3.01_RFP_N0010422RC003.pdf

PDF 765 KB Posted

Attached to
4630 - Requirements Long Term Contract Notice of Intent
Solicitation number
N0010422RC003Amd0003
Issued by

About this file

This is a Navy solicitation (Request for Proposal) N0010422RC003 for a five-year firm fixed-price requirements contract to repair and modify two types of naval equipment: Pumping Units, Sewage and Flow Control Valves. The contract covers repair of 700 Pumping Units and 660 Flow Control Valves, with required repair turn-around times of 120 and 180 days respectively. The estimated contract period runs from 01 June 2022 to 31 May 2027, with items to be delivered FOB Origin. The solicitation includes provisions for Commercial Asset Visibility (CAV) reporting, configuration control, and web-based tracking of repaired items. Contractors must comply with various federal regulations, including small business program representations, cybersecurity requirements, and specific Navy inventory management protocols.

View the file

Other files

File Type Posted
3.02_N0010422RC003 Amend 0001.pdf PDF
3.02_N0010422RC003 Amend 0003.pdf PDF
3.02_N0010422RC003 Amend 0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 05:00 PM local time 31 Dec 2021

X

A

X B

X C X D

EX

X

G

F 35 - 60

61 - 64

X H sarah.e.ream.civ@us.navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-A3 1 64

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00104 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and no hand carry; see item 10 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

SARAH E. REAM 717-605-6457

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 5

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

6 - 10

11 - 15

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

16 - 17

18 - 23 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 24 - 26 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 27 M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

28 - 34

PART II - CO NTRACT CLAUSES

N771 COMMON HM&E

5450 CARLISLE PIKE

MECHANICSBURG PA 17050-2411

717-605-6457

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

29 Nov 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0010422RC003

Section B - Supplies or Services and Prices

SECTION B

B01 - TYPE OF CONTRACT - REQUIREMENTS

This is a five (5) year Contract.

Prices are for Repair/Modification of the items specified in the Section B schedule, for a period of five (5) years from the date of award. The quantities shown are the Government's best estimates and are neither minimum nor maximum quantities. All orders placed for repair during this time period shall be issued as priced orders.

B02 - SUPPLIES, MATERIALS, AND PARTS TO BE FURNISHED

(a) The Government may issue Delivery Orders, in the manner provided elsewhere herein, the following types of effort:

(1) Repair and/or Modification: The Contractor shall furnish all effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of repairable assemblies

(hereinafter repairable assemblies or items) as identified in the schedule. The repairable assemblies to be repaired and/or modified under this Contract are set forth by manufacturer's part number or National Stock

Number (NSN) in the schedule and constitute “Government Property” as defined in FAR clause 52.245-1 or 52.245-1 Alternate I, as applicable. Repair and/or modification of repairable assemblies will be accomplished in accordance with the Specifications for Repair/Modification Statement of Work.

(2) Web-based Commercial Asset Visibility (WEBCAV) Reporting: The Contractor’s effort on each

Delivery Order for repair and/or modification of Government property shall include furnishing all effort, including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions specified in Sections C04 and F06.

B03 - WSSTERMBA00 CONTACT INFORMATION

When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.

Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:

Code (N771) Weapon System LRC (BAF)

Telephone (717-605-6457)

E-Mail: (sarah.e.ream@navy.mil)

In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact itimp.wss.fct@navy.mil .) (01-18)

B04 - WSSTERMBZ01 ***IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION

REPORTING***

Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Additional information regarding reporting via Commercial Asset Visibility (CAV) is available at https://www.navsup.navy.mil/public/navsup/wss/pi_cd/.

Questions can be addressed to NAVSUPWSSCAVSOW@navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to NAVSUPWSSM.CAVSOW@navy.mil for

NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104). (06-16) mailto:itimp.wss.fct@navy.mil https://www.navsup.navy.mil/public/navsup/wss/pi_cd/

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 700 Each Pumping Unit, Sewage

FFP

NIIN: 014125270

Required Repair Turn-Around Time (RTAT): 120 days

Note: Period of Performance (POP) dates listed in Section F are the Government's estimated start/end dates of the ordering period. Start/end dates are subject to change based on the actual effective date of the resulting Long Term Contract

(LTC).

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

VENDOR PART NR: 7250019

PSC CD: 4630

ESTIMATED

NET AMT

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 660 Each Valve, Flow Control

FFP

NIIN: 015614611

Required Repair Turn-Around Time (RTAT): 180 days

Note: Period of Performance (POP) dates listed in Section F are the Government's estimated start/end dates of the ordering period. Start/end dates are subject to change based on the actual effective date of the resulting Long Term Contract

(LTC).

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

VENDOR PART NR: 4515505

PSC CD: 4630

ESTIMATED

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

52.216-21 REQUIREMENTS (OCT 1995)

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the

Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated'' or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and

Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 2,191 days after the effective date of this contract.

(End of clause)

Section C - Descriptions and Specifications

SECTION C

C01 – CONFIRMING ORDERS

(a) Orders issued under this Contract shall be prepared on DD Form 1155; however, if exigency so demands, order may be issued via electronic transmission (e.g., e-mail) and will be confirmed by DD Form 1155 as soon as practicable thereafter, and will bear the notation "CONFIRMING ORDER.”

C02 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED

(a) Articles to be repaired and/or modified under this agreement, as shown in the schedule, will be shipped at the

Government's expense to the plant of the Contractor at the address listed at the delivery order level.

(b) The Contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.

(c) Upon receipt of such articles, the Contractor shall:

(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment;

and further verify that the articles received are covered by the applicable Delivery Order;

(2) Segregate those assets that were improperly sent to the Contractor, contact PCO for return shipping instructions, and return improperly sent items to the Government;

(3) Advise the Government PCO if any portion of the required repair is covered under a warranty; or is a result of the furnishing by the Contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished.

C03 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK

1.0 SCOPE

1.1. General. The items to be furnished hereunder are Government Furnished Property (GFP) and shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this Contract. Equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for as Government Furnished Property.

This limitation regarding the furnishing of equipment applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the Contract items.

1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see the schedule for a list of these items) to a Ready for Issue (RFI) condition. RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. Items repaired under this contract shall meet the operational and functional requirements as represented by the Original Equipment Manufacturer’s (OEM) drawings.

All repair work shall be performed in accordance with the Contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other Contractor or government approved documents developed to provide technical repair procedures.

1.2.1. Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted.

1.2.2. The Contractor is not entitled to any equitable adjustment to the price or Contract terms based on the

Government’s disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

1.3. Beyond Repair (BR) and No Fault Found (NFF)

1.3.1. BR is a term used in the field of maintenance, where an item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage. If an item is determined BR, and the Contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced price associated with the repair effort to reflect the BR status of the equipment. Such documentation must be submitted within 30 days receipt of the contracting officer’s BR disposition instructions.

1.3.2. NFF is a term used in the field of maintenance, where a unit is removed from service following a complaint of a perceived fault by operators or an alarm notification. The unit is then checked, but no anomaly is detected by the maintainer. If an item is determined NFF, and the Contractor provides documentation that costs were incurred during evaluation and determination of NFF, the contracting officer will negotiate a reduced price associated with the repair effort to reflect the NFF status of the equipment. Such documentation must be submitted within 30 days receipt of the contracting officer’s NFF disposition instructions.

1.3.3. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the

Contractor to be BR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Item Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions. The Government shall provide the Contractor timely disposition instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

2.0 PARTS AND MATERIAL

2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this Contract unless parts or material are specifically identified as Government Furnished Material (GFM).

All parts and material used in performance of this contract shall be in accordance with currently approved applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this Contract to updated drawings and specifications for parts and material required for repairs performed under this Contract. Any change to such parts/material drawings or specifications requires Government PCO approval.

2.2. All parts and material, that are not repairable items, shall be new in accordance with FAR 52.211-5, Material

Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization and swapping of piece parts is approved. However, cannibalization of units that have not been inducted is not authorized and requires specific additional approval by the PCO. Cannibalization or swapping,shall not render an item “beyond repair”.

2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval. However, if the Contractor has been delegated authority in writing by another Navy Command to approve a change in manufacturing source or a manufacturing facility, the Contractor may implement such a change after notifying the PCO, providing a copy of such delegation to the PCO, and receiving acknowledgment of such delegation from the PCO.

2.3.1. Where there has been a change to a manufacturing source for a NIIN that required qualification testing, the

Contractor shall complete all qualification testing that was required when that item or component was originally qualified. Any changes in such testing shall be submitted to the Contracting Officer for Government review and approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are not authorized. The Contractor is not authorized to deliver any items until such testing

(including revised testing as properly approved) has been completed and the delivered items are repaired/manufactured in accordance with the qualification requirements package.

2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, ensure that the parts and material purchased are in compliance with the requirements of this Contract.

2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the

Contractor upon receipt at the Contractor’s facility to ensure conformance with all requirements of the applicable drawings and specifications. Alternatively, the Contractor shall submit, prior to contract award, evidence for

Government review and approval of a purchased parts and material system which provides for adequate inspection to ensure parts and material conform to all requirements of the applicable drawings and specifications.

2.5.1. Evidence of such inspections shall be maintained by the Contractor or SubContractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.

3.0 INSPECTION PROVISIONS

3.1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price incorporated by reference in Section E, at source by DCMA unless otherwise specified in the Contract/Delivery

Order or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or re-conduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this Contract.

C04 - WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK (SOW)

The CAV Statement of Work (SOW) is located at: https://www.navsup.navy.mil/public/navsup/wss/pi_cd/; and incorporated herein by reference. The CAV SOW is subject to charge throughout the ordering period of this contract.

C05 – SPECIFICATION FOR CONSUMABLE PARTS (CONTRACTOR-FURNISHED)

The Contractor shall furnish on an "as required" basis all parts required to complete servicing of repairable articles hereunder within established delivery schedules. Such parts shall be in accordance with applicable drawings and specifications.

C06 - WSSTERMCZ04 - GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP)

a. The Contractor will actively participate in the Government Industry Data Exchange Program (GIDEP) per the Operations Manual (OM). The Contractor will submit information concerning critical or major nonconformance, as defined in FAR 46.101, to the GIDEP information system.

b. The Contractor will insert paragraph (a) of this clause in any subcontract when deemed necessary by the

Contractor. When so inserted, the word "Contractor" will be changed to "subContractor."

c. The Contractor will, when it elects not to insert paragraph (a) in a subcontract, provide the subContractor any GIDEP data which may be pertinent to items of its manufacture and verify that the subContractor utilizes any such data.

d. The Contractor shall, whether it elects to insert paragraph (a) in a subcontract or not, verify that the subContractor utilizes and provides feedback on any GIDEP data that may be pertinent to items of its manufacture.

e. Associated Data Item Description (DID) DI-QCIC-80125B: Alert/Safe-Alert Reporting to GIDEP. (06-17)

C07 – CONFIGURATION CONTROL/MANAGEMENT

The Contractor agrees to comply with Configuration Control for Sole Source Part Numbered Items listed in the schedule. For the order, the term “part number” used in the configuration clause, is understood to mean the

Environmental Systems, LLC, CAGE 65625, identifier number.

WSSTERMCZ01 CONFIGURATION CONTROL

(a) The Contractor shall maintain the total baseline configuration of the contract items, including, but not limited to, hardware, software and firmware, in accordance with the configuration management provisions of this contract.

(b) Definitions

(1) Critical Application Item (CAI) – CAI is defined as an item that is essential to weapon system performance or operation, or the preservation of life or safety of operational personnel, as determined by the military services. The subset of CAIs, whose failure could have catastrophic or critical safety consequences (Category I or II as defined by MIL-STD-882), are Critical Safety Items (CSI).

(2) Critical Safety Item (CSI) - CSI is defined as a part, an assembly, installation, or production system with one or more critical or critical safety characteristics that, if missing or not conforming to the design data, quality requirements, or overhaul and maintenance documentation, would result in an unsafe condition that could cause loss or serious damage to the end item or major components, loss of control, un-commanded engine shutdown, or serious injury or death to personnel and unsafe conditions, which relate to hazard severity categories I and II of

MIL-STD-882, System Safety Requirements. CSIs are a subset of CAIs and include, but are not limited to, items determined to be life-limited, fracture critical, or fatigue sensitive. A Critical Safety Item may also be known by terms such as a Flight Safety Critical Aircraft Part, Flight Safety Part, or Flight Safety Critical Part. For purposes of this contract, the term used will be Critical Safety Item.

(3) Engineering Change Proposal (ECP) – An ECP is the documentation by which an engineering change and its implementation for items to be delivered under this contract is proposed, justified and submitted to the appropriate authority for approval or disapproval. Class I and Class II ECPs will be classified as follows:

(i) Class I ECP. An engineering change will be classified as Class I if:

(A) it affects any physical or functional requirement in approved functional or configuration documentation, or

(B) it affects any approved functional, allocated or product configuration documentation, cost to the

Government, warranties or contract milestones, or

(C) it affects approved product configuration documentation and one or more of the following:

Government furnished equipment (including Government test equipment and associated programs such as Test

Program Sets/Software); safety; compatibility, interoperability, or logistic support; delivered technical manuals for which changes are not funded; will require retrofit of delivered units; preset adjustments or schedules affecting operating limits or performance to the extent a new identification number is required; interchangeability, substitutability, or replacement of any item down to non-repairable assemblies, sources on a source control drawing;

or skills manning, training, biomedical factors or human engineering design.

(ii) Class II ECP. An engineering change is Class II if it does not impact any of the Class I factors specified above.

(4) Deviation – A deviation is the specific written authorization to depart from a particular requirement of the item’s configuration for a specific number of units or for a specific amount of time. It is also a specific written authorization to accept items, which are found to depart from specified requirements, but which nevertheless is considered suitable for use “as is” or after correction by a specified method. The term deviation encompasses what previously had been defined as both a deviation and waiver, and therefore includes requests to depart from a known requirement before, during or after manufacture. Deviations will be classified as follows:

(i) Major. A deviation is major when it involves a departure from requirements or specifications involving: health, performance, interchangeability, reliability, survivability, maintainability or durability of the item or parts, effective use or operation of the item or system, weight or size, and appearance (when a factor).

(ii) Critical. A deviation is critical when the deviation involves or impacts safety.

(iii) Minor. A deviation is minor when the deviation does not involve factors listed above for either critical or major deviations.

(c) Configuration Management/ECPs

(1) The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the contract items and sub-assemblies. Guidelines for preparing Class I and Class II ECPs may be found in MIL-HDBK-61A, Configuration Management Guidance and ANSI/EIA-649, National Consensus Standard for Configuration Management. The Contractor will maintain configuration of the items in accordance with the requirements of this contract.

(2) The Contractor shall submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the items covered by this contract. An ECP shall be designated Class I or Class II, as defined in this contract.

(i) If the Contractor has an ECP pending with another Government activity, has an approved ECP that the Contractor proposes to incorporate under this contract, or has an ECP pending or approved under a production contract, the Contractor will notify the PCO of the status of the ECP and provide a copy of the ECP submission.

Any such Class I ECPs, however, will be incorporated only by modification to the contract.

(ii) A properly documented ECP submitted under this contract shall be processed as follows:

(A) Any Class I ECP must be submitted to the contracting officer for approval/disapproval. A Class

I change will be not be implemented until a contract modification is issued by the contracting officer.

(B) Any Class II ECP involving a non-critical item or a CAI shall be submitted to the cognizant

Defense Contract Management Agency (DCMA) for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Any Class II ECP involving a CSI must be clearly identified as involving a

CSI, must be submitted to the contracting officer for review by the contracting officer and the Navy’s Basic Design

Engineer, and may be implemented only upon the approval of the contracting officer. If, however, authorized in writing by the contracting officer or if the Naval Air Systems Command has delegated authority in writing to the

DCMA to concur in Class II ECPs involving CSIs for the Contractor (which is specific to the Contractor’s location and CAGE code), a Class II ECP involving a CSI may be submitted to the DCMA and implemented upon DCMA’s concurrence with classification. If the affected Class II ECP item or items have not been identified as CAI, CSI or as non-critical by the Government, the Contractor will contact the contracting officer to obtain a classification for the affected items. The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the contractor due to a misclassification of an ECP by the contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. Class II changes shall be made at no additional cost to the Government.

(iii) The Contractor shall coordinate with the cognizant NAVAIR PMA office prior to any ECP submission. The Contractor will provide copies of configuration changes affecting FMS customers to NAVSUP

Weapon Systems Support FMS, Code N521.

(iv) Under this contract, a Class I ECP may be prepared in the contractor’s format but in a medium compatible with Government information management systems. In addition, a Class I ECP shall provide all information required by DI-CMAN-80639C – Engineering Change Proposal. A Class II ECP may be prepared in the contractor’s format. The minimum required data is: name and part number of item affected; name and part number of next higher assembly; description of the engineering change; need and reason for the change; all government contract numbers for which the change applies; and the change document number. Justification codes are not required for Class II ECPs.

(v) The contractor is not entitled to any equitable adjustment to the contract price or terms based on the

Government’s disapproval of a Class I or Class II ECP.

(d) Configuration Management/Deviations

(1) The Contractor shall not manufacture any item for acceptance by the Government that incorporates a known departure from technical or contractual requirements unless a request for a deviation has been approved.

Authorized deviations are a temporary departure from the requirements only and do not authorize a change to the item’s configuration baseline.

(2) Deviation requests shall be prepared in accordance with DI-CMAN-80640C – Request for Deviation.

Guidelines for preparing deviations may also be found in MIL-HDBK-61A, Configuration Management Guidance and ANSI/EIA-649, National Consensus Standard for Configuration Management.

(3) Major, critical and minor deviations are classified in accordance with the definitions in this contract.

(4) A Request for Deviation shall be processed as follows upon submission of a properly documented request:

(i) For items involving a major or critical deviation, delivery and/or shipment of such items of items under this contract is not permitted until authorized in writing by the contracting officer.

(ii) For any non-critical item or CAI involving a minor deviation, delivery and/or shipment of such items under this contract is not permitted until authorized by the cognizant DCMA. Minor deviations affecting CSI must be identified as involving a CSI, must be submitted to the contracting officer for review by the contracting officer and the Navy’s Basic Design Engineer, and may be delivered only upon the approval of the contracting officer. If, however, authorized in writing by the contracting officer or if the Naval Air Systems Command has delegated authority in writing to the DCMA to approve minor deviations involving CSIs for the Contractor (which is specific to the Contractor’s location and CAGE code), a minor deviation affecting a CSI may be reviewed by the

DCMA and may be delivered if authorization from DCMA is received. If the affected item or items have not been identified as CAI, CSI or as non-critical by the Government, the Contractor will contact the contracting officer to obtain a classification for the affected items.

(5) Recurring deviations are discouraged and shall be minimized. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a major/critical or minor deviation. In addition, the Government may be entitled consideration from the contractor if a deviation is approved.

(10-04, rev. 1)

Section D - Packaging and Marking

SECTION D

WSSTERMDZ03

PRESERVATION, PACKAGING, PACKING AND MARKING

The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.

1. PRESERVATION REQUIREMENTS

a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to enter the military distribution system for stock in accordance with the MIL-STD-2073-1, “Standard Practice for Military Packaging”, Packaging Requirements Code specified in the Schedule. When a Specialized Preservation Code/Method of

Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence.

Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal Regulations (CFR); when HM = N the item is not regulated for transportation.

1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF-22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.

b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS – Government PCO or

ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered

(NSN) item required for immediate use (used or consumed within 7 days of receipt) or direct installation, or part numbered item (authority granted to ship without NSN) shall be preserved and packed in accordance with ASTM

D3951, “Standard Practice for Commercial Packaging”, for all shipments to a Continental United States (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with MIL-STD-2073-1.

c. GOVERNMENT-OWNED MATERIAL – In the event that the contract expires, is terminated, or completed, and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.

2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC

(EM) FORCES

a. When ASTM D3951 is authorized for packaging and the item is considered ESD Sensitive (ESDS), protection shall be in accordance with ANSI/ESD S20.20-2014, “For the Development of an ESD Control Program for – Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated

Explosive Devices).”

b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor’s proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.

3. PACKING REQUIREMENTS – The contractor shall pack as follows:

Domestic Shipments (CONUS): Level B

Overseas Shipments (OCONUS) (including Navy ships at sea):

Via air, FPO, APO Level B

Via freight forwarder Level B

Via surface Level A

Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II.

Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.

4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129. In addition, the following specific requirements apply:

a. ADDITIONAL MARKING FOR SPARES ONLY – Each MIL-STD-129 label shall also include the following:

http://qpldocs.dla.mil/

1) Procurement Instrument Identifier (PIID) – the 13-digit contract order number,

2) Contract Line Item Number (CLIN) – the 4-digit individual line item number (e.g. 0001, 0002, etc.), and

3) SubCLIN – the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).

b. DEPOT LEVEL REPAIRABLE (DLR) LABELS

1) Items identified with a Cognizance (COG) Code of either “7” or an even number preceding the

NSN, excluding 6A, 6H and 6X COGs (e.g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.

2) Labels are available via the Naval Forms Online website:

https://forms.documentservices.dla.mil/order/. The website will advise the procedures for ordering and establishing an account.

3) NAVSUP WSS authorizes contractors to create and print their own DLR labels.

Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow “DLR” text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-

PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.

NSN DESCRIPTION QUANTITY

PER UNIT

PACKAGE

APPLICATION FORM NUMBER

0108LF5055300 DLR Label

2 in. x 3 in.

100 Unit

Container

NAVSUP 1397-1

0108LF5055000 DLR Label

3 in. x 5 in.

100 Intermediate /

Shipping

Container

NAVSUP 1397

c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME

REQUIREMENTS ONLY

1) Certain Program-related items are identified by a two-position SMIC, which appears as a suffix to the

NSN (e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked with letters, maximum two inches high on two (2) sides and two (2) ends as follows:

SMIC MARKINGS COLOR TYPE CONTAINER

L1 LEVEL 1 RED Unit, intermediate and shipping

(size permitting)

S1 SURFACE

LEVEL 1

RED Unit, intermediate and shipping

(size permitting)

D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping

(size permitting)

C1 * LEVEL 1 SPECIAL

CLEAN O2-N2

GREEN Unit, intermediate and shipping

CP/VG * SPECIAL CLEAN

O2-N2

GREEN Unit, intermediate and shipping

D0/D6/D8 * DSS-SOC SPECIAL CLEAN

O2-N2

GREEN Unit, intermediate and shipping

VU FBW SFCC VU BLUE Unit, intermediate and shipping

(size permitting) https://forms.documentservices.dla.mil/order/

SW FBW SFCC SW BLUE Unit, intermediate and shipping

(size permitting)

Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping

* denotes Oxygen Clean requirements in accordance with MIL-STD-1330 “Precision Cleaning and Testing of

Shipboard Oxygen, Helium, Helium-Oxygen, Nitrogen, and Hydrogen Systems.”

5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 “DOD

Standard Practice: Palletized Unit Loads.” Failure to meet these palletization/packaging requirements and measures, without a written waiver from the PCO or ACO, may result in charges back to the contractor for repalletization and/or repackaging of items. Pallets shall conform to the requirements of American National

Standards Institute, Material Handling-MH1-2016, Pallets, Slip Sheets, and Other Bases for Unit Loads. MH1-2016 may be obtained at the following website: http://www.mhi.org.

a. General Purpose Unit Loads - When shipping directly to a Navy afloat unit, pallets meeting MH1-2016, Part No. MH1/9-02SW4048 or MH1/9-10BW4048 for unit loads under 1,500 pounds and MH1/9-03SW4048 for unit loads over 1,500 pounds shall be used.

b. Hazardous Material Unit Loads - Unless otherwise specified in the contract or purchase order hazardous material containers, except cylinders and 55 gallon drums, shall be palletized utilizing MH1-2016 Part No. MH1/9-

07SW4848 pallets.

c. Use of nonstandard commercial pallets is prohibited.

6. WOOD PACKAGING MATERIAL (WPM). All shipments destined to the DOD must be treated and marked in accordance with the International Standards for Phytosanitary Measures Guidelines for Regulating Wood

Packaging Material in International Trade (ISPM 15) for OCONUS shipments.

a. For all WPM furnished under this contract the contractor shall ensure the American Lumber Standards

Committee (ALSC) approved mark is applied to every shipment regardless of destination.

b. Failure to comply with the requirements of ISPM 15 may result in refusal, destruction or treatment of

WPM at the point of receipt and the associated costs charged back to the contractor.

7. NAVY SHELF-LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item

(Type I, non-extendible or Type II, extendible), and the number of months an item can remain ready for issue in a

Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129 to apply either Type I or Type II shelf-life markings to an item's unit, intermediate and shipping containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.

8. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the “Container NSN” field (e.g . 8145

012622982) requires shipment in a reusable shipping and storage container.

a. REUSABLE CONTAINERS FOR NAVSUP WSS, MARITIME REQUIREMENTS - Reusable NSN containers for maritime material (designated by a COG Code of “7E”, “7G” and “7H”) shall be provided as contractor-furnished material (CFM).

b. REUSABLE CONTAINERS FOR NAVSUP WSS, AVIATION REQUIREMENTS - Reusable NSN containers (excluding fiberboard and most wood) for aviation material (designated by a COG Code of “7R”, “6K” or “0R”) shall be provided as government-furnished material (GFM). Fast pack containers will not be provided as

GFM. To obtain GFM reusable containers, the contractor must submit the Container Request Form available at https://www.navsup.navy.mil/site/public/wss/documents/business_opps/local_clauses_contracts/container_request_f orm.pdf. Email the completed form to NAVSUPCRF.fct@navy.mil at least 90 days prior to the anticipated shipping date (monthly for repair contracts). If the Navy’s Container Management Area (CMA) informs the contractor that containers are unavailable, the following alternate packaging requirements apply. The unavailability of reusable containers shall not be an excusable delivery delay.

ALTERNATE PACKAGING REQUIREMENTS FOR ITEMS ASSIGNED THE FOLLOWING CONTAINERS

Container

NSN

Container

Part Number (80132)

Alternate Packaging Code

IAW MIL-STD-2073-1

8145 002609548 P069-2 https://www.ippc.int/en/publications/640/ https://www.navsup.navy.mil/site/public/wss/documents/business_opps/local_clauses_contracts/container_request_form.pdf https://www.navsup.navy.mil/site/public/wss/documents/business_opps/local_clauses_contracts/container_request_form.pdf

8145 002609556 P069-1 GX10000LTBED

(QUP = 001)

(ICQ = 000)

8145 002609559 P069-3

8145 002609562 P069-4

8145 010124088 P069-6

8145 010140440 P069-5

8145 011644073 P069-7

8145 012622982 15450-1 If MOP/PMT = GX, GX100K3GHFED

(QUP = 001)

(ICQ = 000)

For all other MOPs/PMTs

51100EAGHFED

8145 012622983 15450-2

8145 012622984 15450-3

8145 012622985 15450-4

8145 012622986 15450-5

8145 012622987 15450-6

8145 012622988 15450-7 (QUP = 001) (ICQ = 000)

c. All excess empty reusable shipping and storage containers shall be turned-in to the nearest Container Reuse and Refurbishment Center (CRRC). CRRC locations/points of contact: Program Manager - 215-697-2063

Norfolk, VA - 757-445-9099 ext. 124 Yokosuka, JAPAN - 011-81-46-816-6304

Cherry Point, NC - 252-466-2331 Lemoore, CA - 559-998-0220

Jacksonville, FL - 904-542-1014 Okinawa, JAPAN - 011-81-46-816-6304

San Diego, CA - 619-545-8360 Iwakuni, JAPAN - 011-81-46-816-6304

Puget Sound, WA - 360-476-9777 Bahrain - 011-318-439-9553

d. The stock-numbered, long-life, reusable containers identified herein as GFM are property of the U.S. Navy and only shall be used to fulfill orders from the Navy and U.S. Marine Corps; these containers shall not be used to fulfill orders from the U.S. Army, U.S. Air Force, any other agency of the U.S. Government or Foreign Military

Sales (FMS) customer.

9. REUSABLE NSN CONTAINERS FOR FOREIGN MILITARY SALES (FMS), JOINT PROGRAM

OFFICE (JPO) OR OTHER FOREIGN FORCES ACQUISITION

a. Reusable shipping and storage containers shall be provided as CONTRACTOR-FURNISHED MATERIAL

(CFM), unless otherwise specified.

b. Contractors may tender offers including alternate, non-reusable, packaging methods and be considered responsive.

10. HAZARDOUS MATERIALS. This section applies when items to be delivered under this contract are considered hazardous materials as defined by 49 CFR, FED-STD-313, or by the Government's technical representative.

a. Packaging and marking for hazardous materials shall comply with applicable requirements for Performance

Oriented Packaging (POP) contained in 49 CFR and the international modal regulations. All performance test requirements shall be supported by test certificates and reports attesting to the date and the results obtained from performance oriented packaging testing. The contractor shall be responsible for assuring that sources providing performance testing services are registered with the U.S. Department of Transportation (DOT). The contractor's signed certification that the packaged configuration meets the applicable modal regulation shall be incorporated on the Wide Area Workflow Receiving Report (WAWF RR), DD Form 250, Material Inspection and Receiving Report, or other related acceptance documents if a WAWF RR, DD Form 250 is not used. The Shipper’s Declaration for

Dangerous Goods (SDDG) must be included for all air shipments. All test certificates, reports and training records shall be available for inspection by authorized Government representatives for a period of three years.

b. When a contract/order for hazardous material requires shipment to a military aerial port or through a military container consolidation point including DODAACs SW3225, SW3123, SW3142, N45627, FB4427, FB9150, FB4497, FY8910, FY9125, FB4418, FY4462, FB4484, FY4494, those shipments shall comply with NAVSUP PUB

505/AFMAN 24-204, Preparing Hazardous Materials for Military Air Shipment.

11. SAFETY DATA SHEETS. As required by clauses FAR 52.223-3 “Hazardous Material Identification and

Material Safety Data” and DFARS 252.223-7001 “Hazard Warning Labels” the contractor/offeror is required to list any hazardous material to be delivered under the resultant contract by the submission of Safety Data Sheets (SDSs) and Globally Harmonized System (GHS) compliant product label, when applicable, to the NAVSUP WSS or DLA

Contracting Officer prior to award. An electronic copy in PDF format of the SDS and GHS product label must also be emailed to NAVSUP WSS Code N242 at hazmat.navsupwss@navy.mil. Please include the NSN, CAGE, Part

Number, contract number, and point of contact for hazardous material questions in the body of the email.

12. REPACKAGING TO CORRECT PACKAGING DEFICIENCIES

a. Notwithstanding inspection and acceptance by the Government of items furnished under this contract, or any condition of this contract concerning the conclusiveness thereof, the contractor guarantees that the preservation, packaging, packing and marking…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .