3.c_Statement of Work (SOW) Multiple Building Mold.docx

DOCX document 49 KB Posted

Attached to
MOLD REMEDIATION PROJECT IN Chase Hall B Annex (decks 2-4), Mac Hall, Yeaton Hall, Smith Hall, and Barber Shop
Solicitation number
60100PR230000596
Issued by

About this file

This statement of work outlines requirements for mold remediation services at multiple buildings on the campus of the United States Coast Guard in New London, Connecticut. The contractor will be required to clean and remediate all mold in specified areas of Chase B Annex floors two through four, McAllister Hall rooms 121, 121A and 122, Smith Hall room 010 and first floor vents, and Yeaton Hall room 218 vents and walls. The work must be performed using negative air containment with air scrubbers and dehumidifiers in operation at all times. The period of performance is urgent and will begin immediately upon award. The contractor must utilize qualified personnel and comply with all applicable regulations and policies. Progress reports will be due weekly to the contracting officer's representative.

View the file

Other files

File Type Posted
12.f_Terms & Conditions For Justification Notice.docx DOCX document
4.d_ JFOTOC_FAR 6.3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #:60100PR230000596

STATEMENT OF WORK

STATEMENT OF WORK (SOW)

FOR

MULTIPPLE BUILDING MOLD REMEDIATION

Urgent and Compelling

1.0 GENERAL

1.1 BACKGROUND

Project is for urgent and compelling mold remediation in the following areas: Chase B Annex 2nd,3rd,4th floors all rooms, McAllister Hall Rooms 122,121A , and Room 121 desks, chairs, walls, and floors, Smith Hall 1st floor vents and Room 010,and Yeaton Hall Room 218 vents and walls, 2nd and 3rd deck pipe chase removal of molded insualation on both the North and South ends of hallways.

1.2 SCOPE

Vendor will clean and remediate all mold in the effected areas listed in paragraph above. The vendor will HEPA vac and clean with an antimicrobial all areas that are effected by mold. The vendor will be required to set up negative air containment for projects. Air scrubbers and dehumidyers must be in operation for the duration of the projects.

1.3 OBJECTIVE

The removal and remediation of all mold in Chase B Annex 2nd,3rd,4th floors all rooms, McAllister Hall Rooms 122,121A , and Room 121 desks, chairs, walls, and floors, Smith Hall 1st floor vents and Room 010,and Yeaton Hall Room 218 vents and walls, 2nd and 3rd deck pipe chase removal of molded insualation on both the North and South ends of hallways.

1.4 APPLICABLE DOCUMENTS

1.4.1 Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

1.4.2 Reference Documents

The following documents may be helpful to the Contractor in performing the work described in this document:

Code of Federal Regulations (CFR) Publications

United States Environmental Protection Agency (EPA) Guidelines and Regulations

Applicable State Regulations, including State of Connecticut

2.0 SPECIFIC REQUIREMENTS/TASKS

The contractor must set up negative air containment before starting work. The contractor must also have air scrubbers and air purifiers in operation during the entire time of the project. All trash will be removed by the contractor.

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.

3.3 KEY PERSONNEL

Before replacing any individual designated as Key by the Government, the Contractor must notify the Contracting Officer no less than 15 business days in advance, submit written justification for replacement, and provide the name and qualifications of any proposed substitute(s). All proposed substitutes must possess qualifications equal to or superior to those of the Key person being replaced, unless otherwise approved by the Contracting Officer. The Contractor must not replace Key Contractor personnel without approval from the Contracting Officer. The following Contractor personnel are designated as Key for this requirement. Note: The Government may designate additional Contractor personnel as Key at the time of award.

3.3.1 Contractor Key personnel must not be assigned by the Contractor to more than one key position for this requirement.

3.5.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.

3.6 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Coordinate with the CSO Office and DHS Instruction Handbook 121-01-007, Department of Homeland Security Personnel Suitability and Security Program to check appropriate box.

Add any additional sections with “-or-“ if appropriate and delete the others.

Security Risk and Background Investigation Form Requirements

The requirements office anticipates the following:

Check Applicable Box
Tier Investigation
Risk
Form
1
Low Risk, Non-Sensitive, Physical/Logical Access (HSPD-12 Credentialing)
SF85
2
Moderate Risk, Public Trust
SF85P
3
Non-Critical Sensitive, L, Confidential and Secret Information
SF86
4
High Risk, Public Trust
SF85P
5
Q, Top Secret, Compartmented Information, Critical Sensitive, Special Sensitive
SF86

-or-

Contractor access to classified information may be required under this SOW. The details will be provided in a Department of Defense (DD) Form 254.

-or-

Contractor access to unclassified, but Security Sensitive Information may be required under this SOW. Contractor employees must safeguard this information against unauthorized disclosure or dissemination.

-or-

Contractor access to classified information is required under this SOW. The maximum level of classification is not applicable. The details will be specified in a Department of Defense (DD) Form 254.

-or-

Contractor access to classified information is not currently required under this SOW. However, the Government at a later date may require all Contractor personnel to have Secret clearances. Accordingly, all Contractor employees provided for this requirement must be eligible for a Secret Clearance.

4.2 PERIOD OF PERFORMANCE

The period of performance is emergency and will start as soon as given the go ahead from procurement.

4.3 PLACE OF PERFORMANCE

CHASE HALL B ANNEX, SMITH HALL, MACALLISTER HALL, AND YEATON HALL

15 MOHEGAN AVE

NEW LONDON,CT 06320

4.4 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0700 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

4.5 TRAVEL

Contractor travel must not be required for this requirement.

4.6 POST AWARD CONFERENCE

4.7 PROJECT PLAN

(e) how quality of service (project) will be maintained throughout life of contract. The Contractor must provide a final Project Plan to the COR not later than 5 business days after the Post Award Conference.

4.8 BUSINESS CONTINUITY PLAN

4.9 PROGRESS REPORTS

4.10 PROGRESS MEETINGS

4.11 GENERAL REPORT REQUIREMENTS

The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).

4.12 INTELLECTUAL PROPERTY

4.13 PROTECTION OF INFORMATION

4.14 SECTION 508 COMPLIANCE

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will provide the following property to the Contractor for work required under this contract:

Government will provide electrical power use and water.

The Government will provide copies of the references cited in SOW 1.4 at the Post Award Conference.

7.0 GOVERNMENT ACCEPTANCE PERIOD

The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 The COR will have 10 business days to review deliverables and make comments. The Contractor must have 10 business days to make corrections and redeliver.

7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.

8.0 DELIVERABLES

The Contractor must consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW.

ITEM
SOW REFERENCE
DELIVERABLE / EVENT
DUE BY

DISTRIBUTION

1
4.6
Post Award Conference
Xxxxx

N/A

2
4.6, 4.7
Draft Contractor Project Plan
Xxxxx

COR, Contracting Officer

3
4.7
Final Contractor Project Plan
Xxxxx
COR, Contracting Officer
4
4.8
Original Business Continuity Plan
Xxxxx
COR, Contracting Officer
5
4.8
Updated Business Continuity Plan
Xxxxx
COR, Contracting Officer
6
4.9
Progress Reports
Xxxxx
COR, Contracting Officer
7
xxx
Xxxxx
Xxxxx

Xxxx

8
xxx
Xxxxx
Xxxxx
Xxxx
9
xxx
Xxxxx
Xxxxx
Xxxx

LAST UPDATED: 08/07/2023 PAGE 8/17

File details come from the government source that posted it. Updated .