for leading their respective teams in the execution of the work
6REQUEST FOR INFORMATION OVERVIEWRPReal PropertyFixed building and/or infrastructure; funded with MILCON or OM-SRM dollars
ARFIs TO DATE[Number]BPAST DUE[Number]RPIEReal Property Installed EquipmentFixed equipment and/or systems funded with MILCON or OM-SRM dollars
RFIRequest for InformationCorrespondence between Government and Contractor
7PROJECT MANAGEMENTTTransitionThe act of moving occupants and property, cleaning, property disposition; OM-IO funded
A-PROJECT MANAGEMENT: CONTRACTORSCAConditional AcceptanceReceipt of Iterim 1354: Conditional Acceptance: FAR term. Also referred to as: “Placed in Service” Date (UFC Term), “Partial Acceptance” Date (Phased Projects) (Agent Term), or “Beneficial Occupancy” or “Early Access” Date (Agent Term)
1BUILDER[Company Name]4BUILDER PROJECT MANAGER[Name & Email]Government assumes ownership of existing identified supplies tendered/approves specific services rendered as partial or complete performance of the contract (FAR 46.101)
2DESIGNER OF RECORD[Company Name]5DOR PROJECT MANAGER[Name & Email]FAFinal AcceptanceReceipt of Revised 1354: Acceptance: A standardized term used extensively throughout contract and construction governance regardless of Agent (FAR, UFCs, UFGS, and DoD Issuances).
3IO/T SUB/CONTRACTOR[Company Name]6IO/T PROJECT MANAGER[Name & Email]CCContract CompleteReceipt of Revised 1354; End of Warranty Period
B-PROJECT MANAGEMENT: DESIGN & CONSTRUCTION/IO&T AGENTADAccepted DesignCorrected final design submittal where the Designer of Record (DOR) has officially stamped and sealed the construction documents, where the government has reviewed the final submittal, and all comments have been resolved
1PROJECT MANAGEMENT OFFICECE-SWL5PROJECT MANAGER (PM)Ben Bradshaw, Kane, benjamin.r.bradshaw@usace.army.milNTPNotice to Proceed
2MEDICAL EXPERTISE OFFICE

Allison Keck: This can be any "Center of Excellence" (i.e. MCX, MO&T, Cybersecurity, etc.)

CE-SWL6CONTRACTING OFFICER (KO)Vonda Rogers, Vonda.S.Rogers@usace.army.milOFBOpen for BusinessSee "Construction Complete"
3ACO OFFICECE-SWL7ADMINISTRATIVE KO (ACO)[Name & Email]Open for Business = DHA Term (Patient Care Starts)
4COR OFFICECE-SWL8CONTRACTING OFFICER REP (COR)Ben Bradshaw, Kane, benjamin.r.bradshaw@usace.army.milInspection of ConstructionAcceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.(FAR 52.246-12 Inspection of Construction)
C-PROJECT MANAGEMENT: DEFENSE HEALTH AGENCY-FACILITIES ENTERPRISE
1DHA-FE BRANCH[Drop-Down Menu]4DHA-FE PROJECT OFFICER[Name & Email]Work in Progress (WIP)UFC 1-300-08: Work-in-Progress (WIP): In the context of real property construction, represents the accumulation of costs by construction agent billed to the sponsoring entity since project inception
2DHA-FE REGION[Drop-Down Menu]5DHA-FE PROJECT LEAD[Name & Email]Costs are recorded in the corresponding CIP account by the sponsoring entity, but only capitalizable costs. See CIP
3DHA-FE AOR[Drop-Down Menu]6DHA-FE PLANNER/IO&T PLANNER LEAD[Name & Email]Critical ItemCritical item: failure likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the item; or is likely to prevent performance of a vital agency mission (FAR 46.101 Quality Assurance, Definitions)
Critical NonconformanceCritical Nonconformance: likely to result in hazardous or unsafe conditions; or is likely to prevent performance of a vital agency mission. (FAR 46.101 Quality Assurance, Definitions)
Major NonconformanceMajor Nonconformance: other than critical, likely to result in failure; or to materially reduce the usability for their intended purpose (FAR 46.101 Quality Assurance, Definitions)
Minor NonconfirmanceMinor Nonconformance: not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. (FAR 46.101 Quality Assurance, Definitions)
TestingTesting: Inspection that determines the properties or elements, including functional operation of supplies or their components, by the application of established scientific principles and procedures (FAR 46.101 Quality Assurance, Definitions)
&"Calibri,Bold"&14&K01+030REPORT DATE: &D&"Calibri,Bold"&14&K01+030TAB 1 OVERVIEW: PROJECT WEEKLY REPORT
&"Calibri (Body),Bold"&14&K01+030PROJECT TITLE

&"Calibri Light (Headings),Regular"&9&K000000PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.06 9 Feb 22

TAB 2 COSTS

POP (CD)SUBCLINSUBCLINSUBCLINSUBCLINTOTAL ($M)EARNINGS ($M)FAC NODESCRIPTION
AFYCLIN TITLECLINDESIGN ($M)BUILD/RPIE ($M)PROCUREMENT ($M)PERSONAL PROPERTYNOTES
1FY22Transition Services0001NA[Days]$0.00$0.00$0.00$0.00$0.00$0.00[Bldg No][CLIN Title]TPFTemporary Phasing FacilityTemporary Facilities (to include planning/design/outfitting/transition) funded with MILCON/OM-SRM)
2FY22Personal Property FF&E LVS0002NA[Days]$0.00$0.00$0.00$0.00$0.00$0.00[Bldg No][CLIN Title]IBEIntegrated Building EquipmentPersonal Property greater than $250K funded with "Procurement" appropriations
3[FY][CLIN Name]003NA[Days]$0.00$0.00$0.00$0.00$0.00$0.00[Bldg No][CLIN Title]RPReal PropertyThe Design/Construction of fixed building and infrastructure funded with "MILCON or OM" appropriations
4[FY][CLIN Name]004NA[Days]$0.00$0.00$0.00$0.00$0.00$0.00[Bldg No][CLIN Title]RPIEReal Property Installed EquipmentFixed building equipment funded with "MILCON or OM" appropriations
5[FY][CLIN Name]005NA[Days]$0.00$0.00$0.00$0.00$0.00$0.00[Bldg No][CLIN Title]PPPersonal PropertyPersonal property (non-fixed) funded with "OM" appropriations (aka OM-IOT)
6[FY][CLIN Name]006NA[Days]$0.00$0.00$0.00$0.00$0.00$0.00[Bldg No][CLIN Title]IOInitial OutfittingIO = act of procuring and installing personal property (PP)
7[FY][CLIN Name]007NA[Days]$0.00$0.00$0.00$0.00$0.00$0.00[Bldg No][CLIN Title]TTransition ServicesT = act of moving occupants & property, cleaning, public relations support; disposition of property
8AWARD TOTALS[ Days]$0.00$0.00$0.00$0.00$0.00$0.00MODModifications
BFYMODIFICATIONSCLINCHANGE TYPEPOPDESIGNBUILD+RPIEPROCUREMENTPERSONAL PROPERTYTOTALEARNINGSTYPEDESCRIPTIONCRChange Request
1[FY][Days][D/ND][Facility Type/Name/Dept Name]CLINCost Line Item Number
2[FY][Days][D/ND][Facility Type/Name/Dept Name]POPPeriod of Performance
3[FY][Days][D/ND][Facility Type/Name/Dept Name]FYFiscal Year Funded
4[FY][Days][D/ND][Facility Type/Name/Dept Name]DesignDesign in includes Real Property, RPIE, EIP, and PP
5[FY][Days][D/ND][Facility Type/Name/Dept Name]
6[FY][Days][D/ND][Facility Type/Name/Dept Name]CHANGE TYPES
7[FY][Days][D/ND][Facility Type/Name/Dept Name]DDiscretionary(FAR 52.243-4) Changes resulting from conditions differing from the original design, e.g., new federal

regulation, code, criteria, mission changes, or enhancement. These changes must be directed by a government agency, using/programming command/service, or customer and generally, relate to ease of maintainability, operability, or an enhancement of quality of life for the user (soldier). Reference FAR 52.243-4.

8[FY][Days][D/ND][Facility Type/Name/Dept Name]NDNon-Discretionary
9[FY][Days][D/ND][Facility Type/Name/Dept Name]ND-ECND-Engineering Change(FAR 52.243-4) Changes, accountable to the U.S. Army Corps of Engineers, which are necessary to remedy deficiencies in the contract plans and specifications (refer to "Changes" Clause – FAR 52.243-4). These changes do not necessarily indicate a Design Deficiency.
10[FY][Days][D/ND][Facility Type/Name/Dept Name]ND-COND-Contract Options(FAR 52.214-27) Changes resulting from various reasons such as changes in tax as a result of tax law changes, decrease in inspections, decreases because of inaccurate price or description furnished by the contractor, etc.
11MOD TOTALS[ Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount]ND-DSCND-Differing Site Conditions(FAR 52.217-7) Exercised with construction funds after award of the basic contract. The option must be specifically identified in the original Bid Documents. Miscellaneous Changes (FAR 52.214-27) changes in tax law, decrease of inspections, decrease because of inaccurate price or description provided by contractor.
CFYCHANGE REQUESTSCHANGE TYPEPOPDESIGNBUILD+RPIEPROCUREMENTPERSONAL PROPERTYTOTALTYPEDESCRIPTIONND-VECND-Value Engineering Change(FAR 52.236-2) Subsurface or latent physical conditions at the site which differ materially from those indicated in the contract or unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract and not identified through a normal engineering site investigation.
1[FY][Days][D/ND][Facility Type/Name/Dept Name]ND-ACND-Administrative Change(FAR 43.101). Change that does not affect the substantive rights of the parties (e.g., a change in the paying office, appropriation data, contractor address change, funding change such as continuing authority civil contracts, etc.). The change MUST be for no cost to the contract price and no time extension.
2[FY][Days][D/ND][Facility Type/Name/Dept Name]ND-ASCND-Adverse Security Conditions(FAR 52.249-10) Change in contract price or time that is caused by acts of civil disobedience, war, or other turmoil, that affects the completion or continuation of contract performance, or that unreasonably delays the contractor’s workforce.
3[FY][Days][D/ND][Facility Type/Name/Dept Name]ND-EDND-Excusable Delay No Default(FAR 52.249-10) Change in contract period for weather (including floods), strikes, fires, epidemics, freight embargoes, material or supply shortages, delays of subcontractors or suppliers, and other events which are determined to be beyond the control a without fault or negligence of both the contractor and the subcontractors or suppliers. Change involves time only, no contract cost.
4[FY][Days][D/ND][Facility Type/Name/Dept Name]ND-GFPND-Govt Furnished Property(FAR 52.245-2 and 52.245-4) Corrections in deficiencies in equipment or property supplied by the Government including delays by the Government in providing GFP.
5[FY][Days][D/ND][Facility Type/Name/Dept Name]ND-VEQND-Variations in Est Quantities(FAR 52.212-11) Overruns and underruns of quantities included in the contract. The quantities MUST be listed as Contract Line Items
6[FY]D[Days][D/ND][Facility Type/Name/Dept Name]ND-SOWND-Suspension of Work(FAR 52.249-2) Temporary work stoppage on all or part of a contract with the intent of restarting work at a later date (Suspensions
7[FY]D[Days][D/ND][Facility Type/Name/Dept Name]ND-TOWND-Termination of Work(FAR 52.249-2) Permanent work stoppage on all or part of a contract by deleting a portion of the scope from the contract requirements.
8[FY]D[Days][D/ND][Facility Type/Name/Dept Name]ND-CCND-Construction Change(FAR 52.242-4) Changes not falling into one of the other reason codes.
10[FY]D[Days][D/ND][Facility Type/Name/Dept Name]ND-RFQND-Revaluation Foreign Currency
11COST EXPOSURE[ Days][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount][$ Amount]NA
DFYPOTENTIAL CHANGESCHANGE TYPEPOPDESIGNBUILD+RPIEPROCUREMENTPERSONAL PROPERTYTOTALTYPEDESCRIPTION
1[FY][Days][D/ND][Facility Type/Name/Dept Name]IBEUFC 1-300-08: Separate lists of installed building equipment (IBE) (real property) and equipment in place (EIP) (personal property) may be attached to the DD Form 1354 in accordance with Service guidance
2[FY][Days][D/ND][Facility Type/Name/Dept Name]EIPUFC 1-300-08: Equipment in Place (EIP) - This is a special category of personal property (not real property). EIP consists of capital equipment and other nonexpendable equipment of a movable nature that has been fixed in place or attached to real property, but not as an integral part of the facility, and therefore may be severed or removed from a facility without severely damaging, destroying or reducing the usefulness of the facility. EIP is personal property and does not include installed building equipment. It is accounted for on property book records (not real property records). EIP costs may be included as a funded construction cost.
3[FY]D-VE[Days][D/ND][Facility Type/Name/Dept Name]NANOT APPLICABLE
4[FY]D[Days][D/ND][Facility Type/Name/Dept Name]
5[FY]D[Days][D/ND][Facility Type/Name/Dept Name]
7COST EXPOSURE[ Days]$0.00$0.00$0.00$0.00$0.00$0.00

&"Calibri (Body),Bold"&14&K01+030REPORT DATE: &D &"Calibri (Body),Bold"&14&K01+029TAB 2 COSTS: PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&14&K01+029PROJECT TITLE

PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE TEMPLATE VERSION: v.06 9 Feb 22

TAB 3 SCHEDULE

CLINORIGINAL DAYSREVISED DAYSDAYS CHANGEDRISKTERMSNOTES
APOPPERIOD OF PERFORMANCE (DESIGN)9509500Red Text = PSR Items - DO NOT DELETE
BPOPPERIOD OF PERFORMANCE (CONSTRUCTION)8608600POPPeriod of PerformanceEstablished by the Contract Documents (refer to contract for whether time is tracked in calendar vs work/duty days)
CPOPPERIOD OF PERFORMANCE (OUTFITTING)21221TPFTemporary Phasing FacilityTemporary facilities used to house medical staff and/or patients during the facility/department renovation process
#PHASEACTIVITYORIGINAL STARTREVISEDDAYS CHANGED% CHANGEEIPEquipment in PlacePersonal Property greater than $250K funded with "Procurement" appropriations
1DESIGNDESIGN AWARD (DB)/DESIGN-CONSTRUCTION AWARD[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!RPReal PropertyFixed building and infrastructure funded with "MILCON or OM" appropriations
2DESIGNDESIGNER OF RECORD SUBMITTAL 5% (DBB) (N/A)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!RPIEReal Property Installed EquipmentFixed building equipment funded with "MILCON or OM" appropriations
3DESIGNDESIGNER OF RECORD SUBMITTAL 20% (DBB) (N/A)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!PPPersonal PropertyPersonal property (non-fixed) funded with "OM" appropriations (aka OM-IOT)
4DESIGNDESIGNER OF RECORD SUBMITTAL 35% (DBB/DB/IDBIO) (N/A)

Allison Keck: MILCON: This is the "post award" DOR-provided 35% Design (it is not the preaward 35% budget quality estimate required by the Comptroller (aka AACEi Class 3/4/5)

[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!PISPlaced In ServiceSee "Conditional Acceptance"
5DESIGNDESIGNER OF RECORD SUBMITTAL 65% (DB)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!IO/TInitial Outfitting/TransitionIO = The act of procuring and installing personal property (PP); T = act of moving occupants & property, cleaning, public relations support; disposition of property
6DESIGNDESIGNER OF RECORD SUBMITTAL 95% (DB)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!CPConstruction Complete
7DESIGNDESIGN SUBMITTAL 100% CORRECTED (ACCEPTED DESIGN) (DRAFT DD FORM 1354s & 250s)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!OFBOpen for Business
8DESIGNREVISED ACCEPTED DESIGN (PERSONAL PROPERTY "REFRESH") (DBB/DB/IDBIO)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!FAR 36.515 Schedules for Construction Contracts
9PRECONPRECONSTRUCTION SUBMITTALS[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!Acceptance: A standardized term used extensively throughout contract and construction governance regardless of Agent (FAR, UFCs, UFGS, and DoD Issuances).
10PRECONGOVERNMENT TRAILER IN PLACE[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!Conditional Acceptance: FAR term. Also referred to as: “Placed in Service” Date (UFC Term), “Partial Acceptance” Date (Phased Projects) (Agent Term), or “Beneficial Occupancy” or “Early Access” Date (Agent Term)
11PRECONTEMPORARY PHASING FACILITIES IN PLACE[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!Real Property Conditional Acceptance (aka “Beneficial Occupancy” or “Early Access”) is governed by FAR 52.236-11 Use and Possession Prior to Completion
12CONST PH 1CONSTRUCTION AWARD (DBB)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!X Text = Milestones Required for 2851 Reports
13CONST PH 1CONSTRUCTION START (DB)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!Open for Business = DHA Term (Patient Care Starts)
14CONST PH 1IO/T AWARD/START (PERSONAL PROPERTY)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!Disposition = To dispose of or excess property via formal channels
15CONST PH 1RP/RPIE: CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
16CONST PH 1PROCUREMENT EQUIP (EIP): CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!FARREFERENCES: ACCEPTANCE
17CONST PH 1WARRANTY STARTS[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!46FAR 46.101 Quality Assurance
18CONST PH 1RP/RPIE: CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received) (BOD/PLACED IN SERVICE)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!46FAR 46.501 Acceptance, General
19CONST PH 1PROCUREMENT EQUIP (EIP): FINAL ACCEPTANCE (Revised DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!52FAR 52.246-21 Warranty of Construction
20IOT PH 1PERSONAL PROPERTY: CONDITIONAL ACCEPTANCE (Interim DD Form 250s)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!52FAR 52.236-11 Use and Possession Prior to Completion
20IOT PH 1PERSONAL PROPERTY: FINAL ACCEPTANCE (Revised DD Form 250s)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!UFC 1-300-08 Criteria and Transfer and Acceptance of Real Property
22IOT PH 1RIBBON CUTTING[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!DODI 5000.64 Accountability and Management of DoD Equipment
23IOT PH 1OPEN FOR BUSINESS[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
24IOT PH 1DISPOSITION OF PROPERTY COMPLETE[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!UFGS 01 45 00 Quality Control, See Acceptance
25CONST PH 2CONSTRUCTION START (NTP) (DBB/DB/IDBIO)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!EP 415-1-260 Area/Resident Engineer Management Guide
28CONST PH 2IO/T AWARD/START (PERSONAL PROPERTY)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
29CONST PH 2RP/RPIE: CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received) (BOD/PLACED IN SERVICE)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!FAR 46.101 Definitions, Acceptance = assumes ownership of existing identified supplies tendered or approves specific services rendered as partial or complete performance of the contract.
30CONST PH 2PROCUREMENT EQUIP (EIP): CONDITIONAL ACCEPTANCE (Interim DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!FAR 46.1010 Conditional Acceptance of supplies or services that do not conform to contract quality requirements, or are otherwise incomplete, that the contractor is required to correct or otherwise complete by a specified date
31CONST PH 2WARRANTY STARTS[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!UFC 1-300-08: The interim DD Form 1354 will include actual project costs to be capitalized as reflected in the CIP account by RPUID. It includes costs such as P&D, SIOH, and construction contracts.
32CONST PH 2RP/RPIE: FINAL ACCEPTANCE (Revised DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
33CONST PH 2PROCUREMENT EQUIP (EIP): FINAL ACCEPTANCE (Revised DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
34IOT PH 2PERSONAL PROPERTY: CONDITIONAL ACCEPTANCE (Interim DD Form 250s)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
36IOT PH 2PERSONAL PROPERTY: FINAL ACCEPTANCE (Revised DD Form 250s)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
37IOT PH 2RIBBON CUTTING[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
38IOT PH 2OPEN FOR BUSINESS[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
39IOT PH 2DISPOSITION OF PROPERTY COMPLETE[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
40CLOSEOUTCLOSEOUT SUBMITTALS[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
41CLOSEOUTRP/RPIE CONTRACT COMPLETE (Close of Warranty-Final DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
43CLOSEOUTEIP CONTRACT COMPLETE (Close of Warranty-Final DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
44CLOSEOUTPP CONTRACT COMPLETE (Close of Warranty-Final DD Form 250s Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
45CLOSEOUTONE-YEAR WARRANTY PERIOD ENDS (Close of Warranty)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
43CLOSEOUTCLOSEOUT SUBMITTALS[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
44CLOSEOUTRP/RPIE CONTRACT COMPLETE (Close of Warranty-Final DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
45CLOSEOUTEIP CONTRACT COMPLETE (Close of Warranty-Final DD Form 1354 Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
46CLOSEOUTPP CONTRACT COMPLETE (Close of Warranty-Final DD Form 250s Received)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!
47CLOSEOUTONE-YEAR WARRANTY PERIOD ENDS (Close of Warranty)[Day-Mo-Yr][Day-Mo-Yr]ERROR:#VALUE!

&"Calibri (Body),Bold"&14&K01+031REPORT DATE: &D &"Calibri (Body),Bold"&14&K01+031TAB 3 SCHEDULE: PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&14&K01+032PROJECT TITLE

&"Calibri Light (Headings),Regular"&9PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.06 9 Feb 22

TAB 4 SCOPE

# CLIN BUILDING DEPARTMENT SCOPING ITEMS

Allison Keck: IN ADDITION TO THE DEPARTMENT/BUILDING NAME, INCLUDE SCOPING DESCRIPTION. EXAMPLES:

6 MSU Beds, 3 ORs, 6 LDRP Beds, 2 Post Part, 1-C-section OR, Behav Hlth, Diagnostic Imaging, E&T, ER, Med/Surg Specialty clinics, Fam Health, Peds, PT/OT, Ortho, Opt, Lab, Rx, Prev Med

16 General DTRs, 2 Peds, 2 Ortho, 1 Endo, 1 Prost, 1 Perio, 1 Oral Surgery), DIPC, Lab, X-RayGROSS SQUARE FEETLEVEL OF ALTERATIONTYPE OF SPACENOTES
AWARDREVISEDDELTAPROPOSEDREVISEDPROPOSEDREVISEDTYPE OF SPACELEVELS OF ALTERATION
10H MCInpatient Hosp/Med Center1
20MC (A)Medical Clinic (attached)2
30MC (F)Medical Clinic (freestanding)3
40MO/AMed Office/AdminNA
5BHMental/Behavioral Health Clinic
6VVeterinary Clinic
7PGParking Garage
8DCDental Clinic
9PharPharmacy (freestanding)
TOTAL00Lab (F)Medical Lab (freestanding)
BEEBEE/EPMU
WMedical Warehouse
ETMed Educ/Training

&"Calibri (Body),Bold"&14&K01+032REPORT DATE: &D &"Calibri,Bold"&14&K01+032TAB 4 SCOPE: PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&14&K01+032PROJECT TITLE

&"Calibri Light (Headings),Regular"&10PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.06 9 Feb 22

TAB 5 RISK

#LEVEL OF RISKDATE ENTEREDPLANNED RESOLUTIONRESOLVEDEST IMPACT TO CRITICAL PATHEST IMPACT TO COSTRISK TYPERISK & PLAN TO MITGATEACTION POCNOTES
1HIGH[1-Feb-21][1-Feb-21][1-Feb-21][Calendar Days][Dollar Value][Owner/Contractor][Description][Name/Email]HIGH30-days until impact to cost/schedule
2MODERATEMODERATE60-days until impact to cost/schedule
3LOWLOW90-days+ until impact to cost/schedule
4NO IMPACTNo Risk to Cost or Schedule (i.e. Administrative Changes)
5POCPoint of Contact accountable to act on the risk
6OwnerGovernment
7Mitigate = to reduce the impact on cost, schedule, quality, scope
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

&"Calibri (Body),Bold"&14&K01+032REPORT DATE: &D &"Calibri,Bold"&14&K01+032TAB 5: PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&14&K01+032PROJECT TITLE

&"Calibri Light (Headings),Regular"&9PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&10TEMPLATE VERSION: v.06 9 Feb 22

TAB 6 RFI LOG

#RFI NOTITLEACTIONSUBMITTEDDATE DUEPAST DUEURGENCYNOTES
1[No][RFI Title][Name, Title, Email][Date][Date][No of Days]HIGHHIGH30-days until impact to cost/schedule
2MODERATEMODERATE60-days until impact to cost/schedule
3LOWLOW90-days+ until impact to cost/schedule
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

&"Calibri (Body),Bold"&14&K01+034REPORT DATE: &D &"Calibri,Bold"&14&K01+032TAB 6 RFIs: PROJECT WEEKLY REPORT &"Calibri (Body),Bold"&14&K01+032PROJECT TITLE

&"Calibri Light (Headings),Regular"&10PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&10TEMPLATE VERSION: v.06 9 Feb 22

TAB 7 PDT_SUBMITTAL DISTRO

#POSITIONAGENCYNAMEADDRESSE-MAILPHONE NUMBERHARD COPY (H)/ELECTRONIC (E)/NONE (0)/COMPACT DISC (CD)
DESIGN SUBMITTALSIOTCONSTRUCTIONALL
BINDERS & DRAWINGSCOLOR BOARDSFINAL ACCEPTED DESIGNIO/T INCL DEPT BINDERSSHOP DRW/ SAMPLES/ REPORTSCONTRACT MODS
1CONTRACTING OFFICERAGENTVonda Rogers700 W. Capitol Ave, Room 7000
Little Rock, Arkansas 72201vonda.s.rogers@usace.army.milE0E00E
2CONTRACTING SPECIALISTAGENTTelia Mahomes700 W. Capitol Ave, Room 7000
Little Rock, Arkansas 72201telia.r.mahomes@usace.army.milE0E + CDEEE
3PROJECT MANAGERAGENTBen Bradshaw700 W. Capitol Ave, Room 3509
Little Rock, Arkansas 72201benjamin.r.bradshaw@usace.army.mil501-340-1046E0EE0E
4CONTRACTING OFFICER REPAGENTBen Bradshaw700 W. Capitol Ave, Room 3509
Little Rock, Arkansas 72201benjamin.r.bradshaw@usace.army.mil501-340-1046E0E + CDEEE
5PROJECT OFFICER/LEAD - GSUDHA-FE1Lt Deon Saunders601 Davy Crockett, Bldg 1534, Suite 100 San Antonio, TX 78226deon.r.saunders.mil@mail.milEEEEE + HE0
6PROJECT ADMINISTRATORDHA-FEYadira Ramirez-Peterson[Address]yadira.p.ramirez-peterson.ctr@mail.milEEE + CDEEE
7PROJECT OFFICER (AD/GS)DHA-FE[Name][Address][Email]EEEEEE
8PROJECT LEAD (CONTRACTOR)DHA-FEScott Shields[Address]rshields@nikasolutions.comEEEEEE
9FACILITY/CLINICAL PLANNERDHA-FE[Name][Address][Email]EEEEEE
10ARCHITECTURAL PLANNERDHA-FE[Name][Address][Email]EEEEEE
11EQUIPMENT REPDHA-FEDonald Napierala[Address]donald.j.napierala.ctr@mail.milEEEEEE
12COMMUNICATIONS/CYBER REPDHA-FEChristine Toscano[Address]christine.f.toscano.ctr@mail.milEEEEEE
13COMMUNICATIONS/CYBER REPDHA-FEJesus Soto[Address]jesus.a.soto18.ctr@mail.milEEEEEE
14COMMUNICATIONS/CYBER REPDHA-FEWillie A (Franco) Francois[Address]willie.a.francois.ctr@mail.milEEEEEE
15INTERIOR DESIGNDHA-FEKaren Samson[Address]karen.d.samson.ctr@mail.milEEEEEE
16IOT COORDINATORDHA-FEKamil Hattoum[Address]kamil.hattoum.ctr@mail.milEEEEEE
17LAN/WLANDHA-FEMarvin Siu[Address]marvin.r.siu.ctr@mail.milEEEEEE
18LAN/WLANDHA-FEScott James[Address]scott.b.james8.ctr@mail.milEEEEEE
19LAN/WLANDHA-FEMikey Pugh[Address]mickey.b.pugh.ctr@mail.milEEEEEE
20ARCHITECTURAL REPDHA-FE[Name][Address][Email]EEEEEE
21MECHANICAL REPDHA-FE[Name][Address][Email]EEEEEE
22ELECTRICAL REPDHA-FE[Name][Address][Email]EEEEEE
23MTF FACILITY MANAGERMTF[Name][Address][Email]EEEE + HEE
24LOGISTICS MANAGERMTF[Name][Address][Email]E0EE0E
25INFORMATION SYSTEMSMTF[Name][Address][Email]E0EEEE
26AUTHORITY HAVING JURISDICTIONINSTALLATION[Name][Address][Email]E0E0EE
27COMMUNICATIONSINSTALLATION[Name][Address][Email]E0E0EE
28CIVIL WORKS/ENGINEERSINSTALLATION[Name][Address][Email]E0E0EE
TOTAL:

&"Calibri,Bold"&K01+034REPORT DATE: &D &"Calibri,Bold"&K01+034TAB 7 PDT-DISTRO: PROJECT WEEKLY REPORT &"Calibri,Bold"&K01+034PROJECT TITLE

&"Calibri Light (Headings),Regular"&9PROJECT SPONSOR: DEFENSE HEALTH AGENCY - FACILITIES ENTERPRISE &"Calibri Light (Headings),Regular"&9TEMPLATE VERSION: v.06 9 Feb 22 mailto:rshields@nikasolutions.commailto:jesus.a.soto18.ctr@mail.milmailto:willie.a.francois.ctr@mail.milmailto:marvin.r.siu.ctr@mail.milmailto:scott.b.james8.ctr@mail.milmailto:mickey.b.pugh.ctr@mail.milmailto:yadira.p.ramirez-peterson.ctr@mail.milmailto:deon.r.saunders.mil@mail.milmailto:vonda.s.rogers@usace.army.milmailto:benjamin.r.bradshaw@usace.army.milmailto:benjamin.r.bradshaw@usace.army.milmailto:karen.d.samson.ctr@mail.milmailto:kamil.hattoum.ctr@mail.milmailto:donald.j.napierala.ctr@mail.milmailto:christine.f.toscano.ctr@mail.mil

TERMS AND DROP DOWN MENUS

MARKET AREAINSTALLATION NAMESPROJECT LOCATIONRESPONSIBLE BRANCHWORK CLASSIFICATIONAGENT MEDICAL SUPPORT OFFICESYES/NOAGENTSEXISTING CONDITIONS: DRAWINGS, SURVEYS & REPORTSPROJECT REQUIREMENT DEVELOPMENT
NATIONAL CAPITAL REGIONRICDABERDEEN PG - USAMRICDALAlabamaCSMCapital Strategy ManagementRRepairMXMX-Center of ExcellenceYesUSACEUSACE-DISTRICTSPrevious Project Documentation: Record Documents
NATIONAL CAPITAL REGIONABERABERDEEN PV GRD-PH CENTERAKAlaskaDCADesign Construction ActivationMMaintenanceMFDOMedical Facility Planning OfficeNoCE-POAAlaska District-USACERecord SpecificationsFunctional Program/Concept of Operations
THAILANDAFBKAFRIMS BANGKOKAZArizonaFOB-EDFOB Engineering & DesignCConstructionNANot ApplicableNACE-SPAAlbuquerque District-USACERecord Drawings (As-Builts)Not Applicable
THAILANDAFPHAFRIMS PHILIPPINESARArkansasFOB SRM-PMFOB SRM Portfolio ManagementDDemolitionOOtherCE-NABBaltimore District-USACERecord O&M ManualsProgram for Design (PFD)
CENTRAL OKLAHOMAALTUALTUS AFBCACaliforniaFOB-OMFOB Ops & MaintenanceCE-LRBBuffalo District-USACERecord Test & Certification ReportsContingency Mode Operations (CMO)
NATIONAL CAPITAL REGIONADRWANDREWS AIR FORCE BASECOColoradoFMBFinancial ManagementPROJECT DESCRIPTIONAGENT FEESCE-SACCharleston District-USACEOtherOther
SOUTHWEST GEORGIAANNIANNISTON ARMY DEPOTCTConnecticutSABStaff & Admin BranchNEWNew Construction (New Mission)2.50%Planning & DesignP&DCE-LRCChicago District-USACEAllAll
NATIONAL CAPITAL REGIONAPGRAPG/EA AREADEDelawareRPMReal Property MgmtADALAddition + Alteration5.70%USACE Supervision & AdminstrationS&ACE-LREDetroit District-USACEFunctional: Surveys & Reports
NORTHERN ITALYAANXAVIANO AIR BASEFLFloridaMTFMedical Treatment FacilityALTAlteration6.50%USACE Supervision & Adminstration-OCOUNSS&ACE-EUEurope District-USACENot ApplicableArchitectural Requirements
NORTHERN ITALYAMAIAVIANO AIR BASEGAGeorgiaOtherOtherADDAddition1.50%Design, During ConstructionDDCCE-POFFar East District-USACEMission Essential Assessment (MEA)Not Applicable
CENTRAL EUROPEBGRAB-GRAFENWOEHR TOWER BCKSHIHawaiiNANot ApplicableRPLReplacementPost Construction Award ServicesPCASCE-SWFFort Worth District-USACESafety Risk Assessment (SRA)Non-Permanent & Temporary Facilities (Div 1)
CENTRAL EUROPEBHOHB-HOHENFELS TR AREAIDIdahoFOB OM-PMFOB Project ManagementLEASELease2.00%Commissioning AgentCXACE-SFGGalveston District-USACEEnvironment of Care ReportSustainability & Energy Efficient Design (Div 1)
CENTRAL EUROPEBKATB-KATTERBACH KASERNEILIllinoisGEOGRAPHIC TEAMDETAILED PROJECT DESCRIPTION0.50%USACE Center of ExpertiseMXCE-POHHonolulu District-USACEMaterial Handling & Transporation StudyDemolition, Remediation & Disposition (Div 2)
CENTRAL EUROPEBSHIB-SHIPTON KASERNEINIndianaEEastNewNew Construction (New Mission)1.00%Earned Value Management SystemGEVMSCE-LRHHuntington District-USACEFood Service StudyCabinetry (Div 6)
CENTRAL EUROPEBPANB-STUTTGART-PANZER KASERNIAIowaWWestADALAddition + Altertion8%NAVFAC Supervision, Inspection, OverheadeSIOHCE-HNCHuntsville Ctr -USACETemporary Facilities /Swing Space SurveyRoofing & Envelope (Div 7)
CENTRAL EUROPEBPATB-STUTTGART-PATCH BCKSKSKansasMModernizationSS-AltSingle System Infrastructure1%In-House Staff (Contractors)HISCE-SAJJacksonville District-USACEOtherDoors & Windows (Div 8)
CENTRAL EUROPEBVILB-VILSECK ROSE BARRACKSKYKentuckyPPacificMS-AltMulti-System InfrastructureCE-POJJapan Engineer District-USACEAllExterior Finishes (Div 9)
SAN DIEGOBALBBALBOALALouisianaEUEuropeSD-AltSingle Dept AlterationTRANSITION COSTSCE-NWKKansas City District-USACEEnvironmental: Surveys & ReportsExterior Signage, Partitions, Storm Shutters (Div 10)
BARKSDALE AFBBARKBARKSDALE AFBMEMaineMD-AltMulti-Dept AlterationLevel of complexity – use price per sq ft based on occupancy:CE-SWLLittle Rock District-USACENot ApplicablePreFab Systems, Shielding & Bracing (Div 13)
BEALE AFBBEALBEALE AFBMDMarylandFISCAL YEARSD-AddSingle Dept Addition2%L1 – General Office (RMO, TOPA, Education & Training, Public Health, etc.)CE-LRLLouisville District-USACEHazardous Material: Report (NEPA)Anti-Terrorism & Physical Security (Div 34)
NBHC FORT WORTHFTWRBHC FORT WORTH TEXASMAMassachusettsFY19Fiscal Year 2019MD-AddMulti-Dept Addition3%L2 – Clinic Space & Heavy Office (Mental Health, Family Health, Women’s Health, TOPA, Medical Records, etc.)CE-MVMMemphis District-USACEOtherAccessibility
CORPUS CHRISTIKINGBHC KINGSVILLE TEXASMIMichiganFY20Fiscal Year 2020SF-RplSingle Facility Replacement5%L3 – Complex – Heavy Equipment Areas (OR, Radiology, Optometry, Dental, Lab, Emergency Dept, Physical Therapy, etc.)CE-MEMiddle East District-USACEArchitectural: Surveys & ReportsSound Transmission
NATIONAL CAPITAL REGIONANNABLDG 695 NHC ANNAPOLISMNMinnesotaFY21Fiscal Year 2021MF-RplMulti-Facility ReplacementsFactors to consider that increase cost:CE--SAMMobile District-USACENot ApplicableDetention Rooms
CENTRAL KENTUCKYBGADBLUE GRASS ARMY DEPOTMSMississippiFY22Fiscal Year 2022BTLBuild to Lease· # of phasesCE-LRNNashville District-USACEWorld-Class Features (Checklist)Security Sensitive Spaces
NATIONAL CAPITAL REGIONPHILBMC PHILADELPHIA PNBCMOMissouriFY23Fiscal Year 2023LeaseLease Only· # of moves per departmentCE-NAENew England District-USACESustainability: Design FeaturesOther
NATIONAL CAPITAL REGIONNSAWBMC WASHINGTON NAVY YARDMTMontanaFY24Fiscal Year 2024OtherOther· # of trips to site for TPCE-MVNNew Orleans District-USACEForce Protection: Situation ReportAll
NATIONAL CAPITAL REGIONBOLLBOLLING AFBNENebraskaFY25Fiscal Year 2025· % of reuse vs. new FFE/LVSCE-NANNew York District-USACEPhysical Security Assessment
COLORADOBUCKBUCKLEY AFBNVNevadaFY26Fiscal Year 2026APPLICABLE CRITERIA· Contingency %CE-NAONorfolk District-USACEDrawings: Construction & Demo BoundariesInterior Design Requirements
JACKSONVILLENASJBUMED HQNHNew HampshireFY27Fiscal Year 2027DHA-FEDHA-FE· Weekend moves vs. weekdayCE-NOWOmaha District-USACEOtherNot Applicable
NATIONAL CAPITAL REGIONBUMDBUMED HQNJNew JerseyFY28Fiscal Year 2028AArmy· Move within facility vs. load on truckCE-NAPPhiladelphia District-USACEAllProject Room Contents List (PRCL) (FF)
GREAT LAKESMOFFCAMMOFNMNew MexicoFY29Fiscal Year 2029NNavy· Specialty 3rd party equipment moves (not de-install/re-install done by vendor)CE-LRPPittsburgh District-USACEInterior Design: Surveys & ReportsInterior Finishes (Div 9)
CENTRAL KENTUCKYATTECAMP ATTERBURYNYNew YorkFY30Fiscal Year 2030AFAir Force· DRMO – how far away is the facility?CE-NWPPortland District-USACENot ApplicableSignage, Fixtures, Storage (Div 10)
SAN ANTONIOBULLCAMP BULLISNCNorth CarolinaVAVeteran Affairs· Does Facility have upper floors without elevators or limited to a small passenger elevatorCE-MVRRock Island District-USACEPersonal Property Inventory ReportFurnishings & Furniture (Div 12)
SAN ANTONIOCBTACAMP BULLISNDNorth DakotaAPPROPRIATION/FUND SOURCE ($)LLeaseCE-SPKSacramento District-USACEReal Property Inventory ReportArtwork (Div 12)
SAN ANTONIOCBTACAMP BULLIS -AMEDD C&SOHOhioUMCMILCON Unspecified Minor ConstructionOOtherPROJECT DESCRIPTION% OF EST CONTRACT COSTCE-SPNSan Francisco District-USACEMTF Furniture/Casework/Signage Standards ListComprehensive Interior Design (CID)
KOREACARRCAMP CARROLLOKOklahomaOM-SRMOperations & MaintenanceIOTPROCURMNTCE-SASSavannah District-USACEOtherStructural Interior Design (SID)
KOREACARRCAMP CARROLL - MRMCOROregonMILCONMilitary ConstructionACC-RPAmbulatory Care Center Replacement17.0%6.0%CE-NWSSeattle District-USACEAllOther
KOREACASECAMP CASEYPAPennsylvaniaPProcurementPROCUREMENT TEMPLATEACC-RAmbulatory Care Center Repair20.0%5.0%CE-MVSSt. Louis District-USACEMedical Devices & Equipment: Surveys & ReportsAll
OKINAWA ISLANDSCOURCAMP COURTNEY-6029RIRhode IslandHNHost NationDOR+IOTDOR ONLY + IOTMcL-RClinic Repair10.0%1.5%CE-MVPSt. Paul District-USACENot Applicable
OKINAWA ISLANDSFOSTCAMP FOSTER-6044SCSouth CarolinaRDTEResearch & DevelopmentDB+IOTDB + IOTDC-RDental Clinic Repair20.0%5.0%CE-TACTransatlantic Afghanistan District-USACEPersonal Property Inventory ReportMedical Devices and Equipment Requirements
SOUTHWEST GEORGIAFKMRCAMP FRANK MERRILLSDSouth DakotaOM-IOTInitial Outfitting & TranstionIDBIOIDBIODC-RPDental Clinic Replacement17.0%4.0%CE-SWTTulsa District-USACEReal Property Inventory ReportNot Applicable
NORTH CAROLINA COASTGEIGCAMP GEIGERTNTennesseeOtherOtherNANot ApplicableH-RPHospital Replacement15.0%1.5%SC-MVKVicksburg District-USACEMTF Medical Device/Equipment Standards ListProject Room Contents List (PRCL)
OKINAWA ISLANDSHNSNCAMP HANSEN-6011TXTexasH-RHospital Repair15.0%5.0%CE-NWWWalla Walla District-USACEOtherMedical Devices & Equipmen t(Div 11)
KOREAHUMPCAMP HUMPHREYSUTUtahFUNDING TYPE ($)REQUIRED/MISCMD-RMedical /Dental Clinic Repair15.0%2.0%CE-SAWWilmington District-USACEAllPrefabricated Equipment (Div 13)
NORTH CAROLINA COASTCPJOCAMP JOHNSONVTVermontSSustainmentYYesMD-RPMedical /Dental Clinic Replacement15.0%2.0%NAVFACNAVAC: REGIONAL COMMANDCommunications: Surveys & ReportsProcurement Equipment (Div 11)
OKINAWA ISLANDSKINSCAMP KINSER-6056VAVirginiaRRestorationNNoMA-RMedical Admin Repair20.0%1.5%NAV-EUNAVFAC Atlantic (EU)Not ApplicableOther

This is the start of the file's text. The full file is on GovTribe.