Summary of Technical Specifications for 2026 45 Goepp Street Corridor Improvements

This is a detailed technical specifications document for the City of Bethlehem's 2026 45 Goepp Street Corridor Improvements project, a municipal infrastructure renovation initiative. The project encompasses multiple work items including removal and replacement of concrete sidewalks, curbs, and driveway aprons; installation of ADA-compliant curb ramps with design and construction components; street tree removal and replacement; and asphalt and brick surface replacements. Key specifications reference PennDOT Publication 408, City of Bethlehem Construction Specification No. 1, and various ANSI standards for arboricultural and tree care operations. The contractor must comply with standard city specifications, federal design guidelines including Title II ADA regulations and the 2004 ADAAG standards, and applicable PennDOT publications. A pre-bid meeting is scheduled for December 4, 2026, at 11:00 AM at Bethlehem City Hall, with sealed bids due via the PennBid Program by 10:00 AM on December 18, 2026. The contract requires adherence to Davis-Bacon wage requirements and compliance with the Build America, Buy America Act mandating that all iron, steel, construction materials, and manufactured products be manufactured in the United States.

The project requires specific workforce participation goals, including a 5% female participation goal and a 5% minority participation goal in the aggregate on-site construction workforce for contracts exceeding $10,000. Contractors must demonstrate utilization of minority and women business enterprises and comply with Section 3 requirements to utilize local area businesses, trainees, and employees within a one-mile radius target area, with goals of 25% local participation and 5% participation of low-moderation income persons. Payment for work items is calculated on unit price bases per quantity performed, including per linear foot for curb installation, per square foot for seeded areas, per tree for removal and replacement, and per quadrant for ADA curb ramp construction. All plant materials must conform to ANSI Z60.1 standards, be nursery-grown within a 150-mile radius of Bethlehem, and include appropriate certifications. The contractor bears responsibility for a two-year guarantee period on all plantings, maintenance of seeded and planted areas, and compliance with comprehensive quality control, inspection, and final acceptance procedures administered by the City Forester and City Engineer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETAILED SPECIFICATIONS

PROJECT NO. 2026 45 GOEPP ST CORRIDOR IMPROVEMENTS

The Contractor shall perform all work as detailed below and in strict accordance with the various Standard

City Specifications, included as part of these Specifications and Pub 408 of the Pennsylvania Department of

Transportation and as prescribed in these Detailed Specifications.

It shall be understood that payment made for the various items includes all labor, supervision, materials, equipment and services to perform the work, complete, in place, including the removal of surplus material from the project site.

ITEM #1-1 & #2-1 – REMOVE AND REPLACE CONCRETE SIDEWALK

The work required under these items shall include:

(a) Removal and disposal of existing sidewalk in areas as directed by the Engineer and as shown on the

Plans.

(b) Construction of new concrete sidewalk in the areas as shown on the Plans.

• Furnishing, placing, and compacting aggregate base material prior to forming as shown on the

Details.

• Forming with steel and wood forms set to line and grade of proposed sidewalk.

• Furnishing all materials to install concrete sidewalk.

• Placing pre-molded expansion joint material at existing curb, sidewalk, any structure, and at the intervals indicated on the Details.

• Placing and finishing Class A cement concrete to the dimensions shown within ten (10) calendar days of removal of existing sidewalk.

• Normal curing of concrete as per PennDOT Pub. 408 Specifications.

• Covering and protecting sidewalk from weather elements and to maintain proper curing temperature.

• Finishing concrete and stripping forms.

• Providing saw cut contraction joints immediately after form removal or tooled contraction joints during concrete placement at the intervals indicated on the Details.

• Preparing and caulking all joints according to the caulking Manufacturer’s recommendations.

• Restoring and/or replacing any existing landscaping (including, but not limited to: mulch, decorative stone, shrubbery and paver blocks) disturbed while installing the sidewalk.

(c) Salvaging and resetting of existing stone curb in the areas as shown on the Plans.

(d) Salvaging and resetting all street, stop sign poles and parking meter poles as directed and as shown on the Plans.

(e) Repair of existing foundations walls and/or steps where a grade change exposes unfinished portions of the same.

(f) The outer edges of concrete sidewalk shall be finished to a radius of ½” and no tool marks are to be left on the exposed edges.

(g) Adjusting and/or resetting sewer vents, sewer clean outs, valve boxes, and metal cellar doors.

Payment shall be made on the basis of the respective bid unit price for these items per quantity of work performed.

ITEM #1-2 & #2-2 – REPLACE CONCRETE SIDEWALK WITH TOPSOIL

The work required under this item shall consist of removal of existing sidewalk, placing topsoil, seed and mulch in areas where directed by the Engineer. The work shall include but not be limited to the following:

a) Excavating and proper disposal of any existing sidewalk or other materials that will need to be removed in order to install the proposed improvements.

b) Preparation of the area as per Section 804 of the Pub 408 specifications.

c) Placing approved topsoil four inches (4”) in depth from topsoil furnished from other sources, all in accordance with Section 801 and 802 of the Pub 408 Specifications.

d) Furnishing and placing seed and mulch in accordance with Sections 804 and 805 of the Pub 408

Specifications.

The Contractor shall be responsible for the proper maintenance of all seeded areas including watering until final acceptance of the project.

Payment of this item will be made on the basis of the bid unit price per square feet of area seeded and mulched.

ITEM #1-3 & #2-5 – CITY STANDARD CONCRETE CURB

A. Description of Work

The work required under this item shall be in accordance with PennDOT Pub. 408: Sections 501, 630, 704, 705, 709, 711, PennDOT Pub. 72M: RC-64M, and City of Bethlehem Construction Specification No. 1.

The work required under these items shall include:

• Saw cutting of existing pavement a minimum offset of 2 feet from face of curb.

• Excavation and proper disposal of the existing pavement, curb, and/or surplus material.

• Installation of safety fencing and traffic delineation to adequately protect pedestrian and vehicular traffic until the new curb is installed and properly backfilled.

• Compacting subgrade prior to installing formwork.

• Forming with steel or wood forms set to line and grade of proposed curb locations. Contractor may choose to slip form the curb in lieu of static forming. Damaged existing or newly installed curb and/or inlet tops will be replaced at the Contractor expense.

• Furnishing all materials to install concrete curb.

• The minimum length of curb to be installed is 4’.

• Saw cutting of existing curb to create a neat, clean surface. If there is a joint or crack in the existing curb within 4 feet of the proposed saw cut, remove the existing curb, saw cut the existing joint or crack and remove the existing curb to that point. If additional curb removal is required to correct vertical or horizontal alignment, due so at the direction of the Engineer.

• Placing ¾” pre-molded expansion joint material conforming to the cross sectional area of the curb at Type C inlet tops, existing curb and previously placed curb and at the intervals indicated on Details.

• Furnishing and installing wooden or steel concrete forms the full depth of the proposed curb.

• Securing the forms in a manner that does not damage the existing curb or the inlet tops.

Curb or inlet tops that are damaged during new curb installation will be replaced to the limits specified by the Engineer at no additional cost to the Owner.

• Placing and finishing Class A cement concrete to the dimensions shown on the Details within ten (10) calendar days of removal of existing curbs.

• Installation of cheek walls for curb ramps as shown on the Details or as needed to achieve required line and grade of sidewalk and/or curb ramp.

• Installation of depressed curb for curb ramps and driveways as shown on the Details.

• Quality control testing of concrete including but not limited to plastic concrete slump, air and temperature.

• Molding, curing and testing of compressive strength test cylinders (structural concrete).

• Normal curing of concrete as per PennDOT Pub. 408 Specifications.

• Covering and protecting curb from weather elements and temperature.

• Stripping forms and correcting surface defects. Curb will be removed and replaced at the

Contractor’s expense if excessive surface defects exist.

• Providing saw cut contraction joints immediately after form removal or tooled joints during placement of Class A Cement Concrete evenly spaced at a minimum of 4’ and a maximum of 20’.

• Preparing and caulking all joints according to the PENNDOT Bulletin 15 approved caulking Manufacturer’s recommendations.

• Furnishing, placing, and compacting suitable embankment material along the back of the curb as soon as possible.

• Furnishing, placing, grading and compacting 2A aggregate backfill / subbase along the front of the curb as soon as possible without damaging the curb. There will be no additional payment for asphalt damaged outside of the two (2) foot restoration.

• The area in Front of the curb will be backfilled up to the depth of the existing pavement structure with No.2A Stone, backfill in lifts not to exceed 6 inches and compact by means of mechanical tampers or roller not to exceed 8 tons. Hand tamping will not be permitted. Bituminous material will be placed for the remainder of the excavated area matching the existing Pavement Structure or a minimum of 5 inches of thickness. After paving seal the paved area with PG 64-22. If concrete Gutter is encountered as part of the Pavement Structure, WMA Base Course can be used in place of the existing concrete.

• Furnishing, placing, and compacting suitable embankment material along the back of the curb to within 6” of the top of the curb as soon as possible, but no later than 72 hours after form removal/slip-forming.

• Furnishing, placing, and compacting topsoil along the back of the curb.

• Furnishing and applying Formula B Seed and soil supplements to topsoil areas.

• Furnishing and applying straw mulch to seeded areas.

• Restoring and/or replacing any existing landscaping (including, but not limited to: mulch, decorative stone, shrubbery and paver blocks) disturbed while installing the curb.

• Failure to comply with the time restraints set forth in this section shall result in the concrete curb being classified as “Defective Work” as defined in Section 14.03 of

Division 00 72 00 Standard General Conditions. If a “Defective Work” declaration is made, the owner may stop work until the “defective Work” is corrected (Section 14.06) or have the “Defective Work” corrected at the Contractors expense (Section 14.07).

B. Measurement and Payment

Payment for this item will be made on the basis of the bid unit price for each lineal foot of curb installed including all labor, materials and equipment required to complete the work.

ITEM #1-4 & #2-6 – REMOVE AND REPLACE DRIVEWAY APRON

Refer to the applicable City Standard driveway entrance and apron, sheet 7 of 8 of Construction

ITEM #1-5 & #2-7 – DESIGN AND CONSTRUCT ADA CURB RAMPS

DESIGN ADA CURB RAMPS

A. Description of Work

The work required under this item shall include the design and preparation of drawings, including obtaining all required permits, for the construction of ADA accessible curb ramps as required to provide pedestrian access.

B. Design

1. Prepare and submit Design Drawings for each quadrant, detailing the proposed curb ramps for each quadrant in accordance with Title II regulations at 28 CFR 35.151; and the 2004 ADAAG at 36 CFR part 1191, appendices B and Publication 13M, Design

Manual, Part 2, Chapter 6 for additional information or alterations.

Detectable warning surfaces must be provided in accordance to ADA regulations. City standard color is brick red.

The Design Drawings must be sealed by a Professional Engineer licensed in

Pennsylvania and the Designer/Engineer required resumes must demonstrate experience and expertise, during the last 5 years, their familiarity with Americans with Disabilities

Act (ADA) requirements as contained in Code of Title II regulations at 28 CFR 35.151;

and the 2004 ADAAG at 36 CFR part 1191.

C. Design Specifications

Use the following listing, in order of governing predominance, for design policy and procedures, design criteria, and additional information:

• Contract special provisions Design Manual Parts 1, 1A, 2 and 3, Publication 10, 10A, 13M, and 14M, latest editions.

• Pavement Policy Manual, Publication 242, latest edition

• Highway Specifications, Publication 408/2007, Change No. in effect on the Let Date

Roadway Construction Standards, Publication 72M, latest edition

• Temporary Traffic Control Guidelines, Publication 213, latest edition

• Traffic Control Pavement Marking and Signing Standards TC-8600 and TC-8700, Publication 111M, latest edition

• Traffic Standards TC-7800, Publication 148, latest edition

• Handbook of Approved Signs, Publication 236M, latest edition

• Official Traffic Control Devices, Publication 212, latest edition

• FHWA’s Manual on Uniform Traffic Control Devices, latest edition

• Work Zone Safety and Mobility Policy, Publication 46 (Traffic Engineering and

Operations Manual), Chapter 6.3

• Publication 35, Approved Construction Materials (Bulletin 15)

• AASHTO’s A Policy on Geometric Design of Highway and Streets (i.e., AASHTO

“Green Book”), 2004 edition

• Publication 149 Traffic Signal Design Handbook

In the event that a clear order of predominance cannot be established, or a difference in interpretation of the design criteria, standards, specifications, or methodology cannot be resolved, (the Chief of Engineering will be the arbiter and this decision will be final).

D. Highway Occupancy Permits

Wherever access is required to the State right-of-way in order to construct, replace, or remove curb and/or sidewalk the Designer/Contractor is responsible for obtaining a

Highway Occupancy Permit from PennDOT. The Owner shall be provided a copy of the approved HOP prior to any construction occurring within the PennDOT right-of-way.

E. Utilities

Design the curb ramps to accommodate the existing utility facilities within the project.

Minor utility adjustments such as, but not limited to, minor vertical adjustments of manholes, junction boxes, and valve boxes, etc. may be required.

F. Signalized Intersections

If necessary, revise the existing traffic signal permit plans including, but not limited to, stop bar locations, crosswalks, pedestrian push button locations, loop detectors, sensors, clearance intervals and installation/removal of pedestrian signs. Coordinate with the appropriate municipalities for the revisions to the traffic signal permit plans and obtain concurrences in writing. Contact the Assistant District Traffic Engineer for Signals at

610-871-4478 for print or CADD files of the existing traffic signal permit plans. Notify the District Offices if changes to the intersection potentially warrant signal timing adjustments. Submit the revised traffic signal permit plans to the District Traffic

Engineer for approval. Upon approval, submit electronic files of the traffic signal permit plans to the District Traffic Engineer. For files not provided to the Contractor in electronic format, revised image files are acceptable.

Ensure that pedestrian visibility is not compromised by the new curb ramp locations.

Ensure that distances to the signal head from the stop bar are within the guidelines ein

Publication 149 – Traffic Signal Designer Handbook.

G. Design Requirements

In field design meeting is required prior to starting the design. The meeting will be in the presence of the Contractor, the Engineering firm, the project engineer and a representative from the Engineering Department.

Submit one hard copy and one electronic copy of all final plans accepted by the City of

Bethlehem Engineering Department as well as forms, and related drawings. Final approved submission package must be sealed by a Professional Engineer licensed in

Pennsylvania.

The design of all curb ramps shall be done in accordance with the Americans with

Disabilities Act Policy and Design Guidance Publication 13M, Design Manual Part 2

(DM2).

Indicate a NORTH arrow on the drawing identifying the direction of magnetic North.

Provide a title block in the lower right hand corner, including the Project’s name, date of submittal, a block for date of re-submittal(s), and the appropriate sheet number(s).

Indicate the type of curb ramp proposed and the location of each quadrant.

Indicate the existing and proposed vertical elevations of the finished grade of roadway directly in front, both sides of wing and at the center of the proposed ramp (designated to the nearest 0.01 foot).

Indicate existing elevations (Slant font) to compare to proposed elevations. Include a description of the improvements or a description of the proposed ramp compared to the existing ramp.

Indicate the existing longitudinal and slopes of the roadway directly in front of and at the center of the proposed ramp (designated to the nearest 0.10%).

Indicate proposed running and cross slope percent of the ramp (designated to the nearest

0.10%).

Indicate proposed running and cross slope percent of the sidewalk transitions to the ramp and/or landing (designated to the nearest 0.10%).

Indicate limits of removal of existing sidewalk curb and curb ramp(s) (designated to the nearest 0.10 foot). Terminate limits of work at existing tooled expansion/contraction joints. Curb may be saw cut.

Indicate proposed length and width of the curb ramp.

Indicate proposed horizontal location and horizontal measurements of the landing area.

Indicate proposed slopes of the landing area (designated to the nearest 0.10%).

Indicate proposed slopes of flares (designated to the Nearest 0.10%).

Indicate proposed horizontal measurement(s) of flares (designated to the nearest 0.10 foot).

Indicate the proposed horizontal placement of Detectable Warning Surface (DWS).

Indicate horizontal relationship of the crosswalk and stop bars (designated to the nearest

0.10 foot).

Indicate any utility features within the curb ramp construction area.

Provide positive drainage for each quadrant.

Indicate existing and proposed right-of-way and construction easements (including the administrator of the Right-of-Way ex. State, municipal or dedicated etc).

All work must be performed within the Legal Right-of-Way unless written permission is obtained from the City.

Designs utilizing cheek-walls and unexpected vertical drops will require City approval.

For designs that may include pedestrian barriers, City approval is required.

All minimum and maximum dimensions contained on the Standard Drawings RC-67M are absolute. Construction tolerances do not apply when a dimension is shown as minimum or maximum.

Complete the PennDOT form entitled “Technically Infeasible form” (TIF), when applicable, and submit to Chief of Engineering for the City of Bethlehem.

H. Review Times

Submittal reviews will be performed within 5 working days for the first submission and within 3 working days for subsequent submissions. Refer to Special Provision “Review

Submissions and Designated Reviewers” for submission requirements.

Review times begin and end when a submission is logged in and out, respectively, by all designated reviewers. The login time will be taken as the latest date in which the submission is received by the reviewers. Submittals received after 11:00 A.M. will be logged in as the next working day following receipt of the submission. If a submission is incomplete or otherwise requires additional information or data to properly complete the review, the review time will begin as specified for the submission when all required information is received. Additional contract time or price adjustment to any contract items will not be considered due to failure to obtain approvals within the specified review times resulting from incomplete or non-conforming submissions. Working days are weekdays, Monday through Friday. The following official City holidays will not be included as working days: New Year’s Day, Martin Luther King, Jr. Day, Presidents’ Day, Primary Election Day, Memorial Day, Independence Day, Labor Day, General Election Day, Thanksgiving Day, Day after Thanksgiving Day, and Christmas

Day.

I. Measurement and Payment – Each. Each consists of one Quadrant

Each corner, median crossing, island, and mid-block crossing (both sides) will be considered to be one quadrant. A “T” intersection will constitute a maximum of three quadrants.

CONSTRUCT CURB RAMPS

1. Description

This work is the construction of concrete curb ramps, concrete curb, all associated pedestrian features work and the restoration of the adjacent area as indicated on the approved curb ramp design drawings and ADA standards.

2. Material

As per the Publication 408 and as indicated and specified on the approved Design Curb

Ramp Drawings.

3. Construction

Construction will be paid for each quadrant constructed. A quadrant is defined as: all of the curb ramps and ADA features associated with a particular corner, median crossing, island, or mid-block crossing. Each corner, median crossing, island and mid-block crossing (both sides) will be considered to be a separate quadrant. A “T” intersection will constitute a maximum of three quadrants.

Detectable Warning Surfaces must be provided at the junction between the Pedestrian

Access Route (PAR) and provided with traffic control devices or driveways that are otherwise permitted to operate like public streets.

The City of Bethlehem standard color is brick red.

In accordance with applicable sections of Publication 408, the special provision of the contract and any additional requirements specified herein.

Curb and sidewalks to be in accordance with Section 630 and Section 676 as indicated and as follows;

Revise Section 630.3(g) as follows;

The area in front of the curb will be backfilled up to the depth of the existing pavement structure with No.2A Stone, backfill in lifts not to exceed 6 inches and compact by means of mechanical tampers or roller not to exceed 8 tons. Hand tamping will not be permitted. Bituminous material will be placed for the remainder of the excavated area matching the existing Pavement Structure or a minimum of 5 inches of thickness. After paving seal the paved area with PG 64-22. If concrete Gutter is encountered as part of the Pavement Structure, WMA 25 MM Base Course can be used in place of the existing concrete.

Revise Section 676.3 Construction by adding the following:

Construct plain cement concrete curb ramps at the locations in accordance with the

Design Curb Ramp Drawings and as shown on the Standard Drawings (RC-67M and RC-

64M) and meeting the requirements of DM-2, Chapter 6. On Standard Drawings – 67M, the details depicted are most appropriate for New Construction. Alterations to existing facilities must meet the requirements to the maximum extent feasible. All field design changes must be submitted to the City for approval.

Work on curb ramps cannot commence until the drawings for the intersection are submitted and approved. All work must be performed within the Legal Right-of-Way unless written permission is obtained from the City. If an Authorization to Enter (waiver of Claim) is required, it must be completed by the City and signed by the property owner prior to work.

Minor utility adjustments such as, but not limited to, minor vertical adjustments of manholes, junction boxes, and valve boxes, etc. may be required. Coordinate with all necessary utility companies for adjustments of their facilities for construction of the curb ramp. Coordinate all utility adjustments as per Special Provision entitled “Utility

Relocation Information for Design/Build Projects”.

All minimum and maximum dimensions contained on the Standard Drawings RC-67M &

RC-64 are absolute. Construction tolerances do not apply when a dimension is as minimum or maximum. Check all slopes with a four foot Smart Level for compliance.

An acceptance certificate will not be issued if any newly constructed curb ramps do not fully comply with the approved curb ramp design drawings and applicable standards.

Remove all existing concrete and curb to existing joint.

Notify the Engineer a minimum of 3 calendar days prior to any work at signalized intersections that may affect loop detectors. Replace any damaged or removed loop detectors, fully restore their operation for each signalized intersections within 7 calendar days. The City is responsible for adjusting the video detection systems. All signalized

Intersections shall be in compliance with the appropriate Traffic Signal Permit.

Modifications to the existing Signal Permit will require municipal and appropriate

Engineering District Approval.

Eradicate and install pavement markings as required by the Curb Ramp Design

Drawings.

Provide access to existing pushbuttons to the maximum extent feasible so as not to create pedestrian obstructions.

Grade areas behind the sidewalk that are within vegetation to match the grade of the new sidewalk and existing topography so the area will drain away from the pedestrian

Facility. Place topsoil as necessary and seed the area with Seeding and Soil Supplements, Formula B as per Section 804.2 of Publication 408.

If a new curb ramp is being placed at a quadrant of an intersection where there is an existing curb ramp but, not at the same location of the placement of the new, the contractor will remove the existing depressed curb and necessary curb to tie into the new curb cut ramp. The Contractor will also remove the existing curb ramp and replace with the appropriate sidewalk or topsoil at a grade to meet the new curb ramp facility.

The Contractor will install/remove any existing Pedestrian signs as indicated by the Curb

Ramp Design Drawings.

Any temporary construction activities required for alterations that affect existing pedestrian circulation paths will require the provision of a safe, alternate and accessible pedestrian route around the construction activities. The alternate route must comply with all applicable design guidelines to the maximum extent feasible so that the usability of the accessible route is maintained. The alternate route will be kept in place through the duration of the construction activity.

4. Measurement and Payment – EACH. Each consists of one quadrant. Each corner, median crossing, island and mid-block crossing (both sides) will be considered to be a separate quadrant. A “T” intersection will constitute a maximum of three quadrants.

Payment will not be made for a quadrant until the City approves construction and issues an acceptance certificate.

The following are incidental to this item:

• Minor utility adjustments such as, but not limited to, minor vertical adjustments of manholes, junction boxes, etc. may be required. Coordination with all necessary utility companies for adjustments of their facilities for construction of the curb ramp.

• Construction of concrete curb ramps, concrete sidewalks, concrete curb, all associated pedestrian features work and the restoration of the adjacent area as indicated on the approved curb ramp design drawings and applicable standards.

• Topsoil, Seeding and Soil Supplements, Formula B as per Section 804.2

• Repair of adjacent roadway

• Longitudinal joint sealing

• Loop sensor repair and/or relocation, video detection system adjustments as required.

• Pavement marking removal and installation.

• Sign installation, removal, relocation.

• Cheek Walls installation

Measurement and Payment – Each (EA).

ITEM #1-6 - REMOVE STREET TREE

ITEM #1-7 & #2-8- PLANT STREET TREE

ITEM #1-8 REMOVE AND REPLACE STREET TREE

Part A – Tree Removal

1. SCOPE OF WORK

A. These specifications apply to those items necessary for and incidental to the execution and completion of tree removal as indicated herein.

B. All labor, supervision, equipment, materials, and supplies necessary for the execution of the work shall be provided for by the Contractor at no additional cost to the City.

2. APPLICABLE SPECIFICATIONS AND STANDARDS

A. American National Standard for Arboricultural Operations-Safety

Requirements, ANSI Z-133.1, most current edition. International Society of

Arboriculture, PO Box 3129, Champaign, IL 61826-3129

B. American National Standard for Tree Care Operations, ANSI A300-most current edition. International Society of Arboriculture, PO Box 3129, Champaign

IL 61826-3129

3. LICENSED ARBORIST

A. Tree removal shall be done by a City licensed arborist.

B. The name and license number of the arborist performing the removal work must be included in the bid document to be considered for this project.

C. Any change in the licensing status of the arborist during the life of this contract must be reported to the City.

D. Failure to have a City licensed contractor perform the tree removals shall result in termination of the contract.

4. SUPERVISION

A. The Contractor shall provide qualified supervision of all subcontractors at all times while working under this contract. The supervisor shall be authorized by the

Contractor to accept and act upon all directives issued by the City.

5. PROPERTY DAMAGE

A. Special care shall be taken to avoid damage to existing sidewalks, roadways, existing trees, other vegetation, street lights, aerial wires, underground utilities, buildings, signs, poles, walkways, structures, and other property.

B. Rope or other mechanical devices shall be used to lower limbs and trunk sections of sufficient size that may cause damage to other trees and other surrounding public and private property.

C. Any damage done by the Contractor or his subcontractors shall be repaired by the

Contractor at his expense.

6. PUBLIC SAFETY

A. The Contractor shall be responsible to supply adequate barricades, flaggers, signs, cones, warning devices, and any other materials necessary to protect motorists and pedestrians during the performance of this contract.

B. It shall be the Contractors responsibility to ensure that all subcontractors adhere to these requirements. All cones, signs, and barricades must conform to PennDOT

Publication 213, 67PA Code, Chapter 212.

7. TREE LOCATIONS

A. All tree removals shall be marked with an orange ‘X’ on the street side of the tree.

The trees to be removed in conjunction with this project are located at the following locations:

1) Base Bid Trees

a. NE Corner of E Laurel Street & Elm Street

8. STUMP GRINDING

A. All stumps above or below ground and all exposed roots shall be ground to a minimum depth of two (2’) ft. Where trees are to be removed and replaced, the stump and roots must be ground out to meet the specifications for ‘excavation of planting areas’ (#9 above).

9. DEBRIS AND CHIP DISPOSAL

A. Disposal of all logs, branches, limbs, bark, chips, or any other debris generated by the work performed under this contract shall be the responsibility of the

Contractor.

B. The Contractor shall remove and dispose of all debris at the end of each day’s operation and leave the site clean and safe. Site clean-up shall include removal of sawdust, small twigs, wood chips, leaves, wood, tree trunks, and fruit generated by the removal.

C. The surrounding street, sidewalk, parkway (the strip between the curb and the sidewalk) and public or private property shall be returned to the same state that existed prior to the removal.

Payments for these items will be made on the basis of the bid unit price per tree removed.

Part B – Tree Replacement

1. SCOPE OF WORK

A. These specifications, including drawings and plant materials lists, apply to those items necessary for and incidental to the execution and completion of planting as indicated herein.

B. All labor, supervision, equipment, materials, and supplies necessary for the execution of the work shall be provided for by the Contractor at no additional cost to the City. The

Contractor shall furnish all materials on the plant list and shall plant, prune, install bio-barriers, mulch and maintain every tree. Contractor shall attend a pre-construction meeting to be held at a mutually agreeable date.

C. Reasonable care shall be exercised during excavation, planting, filling, grading, and clean-up, to protect all existing trees, shrubs, and other specified vegetation, and other site features, improvements, structures, and utilities from damage.

D. The species for all replacement trees for this project shall be determined by the City Forester.

E. All replacement trees shall be minimum 2.5” caliper, single-trunk “street tree-form” capable of establishing the first permanent branch at 7’ of height.

2. APPLICABLE SPECIFICATIONS AND STANDARDS

A. American Standard for Nursery Stock, ANSI Z60.1. most current edition.

American Nursery and Landscape Association, 1000 Vermont Ave. NW, Suite 300, Washington, D.C. 20005

B. American National Standard for Tree Care Operations, ANSI A300-most current edition.

International Society of Arboriculture, PO Box 3129, Champaign IL 61826-

C. Index of Garden Plants: The New Royal Horticultural Society

Dictionary. By Mark Griffiths.1994. Timber Press, Inc. Portland OR.

D. American National Standard for Arboricultural Operations-Safety

Requirements, ANSI Z-133.1, most current edition. International Society of

Arboriculture, PO Box 3129, Champaign, IL 61826-3129

3. PLANTING SEASON

A. Planting shall be done within the following dates:

1) Spring planting: March 15 to June 1

Or

2) Fall Planting: September 15 to December 15

B. If special conditions exist that warrant a variance in the above planting dates, a written request shall be submitted by the Contractor to the City Forester stating the special conditions and the proposed variance. Permission for the variance will be granted at the discretion of the City Forester.

C. No planting shall be done when the soil is excessively wet, frozen, or otherwise in unsatisfactory condition for working, as determined by the City

Forester.

4. MATERIALS

A. A complete list of plants including a schedule of quantities, sizes, and other requirements is included. In the event that discrepancies occur between quantities of plants indicated in the Plant List, and as indicated on any

Drawings, the plant quantities indicated on the Drawings shall govern.

Acceptance of the Contract carries with it the assumption that the Contractor is able to supply all plant materials indicated in the Plant List, on the

Drawings, and as specified. The Contractor shall furnish a written list of the proposed sources of nursery stock. Such a list shall be furnished with completed bid documents. Such list may not be added to or altered without the consent of the City Forester. No substitutions of plant material will be permitted without the approval of the City Forester. Substitutions shall be approved by the City Forester in writing. When sources for plant materials are located by the City Forester, there shall be no substitutions, and those sources shall be used.

TREES

All plant material shall conform to the requirements of the plant list and shall be true to the botanical names and standards as established by the current editions of American Association of Nurserymen Horticultural

Standards, American Standard for Nursery Stock, and Index of Garden

Plants. All plants shall be true to species and variety specified and nursery grown in accordance with good horticultural practices under climatic conditions similar to those in the locality of the project for at least 2 years.

They shall have been freshly dug (during the most recent favorable harvest season). Plants shall be so trained in development and appearance as to be unquestionably superior in form, compactness, and symmetry. They shall be sound, healthy, vigorous, well branched and densely foliated when in leaf and free of disease and insect adults, eggs, pupae or larvae. They shall have healthy, well developed root systems and shall be free from physical damage or other conditions that would prevent thriving growth. Trees shall be free of branches to a point not more nor less than approximately fifty (50%) percent of their height. All plants shall be balled and burlapped, single stemmed, tree form unless otherwise specified.

Trees with multiple leaders, unless specified, will be rejected. Trees with damaged, cut, or crooked leaders, included bark, abrasion of bark, sunscald, disfiguring knots, insect damage, mold, prematurely opened buds, or cuts of limbs over ½ inch diameter that are not completely callused are cause for rejection.

Balled and burlapped plants shall be dug with solid balls of standard size, the balls securely wrapped with non-synthetic, untreated, biodegradable burlap, and tightly bound with non-synthetic, biodegradable rope or twine. Alternatively, they may be placed in wire baskets lined with non-synthetic, untreated, biodegradable burlap and tightly bound with non-synthetic, biodegradable rope or twine. Root collar shall be apparent at surface of ball. Bare root plants shall have a healthy, well branched root system characteristic of the species and with adequate spread.

Containerized plants shall be well established in the container with a root system sufficiently developed to retain its shape and hold together when removed from the container. Plants shall not be pot bound, nor have kinked, circling, or bent roots. Root collar shall be apparent at surface of ball.

Plants shall conform to the measurements specified, except those plants larger than those specified may be used if approved by the City. Use of larger plants shall not increase the contract price nor allow the Contractor to use smaller than specified material on other plants. If larger plants are approved, the root ball, root spread, or container shall be increased in proportion to the size of the plant.

Root collar shall be apparent at surface of root ball. Caliper measurements shall be taken on the trunk 6 inches above the root collar for trees up to 4 inches in caliper, and 12 inches above the root collar for trees over 4 inches in caliper.

Height and spread dimensions specified refer to the main body of the plant and not from branch tip to branch tip. Plants shall be measured when branches are in their normal position. If a range of size is given, no plant shall be less than the minimum size, and no less than 50 percent of the plants shall be as large as the maximum size specified. Plants that meet measurements but do not possess a normal balance between height and spread shall be rejected.

Substitutions of plant materials will not be permitted unless authorized in writing by the City Forester. If proof is submitted, substantiated in writing, that a plant specified is not available, consideration will be given to the nearest available size or similar variety, with a corresponding adjustment of the contract price. The contractor shall submit request for substitution not less than 30 days prior to the scheduled start of the planting.

B. All plants shall be labeled by size and scientific plant name as listed in the current edition of Index of Garden Plants. Labels shall be attached securely to all plants, bundles, and container of plant materials when delivered. Plant labels shall be durable and legible, with information given in weather-resistant ink or embossed process letters. All plants of patented variety shall bear the official tag of patent number. Trees not bearing tags and/or patent tags shall not be accepted.

C. Mulching material shall consist of licorice root or shredded hardwood bark and shall be free of material injurious to plant growth.

D. Water shall be provided by the Contractor and be suitable for irrigation and free from ingredients harmful to plant life.

E. Trunk wrapping material, if specified, shall be perforated drainage tubing or similar material approved by the City, large enough in diameter to prevent abrasion of the trunk and to allow air circulation between the tubing and the trunk.

F. Guying and staking materials, if specified, shall be as follows:

Stakes shall be 6’ to 8’ long sections of unflanged metal or 2” by 2” hardwood.

Support ties shall be 2” or wider bands of polypropylene, or elasticized or webbed strapping. Ground anchors shall be arrowhead shaped earth anchors of malleable iron castings, aluminum castings, or stamped steel.

G. A Typar Bio Barrier Root Control System shall be installed with the planting of all trees. The root barrier shall be a minimum of eighteen (18”) inches wide. Any substitution shall be approved by the City Forester. The root-control system is to be installed per manufacturer’s recommendations. Tree openings in the sidewalk shall have the bio-barrier installed along the face of the tree opening which is parallel to the street and closest to the property line, overlapping the nearest two corners by approximately four (4”) inches. Where trees are to be planted in a parkway or planting strip between curb and sidewalk, the barrier shall be installed along the sidewalk edge closest to the curb and centered on the root source. The length of the barrier shall be a minimum length equal to the spread of the tree canopy at maturity plus ten (10’) feet.

5. CERTIFICATION

A. All plant materials, shipments, and deliveries shall comply with state and federal laws and regulations governing inspection, shipping, selling, and handling of plant stock. A certificate of inspection, or a copy thereof, for injurious insects, plant diseases, and other plant pests shall accompany each shipment or delivery of plant material. The certificate shall bear the name and address of the source of the stock.

6. SELECTION AND TAGGING

A. Plants shall be subject to inspection for conformity to specification requirements and approval by the City at their place of growth prior to award of bid. The City

Forester accompanied by the lowest bidding contractor or his representative, shall inspect the trees offered by the contractor to fulfill the contract. The nursery must be located at a distance no greater than a 150-mile radius from the City of

Bethlehem. Inspection beyond the 150-mile radius shall be done at the expense of the Contractor.

B. Once the trees have been accepted and the Contract has been awarded, the City

Forester will tag and reserve the trees that are acceptable to the City. City tags will remain on the trees until the time of final inspection. A written request for the inspection of plant material at their place of growth shall be submitted to the City Forester at least ten (10) working days prior to digging. This request shall state the location of the nursery and the quantity and name of plants to be inspected. The City may refuse inspection at this time if a sufficient quantity of plants is not available for inspection.

C. All plants shall be selected and tagged by the City at their place of growth. All plants to be considered for inspection shall be legibly tagged with the correct name and cultivar.

D. Plants shall be inspected upon delivery, and the City reserves the right to reject any plants that do not meet the standards or that have been damaged during shipment. Such approval shall not impair the right of inspection and rejection during the course of the work.

E. The Contractor or the Contractor’s representative shall be present at all inspections.

F. The City shall be the sole judge of acceptability of stock at any time during the course of this contract. Any plant delivered to the contract site which does not satisfy all the requirements of this specification shall be removed from the site by the Contractor and replaced by materials meeting the requirement of the specification.

7. DIGGING AND HANDLING OF PLANT MATERIALS.

A. Plants to be balled and burlapped shall be dug with firm, natural balls of earth of diameter not less than that recommended in the current edition of American

Standard for Nursery Stock, and of sufficient depth to include fibrous and feeding roots. The root collar shall be within the top 2” of the soil ball. Balled and burlapped plants with manufactured balls or balls that are dry, cracked, or broken before or during planting operation will not be accepted.

8. TRANSPORTATION AND STORAGE OF PLANT MATERIAL

A. Fresh dug material is given preference over plant material held in storage. Plant material held in storage will be rejected if excessive growth or dieback of branches has occurred in storage.

B. Branches shall be tied with rope or twine only, and in such a manner that no damage will occur to the bark and branches.

C. During transportation of plant material, the Contractor shall exercise care to prevent injury and drying out of the trees. Should the roots become dried out, large branches broken, balls of earth broken or loosened, or areas of bark torn, the

City Forester may reject the injured tree(s) and order them replaced at no additional cost to the City.

D. The root systems of each load of bare root stock sent from the storage facility shall be adequately covered with wet soil, sawdust, wood chips, moss, peat, straw, hay or other acceptable moisture-holding medium, and shall be covered with an open-mesh tarpaulin or canvas. Loads that are not protected in the above manner may be rejected.

E. Plants must be protected at all times from drying winds or sun. Plants shall be planted promptly after arrival at the site(s). Plants that cannot be planted immediately on delivery shall be kept shaded, well protected with soil covered by wood chips or other acceptable material, and kept well-watered. Plants shall not remain unplanted longer than 3 days after delivery without permission from the

City. Plants shall not be bound with wire or rope at any time so as to damage the bark or break branches. Plants shall be lifted and handled with suitable support of the soil ball to avoid damage.

F. The City Forester shall be notified of the start of the planting operation not less than five (10) working days in advance.

9. EXCAVATION OF PLANTING AREAS

A. The City will specify all planting areas. The Contractor will notify PA One Call to verify location of underground utilities before excavation begins. The Contractor shall be responsible for assuring that utility marking is complete prior to excavation. The Contractor shall be responsible for all damage resulting from neglect or failure to comply with this requirement.

B. Any underground obstruction, other than underground utilities, shall be removed to the depth and width necessary to permit proper planting and future growth of the trees. Any resulting depressions or pockets shall be filled with approved soil and thoroughly tamped before proceeding with the planting.

The Contractor shall take care not to undermine existing sidewalks and curb during excavation. Any damages or deficiencies caused by excavation shall be restored by the Contractor to the satisfaction of the City Engineer at no additional cost to the City. The Contractor shall excavate planting areas as shown on the drawings, if specified. Excavation may be done by shovel, backhoe, or stump grinder, but a soil auger may not be used. The planting hole shall be at least 3 times the diameter of the soil ball and the soil shall be loosened at least one ball diameter’s distance beyond the hole to a depth of 6’’ to

12”. If the planting site is restricted such as between the curb and sidewalk, an equivalent rectangular area shall be dug per the dimensions specified on the Plan.

The root ball shall be placed in the planting hole on a pad of undisturbed or firmly tamped soil to a depth corresponding to the distance from the bottom of the root ball to the root collar or slightly higher. Any glazed areas within the planting hole shall be sufficiently roughened prior to backfilling.

C. Excavated planting holes that will be left open when work is not in progress or pose an immediate and considerable hazard to pedestrians or vehicles shall be adequately barricaded with appropriate warning devices.

D. The Contractor shall notify the City, in writing, of soil conditions or other obstructions the Contractor considers detrimental to tree growth. Such conditions shall be described, as well as suggestions for correcting them. Proper water drainage must be assured.

E. Where soil conditions or below ground obstructions which cannot be remedied are encountered, the City shall designate alternate planting locations. The City shall bear any costs associated with such relocation.

F. Where trees are to be planted in existing wells with tree grates the contractor shall be responsible for the removal and replacement of said grates during the course of the work. The entire area beneath the grate shall be free of weeds and mulched as stated in Planting Operations.

G. All existing tree well dimensions shall be expanded as directed by the City to a minimum of 6’ long by 3’ wide to allow proper future root growth of the tree(s) to be planted.

10. PLANTING OPERATIONS- ANSI A-300 Transplanting Standards and ISA Best Management Practices - Tree Planting.

A. Plants shall not be thrown or bounced off the truck or loader to the ground and must be protected from excessive vibrations. Plants, shall not be dragged, lifted or pulled by the trunk, foliage, branches or any parts in a manner that will loosen the root ball or cause damage to the plant.

B. Plants shall be set with the root collar at or slightly above finished grade. Plants shall be centered and set plumb so that they will be at the same level at which they previously grew. Plants shall be set so that they are at the same depth 1 year after planting.

C. Bare root plants shall have their roots spread into a natural position, free of bunching, kinking, or circling. All broken or damaged roots shall be cut back to the point where they are clean and free of rot. No other root pruning shall be done.

D. For plants in plastic, metal, or biodegradable containers, the containers shall be removed before planting. If roots are crowded or coiled on the bottom, sides, or surface of the root ball, they shall be gently separated from the edges or surface.

E. For all plants moved with a tree spade, all holes and cavities between the ball and the surrounding soil shall be filled. Glazed planting hole surfaces shall be sufficiently roughened prior to backfilling. The ball shall be thoroughly soaked with water after planting.

F. After the plant has been set and one half of the backfilling complete so as to support the root ball, ropes, strings, twine burlap and any other wrappings shall be removed from at least the top one-half of the root ball. If the root collar is deep in the ball, remove excess soil away from the trunk using hands, not tools.

G. Planting holes shall be backfilled using excavated soil wherever possible. When holes are two-third full, they shall be thoroughly watered to eliminate air pockets.

After this initial watering, backfill with excavated soil to the top of the hole and water to settle. Prevent puddled soil conditions by avoiding compaction once the soil is wet. A shallow saucer shall be formed around each tree by placing a three to four (3’ to 4”) inch high ridge of soil just outside the diameter of the root ball as specified in the planting detail.

H. Planting areas shall be finish-graded to conform to drawings, if provided, after settlement has occurred.

I. All plants shall be mulched over the root system with a two to four (2”-4”) inch layer of mulch immediately after planting. Mulching material shall be pulled back no less than three (3”) inches from the trunk and no more than six (6”) inches from the trunk.

J. Plants shall be thoroughly watered after planting is completed.

K. All twine, ties, rope, guards, and wrappings, shall be removed from plants after planting. City tags and plant labels shall remain until inspection and acceptance of the planting. City tags and plants labels are to be removed by the Contractor after acceptance of the planting by the City Forester.

11. GUYING, STAKING WRAPPING, AND PRUNING

A. Only those plants designated by the City shall have trunk protection installed or be staked and/or guyed.