18. DRAFT - DHA 27 52 33 Refrigerator Monitoring Systems.pdf

PDF 61 KB Posted

Attached to
Charleston Consolidated Storage Distribution Center Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Army Corps of Engineers Engineering District Little Rock

About this file

This document contains a draft performance specification for refrigerator monitoring systems and a related special notice for an initial outfitting project at a consolidated storage and distribution center.

The draft specification outlines technical requirements for a non-proprietary monitoring system including accuracy standards for temperature and humidity sensors, data storage capabilities, alarm functions and training requirements. Product literature, warranty information and qualifications for installers must be submitted for review. Performance verification will include calibration tests, demonstration of backup power and interface functionality, and verification of cybersecurity controls.

The special notice indicates that the U.S. Army Corps of Engineers Little Rock District intends to issue a request for quote for an initial outfitting project at the Charleston Consolidated Storage and Distribution Center with an estimated value between $1.5-2 million. The requirement will be set aside for small businesses and quotes are due September 2nd, with award by January 19th, 2023. A site visit is scheduled for August 23rd and questions will be accepted through August 25th.

View the file

Other files for this federal contract opportunity

Other files attached to Charleston Consolidated Storage Distribution Center, newest first.
File Type Posted
7. DRAFT - CSDC GC Schedule 30Jun22.pdf PDF
11. DRAFT - JSN U0096 3-phase 480 VAC Powered Battery Charger For JSN U0060 Electric Forklift.pdf PDF
2. Base Access WORKSHEET V9_Dec20_ACC (002).pdf PDF
30. DRAFT - Template-DHA-FE FRCS Vendor Risk Assessment_v2.0.docx DOCX document
17. DRAFT - DHA 27 41 43 Audio Video Conferencing.pdf PDF
19. DRAFT - DHA ACAS-NESSUS Scanning Guide-CUI.pdf PDF
12. DRAFT - DHA FE Wayfinding Guidelines-Signage Standards (Draft)_01Mar22.pdf PDF
11. DRAFT - JSN U1021 Wall-MountedWireGuidanceSystemLineDriverandGuidanceControlWire-Forklift(JSN U0060).pdf PDF
5. DRAFT - Interiors_JBC CSDC - DP2 FINAL_drawings.pdf PDF
1. DRAFT - Drawings Installation Map - CSDS and ACC.pdf PDF
8. DRAFT - JB Charleston CSDC_PRCL_v.2_21Jan21.pdf PDF
20. DRAFT - DHA FRCS Baseline Categorization Memorandum-1 Oct 2020.pdf PDF
0. DRAFT FY22 IOT CSDC_Div 00_CLIN BID Schedule.xlsx XLSX spreadsheet
15. DRAFT - JB Charleston CSDC_Facility Site Approval.pdf PDF
13. DRAFT - JB Charleston CSDC_Program for Design_5Feb22.pdf PDF
Draft Solicitation_Special Notice_Charleston CSDC.pdf PDF
25. DRAFT - Template_DHA RMF Security Control Plan_Implementation Guidance.xlsx XLSX spreadsheet
31. DRAFT - Template-Inventory Report-Hardware-Software.pdf PDF
6. DRAFT - JBC CSDC - DP2 FINAL_drawings.pdf PDF
10. DRAFT - JB Charleston CSDC_DOR-Provided Final Furniture-Equipment Package_17Jan22.pdf PDF
22. DRAFT - DHA Privacy Impact Assessment PIA_Processes and Procedures.docx DOCX document
21. DRAFT - DHA MDE Categorization Memo.pdf PDF
11. DRAFT - JSN U0060 Electric Swivel Seated-Narrow-Isle 33' Vertical Swing Reach 3K Fork Lift.pdf PDF
32. DRAFT - Template-Ports-Protocols-Services Management Registry Update.xlsx XLSX spreadsheet
28. DRAFT - Template_Program of Record_DHA Info Sys Contingency Plan.docx DOCX document
2. Real ID TRI-Fold (15Sep20-V42).pdf PDF
27. DRAFT - Template_Information System_Incident Response Plan.docx DOCX document
24. DRAFTExample_IP Network External to Control System_Generic ICS Med-COI Boundary Diagram v4 (1).pdf PDF
16. DRAFT - Checklist_Control System Factory Acceptance Test and Site Acceptance Test.pdf PDF
9. DRAFT - JB Charleston CSDC_Existing Inventory_ 23Mar22.pdf PDF
29. DRAFT - Template-DHA RMF System Enterprise and Information Security Architecture.pdf PDF
26. DRAFT - Template_DHA RMF System Authorization Boundary.pdf PDF
0. DRAFT - SOW-FY22. IOT RD_PN89902_CSDC Charleston_2022.08.05.docx DOCX document
23. DRAFT - DHA RMF Information Flow Diagram.pdf PDF
14. DRAFT - JBCHS IDEA FONSI-FONPA_A7 Signed (2).pdf PDF
33. DRAFT - Template-System Level Configuration Management Plan.doc DOC document
3. DRAFT - Charleston CSDC IOT Project Status Report (PSR).xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

(October 2018)

DHA PERFORMANCE STANDARDS

FOR

SECTION 27 52 33

REFRIGERATOR MONITORING SYSTEMS

10/18

TABLE OF CONTENTS

GENERAL

1.1 REFERENCES

2.1 DESCRIPTION & MATERIALS

3.1 SUBMITTALS

3.2 PERFORMANCE VERIFICATION AND ACCEPTANCE TESTING

3.2.1 Qualifications of Installers and Inspectors

3.2.2 Inspections and Tests to be Performed

3.3 WARRANTY

3.4 OPERATIONS AND MAINTENANCE (O & M)

GENERAL

This Performance Specification (PS) specifies the installation and quality of refrigerator monitoring systems.

Note: A typical monitoring system consists of a network of sensors that are linked together to form a temperature, humidity, and event alarm and logging system. Real property, including raceway, cable tray, junction boxes, etc. are addressed in their respective UFGS sections and not included in this specification.

1.1 REFERENCES

Contractor must comply with the following:

1.1.1 United Facilities Criteria (UFC)

A. UFC 1-200-01 General Building Requirements B. UFC 3-501-01 Electrical Engineering C. UFC 4-010-06 Cybersecurity D. UFC 4-510-01 Military Medical Facilities

1.1.2 Military Standard

A. Reserved for future

1.1.3 Military Health Services Standards

A. Food and Drug Administration

1. CFR Title 21, Chapter I B. Defense Health Agency Standards

1. Building Control Systems Categorization Memorandum

2. Cyber Security Controls for Physically Isolated Systems

3. Cyber Security Controls for Medical Community of Interest (MEDCOI)

C. Department of Defense Standards

1. Department of Defense Instruction (DoDI) Number 8500.01

2. Department of Defense Instruction (DoDI) Number 8510.01

1.1.4 Other Standards

A. American Association of Blood Banks (AABB) Standards

B. College of American Pathologists (CAP) Guidelines C. Department of the Army Supply Bulletin SB 8-75-11 D. World Health Organization Technical Report Series No. 961, Annex 9

2.1 DESCRIPTION & MATERIALS

2.1.1 General

A. Materials used must be suitable for the environment in which they are installed.

B. Monitoring system must be non-proprietary.

C. Utilize the most current approved version of Windows operating systems at the time of initial testing or as specifically approved for workstations and servers. Entire network must be supervised, monitored, patched, maintained, and life-cycled. Vendor must coordinate with Government to establish a plan of action for approval and dissemination of required Information Assurance Vulnerability Alert (IAVA) patches as well as software and security updates. Locate server in computer room (room code CMP01).

D. Disable any unused communications ports and protocols such that they can be reactivated by the government at a later date. Where Bluetooth functions are available, disable the Bluetooth functionality on delivery. The Bluetooth functionality must be able to be turned on after installation and review with the Cybersecurity Representative.

E. Monitoring system must provide monitoring 24 hours per day, 7 days per week.

F. System must provide storage for [[three] [___] years of data] [data in accordance with FDA regulations].

G. Provide local, wall mounted display of individual monitoring system inputs in [laboratories], [pharmacies], and [___].

H. Provide monitoring system with minimum [16] [___] input/output points. System must be expandable to [144] [___] input/output points.

I. Provide monitoring system and all remote sensors and alarm points with minimum [24] [___] hours of battery backup and battery condition indication.

J. Provide surge protection for monitoring system components.

K. Power cords must be a minimum [6] [___] feet in length.

L. System communication must be through [Bluetooth] [Wi-Fi] [Radio-Frequency 418/433 MHz] [900 MHz] [Cellular Dialer] [Category 6 cable] [___].

M. [System must interface to building management system through [Modbus][BacNet][___].

N. Provide cabling and other appurtenances in accordance with the manufacturer’s recommendations.

O. Coordinate with Medical Treatment Facility (MTF) IT department for currently installed servers, switches, PCs and other similar hardware components. Where no manufacturer’s requirements conflict, provide hardware components to be fully compatible with those currently installed in the MTF

P. System and other appurtenances must not have an anticipated end of system support in the next [18] [___] months.

Systems being phased out are not acceptable.

Q. [System must interface with Real Time Location System (RTLS).]

2.1.2 Temperature Monitoring System

A. Electronic sensors must be accurate to [+/-0.5°F] [___].

B. Provide [glycol] [glass bead] [[nylon][aluminum] block] thermal buffer to insulate temperature probes.

C. Locate sensors to be minimally affected by transient events such as door opening.

2.1.3 Temperature Controlled Rooms

A. Provide a temperature record with a minimum recording frequency of [[six] [___] times per hour] [continuous recording] for each monitoring sensor position.

B. Provide documentation for each monitoring sensor position, which can be stored and accessed.

2.1.4 Refrigerators and Freezers

A. Provide a multipoint monitoring system with [a minimum recording frequency of [six] [___] times per hour] [continuous recording] for each monitoring sensor.

B. Provide documentation for each appliance, which can be stored and accessed.

2.1.5 Humidity Monitoring System

A. Electronic sensors must be accurate to [+/-5% RH] [___].

B. Locate sensors to monitor worst-case humidity levels within the space/appliance.

C. Locate sensors to be minimally affected by transient events such as door opening.

D. Provide a humidity record with [a minimum recording frequency of [six] [___] times per hour] [continuous recording] for each monitoring sensor.

E. Provide documentation for each sensor position, which can be stored and accessed.

2.1.6 Alarm System

A. Provide with [local] [and] [central] alarm.

B. Alarm system must be integrated with the monitoring system.

C. Alarm system must trigger audio and visual alarms when high/low set points are exceeded.

D. Alarm system must trigger audio and visual alarms when power loss is detected.

E. Alarm system must trigger an alarm when loss of communication is detected.

F. Provide with programmable [automatic telephone dial-up], [email] [and] [SMS text warning system] to alert on-call personnel when an alarm is triggered outside on-duty hours.

3.1 SUBMITTALS

3.1.1 Submittals required for government review

A. Submittal requirements are outlined in [Division 01] [PWS SOW] [___].

B. [Submit the following for government review in addition to the submittal requirements in the [PWS SOW] [Division 1]

C. [Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.] D. [Warranty information.] E. [Joint Interoperability Test Command (JTIC) Approval Documentation.] F. [Contact Information for Repair Technician or Emergency Repair Company] G. [Qualifications of installers and inspectors.] H. [Calibration Data] I. [Contact Information for Logistics, Pharmacy, Laboratory, and Medical Maintenance Personnel] J. [Specification Compliance Document]

3.2 PERFORMANCE VERIFICATION AND ACCEPTANCE TESTING

Install monitoring systems in accordance with manufacturer’s instructions. Demonstrate system is in operating condition in accordance with manufacturers’ specifications, and meets performance requirements stated in referenced criteria. Perform final verification and acceptance testing after facility construction is complete. If portions of the system were tested before final construction completion, retest system communications and functionality after completion of facility construction.

3.2.1 Qualifications of Company, Lead Installers, and Inspectors

A. Company specializing in installing the products specified in this section with minimum 5 years of documented experience.

B. Provide written Specification Compliance Document that the system and products submitted meet or exceed all requirements stated in this specification and referenced criteria as installed or that declares any omissions to the specification and referenced criteria compliance.

3.2.2 Inspections and Tests to be Performed

A. Calibrate devices against a certified, traceable reference standard. Calibration must demonstrate the accuracy of the unit across the entire [temperature] [and] [humidity] range over which the device is to be used.

B. Simulate a power outage to demonstrate functionality of back-up power system and power loss alarms.

C. Demonstrate functionality of interfaces to other systems and networks required.

D. Demonstrate implementation of cyber-security controls in accordance with DoDI 8510.

3.3 WARRANTY

3.3.1 Minimum Requirements

A. Warranty requirements are outlined in [Division 01] [PWS SOW] [___].

3.4 OPERATIONS AND MAINTENANCE (O & M)

3.4.1 Provide the following to the final owner

A. Provide O & M data for all FFE-LVS as outlined in [Division 01] [PWS SOW] [___].

B. Provide calibration verification, testing, certification and documentation 30 days prior to training sessions.

C. Train designated staff in the operation and maintenance of the provided system. Provide two training sessions for system users and two training sessions for maintenance personnel scheduled to accommodate shift work. [Eleven months after the system is installed, provide a refresher course for each group of trainees.] Provide video of the training with the O & M data.

--End of Section--

1.1 REFERENCES
1.1.1 United Facilities Criteria (UFC)
A. UFC 1-200-01 General Building Requirements
B. UFC 3-501-01 Electrical Engineering
C. UFC 4-010-06 Cybersecurity
D. UFC 4-510-01 Military Medical Facilities
1.1.2 Military Standard
A. Reserved for future
1.1.3 Military Health Services Standards
A. Food and Drug Administration
1. CFR Title 21, Chapter I
B. Defense Health Agency Standards
1. Building Control Systems Categorization Memorandum
2. Cyber Security Controls for Physically Isolated Systems
3. Cyber Security Controls for Medical Community of Interest (MEDCOI)
C. Department of Defense Standards
1. Department of Defense Instruction (DoDI) Number 8500.01
2. Department of Defense Instruction (DoDI) Number 8510.01
1.1.4 Other Standards
A. American Association of Blood Banks (AABB) Standards
B. College of American Pathologists (CAP) Guidelines
C. Department of the Army Supply Bulletin SB 8-75-11
D. World Health Organization Technical Report Series No. 961, Annex 9
PART 2 -
2.1 DESCRIPTION & MATERIALS
2.1.1 General
A. Materials used must be suitable for the environment in which they are installed.
B. Monitoring system must be non-proprietary.
C. Utilize the most current approved version of Windows operating systems at the time of initial testing or as specifically approved for workstations and servers. Entire network must be supervised, monitored, patched, maintained, and life-cycled. Ve...
D. Disable any unused communications ports and protocols such that they can be reactivated by the government at a later date. Where Bluetooth functions are available, disable the Bluetooth functionality on delivery. The Bluetooth functionality must ...
E. Monitoring system must provide monitoring 24 hours per day, 7 days per week.
F. System must provide storage for [[three] [___] years of data] [data in accordance with FDA regulations].
G. Provide local, wall mounted display of individual monitoring system inputs in [laboratories], [pharmacies], and [___].
H. Provide monitoring system with minimum [16] [___] input/output points. System must be expandable to [144] [___] input/output points.
I. Provide monitoring system and all remote sensors and alarm points with minimum [24] [___] hours of battery backup and battery condition indication.
J. Provide surge protection for monitoring system components.
K. Power cords must be a minimum [6] [___] feet in length.
L. System communication must be through [Bluetooth] [Wi-Fi] [Radio-Frequency 418/433 MHz] [900 MHz] [Cellular Dialer] [Category 6 cable] [___].
M. [System must interface to building management system through [Modbus][BacNet][___].
N. Provide cabling and other appurtenances in accordance with the manufacturer’s recommendations.
O. Coordinate with Medical Treatment Facility (MTF) IT department for currently installed servers, switches, PCs and other similar hardware components. Where no manufacturer’s requirements conflict, provide hardware components to be fully compatible ...
P. System and other appurtenances must not have an anticipated end of system support in the next [18] [___] months. Systems being phased out are not acceptable.
Q. [System must interface with Real Time Location System (RTLS).]
2.1.2 Temperature Monitoring System
A. Electronic sensors must be accurate to [+/-0.5 F] [___].
B. Provide [glycol] [glass bead] [[nylon][aluminum] block] thermal buffer to insulate temperature probes.
C. Locate sensors to be minimally affected by transient events such as door opening.
2.1.3 Temperature Controlled Rooms
A. Provide a temperature record with a minimum recording frequency of [[six] [___] times per hour] [continuous recording] for each monitoring sensor position.
B. Provide documentation for each monitoring sensor position, which can be stored and accessed.
2.1.4 Refrigerators and Freezers
A. Provide a multipoint monitoring system with [a minimum recording frequency of [six] [___] times per hour] [continuous recording] for each monitoring sensor.
B. Provide documentation for each appliance, which can be stored and accessed.
2.1.5 Humidity Monitoring System
A. Electronic sensors must be accurate to [+/-5% RH] [___].
B. Locate sensors to monitor worst-case humidity levels within the space/appliance.
C. Locate sensors to be minimally affected by transient events such as door opening.
D. Provide a humidity record with [a minimum recording frequency of [six] [___] times per hour] [continuous recording] for each monitoring sensor.
E. Provide documentation for each sensor position, which can be stored and accessed.
2.1.6 Alarm System
A. Provide with [local] [and] [central] alarm.
B. Alarm system must be integrated with the monitoring system.
C. Alarm system must trigger audio and visual alarms when high/low set points are exceeded.
D. Alarm system must trigger audio and visual alarms when power loss is detected.
E. Alarm system must trigger an alarm when loss of communication is detected.
F. Provide with programmable [automatic telephone dial-up], [email] [and] [SMS text warning system] to alert on-call personnel when an alarm is triggered outside on-duty hours.
PART 3 -
3.1 Submittals
3.1.1 Submittals required for government review
A. Submittal requirements are outlined in [Division 01] [PWS SOW] [___].
B. [Submit the following for government review in addition to the submittal requirements in the [PWS SOW] [Division 1] [___].
C. [Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.]
D. [Warranty information.]
E. [Joint Interoperability Test Command (JTIC) Approval Documentation.]
F. [Contact Information for Repair Technician or Emergency Repair Company]
G. [Qualifications of installers and inspectors.]
H. [Calibration Data]
I. [Contact Information for Logistics, Pharmacy, Laboratory, and Medical Maintenance Personnel]
J. [Specification Compliance Document]
3.2 PERFORMANCE VERIFICATION AND ACCEPTANCE TESTING
3.2.1 Qualifications of Company, Lead Installers, and Inspectors
A. Company specializing in installing the products specified in this section with minimum 5 years of documented experience.
B. Provide written Specification Compliance Document that the system and products submitted meet or exceed all requirements stated in this specification and referenced criteria as installed or that declares any omissions to the specification and refer...
3.2.2 Inspections and Tests to be Performed
A. Calibrate devices against a certified, traceable reference standard. Calibration must demonstrate the accuracy of the unit across the entire [temperature] [and] [humidity] range over which the device is to be used.
B. Simulate a power outage to demonstrate functionality of back-up power system and power loss alarms.
C. Demonstrate functionality of interfaces to other systems and networks required.
D. Demonstrate implementation of cyber-security controls in accordance with DoDI 8510.
3.3 WARRANTY
3.3.1 Minimum Requirements
3.4 OPERATIONS AND MAINTENANCE (O & M)
3.4.1 Provide the following to the final owner