3-Borough of Conshohocken Authority Contract 25-1 Bid Form.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Contract 25-1 LV Switchgear Rehab and MCC Replacements
Solicitation number
Not on record
Issued by
Montgomery County, Pennsylvania

About this file

The document is a bid form for Contract 25-1, issued by the Borough of Conshohocken Authority for a Wastewater Treatment Plant Low Voltage (LV) Switchgear Rehabilitation and Motor Control Center (MCC) Replacement project in Conshohocken, Montgomery County, Pennsylvania. The project involves supplying and installing new MCCs throughout the plant, an Automatic Transfer Switch in the Administration Building, associated conductors and raceways, a Coordination and Arc Flash Hazard Study, temporary power equipment, and demolition of existing MCCs and power feeders. Site visits are scheduled for September 8-10, 2025, between 7:00 AM and 2:00 PM, with sealed bids to be submitted online via the PennBid Program until 2:00 PM on September 17, 2025.

The bid form includes nine line items covering project mobilization, equipment removal, electrical study, MCC installation, acceptance testing, electrical work, conductor replacement, transfer switch installation, and miscellaneous project components. Each item is to be priced as a lump sum or per linear foot, with a total of 100 linear feet specified for conductor replacement. The project requires a 10% Bid Bond, 100% Performance and Payment Bonds, a 10% Maintenance Bond, and specific contractor insurance. The contact for site visits and additional information is Edward Mongan, Operations Manager, who can be reached at 610.828.0979.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recovered_Sheet1

Borough of Conshohocken Authority Contract 25-1 LV Switchgear Rehab and MCC Replacements
Extended Price Analysis
Reference NumberDescriptionTypeUOMQuantityExtended Estimate
Pricing Items
1All work associated with the project mobilization and closeout shall be completed for the Lump Sum Price of:BaseLump Sum1
2All work associated with the removal of existing MCCs and equipment. Work shall include removal and disposal of existing MCCs and appurtenances. All demolition work shall be completed for the Lump Sum Price of:BaseLump Sum1
3All work associated with the field investigation and preparation of an electrical study. The electrical study shall be completed as shown on the contract drawings and specified in the contract documents and shall be completed for the Lump Sum price of:BaseLump Sum1
4All work associated with the installation of the motor control centers (MCCs) in the WWTP. The work shall include the replacement of the existing MCCs. At a minimum, the work shall include installation of temporary electrical equipment while the MCCs are being installed. Installation work also includes the cleaning and leveling of all MCC base pads. MCC replacements shall be completed as shown on the contract drawings and specified in the contract documents and shall be completed for the Lump Sum price of:BaseLump Sum1
5All work associated with the acceptance testing of the motor control centers and appurtenant equipment. Motor control center acceptance testing shall be completed as shown on the contract drawings and specified in the contract documents and shall be completed for the Lump Sum price of:BaseLump Sum1
6All work associated with the electrical work of the motor control centers included in the Specifications and as identified on the Drawings, including replacement of feeder conductors. The motor control centers electrical work shall be completed as shown on the contract drawings and specified in the contract documents and shall be completed for the Lump Sum price of:BaseLump Sum1
7In addition to the electrical work listed in Item 6 above, all work associated with testing existing conductors between MCC B4 and RBC Tank 3C and replacing the conductors if needed. Work shall consist of removing existing (failed) conductors from the existing raceway between MCC B4 and RBC Tank 3C and pull new #12 AWG stranded conductors through the existing raceway and label conductors and terminate. Quantities below or in addition to the bid amount listed below shall be adjusted upward or downward based on the actual quantity authorized by the Engineer and the unit bid price. Conductor replacement shall be completed as shown on the contract drawings and specified in the contract documents and shall be completed for the Linear Foot price of:BaseLinear Feet100
8All work associated with the installation of the automatic transfer switch (ATS) in the BLDG EB-1 and the installation of new feeder conductors from the switchgear. ATS installation shall be completed as shown on the contract drawings and specified in the contract documents and shall be completed for the Lump Sum price of:BaseLump Sum1
9Purchase and installation of all items shown on the plans or specified in the specifications or required for proper installation and operation of the project which are not included in Items 1 through 9 for the Lump Sum price of:BaseLump Sum1

File details come from the government source that posted it. Updated .