3_
53 KB Posted
- Attached to
- LED Light Conversion Project
- Solicitation number
- RFP-WAS-180000003098-1
- Issued by
- Mackinac County, Michigan
About this file
This is a bid proposal package and vendor qualification forms from Whiteford Agricultural Schools in Ottawa Lake, Michigan for a Comprehensive LED Lighting Conversion project (RFP # LED 2018). The project requires the contractor to furnish all permits, labor, materials, tools, equipment, supervision, and services for a complete LED lighting conversion. The project completion date is set for October 31, 2018, and includes third-party functional testing of the lighting control system.
The contractor must provide a performance bond and labor and materials payment bond equal to 100% of the contract value, with the cost included in the base bid. The package includes required certifications regarding debarment, nondiscrimination, Iran Economic Sanctions Act compliance, and familial relationship disclosures. Vendors must submit references from three clients and provide company qualifications including financial ratings and years in business. The documents indicate this is an institutional project that will require comprehensive LED lighting upgrades across school facilities, though specific quantities are not provided in these forms.
Text of this file
Whiteford Agricultural Schools, 6655 Consear Rd, Ottawa Lake, MI 49267 734-856-1443
Attachment “D”
Vendor Bid Proposal
RFP # LED 2018 – Comprehensive LED Lighting Conversion
Having read and examined the Documents entitled: Comprehensive LED Lighting Conversion
And Addenda Numbers_______________________________________________
And, inspected the site and the conditions affecting and governing the construction of said project, the undersigned:
Vendor:
Address: Phone Number:
Fax Number:
Vendor Web Site: Email:
Hereby proposes to furnish all permits, labor, materials, tools, equipment, supervision, and service required for the completion of the work described in the documents for the following sums.
Total Project Summary Total Cost of Conversion: *
* Identify all applicable rebates and programs applicable to the Project that have been factored into the Total Cost:
Program Savings
PERFORMANCE BOND – Each successful bidder will be required to furnish a performance bond and labor and materials payment bond equal to one hundred (100%) percent of the contract including accepted alternates and in accordance with the contract conditions. Premium for bonds shall be included in the base bid.
And, with the signing of this Proposal, the Bidder affirms the Cost of the Performance Bond is included in the Total Cost of the Conversion Sum.
NOTE: The lighting control system shall have third-party functional testing. The testing shall be included in this contract. The testing shall verify operation of all of the lighting and controls installed as part of this contract.
The Cost of the Third-Party Functional Testing included in the sum above is
Dollars. $
Any Additional Information/Explanation/Exceptions:
Owner desires completion of the project no later than Wednesday, October 31, 2018.
The undersigned warrantees that “Substantial Completion of the Work” as defined by the Construction Documents, shall be achieved no later than _________________ calendar days from the date of award of contract.
Signature: Date:
Attachment “E”
VENDOR STATEMENT OF QUALIFICATIONS
Company Name:____________________________________________________________________________________
Company Address:__________________________________________________________________________________
Telephone Number: __________________________________________ Fax Number: _____________________________________
Contact Name:__________________________________________ Contact Title:____________________________________
Number of Years in business:_________ Contact Email:___________________________________
Company’s financial rating:
Duns or Bank reference:___________________________________________________________
Client Data (Reference #1) Description of Service
Client Data#1:________________________________ __________________________________________
Address: _________________________________
Contact Name:_________________________________________ Contact Phone:_________________________________________
Contact Email:_________________________________________
Client Data (Reference #2) Description of Service
Client Data#1:________________________________ __________________________________________
Address: _________________________________
Contact Phone:_________________________________________
Contact Email:_________________________________________
Client Data (Reference #3) Description of Service
Client Data#1:________________________________ __________________________________________
Address: _________________________________
Contact Phone:____________________________________
Contact Email:_________________________________________
Attachment “F”
ASSURANCES and CERTIFICATIONS
Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion
The prospective Contractor certifies, by submission of this proposal, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded for from participating in this transaction by any Federal department of agency. Where the prospective Contractor is unable to certify to any of the statements in this certification, such prospective Contractor shall attach an explanation to this proposal.
Certification Regarding Nondiscrimination Under Federally and State Assisted Programs
The applicant herby agrees that it will comply with all federal and Michigan laws and regulations prohibiting discrimination and, in accordance therewith, no person, on the basis of race, color, religion, national origin or ancestry, age, sex, marital status or handicap, shall be discriminated against, excluded from participation in, denied the benefits of, or otherwise be subjected to discrimination in any program or activity for which it is responsible or for which it receives financial assistance from the U.S.
Department of Education or the MDE.
Iran Economic Sanctions Act
The prospective Contractor certifies that its organization, by submission of this proposal, is not an Iran Linked Business. Please refer to the “Iran Economic Sanction Act” Public Act 517 for clarifications or questions. Whiteford Agricultural Schools as a Michigan public entity is required to follow Public Act 517 of 2012.
Date Signature
Attachment “G” Iran Economic Sanctions Act Certification
I am the _______(title)________ of _____________(Bidder)_______________, or I am bidding in my individual capacity ("Bidder"), with authority to submit a binding Bid for the provision of LED Lighting and Controls improvements to Whiteford Agricultural Schools. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq. ("Act"). I am fully aware that the school district will rely on my representations in evaluating Bids.
I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to Bid for three (3) years, and a civil penalty of $250,000 or twice the Bid amount, whichever is greater, plus related investigation and legal costs.
(signature)
(printed)
(date)
Attachment “H”
FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT
(This disclosure statement must be included with your Bid as required by Public Act 232 of 2004)
All Bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or any employee of the Bidder and any member of the Board of Education or Superintendent of Whiteford Agricultural Schools.
The undersigned, the Owner or authorized officer of (the “Bidder”), pursuant to the familial disclosure requirement provided in the attached invitation to Bid, hereby represent and warrant, except as provided below, that no familial relationships exist between the Owner(s) or any employee of the company and any members of the Boards of Education and Superintendent of Schools as listed above. If such a relationship exists, please explain:
By: (Bidder’s signature) Name: (type or print)
Date:
Subscribed and Sworn to Before Me:
This day of , 2018 A.D., in and for the County of
, State of . My commission expires: .
Signature of Notary
| 1 = Front Cover |
| 2 = Index |
| INDEX |
| CONTRACT FOR CONSTRUCTION |
| OR |
| DRAWINGS FOR REFERENCE ONLY |
| 3 = Project 201843 - Whiteford Lighting Bidding w JDRM Updates |
| LED Lighting and Controls Package |
| Attachment “C” |
| TERMS OF PERFORMANCE |
| RFP # LED 2018 – Comprehensive LED Lighting Conversion |
| ASSURANCES and CERTIFICATIONS |
| 4 = A105-2017 - Working Draft - 001 (9) |
| ARTICLE 1 THE CONTRACT DOCUMENTS |
| ARTICLE 2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION |
| ARTICLE 3 CONTRACT SUM |
| ARTICLE 4 PAYMENTS |
| ARTICLE 5 INSURANCE |
| ARTICLE 6 GENERAL PROVISIONS |
| ARTICLE 7 OWNER |
| ARTICLE 8 CONTRACTOR |
| ARTICLE 9 ARCHITECT |
| ARTICLE 10 CHANGES IN THE WORK |
| ARTICLE 11 TIME |
| ARTICLE 12 PAYMENTS AND COMPLETION |
| ARTICLE 13 PROTECTION OF PERSONS AND PROPERTY |
| ARTICLE 14 CORRECTION OF WORK |
| ARTICLE 15 MISCELLANEOUS PROVISIONS |
| ARTICLE 16 TERMINATION OF THE CONTRACT |
| ARTICLE 17 OTHER TERMS AND CONDITIONS |
| 5 = SC AIA A105 2017 OwnerContractorAgreement |
| SECTION SC - SUPPLEMENTARY GENERAL CONDITIONS |
| GENERAL CONDITIONS |
| ARTICLE 5, INSURANCE AND BONDS |
| ARTICLE 10, CHANGES IN THE WORK |
| Add the Following Article 17 and Sub-Paragraphs: |
| Article 17 OTHER TERMS AND CONDITIONS |
| 17.1 LANGUAGE OF SPECIFICATIONS |
| 17.2 LAYING OUT WORK |
| 17.3 VERIFICATION OF EXISTING CONDITIONS |
| 17.5 PRIME CONTRACTOR |
| 17.6 ACCIDENTS |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .