3-Chester Upland Athletic Fields Geotech Report.pdf
PDF 5 MB Posted
- Solicitation number
- US.262492
- Issued by
- Delaware County, Pennsylvania
About this file
This is a Geotechnical Investigation Report prepared by ACER Associates, LLC for the Chester Upland School District regarding proposed athletic complex improvements located at 1100 West 10th Street in Chester, Delaware County, Pennsylvania. The investigation, conducted on August 10-11, 2026, encompassed eight standard earth borings (B-1 through B-8) across the site to define subsurface soil stratification and engineering properties. The boring program targeted specific facility footprints including a proposed two-story training facility (10,802 square feet), single-story restroom building (3,600 square feet), single-story concessions structure (1,200 square feet), and grandstand areas. Boring depths ranged from approximately 18.2 to 30 feet below ground surface. The investigation identified four soil strata consisting primarily of weathered micaceous silty sand to sandy silt materials derived from the Wissahickon Formation and Pennsauken and Bridgeton Formations. Groundwater was encountered at depths ranging from 11 to 14 feet below ground surface.
The report provides comprehensive foundation design recommendations including allowable soil bearing pressures of 1,900 pounds per square foot for building structures on shallow foundations at 3 feet depth and 2,200 pounds per square foot for grandstand spread footings. Alternative drilled shaft ("caisson") foundations are recommended for grandstands with an allowable bearing capacity of 4,000 pounds per square foot for 2-foot diameter shafts at 8 feet depth. Site preparation requirements include stripping unsuitable materials, proof-rolling with vibratory equipment and loaded tri-axle trucks, and structural fill placement and compaction to minimum 95 percent of maximum dry density in foundation areas. The report specifies that Stratum I, II, and IV soils are moisture-sensitive and suitable for use as structural fill only under controlled conditions. Laboratory testing of two representative samples confirmed soil classifications and provided particle size distributions and Atterberg limits. Construction quality control and assurance by a qualified geotechnical engineer during construction is mandatory to ensure recommendations are implemented and settlement is minimized to approximately 1 inch or less.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Specifications - Updated 11-10-26.pdf | ||
| 2-STEM Rev3 111126.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEOTECHNICAL INVESTIGATION REPORT
PROPOSED ATHLETIC COMPLEX
“CHESTER UPLAND SCHOOL DISTRICT”
1100 West 10th Street
City of Chester, Delaware County, Pennsylvania 19013
September 17, 2026
Prepared for: Prepared by:
334 W Front Street
Media, PA 19063
1012 Industrial Drive
West Berlin, New Jersey 08091
ACER Project Number: 20260552
1012 Industrial Drive, West Berlin, New Jersey 08091
Tel. (856) 809-1202 Fax. (856) 809-1203
ACER ASSOCIATES, LLC
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 SITE AND PROJECT DESCRIPTION
3.0 FIELD INVESTIGATION
3.1 Geotechnical Sampling
4.0 SUBSURFACE CONDITIONS
4.1 Geology
4.2 Soils
4.3 Bedrock
4.4 Groundwater
5.0 LABORATORY ANALYSES
6.0 CONCLUSIONS AND RECOMMENDATIONS
6.1 Site Preparation
6.2 Proof-rolling
6.3 Backfill & Compaction
6.4 Building Structure Foundations
6.5 Grandstand Foundations
6.5.1 Shallow Foundations
6.5.2 Drilled Shafts (“Caissons”)
6.5.3 Lateral Earth Pressures
6.6 Floor Slab Support
6.7 Seismic Site Class
6.8 Excavations
6.9 Dewatering
6.10 Construction Quality Control & Assurance
7.0 LIMITATIONS
8.0 APPENDICES
Appendix A Site Location Map
Appendix B Boring Location Plan
Appendix C Boring Logs
Appendix D Geologic Map
Appendix E Laboratory Results
Appendix F General Information for Geotechnical Reporting
ACER ASSOCIATES, LLC
1.0 INTRODUCTION
This Geotechnical Investigation Report was prepared by ACER Associates, LLC (ACER) at the request of MG Engineering Associates, LLC (Galante), and contains the results of a geotechnical engineering investigation conducted at the site of proposed renovation and construction for an athletic complex in the City of Chester, Delaware County, Pennsylvania. The purpose of this investigation was to define the stratification of subsurface soils and the engineering properties of these materials in the project area.
The scope of work for this project included a subsurface field investigation, laboratory testing program, and a geotechnical engineering evaluation. This report summarizes the results of the work performed and gives recommendations regarding foundation placement, soil strength conditions, and general site preparation criteria.
END OF SECTION
ACER ASSOCIATES, LLC
2.0 SITE AND PROJECT DESCRIPTION
The project site is located at the corner of Lamokin Street and Concord Avenue in the City of
Chester, Delaware County, Pennsylvania. The site is situated within the Atlantic Coastal Plain
Physiographic Province which is characterized by flat upper terrace surface cut by shallow valleys with very low relief and typically underlain by unconsolidated to poorly consolidated sediments and metamorphic rocks.
At the time of the investigation, the project site consisted of the existing Chester Upland School
District athletic field, including a centrally located football and track field, grandstands along the eastern and western sides of the field, grass-covered areas, and asphalt-paved areas. Topography across the proposed construction area was relatively flat, sloping gently towards the south. The location of the site is presented on the Site Location Map found in Appendix A.
The proposed project will consist of improvements to the existing Chester Upland School
District athletic field, including the construction of new home and visitor grandstands, a proposed two-story training facility with an approximate footprint of 10,802 square feet, a proposed single-story restroom building with an approximate footprint of 3,600 square feet, and a proposed single-story concessions structure with an approximate footprint of 1,200 square feet. It is assumed, that cuts and fills across the proposed construction areas will balance.
ACER ASSOCIATES, LLC
3.0 FIELD INVESTIGATION
ACER performed a field investigation, consisting of geotechnical sampling, at the project site on
August 10 and August 11, 2026. Details regarding this task are presented below.
3.1 Geotechnical Sampling
The geotechnical investigation consisted of installing eight (8) standard earth borings, referenced as B-1 through B-8, across the site. B-1 through B-3 were installed within the footprint of the proposed two-story training facility, B-4 through B-6 were installed in the areas of the grandstands, B-7 was installed within the footprint of the proposed bathroom building, and B-8 was installed within the footprint of the proposed concessions structure.
B-1 was installed to a termination depth of approximately 28.7 feet below ground surface
(bgs), B-2 was installed to approximately 18.2 feet bgs, B-3 to approximately 28.8 feet bgs, B-4 and B-5 to approximately 30 feet bgs, B-6 to approximately 23.6 feet bgs, and B-7 and
B-8 to approximately 20 feet bgs. The locations of borings have been depicted on the
Boring Location Plan found in Appendix B.
The test borings were advanced using a Geoprobe 7822DT track-mounted drilling rig equipped with hollow stem augers and split spoon samplers. Subsurface soils were sampled in accordance with ASTM D1586/D1586M-18e1 procedures for the Standard
Penetration Test (SPT). The SPT value, which is a measure of the soil density and consistency, consists of advancing a 2-inch outer-diameter split-barrel sampler, driven by a 140-pound hammer, free falling 30 inches. The number of blows required to advance the sampler over the 12-inch interval from 6 to 18 inches is considered the field "N" value, or SPT value. All samples were visually analyzed and classified in the field using the United
Soil Classification System (USCS). Soil descriptions, depths to compositional changes, and
SPT values encountered in the borings were recorded in the field, and are presented in the Boring Logs included in Appendix C.
ACER ASSOCIATES, LLC
4.0 SUBSURFACE CONDITIONS
4.1 Geology
According to the U.S.G.S., Geologic Map of Pennsylvania, two (2) separate geologic formations are mapped underlying the project site. These are the Wissahickon Formation
(Xw) at the southern portion of the site and the Pennsauken and Bridgeton Formations
(Tpb) at the northern portion of the site.
According to the Pennsylvania Geological Survey, Engineering Characteristics of the Rocks of Pennsylvania, Fourth Series, Revised 1982, the Wissahickon Formation is primarily composed of a gray to green albite-chlorite schist, oligoclase-mica schist, and the marburg schist, but also includes hornblende gneiss. Bedding within this portion of the
Wissahickon formation is common and flaggy. Its joints have a blocky pattern, are irregular and are often steeply dipping.
According to the Pennsylvania Geological Survey, Engineering Characteristics of the Rocks of Pennsylvania, Fourth Series, Revised 1982, the Pennsauken and Bridgeton formation is primarily composed of a yellow to reddish-brown sand, with extensively crossbedded, interbedded, coarse gravel.
The observed subsurface conditions generally corresponded with the mapped geologic setting. The soil materials encountered in B-1 through B-6 appeared generally consistent with weathered materials associated with the Wissahickon Formation, while the materials encountered in B-6 through B-8 appeared generally consistent with the unconsolidated
Pennsauken and Bridgeton Formations.
The location of the site in relation to the regional bedrock geology is presented on the
Geologic Map found in Appendix D.
4.2 Soils
The surface at test borings B-1 through B-4, and B-7 through B-8 were covered be an approximate 3-inch-thick layer of topsoil. The surface at test borings B-5 and B-6 were covered by an approximate 6-inch-thick layer of asphalt.
Below the surficial layers, the subsurface profile underlying the project area was found to consist of four (4) soil strata, referenced herein as Stratum I through Stratum IV. Detailed descriptions of the subsurface conditions encountered, along with profiles of the test borings displaying subsurface conditions and other information obtained from the field investigation, are presented on the Boring Logs included in Appendix C. A general description of the soils encountered is as follows.
Stratum I – Yellowish brown to pale brown to grayish brown micaceous silty sand to sandy silt with varying amounts of clay (SM, ML, MH, SM-SC)
ACER ASSOCIATES, LLC
Stratum I was encountered within test borings B-1 through B-6 performed at the site, directly below the surficial layer within B-1 through B-5, and directly below Stratum IV in
B-6. Stratum I extended to depths ranging from approximately 13 to 23 feet bgs across the borings. SPT N-values recorded while sampling Stratum I ranged from 2 blows per foot (bpf) to 36 bpf, and averaged approximately 11 bpf. Based on these values, the soils of Stratum I were found to be generally in a medium dense state, and ranged from very loose to dense. Laboratory results indicate these soils to be poorly graded, and range from non-plastic to low plasticity. Stratum I consisted predominantly of weathered mica schist soils derived from the underlying Wissahickon Formation.
Stratum II – White to grayish brown to reddish yellow micaceous silty sand to sandy silt with varying amount of clay (SM, ML, SM-SC)
Stratum II was encountered within test borings B-1 through B-6 performed at the site, directly below the soils of Stratum I. In borings B-2 through B-6, Stratum II extended to the termination depth within those borings. Within boring B-1, Stratum II extended to a depth of approximately depths ranging from 23 feet bgs. SPT N-values recorded while sampling Stratum II ranged from 21 bpf to in excess of 50 blows per 1 inch. Based on these values, the soils of Stratum II were found to exist in a medium dense to very dense state. Visual review of this soil shows it to be poorly graded, and range from non-plastic to low plasticity. Stratum I consisted predominantly of weathered mica schist soils derived from the underlying Wissahickon Formation.
Stratum III – Gray micaceous silty sand with decomposed weathered gneiss fragments
(SM)
Stratum III was encountered only within test boring B-1, directly below the soils of
Stratum II. Within B-1, Stratum III extended to the termination depth, approximately 28.7 feet bgs. SPT N-values recorded while sampling Stratum III ranged from 50 blows per 5 inches to 50 blows per 2 inches. Based on these values, the soils of Stratum III were found to exist in a very dense state. Visual review of Stratum III has shown it to be poorly graded, and non-plastic. Stratum III consisted predominantly of weathered micaceous gneiss derived from the underlying Wissahickon Formation.
Stratum IV – Strong brown sandy silt to silty sand with varying amounts of clay and gravel
(ML, SM, SC, GW-GM)
Stratum IV was encountered only within test borings B-6 through B-8, directly below the surficial layer. Within B-6, Stratum IV extended to a depth of approxiamtely 6 feet bgs, and within B-7 and B-8 Stratum IV extended to the termination depth, approximately 20 feet bgs. SPT N-values recorded while sampling Stratum IV ranged from 7 to 36 bpf, and averaged approximately 15 bpf. Based on these values, the soils of Stratum IV were found to exist generally in a medium dense state and ranged from loos to dense. Visual review of Stratum IV has shown it to be poorly graded, and range from non-plastic to low
ACER ASSOCIATES, LLC
plasticity. Stratum IV is believed to be associated with the underlying Pennsauken and
Bridgeton formations.
4.3 Bedrock
The bedrock surface was not encountered within any of the test borings performed at the site. Bedrock is defined as the depth at which auger refusal is encountered within a test boring.
4.4 Groundwater
Groundwater was encountered within each boring, ranging from approximately 11 feet bgs to 14 feet bgs It should be noted that these observations were made at the time of the drilling operation and that groundwater table elevations may fluctuate with daily, seasonal, and climatic variations.
ACER ASSOCIATES, LLC
5.0 LABORATORY ANALYSES
In order to supplement visual classifications, two (2) representative soil samples were obtained from the test borings and subjected to laboratory testing in accordance with ASTM C117, ASTM
C136, ASTM D4318, ASTM D2216, and ASTM D2487. The results of the laboratory analyses are presented in Appendix E of this report and have been summarized in Table 1 below.
Table 1
Summary of Laboratory Analyses of Soils
Sample Information
Boring Number B-1 B-5
Sample Number S-5 S-4
Sample Depths (ft.) 8’ – 10’ 4’ – 6’
Soil Type Stratum I Stratum I
Moisture Content Determination
Moisture Content (%) 23.1 26.6
Particle Size Distribution
Percent
Passing Sieve
Gravel
1½” 100.0 100.0
3/4” 100.0 100.0
3/8” 100.0 100.0
No. 4 100.0 100.0
Sand
No. 10 99.7 99.6
No. 40 83.6 91.2
No. 100 53.0 69.4
Silt & Clay No. 200 40.0 56.8
Atterberg Limits
Liquid Limit (LL) NP 42
Plastic Limit (PL) NP 32
Plasticity Index (PI) NP 10
Classification
USCS Group Name
(Group Symbol)
Silty Sand
(SM)
Sandy Silt (ML)
NP = Non-plastic
ACER ASSOCIATES, LLC
6.0 CONCLUSION AND RECOMMENDATIONS
Based on the subsurface conditions encountered and the results of the investigation, it is our opinion that the existing competent soils, as well as properly placed and compacted structural fill under engineering control, are capable of supporting the proposed building structures and grandstands on conventional shallow foundations. Alternatively, the proposed grandstands may be supported on deep foundations.
The recommendation to support the proposed building structures on shallow foundations and the grandstands on either shallow or deep foundations is provided under the premise that site preparations as described in this report are followed. Details regarding site development requirements are presented below.
6.1 Site Preparation
At the outset of the project, structural areas should be stripped of all existing asphalt pavements, vegetative cover, topsoil, roots, and other deleterious materials. Structural areas are defined as those areas to be covered by the proposed structures, extending a minimum of five (5) feet beyond the proposed building lines, where feasible, as well as any portions of the site to be covered by new asphalt or concrete pavements. Any weak, soft, unstable, non-native, deleterious materials, undocumented fill, and/or construction debris encountered below the surface should also be removed. Removal should continue until competent and stable bearing soils are encountered.
Where existing fill or other unsuitable materials are present within the zone of influence of proposed foundations, such materials should be removed and replaced with properly compacted structural fill. The zone of influence should extend downward and outward from the bottom outside edge of the proposed foundation at a minimum of 1 Horizontal to 1 Vertical (1H:1V) projection.
Following stripping and removal of unsuitable materials, exposed subgrades should be proof-rolled as desbribed in Section 6.2 below.
Care should be exercised during site preparation and construction activities to avoid disturbing, undermining, or otherwise damaging existing asphalt pavement subgrades and associated underground utilities at the site. Construction operations should maintain the stability of adjacent pavement areas that are to remain in service. Existing utility lines located within the zone of influence of proposed foundations should be relocated as part of the site preparation work. Utilities to be abandoned or removed should be rerouted to locations beyond the limits of proposed construction. Excavations resulting from utility removal should be over-excavated as necessary to provide sufficient working width for proper backfilling and compaction using appropriate construction equipment.
All backfill and structural fill should be placed and compacted in accordance with Section
ACER ASSOCIATES, LLC
6.3 of this report and performed under the direction of the Geotechnical Engineer or qualified geotechnical technician.
6.2 Proof-rolling
Having completed the site preparation as outlined above, all structural areas should first be densified using a smooth-drum vibratory roller having a maximum static weight of 10 tons, and then proof-rolled using a fully loaded tri-axle dump truck. Proof-rolling is necessary to verify the integrity of the upper zones of the soils. A qualified geotechnical representative should be present during proof-rolling operations to evaluate deflection, rutting, pumping, or other signs of instability. Areas exhibiting excessive deflection
(typically greater than approximately 1 inch of rutting), pumping, weaving under load, or generally loose soils should be considered unsuitable and should be undercut and replaced with approved structural fill, or otherwise stabilized as directed by the geotechnical engineer. Removal and placement of existing soil with structural fill, if necessary, should follow Section 5.3 outlined below. In areas of the site where a cut or removal of soil is necessary to achieve the required soil subgrade elevation, proof-rolling of the surface should not be performed until the proposed subgrade elevation has been achieved.
6.3 Backfill & Compaction
Following the site preparation procedures discussed above, structural fill required to elevate the site to the planned subgrade elevations or replace any weak and unstable areas may be placed.
The following considerations should be given to the suitability of on-site soils to be utilized as structural fill:
Stratum I – The soils of Stratum I were found to consist of mostly of a micaceous silty sand to sandy silt with varying amounts of clay.
Visual review of this soil stratum has shown it to consist of the group symbols: SM, ML, MH, SM-SC. Stratum I may be considered suitable for use as structural fill at the site. However, significant portions of Stratum I were found to contain mostly or significant amounts of fine-grained soils (i.e., silt and clay).
Therefore, Stratum I will be moisture-sensitive and difficult to compact during wet conditions.
Stratum II – The soils of Stratum II were found to consist of mostly of a micaceous silty sand to sandy silt with varying amounts of clay.
Visual review of this soil stratum has shown it to consist of the group symbols: SM, ML, SM-SC. Stratum II may be considered suitable for use as structural fill at the site. However, significant
ACER ASSOCIATES, LLC
portions of Stratum II were found to contain mostly or significant amounts of fine-grained soils (i.e., silt and clay). Therefore, Stratum II will be moisture-sensitive and difficult to compact during wet conditions.
Stratum IV – The soils of Stratum IV were found to consist mostly of a micaceous silty sand to sandy silt with varying amounts of clay and gravel. Visual review of this soil stratum has shown it to consist of the group symbols: ML, SM, SC, GW-GM. Stratum IV may be considered suitable for use as structural fill at the site.
However, significant portions of Stratum IV were found to contain mostly or significant amounts of fine-grained soils (i.e., silt and clay). Therefore, Stratum IV will be moisture-sensitive and difficult to compact during wet conditions.
The recommendation for use of on-site soils as structural fill is based on analysis of soil samples retrieved from the test borings. Confirmation of any soil’s suitability should be made during construction by a qualified Geotechnical Engineer.
Any imported structural or load-bearing soil that is required should meet the following criteria:
• Free of organic matter, ash, cinders, and demolition debris
• Particle size distribution that is well graded
• Plasticity index less than 10
• Less than 15 percent by weight rock fragments larger than 3", less than 30 percent by weight larger than 3/4" and less than 10 percent by weight smaller than the No. 200 sieve.
Structural fill should be placed in lifts not exceeding 8 inches in loose thickness and compacted with a smooth-drum vibratory roller having a minimum static weight of 10 tons. The optimum lift thickness and number of repetitive passes with compaction equipment necessary to achieve the required percentage compaction values should be determined in the field with test passes of the chosen compaction equipment. All fill should be placed at the optimum moisture content ± 3% as determined by ASTM D1557
(Modified Proctor) and compacted to a minimum percentage of the maximum dry density as indicated in Table 2.
ACER ASSOCIATES, LLC
Table 2
Compaction Criteria
Fill Area Percent of Maximum Dry Density as per ASTM D1557 (Modified Proctor)
Foundation Areas 95
Slab-On-Grade, Paved Areas 95
Non-Structural 92
Structural fill utilized to backfill excavations for foundations, utilities, or any other new subsurface elements should also be placed and compacted in accordance with the guidelines set forth in this section.
6.4 Building Structure Foundations
As mentioned above, borings B-1 through B-3, B-7, and B-8 were installed within the proposed building structure footprints. After site preparation operations have been satisfactorily completed, the on-site soils and/or imported structural fill may be utilized for the support of the proposed buildings using shallow foundation systems. The calculations are based on a proposed foundation design consisting of 18-inch-wide continuous reinforced footings to be installed at a depth of 3 feet bgs. The soil bearing conditions at the site were evaluated based on the information derived from this investigation. The following conclusions and engineering recommendations are provided regarding the proposed foundation elements:
• Shallow foundations may be used to support the planned structures given the expected foundation loads.
• Foundations for the proposed structure may be designed for an allowable soil bearing pressure of 1,900 pounds per square foot (psf) using 18-inch-wide continuous footings at a depth of 3 feet bgs.
• Exterior foundations and those in unheated areas should be placed a minimum of
3 feet below final exterior grade to minimize the potential for frost heave.
• All foundation bottoms should be completely cleaned of loose material or debris immediately prior to the placement of concrete or structural fill.
• The actual bearing conditions of the soil at the foundation subgrade elevation should be confirmed in the field during excavation, by inspection under the supervision of a Professional Engineer qualified in Geotechnical Engineering.
Given the above recommendations and design parameters, it is anticipated that total settlement of the structure will not exceed 1 inch with maximum differential settlement of foundation elements estimated to be less than 0.5 inches.
ACER ASSOCIATES, LLC
Prior to placement of concrete, all foundation bottoms should be densified and compacted using a walk behind vibratory roller, jumping jack, or similar equipment. Densification is required to provide uniform density of the foundation subgrade and allow for proper distribution of loads. Proper compaction and densification of the foundation soils should be verified by a qualified Geotechnical Engineer prior to placement of concrete. If compaction is not performed on the foundation subgrade soils, the above referenced bearing capacity of 1,900 psf will not be achieved and the conclusions and recommendations found in this report will be invalid.
It is emphasized that caution should be exercised in order to not disturb foundation subgrade soils. Should the foundation subgrade be disturbed during excavation, the soils should be compacted in place or removed and replaced with structural fill as outlined in this report. It is also recommended that footing excavations and placement of concrete be performed during fair weather conditions. Installation of the foundations should be carried out in accordance with applicable ACI guidelines, under the direction of a licensed
Professional Engineer.
6.5 Grandstand Foundations
As mentioned above, borings B-4 through B-6 were installed at the approximate area of the proposed grandstands. Based on the Standard Penetration Test (SPT) data collected during this investigation, it is ACER’s opinion that the subsurface underlying the site is considered capable of supporting the proposed grandstands on either a shallow foundation system consisting of “spread” footings or on drilled shaft foundations
(“caissons”). These conclusions are provided under the premise that the recommendations regarding foundation design parameters presented below are followed.
6.5.1 Shallow Foundations
Should a shallow foundation system be used to support the proposed grandstand structures, it is ACER’s opinion that spread footings consisting of a mat and pier for each column may be considered suitable.
Assuming a series of shallow spread footings measuring 4-feet square, bearing on soils situated at least 3 feet below grade, it is ACER’s recommendation that a maximum allowable bearing capacity of 2,200 psf may be used for design of a shallow foundation system.
The following conclusions and engineering recommendations are provided regarding shallow foundation elements:
• Foundations should be placed a minimum of 3 feet below final grade to minimize the potential for frost heave.
• All foundation bottoms should be completely cleaned of loose material or
ACER ASSOCIATES, LLC
debris immediately prior to the placement of concrete or structural fill.
• The actual bearing conditions of the soil at the foundation subgrade elevation should be confirmed in the field during excavations, by inspection under the supervision of a Professional Engineer qualified in
Geotechnical Engineering.
Prior to placement of concrete, all shallow foundation bottoms should be densified and compacted using a walk behind vibratory roller, jumping jack, or similar equipment. Densification is required to provide uniform density of the foundation subgrade and allow for proper distribution of loads. Proper compaction and densification of the foundation soils should be verified by a qualified Geotechnical
Engineer prior to placement of concrete. If compaction is not performed on the foundation subgrade soils, the above referenced bearing capacity of 1,800 psf will not be achieved and the conclusions and recommendations found in this report will be invalid.
It is emphasized that caution should be exercised in order to not disturb foundation subgrade soils. Should the foundation subgrade be disturbed during excavation, the soils should be compacted in place or removed and replaced with structural fill as outlined in this report. It is also recommended that footing excavation and placement of concrete be performed during fair weather conditions. Installation of the foundations should be carried out in accordance with applicable ACI guidelines, under the direction of a licensed Professional Engineer.
As previously stated, the sizing and other aspects of the design of the foundation members should be determined by the structural engineer for the project. The foundations should be placed at a sufficient depth for structural considerations, including requirements for handling uplift and overturning. The design to resist uplift and overturning should also include the dead weight of the foundations.
It should be noted that the foundation design parameters provided above are only recommendations, based on the subsurface conditions encountered within the test boring, and on ACER’s experiences with similar projects, and that actual foundation design is beyond the scope of this evaluation.
6.5.2 Drilled Shafts (“Caissons”)
Should a series of caisson foundations be used to support the proposed grandstands, it is ACER’s opinion that the subsurface soils are suitable for support of the proposed structures.
ACER has calculated an allowable bearing capacity of 4,000 psf for each caisson.
This calculation is based on a 2-foot diameter drilled shaft to a depth of 8 feet bgs.
ACER ASSOCIATES, LLC
The earth pressure coefficients that can be used in the drilled caisson design are provided in the “Lateral Earth Pressures” section of this report.
The drilled shaft excavations should be temporarily cased during installation to avoid collapse and protect personnel. This can be achieved using “sonotubes”. The excavations should also be kept as dry as possible and cleaned of loose material and/or debris immediately prior to inspection and concrete placement.
The sizing and other aspects of the design of the foundation members should be determined by the structural engineer for the project. The foundations should be placed at a sufficient depth for structural considerations, including requirements for handling uplift and overturning. The design to resist uplift and overturning should also include the dead weight of the foundations.
6.5.3 Lateral Earth Pressures
Design of a caisson foundation system will require the consideration of lateral earth pressures imposed on this element, such as in the case of skin frictional resistance as it is related to uplift capacity. ACER recommends using a friction factor of tan = 0.4, between the interface of the concrete and the soils. Table 3 provides a summary of the typical soil properties of the materials encountered.
No strength testing was performed on any of the samples taken and the values reported in the table are based on results obtained from the field investigation and reported in literature.
Table 3
Earth Pressure Coefficients
Parameter Stratum I Stratum II Stratum III Stratum IV
Angle of Internal Friction
(Φ)1
27° 32° 33° 33°
Unit Weight of Soil1 100.0 pcf 110.0 pcf 120.0 pcf 120.0 pcf
Submerged Unit Weight 37.6 pcf 47.6 pcf 57.6 pcf 57.6 pcf
Coefficient of Active Earth
Pressure (KA)2
0.38 0.31 0.29 0.29
Coefficient of Passive Earth
Pressure (KP)
2.66 3.25 3.39 3.39
Coefficient of At-Rest Earth
Pressure (KO)4
0.55 0.47 0.46 0.46
Friction Angle (Soil to
Concrete) (δ) 20.25° 24° 24.75° 24.75°
Cohesion 0 psf 0 psf 0 psf 0 psf
Notes:
1. The angle of internal friction and the unit weights reported are based on the field SPT results and values reported in literature (Reference: Bowles, J.E (1988). Foundation Analysis and Design, ACER ASSOCIATES, LLC
4th Edition, 1988, McGraw-Hill, Inc. p. 141)
2. KA = tan2(45 - Φ/2)
3. KP = tan2(45 + Φ/2)
4. KO = 1- sin Φ (assuming normally consolidated conditions)
6.6 Floor Slab Support
The floor for the proposed buildings, may be constructed as a conventional slab-on-grade and should be supported on firm and stable subgrade and compacted in accordance with
Section 6.3 above. Once the finished subgrade elevations are reached, the entirety of the pads should be proof-rolled using a fully loaded, tri-axle dump truck under the review of a qualified Geotechnical Engineer. Following verification that the pad subgrades are firm and stable, efforts should be taken to protect the subgrade from adverse weather conditions, and minimize disturbance by construction vehicles, prior to concrete placement for the slab.
The floor slabs should be underlain by a bedding of clean stone to provide a capillary break. The stone bedding should have a minimum thickness of 6 inches and should be comprised of clean, crushed stone (such as AASHTO No. 57). A vapor/moisture barrier should be installed directly beneath the slab and above the stone subbase to reduce moisture migration into the slab.
Floor slabs designed and constructed in accordance with the recommendations provided herein are anticipated to experience total settlements of less than approximately one inch under anticipated service loading conditions.
6.7 Seismic Site Class
The American Society of Civil Engineers (ASCE) standard for Minimum Design Loads for
Buildings and Other Structures (ASCE/SEI 7-16) provides a methodology for the interpretation of SPT N-values to determine a Site Class Definition; however, this method requires averaging the N-values over the top 100 feet of the subsurface profile, a depth well in excess of the depths of our exploration at this particular project site. Based on the information obtained from the geotechnical field investigation, and general guidelines provided in Chapter 20 of ASCE/SEI 7-16, we recommend that a Site Classification “E” can be used for seismic design considerations.
6.8 Excavations
Excavation during construction of the proposed structures is expected to take place within the soils of Stratum I and Stratum IV, and may extend into the soils of Stratum II.
These soils may be removed using conventional excavation equipment.
ACER ASSOCIATES, LLC
Excavations greater than 5 feet will require temporary shoring of the excavation with trench boxes, or with sheeting and bracing, to obtain a safe working environment in accordance with local, state and federal regulations, including OSHA (CFR Part 1926) excavation trench safety standards. It is recommended that excavated soils be placed away from the edges of the excavation, at a distance equal to or exceeding the depth of the excavation. In addition, surface runoff should be diverted away from the crest of excavated slopes to prevent erosion and sloughing.
6.9 Dewatering
As previously discussed, groundwater was encountered as shallow as 11 feet bgs. It should be noted that these observations were made at the time of the field investigation and that groundwater table elevations will fluctuate with daily, seasonal, and climatic variations. Therefore, depending on the time of year, subsurface conditions at the time of construction, and if any undercutting of soils is required, dewatering during construction may be required.
Should it be deemed necessary to dewater during foundation construction due to elevated groundwater tables and/or perched water conditions, a series of well points or submersible pumps installed during the planned excavations should adequately dewater the construction area. The final selection of the dewatering system, and the exact placement of any well points, should be determined by the contractor and approved by the project engineer. Dewatering operations should be maintained during excavation and placement of the proposed foundations. A backup system should also be available in the event that the primary system fails. The water level should be maintained at a minimum of two (2) feet below the foundation subgrade elevation(s) prior to and during the placement of concrete. The dewatering system should be installed in such a manner that minimizes soil disturbance.
6.10 Construction Quality Control & Assurance
The proposed development at the site will include earthwork and concrete foundation construction. As the geotechnical engineering consultant of record, Acer Associates, LLC should be retained during the construction phase for the project to monitor these activities and provide materials testing services, in order to ensure that the recommendations presented within this report are followed, and that all relevant construction activities are performed in accordance with project specifications.
ACER ASSOCIATES, LLC
7.0 LIMITATIONS
The conclusions and recommendations contained in this report are based upon the subsurface data collected and on details stated in this report. Should conditions be encountered during construction that differ from those specifically stated herein, our office should be notified immediately so that our recommendations can be reviewed and revised, if necessary.
Our recommendations are also based on the assumption that a Professional Engineer, registered in the Commonwealth of Pennsylvania, and qualified in Geotechnical Engineering will be retained to oversee the installation of the proposed structure.
The boring logs are ACER’s interpretation of the subsurface conditions found by collecting intermittent samples within each boring as it progressed downward. Detailed soil descriptions and interfaces between each stratum are interpretive, and actual changes are gradational.
The boring logs are descriptive only of the subsurface conditions in the specific location of each boring at the exact time it was installed. Subsurface conditions at other locations in the project area may differ from those in the location of the borings.
It is emphasized that this analysis was made for the proposed structures and grandstands to be constructed at the Chester Uplands Athletic School District at Lamokin Street and Concord
Avenue in the City of Chester, Delaware County, Pennsylvania. ACER does not assume any responsibility in using this report to generate foundation design conclusions for any project other than that specifically described herein.
Prepared By: Reviewed By:
Stephen Kochenberger J. Scott Horn, PG, CHMM
Project Manager President and
Jody F. DeMarco, P.E.
PA Professional Engineer
License # 49032
8.0 APPENDICES
Appendix A
Site Location Map
SITE LOCATION MAP±
1012 INDUSTRIAL DRIVE
WEST BERLIN, NEW JERSEY 08091
Tel (856) 809-1202 / Fax (856) 809-1203
SITE LOCATION
Proposed Athletic Field Improvements Chester Upland School District Athletic Field
Lamokin Street & Concord Avenue Chester, Delaware County, PA
0 1,000 2,000500 Feet
Appendix B
Boring Location Plan
BORING LOCATION MAP
Co nco rd Av e
Lam okin
S t
Lam okin
S t
Con cord
Ave
L am o kin
S t
B-1
B-2
B-3
B-4
B-5
B-6
B-7
B-8
0 75 15037.5 Feet
ACER ASSOCIATES, LLC
1012 INDUSTRIAL DRIVE
WEST BERLIN, NEW JERSEY 08091
Tel (856) 809-1202 / Fax (856) 809-1203
Indicates number and approximate location of test boring
B-#
Proposed Athletic Field Improvements Chester Upland School District Athletic Field
Lamokin Street & Concord Avenue Chester, Delaware County, PA
Area Map
Appendix C
Boring Logs
Project Number: Client: Started:
20260552 8/10/2026
Drilling Contractor: Completed:
8/10/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 1 1 2 2 3
2 - 4 S - 2 2 3 3 4 6
4 - 6 S - 3 3 5 7 8 12
6 - 8 S - 4 5 7 8 10 15
8 - 10 S - 5 8 7 7 7 14
13 - 14.3 S - 6 25 25 50/4" 50/4"
18 - 19.3 S - 7 3 8 50/3" 50/3"
23 - 23.9 S - 8 14 50/5" 50/5"
28 - 28.7 S - 9 10 50/2" 50/2"
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 1 of 8
Gray (10YR 5/1) micaceous silty sand (SM), with decomposed gneiss fragments
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Dark yellowish brown (10YR 4/4) micaceous silty sand (SM), highly weathered
3" Topsoil
Dark yellowish brown (10YR 4/4) micaceous silty sand (SM), highly weathered
Gray (10YR 5/1) micaceous silty sand (SM), with decomposed gneiss fragments
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
D e p th fe e t)
S a m p le
D e p th fe e t)
S a m
N u m b e r
Blow Counts
N
V a lu e
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-1 ±74' ASL 12'
G ra p h ic L o g
Description Remarks
LEGEND
Very pale brown (10YR 7/3) micaceous silty sand (SM), highly weathered soils
Light brownish gray (10YR 6/2) micaceous silty sand (SM), highly weathered soils
Pale brown (10YR 6/3) micaceous silty sand (SM), highly weathered soil moisture content =
23.1%
White (10YR 8/1) to grayish brown (10YR 5/2) micaceous silty sand (SM), trace decomposed rock fragments
Reddish yellow (5YR 6/6) to grayish brown (10YR 5/2) micaceous silty sand
(SM), highly weathered
END OF BORING AT 28.7 FEET
(Spoon Refusal)
Topsoil
Stratum I
Stratum II
Stratum III
Drilling Contractor: Completed:
8/10/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 0 2 2 3 4
2 - 4 S - 2 2 3 5 6 8
4 - 6 S - 3 7 8 9 11 17
6 - 8 S - 4 7 8 11 12 19
8 - 10 S - 5 11 14 14 15 28
13 - 14.3 S - 6 18 20 19 20 39
18 - 18.2 S - 7 50/2" 50/2"
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 2 of 8
LEGEND
Pale brown (10YR 6/3) micaceous sandy silt (ML), highly weathered soil
END OF BORING AT 18.2 FEET
(Auger Refusal)
Pale brown (10YR 6/3) micaceous silty sand (SM), highly weathered soil
Light brownish gray (10YR 6/2) micaceous silty sand (SM), highly weathered soils
Light brownish gray (10YR 6/2) micaceous silty sand (SM), highly weathered soils
Brownish yellow (10YR 6/6) micaceous silty sand (SM), highly weathered soils
Light gray (10YR 7/2) micaceous silty sand (SM), highly weathered soil
3" Topsoil
Yellowish brown (10YR 5/4) micaceous sandy silt (ML), highly weathered
13'
D e p th fe e t)
S a m p th fe e t)
S a m m b e r
Blow Counts
N
V a lu e
G ra p h ic L o g
Description Remarks
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-2 ±75' ASL
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
Topsoil
Stratum I
Drilling Contractor: Completed:
8/10/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 0 2 2 3 4
2 - 4 S - 2 1 2 2 2 4
4 - 6 S - 3 1 1 3 3 4
6 - 8 S - 4 5 3 8 18 11
8 - 10 S - 5 7 2 3 4 5
13 - 15 S - 6 11 9 8 10 17
18 - 20 S - 7 9 8 13 14 21
23 - 25 S - 8 20 11 19 19 30
28 - 28.8 S - 9 40 50/3" 50/3"
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 3 of 8
LEGEND
Grayish brown (10YR 5/2) micaceous silty sand (SM), highly weathered soil
END OF BORING AT 28.8 FEET
(Spoon Refusal)
Yellowish brown (10YR 5/4) micaceous silty sand (SM), highly weathered soil
Brown (10YR 5/3) micaceous silty sand (SM)
Dark brown (10YR 3/3) micaceous silty sand (SM)
Light brownish gray (10YR 6/4) micaceous silty sand with gravel (SM)
Yellow brown (10YR 5/4) micaceous silty sand (SM)
Grayish brown (10YR 5/2) micaceous silty sand (SM)
Brown (10YR 5/3) micaceous silty sand (SM), highly weathered soil
3" Topsoil
Brown (10YR 4/3) micaceous silty sand (SM)
12'
D e p th fe e t)
S a m p th fe e t)
S a m m b e r
Blow Counts
N
V a lu e
G ra p h ic L o g
Description Remarks
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-3 ±80' ASL
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
Topsoil
Stratum I
Drilling Contractor: Completed:
8/10/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 1 5 5 4 10
2 - 4 S - 2 2 3 2 3 5
4 - 6 S - 3 0 2 2 3 4
6 - 8 S - 4 3 4 4 5 8
8 - 10 S - 5 4 4 4 6 8
13 - 15 S - 6 2 6 8 9 14
18 - 20 S - 7 11 10 12 17 22
23 - 25 S - 8 9 11 11 14 22
28 - 28.8 S - 9 12 20 36 42 56
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 4 of 8
Dark yellowish brown (10YR 4/4) micaceous silty sand (SM)
END OF BORING AT 30 FEET
LEGEND
Grayish brown (10YR 5/2) micaceous silty clayey sand (SM-SC)
Light yellowish brown (10YR 6/4) micaceous elastic silt (MH)
Yellowish brown (10YR 5/6) micaceous sandy silt (ML)
Yellowish brown (10YR 5/6) micaceous silty sand (SM)
Yellow brown (10YR 5/4) micaceous sandy silt (ML)
Pale brown (10YR 6/3) micaceous sandy silt (ML)
Brown (10YR 6/3) micaceous micaceous sandy silt (ML)
3" Topsoil
Light yellowish brown (10YR 6/4) micaceous sandy silt (ML)
13'
D e p th fe e t)
S a m p th fe e t)
S a m m b e r
Blow Counts
N
V a lu e
G ra p h ic L o g
Description Remarks
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-4 ±84.5' ASL
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
Topsoil
Stratum I
20260552 8/11/2026
Drilling Contractor: Completed:
8/11/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 5 6 3 3 9
2 - 4 S - 2 2 0 3 1 3
4 - 6 S - 3 1 1 1 2 2
6 - 8 S - 4 3 5 5 6 10
8 - 10 S - 5 4 5 5 8 10
13 - 15 S - 6 9 11 14 14 25
18 - 20 S - 7 16 17 19 19 36
23 - 25 S - 8 25 30 30 40 60
28 - 28.8 S - 9 18 27 33 30 60
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 5 of 8
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Yellowish brown (10YR 5/8) micaceous sandy silt (ML)
11'
D e p th fe e t)
S a m p th fe e t)
S a m m b e r
Blow Counts
N
V a lu e
G ra p h ic L o g
Description Remarks
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-5 ±85' ASL
6" Asphalt
Grayish brown (10YR 5/2) micaceous silty clayey sand (SM-SC), highly weathered soil
Yellowish brown (10YR 5/6) micaceous sandy silt (ML)
Dark yellowish brown (10YR 4/6) micaceous sandy silt (ML)
Brown (7.5YR 4/4) micaceous sandy silt (ML)
Dark yellowish brown (10YR 4/4) micaceous silty clayey sand (SM-SC)
Light brownish gray (10YR 6/2) micaceous sandy silt (ML)
Brown (10YR 5/3) micaceous micaceous silty sand (SM) plasticity index = 10 moisture content = 26.6%
Grayish brown (10YR 5/2) micaceous silty clayey sand (SM-SC), highly weathered soil
END OF BORING AT 30 FEET
LEGEND
Asphalt
Stratum I
Drilling Contractor: Completed:
8/11/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 0 8 5 5 13
2 - 4 S - 2 4 4 6 8 10
4 - 6 S - 3 9 7 6 9 13
6 - 8 S - 4 7 13 13 8 26
8 - 10 S - 5 14 5 4 4 9
13 - 15 S - 6 9 8 11 11 19
18 - 20 S - 7 14 15 14 16 29
23 - 23.6 S - 8 15 50/1" 50/1"
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 6 of 8
Brown (10YR 5/3) micaceous silty sand (SM), highly weathered soil
END OF BORING AT 23.6 FEET
(Auger Refusal)
Grayish brown (10YR 5/4) micaceous sandy silt (ML)
Yellowish brown (10YR 5/4) micaceous micaceous silty sand with gravel (SM)
LEGEND
Very pale brown (10YR 7/4) micaceous silty clayey sand (SM-SC)
6" Asphalt
Strong brown (7.5 YR 5/6) silty sand (SM)
Strong brown (7.5 YR 5/8) silty sand with gravel (SM)
Strong brown (7.5 YR 5/8) silty sand with gravel (SM)
Dark yellowish brown (10YR 4/6) micaceous clayey sand with gravel (SC)
14'
D e p th fe e t)
S a m p th fe e t)
S a m m b e r
Blow Counts
N
V a lu e
G ra p h ic L o g
Description Remarks
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-6 ±85' ASL
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
Asphalt
Stratum I
Stratum II
Stratum IV
Drilling Contractor: Completed:
8/11/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 2 4 4 5 8
2 - 4 S - 2 4 4 11 9 15
4 - 6 S - 3 5 8 5 6 13
6 - 8 S - 4 7 5 5 4 10
8 - 10 S - 5 1 1 3 2 4
13 - 15 S - 6 4 3 4 7 7
18 - 20 S - 7 12 18 18 15 36
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 7 of 8
Pale brown (10YR 6/3) silty sand (SM)
END OF BORING AT 20 FEET
Pale brown (10YR 6/3) clayey sand (SC)
LEGEND
Light brownish gray (10YR 6/2) sandy silt with gravel (ML)
3" Topsoil
Strong brown (7.5YR 5/6) silty sand (SM)
Strong brown (7.5YR 5/6) silty sand (SM)
Brown (7.5YR 5/4) silty sand with gravel (SM)
Light brownish gray (10YR 6/2) sandy silt with gravel (ML)
14'
D e p th fe e t)
S a m p th fe e t)
S a m m b e r
Blow Counts
N
V a lu e
G ra p h ic L o g
Description Remarks
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-7 ±85' ASL
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
Topsoil
Stratum I
Stratum II
Drilling Contractor: Completed:
8/11/2026
Drill Rig Type:
Logged By: Surface Elevation (estimate)
SK
0 - 2 S - 1 4 5 3 3 8
2 - 4 S - 2 2 4 5 5 9
4 - 6 S - 3 4 7 18 13 25
6 - 8 S - 4 21 20 15 13 35
8 - 10 S - 5 5 7 7 8 14
13 - 15 S - 6 5 4 6 7 10
18 - 20 S - 7 11 11 15 15 26
Stabilized Groundwater Groundwater At Time of Drilling Boring Log: Sheet 8 of 8
END OF BORING AT 20 FEET
LEGEND
Strong brown (7.5YR 4/6) sandy silt (ML)
Strong brown (7.5YR 4/6) sandy silt (ML)
Brownish yellow (10YR 6/6) clayey sand with gravel (SC)
3" Topsoil
Strong brown (7.5YR 5/6) sandy silt (ML)
Strong brown (7.5YR 5/6) silty sand (SM)
Reddish yellow (7.5YR 6/6) silty sand with gravel (SM)
Light yellowish brown (10YR 6/4) well graded gravel with sand and silt (GW-GM)
13'
D e p th fe e t)
S a m p th fe e t)
S a m m b e r
Blow Counts
N
V a lu e
G ra p h ic L o g
Description Remarks
Environmental & Geotechnical Services Boring No. Groundwater Depth:
B-8 ±84' ASL
Sample Method: Hammer Weight:
Standard Penetration Split Spoon Sampler (SPT) Geoprobe 7822DT 140 lb.
Project:
D a teChester Upland Athletic Complex MG Engineering Associates, LLC
Location:
1100 W 10th St., Chester, Delaware Co.,Pennsylvania Pennington
Topsoil
Stratum I
Stratum II
Appendix D
Geologic Map
Con co rd
Rd
E ls o n R d
R a in e r R d
Harris St
H a rs h a w R d
R u ra l A v e
E n g le S t
Caleb Pusey Historic Site
Palm er
S t
E ngle
S t
Veterans Memorial Park
Community Hospital
Ch es ter
Cr ee k
K e rlin
S t
U p la n d A ve
Upland Ave
P usey
S t
Tilghm an
S t
Lloyd S t
P a rk e r S t
H il l S t
Co nco rd Ave
Concord Ave
Ma ry
St
M a in
S t
C en tral
A ve
Jam es
St
L in c o ln
S tC a rlas
L n
W 3rd St
Lam o kin
S t
W 5th
St
B arclay
S t
F u lto n S t
9th St
G ri ff it h S t
Race St
W th
St
W th
St
K e rlin
S t
W 9t h St
W 9th
St
Crozier Park
Camp Upland Park
Wright School
Christopher Columbus
Elementary School
Main Street Elementary
School
Showalter Middle School
Chester Upland School District
Crozer-Chester Medical Center
Upland
C entral
A ve
W Un io n St
W 4t h St
Ma ry
St
Ma ry
St
Tilghm an
S t
W 3r d St
W 7t h St
N orris
S t
W Fro nt St
W Fr on t S t
W 6t h St
De law ar e A ve
E dw ard s S t
W th
St E ngle
S t
W 2n d St
C o m m o d o re
Jo h n B arry
B rg
W 9t h St
Douglas School
Washington School
B a rc la y S t
Franklin School
W Fro nt St
Trenton Gravel
Pensauken and Bridgeton Formations, undifferentiated
Wissahickon Formation
Mafic gneiss
Pensauken and Bridgeton Formations, undifferentiated
Pensauken and Bridgeton Formations, undifferentiated
GEOLOGIC MAP±
ACER ASSOCIATES, LLC
1012 INDUSTRIAL DRIVE
WEST BERLIN, NEW JERSEY 08091
Tel (856) 809-1202 / Fax (856) 809-1203
APPROXIMATE SITE LOCATION
Proposed Athletic Field Improvements Chester Upland School District Athletic Field
Lamokin Street & Concord Avenue Chester, Delaware County, PA
0 1,500 3,000750 US Feet
Appendix E
Laboratory Results
Tested By: R. Sheehan Checked By: M. Thomas (Laboratory Mgr.)
9/8/2026
(no specification provided)
PL= LL= PI=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
USCS Classification: Silty Sand (SM)
1.5
0.75 0.375
#…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .