3. Chuchupate Engine Garage Exhibits and Details.pdf

PDF 309 KB Posted

Attached to
Los Padres National Forest Chuchupate Engine Garage Project
Solicitation number
127EAW21R0070
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chuchupate Engine Garage

Exhibits and Details

Chuchupate Engine Garage – Site Layout Exhibit

Concrete Exterior Footings Detail

Garage & Apron Slab Detail

Notes:

1.Garage/Apron Slab to be reinforced with #4 bars at 18” OC Each way

2. Space Joints 18’ Each Way Maximum

Concrete Bollards Detail

Lighting Schedule

Note: High bay fixtures shall be equally mounted to clear 13’ above finished floor.

Underground Electrical Trench Detail

File details come from the government source that posted it. Updated .