3-BPAttach 482-11103.pdf
PDF 1 MB Posted
- Attached to
- Pawnee Prairie Park Trail Improvements
- Solicitation number
- 260305
- Issued by
- Sedgwick County, Kansas
About this file
This file consists of three exhibits containing technical specifications and site plans for the City of Wichita's Pawnee Prairie Park Trail Improvements project (482-11103), a public works construction project involving improvements and replacement of park gravel trails. The project encompasses multiple work components including the scraping and filtering of existing gravel pathways, removal and replacement of eroded gravel sections, installation of concrete flumes for drainage, and optional concrete pathway construction. The base bid work involves treating approximately 10 feet of pathways totaling 1,785 linear feet and 6 feet of pathways totaling 570 linear feet, along with removal and replacement of 4,940 linear feet of existing gravel paths with new 3/8-inch clean crushed angular gravel compacted to 95 percent density. Alternate #1 addresses pathways with oversized gravel unsuitable for cycling and pedestrian use, requiring scraping and filtering of large gravel particles. Alternate #2 proposes approximately 465 square feet of new concrete pathway north of Cowskin Creek with 5-inch depth and welded wire fabric reinforcement.
The technical specifications require contractors to submit material samples for approval prior to mobilization and comply with ADA standards. Concrete work must include fiber mesh reinforcement at 2 pounds per cubic yard, proper backfill with gravel and soil, field location by City of Wichita staff, and restoration of disturbed areas including re-seeding. All removed gravel material is to be stockpiled in a designated 1,000 square foot area to be field-located by city staff. The project documentation is dated November 13, 2026, and indicates field conditions including existing drainage considerations and specific dimensional requirements for all constructed elements, with concrete flumes specified at 8 feet wide in 30-foot and 40-foot lengths.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-BP 482-11103.pdf | ||
| 1-260305 Bid Table.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT
CITY OF WICHITA | PAWNEE PRAIRIE PARK TRAIL IMPROVEMENTS (482-11103) | IMPROVEMENTS AND REPLACEMENT OF PARK GRAVEL TRAILS
DATE 11/13/2026
N
W
IC
H
IT
A D
W
IG
H T
D . E
IS
EN
H O
W
ER
N
AT
IO
N
AL
A
IR
PO
RT
S M
A
IZ
E
RD
S
TY
LE
R
RO
A
D
ADD ALTERNATE #1 IN ORANGE:
PATHWAYS CONTAIN OVERSIZED GRAVEL, NOT SAFE FOR CYCLING AND PEDESTRIAN USE
PATHWAYS TO BE SCRAPED WITH BOXSCRAPER OR SIMILAR EQUIPMENT TO FILTER LARGE GRAVEL PARTICLES. KEEP FLUSH WITH EX. GRADE SCRAPED MATERIAL TO BE STOCKPILED IN LOCATION PROVIDED ON MAP. FILTER FABRIC TO BE DISCARDED BY CONTRACTOR.
PATHS 10’ TOTAL: 1,785 LF’
PATHS 6’ TOTAL: 570 LF‘
BASE BID IN BLUE: PATHWAYS REPRESENTED IN BLUE SUFFER FROM HEAVY USE AND, SEVERE EROSION IN SOME AREAS
REMOVE 4” OF EXISTING GRAVEL PATH & FILTER FABRIC
REPLACE WITH NEW 4” LAYER OF 3/8” CLEAN CRUSHED ANGULAR GRAVEL, COMPACTED TO 95%
NEW GRAVEL PATH TO BE FLUSH WITH EX. GRADE.
CONTRACTOR MUST SUBMIT A SAMPLE TO WICHITA CITY STAFF FOR APROVAL PRIOR TO MOBILIZATION
TOTAL LINEAR FT: 4,940 LF’
W PAWNEE AVE
S YELLOWSTONE ST
CONCRETE FLUMES TO BE ADDED, SEE DETAILS ON PAGE 2
ALL REMOVED GRAVEL WILL BE STOCKPILED
IN 1,000 SF’ AREA
AREA TO BE FIELD LOCATED BY STAFF BUT
SHOULD BE IN THIS GENERAL LOCATION
8’
40’
0.18 in 8’ 30’
EXHIBIT
CITY OF WICHITA | PAWNEE PRAIRIE PARK TRAIL IMPROVEMENTS (482-11103) | PROPOSED CONCRETE FLUME LOCATIONS AND SECTION DETAIL
DATE 11/13/2026
N
NOTES:
1. FLUMES ARE TO BE
CONCRETE, REINFORCED WITH
FIBER MESH AT 2LBS PER C.Y., 30
AND 40' IN LENGTH, 8' IN WIDTH
2. FLUMES TO HAVE 1' BACKFILL
OF 3/4" GRAVEL BACKFILL (ON
PATH) AND SOIL (OFF PATH)
3. FLUMES TO BE FIELD
LOCATED BY CITY OF WICHITA
STAFF
8’ WIDE CONCRETE FLUME
DRAINAGE
DIRECTION
DRAINAGE
DIRECTION
CROSS SECTION OF FLUME
125’
0.18 in
1.15 in
1.43 in
EXHIBIT
CITY OF WICHITA | PAWNEE PRAIRIE PARK TRAIL IMPROVEMENTS (482-11103) | ADD ALTERNATE #2, PROPOSED CONCRETE NORTH OF COWSKIN CREEK
DATE 11/13/2026
ADD ALTERNATE #2 NOTES:
1. New concrete to be installed at the desired location north of cowskin creek narrow bridge, path to be 5" in depth with 6" x 6" W4.0 by W4.0 welded wire fabric reinforced on chairs that are minimum 2' apart.
2. Existing gravel shall be excavated as needed to meet existing adjacent grades and be ADA compliant.
3. Expansion joints shall be installed and sealed whenever new concrete meets existing concrete.
4. Gravel may remain but shall be compacted to 95% proctor test.
5. Organic material such as leaves and sticks shall be removed prior to pouring concrete.
6. Forms to be reviewed by city sta� before concrete pour.
7. Soil back�ll required on either side of new concrete after drying.
8. Restoration of any disturbed soil is necessary after work is done, re-seeding of bu�alo
ADD ALTERNATE #2: INCLUDE 10’ PATH
WHICH PINCHES INTO 4’
APPROX. 465 SF’
4 ft
16 ft diameter curve
10 ft
10 ft
North of cowskin creek
N
File details come from the government source that posted it. Updated .