1-2026 45 Goepp St Project Manual.pdf

PDF 3 MB Posted

Attached to
2026 45 Goepp Street Corridor Improvements
Solicitation number
US.263084
Issued by
Northampton County, Pennsylvania

About this file

This is a Project Manual for a public works contract issued by the City of Bethlehem, Pennsylvania for the 2026 45 Goepp Street Corridor Improvements project. The work consists of providing labor and materials to furnish and install various streetscape improvements including sidewalks, curbs, ADA ramps, and driveways. Sealed bids will be received electronically through the PennBid program (https://pennbid.bonfirehub.com) until December 18, 2026 at 10:00 a.m., at which time bids will be opened publicly and electronically. A pre-bid conference will be held on December 4, 2026 at 10:00 a.m. at Bethlehem City Hall, Room B-504 to discuss the project; bidders are encouraged but not required to attend. The contract will be awarded to the lowest responsible bidder whose bid complies with all requirements. The successful contractor must substantially complete the work within 90 days from the Notice to Proceed and be fully completed and ready for final payment within 90 days thereafter. All bids must remain effective for 60 days from the bid opening date, or 120 days if award is delayed due to required approvals from other government agencies, bond sales, or grant awards.

Bid security in the amount of 10 percent of the total bid amount must accompany each proposal in the form of a certified check, bank money order, or bid bond. The successful bidder will be required to provide performance and payment bonds equal to 100 percent of the contract amount, with both bonds covering a one-year correction period following completion. The project is funded with Community Development Block Grant (CDBG) funds and Community Project Funding (CPF), and is subject to Davis-Bacon wage requirements, the Build America, Buy America Act (requiring all materials and products be domestically manufactured), Title VII of the Civil Rights Act, Executive Order 11246, and Section 3 of the Housing and Urban Development Act of 1968. Contractors must demonstrate commitment to employing minority and women-owned business enterprises and low-to-very-low-income workers to the greatest extent feasible. Liquidated damages of $250 per day apply for failure to achieve substantial completion or final completion within the specified contract times. Progress payments will be made with 10 percent retainage until 50 percent completion, then 5 percent retainage thereafter, with one-and-a-half times the amount needed to complete remaining work retained after substantial completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual

City of Bethlehem

10 E. Church Street

Bethlehem, PA 18018

Project Name: 2026 45 Goepp Street Corridor Improvements

Printed: Tuesday, November 17, 2026, 5:25 PM

Return comments and questions to:

Geoffrey Karanja

Project Engineer

City Hall, Room B-408

City of Bethlehem

Bureau of Engineering

10 E. Church Street

Bethlehem, PA 18018 gkaranja@bethlehem-pa.gov

W: 610-997-7956

F: 610-865-7331

PROJECT MANUAL

INTRODUCTION:

This Project Manual is comprised of all forms and documentation needed for the project described herein. Each of the forms listed below is considered a separate chapter of this Project Manual. As a general rule, the chapters are arranged in the chronological order in which they are to be needed. For example, Chapter A- Invitation to Bidders is necessarily first since a potential contractor will need to read the Invitation prior to considering whether he/she/it wishes to acquire

Chapter B - Instructions to Bidders for purposes of completing Chapters C through G. Likewise, only after receipt of items C through G, can the City of Bethlehem determine the party, scope of work, and amounts to be set forth in Chapter

H - Notice of Award and subsequent forms.

The forms/chapters listed below are set forth in the following pages in the order listed. For the sake of clarity, each chapter is identified in the footer of every page and every page is numbered sequentially within each chapter. There is no page numbering system for Project Manual as a whole, but only for each chapter.

TABLE OF CONTENTS/INDEX TO FORMS

Pre-Bid Forms

A. Invitation to Bidders (advertisement)

B. Instructions to Bidders

Pre-Award Forms

C. Bid Form

D. Contractor’s Qualification Statement

E. Bid Security (bid bond)

F. Non-Collusion Affidavit

G. Public Works Employment Verification Form

Award and Post Award Forms

H. Notice of Award

I. Agreement

J. General Conditions

K. Supplementary Conditions

L. Certificate of Insurance

M. Affidavit Accepting Provisions of PA Workers’ Compensation Act

N. Performance Bond

O. Payment Bond

P. Notice to Proceed

Q. Contractor’s Application for Payment

R. Certificate of Substantial Completion

S. Certificate of Completion/Notice of Acceptability and Release of Final Payment

T. Field Orders (no change in scope, price or time)

U. Change Orders (agreed changes in scope, price and/or time)

V. Work Change Directives (Owner unilaterally-ordered changes in scope, price and/or time)

W. Minimum Wage, Special Solicitation, Federal, State, Local and Other Legal Requirements

X. Technical Engineering Specifications

Chapter A: Invitation to Bidders - page 1 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

INVITATION TO BIDDERS

Sealed Proposals will be received on the Pennsylvania electronic document and bid management website known as

PennBid at https://pennbid.bonfirehub.com/ by the City of Bethlehem, Pennsylvania (OWNER), 10 E. Church Street, Bethlehem, PA 18018, until December 18, 2026 at 10am, at which time Bids will be opened on the website for the 2026

45 Goepp Street Corridor Improvements Project, which website permits an unlimited number of persons to simultaneously observe the opened bids and automatic tabulation thereof at the same time that the information becomes available to OWNER.

The Work to be performed for the 2026 45 Goepp Street Corridor Improvements Project consists of the following:

To provide labor and materials to furnish and install various streetscape improvements including sidewalks, curbs, ADA ramps, and driveways, etc., as more particularly specified in the Contract Documents.

The Bid for the 2026 45 Goepp Street Corridor Improvements Project (PROJECT) shall be accompanied by Bid Security in the amount of ten percent (10%) of the total amount of the Bid in the form of a certified check, bank money order, or bid bond. All Bids shall be effective for sixty (60) calendar days from the date of the Bid opening, unless an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, in which case all bids shall remain effective for one hundred twenty (120) calendar days from the date of the Bid opening.

On or before the last day during which bids shall be effective, if a contract will be awarded it shall be awarded to the lowest responsible bidder. After issuance of the Notice of Award, such contract must be completed within 90 calendar days from the date of the Notice to Proceed. The successful bidders will be required to provide Construction Performance and Payment Bonds equal to 100% of the contract amount as specified in the contract documents, which bonds shall also cover a 1-year correction period which will commence upon completion of the Work.

The Contract Documents in the form of a project manual for the Work can be obtained over the internet from the

Pennsylvania electronic document and bid management program known as PennBid at https://pennbid.bonfirehub.com/.

Potential bidders must register with PennBid online to have access to said documents. Registration is at no cost and the process takes only a few minutes. Once registered, potential bidders can obtain all project documents for this project and any other PennBid-registered project and submit and update his/her/its confidential proposals online prior to the deadline for submitting a bid.

This project is subject to certain special requirements. For example, as more specifically detailed in the Contract

Documents, the successful bidder shall be required to (a) assure protection against discrimination for employees, applicants for employment, and subcontractors on the grounds of actual or perceived race, color, sex, religion, ancestry, genetic information, national origin, sexual orientation, gender identity or expression, familial status, marital status, age, mental or physical disability, use of guide or support animals and/or mechanical aids; (b) pay certain minimum salaries and wages; and ( c) reserved.

The bidder is specifically advised that the project is receiving or is anticipated to receive Community Development

Block Grant (CDBG) funds pursuant to the Housing and Community Development Act of 1974, as amended, and other federal funding, including without limitation Community Project Funding (CPF). Consistent with other Federal programs, CDBG funds require that the successful bidder and its subcontractors must comply with various federal laws, regulations and guidelines, including without limitation: Title VII of the Civil Right Act of 1964 and Executive

Order 11246; 29 CFR Parts 1, 3, 5, 6, and 7 Davis-Bacon Act; 40 U.S.C. 327- 333 Contract Work Hours and Safety

Standards Act, and the Build America, Buy America (BABA) Act, (Division G, Title IX, Subtitle A, Parts I-II, Sections 70901 through 70927 of the Infrastructure Investment and Jobs Act), Public Law 117-58, 135 Stat. 429, Nov.

15, 2021, 2 CFR Part 184. The project documents contain certain federal requirements related to making affirmative efforts to solicit minority and women-owned, and other target firms as part of the bid submission. This project is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C.

1702), subject to 24 CFR Part 75. Section 3 requires that to the greatest extent feasible, employment, training, and other economic opportunities related to this project are directed to low- and very-low-income persons (Section 3 workers and Targeted Section 3 workers) and to eligible businesses (Section 3 Businesses). The project is receiving funds under Title I of the Housing and Community Development Act of 1974, as amended, and the Davis-Bacon Act https://pennbid.bonfirehub.com/

Chapter A: Invitation to Bidders - page 2 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem applies. The successful Bidder shall pay no less than the Federal Wage Rates determined for the project area. For these reasons, prospective bidders should not submit their bids until ten (10) days prior to the bid opening date.

The Build America, Buy America Act, (Division G, Title IX, Subtitle A, Parts I-II, Sections 70901 through 70927 of the

Infrastructure Investment and Jobs Act), Public Law 117-58, 135 Stat. 429, Nov. 15, 2021 (“BABAA”), was enacted in the Infrastructure Investment and Jobs Act on November 15, 2021. According to BABAA, “none of the funds made available for a Federal Financial Assistance program for infrastructure, including each deficient program, may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States.” This requirement is known as the “Buy America Preference (BAP)” (or "domestic procurement requirement”). The general contractor and all subcontractors (all tiers) must comply with the BABAA, and all applicable rules and notices promulgated thereunder, as may be amended. Accordingly, prospective bidders are strongly encouraged to review applicable Federal guidance and regulations regarding BABAA compliance. All bids must comply with BABAA’s Buy America Preference requirements to be considered for award.

A prebid conference will be held on December 4, 2026 at 10 am in/at Bethlehem City Hall, Room B-504. Representatives of the OWNER will be present to discuss the Project. Bidders are ENCOURAGED to attend this conference to facilitate the award and administration of this contract in the most efficient manner possible. The City representative will transmit to all prospective Bidders of record such Addenda as the City representative considers necessary in response to questions arising at the conference. In the meantime, questions may be directed to the Project Manager identified for this Project via the “Messages, Public Q&A” feature in PennBid.

OWNER reserves the right to accept or reject any or all Bids or portions thereof.

All Proposals shall be submitted exclusively in electronic format to OWNER through PENNBID at https://pennbid.bonfirehub.com/. Proposals provided by any other means will not be accepted. All proposals must be labeled “Proposal for 2026 45 Goepp Street Corridor Improvements” and submitted in PDF format. Incomplete proposals and those received after the specified date and time will not be considered. Hand delivered, mailed, courier, faxed and/or emailed responses will not be accepted. Upon OWNER’s request, Bidders must deliver the original bid security within seventy-two (72) hours (weekends and holidays excluded) of a demand for same.

Bethlehem Press: November 18, 2026 and November 25, 2026

Chapter B: Instructions to Bidders - page 1 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

INSTRUCTIONS TO BIDDERS

ARTICLE 1 – DEFINED TERMS

Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions, except where amended, superseded or otherwise indicated in the Supplementary Conditions. Additional terms used in these

Instructions to Bidders have the meanings indicated below:

ISSUING OFFICE – this term shall have the same meaning as OWNER and refer only to the office which issues the Bidding Documents.

OWNER – the City of Bethlehem.

BIDDER – any natural person or legally-recognized entity which is sui juris.

LOWEST RESPONSIBLE BIDDER – the bidder to whom the project is awarded.

ENGINEER – the Chief Engineer employed by OWNER or his/her designee.

ARTICLE 2 – BIDDING DOCUMENTS

The Project Manual contains all pertinent and expected Contract Documents to be used in connection with the

Work, if a contract is awarded. The Bidding Documents are those documents required to be submitted as part of any Bid and are a subset of, and can be found within, the Project Manual. The documents constituting the

Bidding Documents are identified in Paragraph 15.02.

Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of the Project Manual, including the Bidding Documents, available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use. The Contract Documents in the form of a project manual for the Work can be obtained over the internet from the Pennsylvania electronic document and bid management program known as PennBid at https://pennbid.bonfirehub.com/. Potential bidders must register with PennBid online to have access to said documents. Registration is at no cost and the process takes only a few minutes. Once registered, potential bidders can obtain all project documents for this project and any other PennBid-registered project and submit and update his/her/its confidential proposals online prior to the deadline for submitting a bid.

All Proposals shall be submitted exclusively in electronic format to OWNER through PENNBID at https://pennbid.bonfirehub.com/. Proposals provided by any other means will not be accepted. All proposals must be submitted in PDF format. Incomplete proposals and those received after the specified date and time will not be considered. Hand delivered, mailed, courier, faxed and/or emailed responses will not be accepted.

Upon OWNER’s request, Bidders must deliver the original bid security within seventy-two (72) hours

(weekends and holidays excluded) of a demand for same.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

Evidence of Bidder’s authority to do business in the Commonwealth of Pennsylvania.

Bidder’s state or other contractor license number, if applicable.

Completed Contractor’s Qualifications Statement form included with Instructions to Bidders.

Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these

Instructions, “Subcontractors, Suppliers, and Others.”

reserved.

Attendance at pre-bid conference, if required by Article 6 of these Instructions to Bidders.

Chapter B: Instructions to Bidders - page 2 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

Compliance with governing laws and regulations (a) requiring the payment of certain minimum salaries and wages and (b) imposing special solicitation requirements during the bidding process intended to promote use of disadvantaged business enterprises and certain qualified business and minority and women-owned enterprises. These requirements for (a)-(b) are set forth in Chapter W of the Project Manual.

A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;

OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE

Site and Other Areas

The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

Existing Site Conditions

Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. To the extent the same exist, Owner will make copies of non-privileged reports and drawings referenced above available to any Bidder on request, including matter which might qualify as a

Geotechnical Baseline Report (GBR) or any portion thereof. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the

Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings. Nothing in the GBR is intended to relieve Bidders of the responsibility to make their own determinations regarding construction costs, bidding strategies, and Bid prices, nor of the responsibility to select and be responsible for the means, methods, techniques, sequences, and procedures of construction, and for safety precautions and programs incident thereto.

Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground

Facilities, including Owner, or others.

Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective

Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning

Chapter B: Instructions to Bidders - page 3 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous

Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any

Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the

Work, appear in Paragraph 5.06 of the General Conditions.

Site Visit and Testing by Bidders

Bidder shall be permitted conduct supervised pre-bid Site visit(s) only with the consent of Engineer and only during pre-arranged times during normal working hours, and shall not disturb any ongoing operations at the Site. Owner shall have the right to exclude any person(s) from entering or remaining upon the Site which Owner in its sole discretion deems appropriate.

Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

Owner’s Safety Program

Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.

Other Work at the Site

Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents.

If Owner is party to a written contract for such other work, then on request, Owner will provide to each

Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

It is the responsibility of each Bidder before submitting a Bid to:

examine and carefully study the Bidding Documents, and any data and reference items identified in the

Bidding Documents;

visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;

Chapter B: Instructions to Bidders - page 4 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding

Documents; and the Site-related reports and drawings identified in the Bidding Documents, if any, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

assert all requests for examinations, investigations, explorations, tests, studies, or data are necessary for the preparation of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents. Notwithstanding the same, by submitting a Bid, Bidder does waive all objections and reservations that it was not provided the responses desired to overcome or resolve such objections and reservations;

become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents, and that Bidder has no claim for compensation, reimbursement for fee and costs, and/or any other benefit for having devoted time and materials in evaluating or submitting a Bid.

ARTICLE 6 – PRE-BID CONFERENCE

A pre-Bid conference will be held at the time and location stated in the invitation or advertisement to bid.

Representatives of Owner and Engineer will be present to discuss the Project. Bidders are ENCOURAGED to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such

Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

All questions about the meaning or intent of the Bidding Documents are to be submitted electronically via the

“Messages, Public Q&A” feature within PennBid. Responses, if any, shall be addressed prior to Bid opening by memoranda uploaded on PennBid as a Public Notice and deemed to be a portion of, and incorporated by reference in, the Project Manual, or by formal Addenda which shall be made available to all bidders on the

PennBid website for the Project. It is the responsibility of each potential bidder to be continuously aware of any interpretations rendered by memoranda uploaded on PennBid as Public Notice and/or by Addenda made available on the PennBid website for the Project without notice from Owner or Engineer. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions answered by memoranda uploaded on PennBid as a Public Notice or by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

ARTICLE 8 – BID SECURITY

A Bid must be accompanied by Bid security made payable to Owner in an amount of 10% percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. Electronic reproductions of the bid security shall be uploaded by Bidder to the PennBid as part of, and concurrent with, the Bid. Within seventy-two (72) hours of bid opening, the original bid security shall be delivered to the Project Manager.

Chapter B: Instructions to Bidders - page 5 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such

Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. Unless altered by the

Notice of Award or by written consent of Owner, in the event the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.

The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the

Bid opening, whereupon Bid security furnished by such Bidders will be released.

Bid security of other Bidders that Owner believes, in its sound discretion, do not have a reasonable chance of receiving the award may be released within seven days after the Bid opening.

ARTICLE 9 – CONTRACT TIMES

The Work is to be substantially completed, and completed and ready for final payment, in accordance with the dates set forth in the Notice to Proceed.

ARTICLE 10 – LIQUIDATED DAMAGES

Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an

Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.

All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at

Bidder’s sole risk.

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do

so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a

Bid.

Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any

Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.

The apparent Successful Bidder, and any other Bidder so requested, shall within ten (10) days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed or expected to furnish any portion of the

Work, and a description of the labor, service materials and/or other things to be so-furnished.

If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other

Chapter B: Instructions to Bidders - page 6 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed

Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent

Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities.

Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder.

Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

ARTICLE 13 – PREPARATION OF BID

The Bid Form is included with the Bidding Documents.

All blanks on the Bid Form shall be completed and the Bid Form signed (nb. Electronic signatures are acceptable).

A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign (see signature authority form included in

Chapter W). The corporate address and state of incorporation shall be shown. The corporate seal shall be affixed and attested by the corporate secretary or an assistant corporate secretary.

A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign (see signature authority form included in Chapter W). The partnership’s address for receiving notices shall be shown.

A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign (see signature authority form included in Chapter W).

The state of formation of the firm and the firm’s address for receiving notices shall be shown.

A Bid by an individual shall show the Bidder’s name and address for receiving notices.

A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.

All names shall be printed below the signatures.

The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

The Bid shall contain the information required by Paragraph 3.01.

ARTICLE 14 – BASIS OF BID

Bidders shall use and complete the Bid Form included with the Bidding Documents, including the Pricing Form for the Project at the PennBid website, which form is incorporated herein by reference as though fully set forth at length.

[reserved].

ARTICLE 15 – SUBMITTAL OF BID

A Bid shall be received no later than the date and time prescribed and in the manner and at the place indicated in the invitation to bid.

A Bid shall be deemed complete if it contains the following fully-completed documents:

Bid Form, accompanied by appropriate evidence of authority to sign;

Chapter B: Instructions to Bidders - page 7 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

Contractor’s Qualification Statement;

Bid Security;

Non-Collusion Affidavit;

Public Works Employment Verification Form.1

Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted.

By submitting a Bid, the Bidder acknowledges that he/she/it has:

Read and will comply with all of the Contract Documents found within the Project Manual, including these

Instructions to Bidders, and insurance amounts and coverages to be provided by Lowest Responsible Bidder in the event a Notice of Award is issued.

Thoroughly read and understood with all of the Contract Documents found within the Project Manual, including these Instructions to Bidders, and other data and forms, and visited the site(s) and transportation routes so as to become familiar with all conditions that may affect cost, performance and ability to provide the work required.

Considered all Federal, state, and local laws and regulations that may affect cost, performance, and ability to provide the work required.

Found no errors, ambiguities, conflicts, or other matter in the Bidding Documents and the remaining

Contract Documents found within the Project Manual, including these Instructions to Bidders, and other data and forms, and site conditions that may affect cost, performance, and ability to provide the work required.

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

A Bid may be withdrawn from consideration on the PennBid website by the Bidder at any time prior to bid opening.

If a Bidder wishes to modify its Bid prior to Bid opening, Bidder may do so on the PennBid website prior to the time designated for opening bids.

If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned.

ARTICLE 17 – OPENING OF BIDS

Bids will be opened at the PennBid website electronically by Owner at the time indicated in the Invitation to

Bidders, which website permits an unlimited number of persons to simultaneously observe the opened bids and automatic tabulation thereof at the same time that the information becomes available to OWNER.

1 The Pennsylvania Public Works Employment Verification Act of July 5, 2012. P.L. 1086, No. 127, 43 P.S. 167-1 et seq. requires, as a precondition to the award of a contract for public work, a public works contractor to submit a completed E-Verify Program (EVP) Form to the public body that is bidding and awarding the public work contract. In relevant part, the form obligates public works contractors and every subcontractor performing work under a public works contract to utilize the United States Department of Homeland Security FVP system to verify the employment eligibility of each new employee hired after January 1, 2013. Afterwards, if a new employee hired by a public works contractor, regardless of whether he will be working onsite or offsite of a public work or otherwise, such employment eligibility shall be verified within 5 business days of his/her start date. Subcontracts between a public works contractor and its subcontractors are required to contain notification of the applicability of the act, information regarding the use of EVP and reference to the web site of the PA Department of General Services at www.dgs.state.pa.us to obtain a copy of the form.

Chapter B: Instructions to Bidders - page 8 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

Except as hereinafter provided, all Bids will remain subject to acceptance for a period of sixty (60) days after the date specified for the opening of bids or the issuance of a Notice of Award, whichever occurs first, unless stated otherwise on the Bid Form. In the event an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, in which case all bids shall remain subject to acceptance for a period of one hundred twenty (120) calendar days from the date of the Bid opening. Owner may, in its sole discretion, release any Bid and return the Bid security prior to the issuance of a Notice of Award or the expiration of the applicable sixty (60) or one hundred twenty (120) day period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract

Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

If quantities have been specified by Owner, both Owner and Bidder agree that the quantities specified are approximate only, and are Owner’s estimates for the purposes of having a uniform basis for comparison of bids or proposals submitted in response to Owner's Invitation to Bidders. OWNER shall have the right, in

Owner's sole discretion, to increase or decrease the quantities specified at the prices specified in the Bid.

Evaluation of Bids

In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

Owner may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Supplementary Conditions.

Owner also may consider the operating costs, maintenance requirements, performance data and guarantee of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.

Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of Bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the

Contract Documents to Owner’s satisfaction within the prescribed time.

If the contract is to be awarded, it will be awarded to the lowest responsible Bidder whose evaluation by

Owner indicates to Owner that the award will be in the best interests of the Project.

If the contract is to be awarded, Owner will give the Successful Bidder a Notice of Award within sixty (60) days after the date specified for the opening of bids. In the event an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, in which case

Owner will give the Successful Bidder a Notice of Award within one hundred twenty (120) calendar days from the date of the Bid opening. Such “Notice of Award” shall describe the nature, scope and facial amount stated in dollars of the Work awarded to Bidder and direct the Bidder submit the following truthful and accurate documents in the manner stated within a specified period of time:

1. Bidder-executed Agreement;

2. Performance Bond;

3. Payment Bond;

4. Certificate of Insurance;

5. Affidavit Accepting Provisions of the Workers Compensation Act;

6. Proof of compliance with the provisions of paragraph 3.01.G of the Instructions to Bidders.

Chapter B: Instructions to Bidders - page 9 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

ARTICLE 20 – BONDS AND INSURANCE

Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the

Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.

ARTICLE 21 – SIGNING OF AGREEMENT

When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by an unexecuted copy of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, or as otherwise specified by Owner in the Notice of Award, Successful Bidder shall execute and deliver the documents required under Paragraph 19.02.E of these Instructions to Bidders, subject to the requirements set forth in Paragraph 2.02 of the General Conditions and Supplementary Conditions.

ARTICLE 22 – RETAINAGE

Bidder acknowledges that payment for the Work is subject to retainage requirements more specifically described in the Agreement.

ARTICLE 23 – SALES AND USE TAXES

To the maximum extent permitted by Pennsylvania law, Owner is exempt from state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid to the extent of the exemption permitted by Pennsylvania law. Bidder is solely responsible for determining the applicability of such exemption to such materials and services to be provided when setting forth the prices or totals comprising its Bid. Bidder is not permitted to rely on any formal or informal or official or unofficial representation(s) by

Owner or its representatives concerning the scope of materials and equipment which may or may not be exempt from sales or use taxes. No price adjustments or allowances will be made for Bidder’s pricing or overall proposal in the event Bidder failed to include, or properly calculate, sales or use taxes applicable to materials or equipment for which the exemption does not apply. For further information, go to the following web page:

http://www.revenue.pa.gov/GeneralTaxInformation/TaxLawPoliciesBulletinsNotices/Pages/Act%2045.aspx#.

V9fw40zD-M9.

ARTICLE 24 – ASSIGNMENTS

Absent the written consent of Owner, the assignment of any bid by any bidder or any contract by the Successful

Bidder is strictly prohibited and shall be grounds for declaring a breach of such Bidder’s obligations hereunder and/or the Agreement to perform the Work. In such event, Owner shall have recourse against Bidder’s bid security or Bidder’s performance bond and/or such other remedies as may be allowed by the Project Manual.

END OF INSTRUCTIONS TO BIDDERS

http://www.revenue.pa.gov/GeneralTaxInformation/TaxLawPoliciesBulletinsNotices/Pages/Act%2045.aspx#.V9fw40zD-M9 http://www.revenue.pa.gov/GeneralTaxInformation/TaxLawPoliciesBulletinsNotices/Pages/Act%2045.aspx#.V9fw40zD-M9

Chapter C: Bid Form - page 1 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem

BID FORM

ARTICLE 1 – BID RECIPIENT

1.01 This Bid is submitted to:

City of Bethlehem

10 E. Church Street

Bethlehem, PA 18018

The name of this Project is 2026 45 Goepp Street Corridor Improvements.

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding

Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS

2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for a period of sixty (60) days after the date specified for the opening of bids or the issuance of a Notice of Award, whichever occurs first, unless stated otherwise on the Bid Form. In the event an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, all bids shall remain subject to acceptance for a period of one hundred twenty (120) calendar days from the date of the Bid opening.

ARTICLE 3 – BIDDER’S REPRESENTATIONS

3.01 In submitting this Bid, Bidder represents that:

A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:

Addendum No. Addendum Date

B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical

Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental

Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.

E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the

Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with

Chapter C: Bid Form - page 2 2026 45 Goepp Street Corridor Improvements Project, City of Bethlehem respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.

F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .