This architectural drawing set for Ada County contains construction documents for a roof replacement project at 400 N. Benjamin Lane, Boise, Idaho 83704. The project scope includes complete removal of the existing TPO (thermoplastic polyolefin) roof and replacement with a new PVC or equivalent membrane across three roof levels totaling 59,158 square feet, plus a lower east bumpout of 258 square feet. The work encompasses comprehensive demolition activities including removal of existing metal fascia, coping, roof drains, and abandoned penetrations; inspection and repair of roof decking as needed; extension of mechanical equipment curbs and plumbing vent stacks to maintain minimum 8-inch clearances above the finished roof surface; temporary disconnection and reconnection of all roof-mounted electrical and mechanical equipment; and installation of new roofing materials with proper flashing, insulation, and drainage systems. The drawings establish detailed specifications for the removal of existing TPO roofing, flashing, and patchwork, with field verification required for all existing conditions and dimensions prior to construction commencement.
The contractor is responsible for providing pricing for all materials and labor necessary for complete roof replacement, including removal costs for existing roofing materials, flashing, adhesives, and mechanical attachments; replacement of damaged or inadequate roofing components such as coping, gutters, downspouts, scuppers, vents, curbs, flashing, coverboard, vapor barriers, and drain crickets; a 30-year manufacturer warranty; and contingency pricing for materials required by the means and methods of construction including membranes, sealants, adhesives, fasteners, and brackets. The construction documents are issued for bid purposes and the specifications provided are described as general guidelines for cost estimation. The contractor must review the complete document set, coordinate with other trades, and notify the architect of any conflicts or discrepancies prior to finalizing bids. Field verification of all existing rooftop mechanical systems, roof drains, roof vents, hatches, skylight locations, and dimensions is mandatory before proceeding with construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Bid26037 Proposal Response Cover Sheet.pdf | ||
| 2-Bid26037 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. UPON REMOVAL OF THE EXISTING ROOFING MATERIALS, THE
CONTRACTOR SHALL NOTIFY THE ARCHITECT TO INSPECT THE
CONDITION OF THE EXISTING ROOF DECKING. ALL AREAS DEEMED
DEFICIENT BY THE ARCHITECT SHALL BE REMOVED, REPLACED OR
REPAIRED. IF DAMAGED AREAS ARE UNANTICIPATED THE
CONTRACTOR SHALL PREPARE AN ESTIMATE TO COMPLETE THE
WORK FOR THE OWNERS APPROVAL.
B. COMPLETELY REMOVE ALL EXISTING METAL FASCIA AND COPING
INCLUDING EXTENDER PLATES, CLEATS, GRAVEL STOP, CLIPS AND
ALL DEVICES USED TO SECURE THE FASCIA AND COPING IN PLACE
AND NEEDED FOR TPO REMOVAL.
C. FLUSH ALL ROOF DRAINS THOROUGHLY USING HIGH PRESSURE
WATER JETTING. SNAKE EACH DRAIN AND SCOPE FOR DAMAGE
PRIOR TO BEGINNING DEMOLITION WORK. THE CONTRACTOR SHALL
BE RESPONSIBLE TO MECHANICALLY SNAKE ANY CLOGGED OR
SLOW DRAINING PIPING AND SHALL PROVIDE THE ARCHITECT WITH A
REPORT UPON VERIFYING THAT ALL DRAINS ARE OPERATIONAL.
DURING THE SCOPE OF WORK THE CONTRACTOR SHALL PROTECT
THE DRAIN PIPING TO PREVENT DAMAGE AND DEBRIS FROM
ENTERING THE EXPOSED PIPING.
D. COMPLETELY REMOVE AND DISPOSE OF EXISTING DRAIN BODY,
MASTIC, WATER CUT-OFF, SUMP AND VERIFY CONDITION OF THE
EXISTING PIPING, JOINTS AND FITTINGS. THE CONTRACTOR SHALL
BE RESPONSIBLE TO REPLACE ANY DAMAGED OR LEAKING FITTING
UP TO 10'-0" FROM THE FLOOR PENETRATION. PREPARE BOWL FOR
NEW RETROFIT DRAIN BODY. IF NECESSARY, CONTRACTOR SHALL
ACCESS THROUGH CEILING BELOW AND PROVIDE 36"X36" ACCESS
PANEL (TAPED, SPACKLER AND PAINTED AT ALL EDGES) FOR FUTURE
USE BY OWNER.
E. PRIOR TO ANY ROOFING DEMOLITION THE CONTRACTOR SHALL
WALK THE ROOF AND VERIFY THE HEIGHTS OF ALL MECHANICAL
EQUIPMENT ROOF CURBS AND PLUMBING VENT STACKS INDICATED
TO REMAIN. THE CONTRACTOR SHALL BE RESPONSIBLE TO EXTEND
THE CURBS, PIPING AND ELECTRICAL CONDUIT, ETC. AS NEEDED TO
COMPENSATE A MINIMUM OF 8" ABOVE ROOF SURFACE. ANY NON-
WORKING EQUIPMENT SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT FOR IT WILL BE ASSUMED THAT ALL EQUIPMENT IS IN
GOOD OPERATING CONDITION PRIOR TO THE WORK STARTING.
F. THE CONTRACTOR SHALL TEMPORARILY DISCONNECT ALL EXISTING
ROOF MOUNTED ELECTRICAL AND MECHANICAL EQUIPMENT AS
REQUIRED TO REMOVE THE EXISTING ROOFING, WETHER INDICATED
ON THE DRAWINGS OR NOT. ITEMS INCLUDE BUT ARE NOT LIMITED
TO CONDUIT, BOXES AND VERTICALLY MOUNTED DEVICES AND LIGHT
FIXTURES. UPON COMPLETION THE ELECTRICAL AND MECHANICAL
EQUIPMENT SHALL BE RE-INSTALLED. THE CONTRACTOR SHALL
HAVE A LICENSED ELECTRICIAN RE-CONNECT AND EXTEND AS
REQUIRED ALL ELECTRICAL AND MECHANICAL CONNECTIONS TO
ENSURE PROPER WORKING ORDER.
G. WHERE EXISTING ABANDONED / OBSOLETE ROOF PENETRATIONS
ARE CALLED TO BE REMOVED THE CONTRACTOR SHALL
COMPLETELY REMOVE ALL BLOCKING, CURBS, FASTENERS, RAILS
AND DEVICES USED TO SECURE THE CURBS IN PLACE. UPON
REMOVAL THE OPENING SHALL BE IN FILLED USING CONSTRUCTION
SIMILAR TO THE ADJACENT AREA.
H. WHERE EXISITING OBSOLETE ELECTRICAL / PIPE PENETRATIONS ARE
CALLED TO BE REMOVED THE CONTRACTOR SHALL CUT BACK THE
EXISTING CONDUIT AND PIPING ONE FOOT BELOW THE ROOF DECK
AND SAFE OFF ALL WIRING. COMPLETELY REMOVE AND DISPOSE OF
EXISING PITCH POCKET AND FLASHINGS.
I. WHERE EXISTING ROOF MOUNTED GAS PIPING IS CALLED TO REMIN
THE CONTRACTOR SHALL SCRAPE, PRIME AND PAINT ALL PIPING
YELLOW.
J. WHERE EXISTING ROOF MOUNTED ELECTRICAL CONDUIT IS CALLED
TO REMAIN THE CONTRACTOR SHALL SCRAPE, PRIME AND PAINT ALL
GALVANIZED SECTIONS WITH A RUST INHIBITING TWO PART PRIMER,
COLOR GREY.
K. COORDINATE DEMOLITION SCOPE OF WORK WITH REQUIREMENTS
FOR NEW WORK. REPAIR ALL INCIDENTAL DAMAGE DONE TO
SURROUNDING AREAS THAT DEMOLITION WAS NOT REQUIRED.
L. WHEN APPLICABLE, COORDINATE DEMOLITION SCHEDULE AND TIMES
WITH OWNER AND OCCUPANTS BEFORE PROCEEDING WITH
CONSTRUCTION.
M. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
N CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD.
GENERAL NOTES
EXISTING PARAPET WALL
(48 TOTAL)EXISTING ROOFTOP
MECHANICAL SYSTEMS TO REMAIN,
(V.I.F)
EXISTING SKYLIGHT TO REMAIN
EXISTING ROOF DRAIN TO REMAIN
ROOF PLAN LEGEND
AREA OF ROOF TO BE REMOVED
• REMOVE EXISTING TPO ROOF
LAYER
• REMOVE ALL TPO PATCHES,
FLASHING
KEY NOTES #
1. REMOVE EXISTING TPO ROOFING, TPO FLASHING AND TPO
PATCHWORK
2. EXISTING HVAC UNITS TO REMAIN. PROTECT FROM DAMAGE.
EXSITING LADDER
EXISTING LADDER HATCH TO INTERIOR
EXSITING ROOF CRICKETS
200'-7" 111'-6"
127'-4" 8" 32'-1" 16'-4"
8"
13'-11" 22'-6" 74'-6"
EXSITING ROOF DRAINS
LEVEL 1
32,859 SQ.FT.
LEVEL 2
5,408 SQ.FT.
LEVEL 3
20,633 SQ.FT.
TOTAL ROOF TO REPLACE
59,158 SQ.FT.
LOWER EAST BUMPOUT
258 SQ.FT.
EXSITING ROOF CRICKETS
EXSITING ROOF DRAINS
1 2 3
A
B
C
1008 W Main St Boise, Idaho 83702 208.345.1800 colearchitects.com Copyright © 2022 Cole Architects, PLLC
CONSULTANT
STAMP
NOT FOR
CONSTRUCTION
DATE
PHASE
SHEET NUMBER
ISSUES
PROJECT INFORMATION
SHEET NAME
JOB NUMBER
BIDDERS ARE INSTRUCTED TO CAREFULLY REVIEW THE
CONSTRUCTION DOCUMENTS AND THE SITE CONDITIONS.
INFORMATION REGARDING THE COMPLETE WORK OF
SPECIFIC TRADES IS DISPERSED THROUGHOUT THE
ENTIRE DOCUMENT SET AND CANNOT BE ACCURATELY
DETERMINED BY REFERENCE TO OTHER THAN COMPLETE
DOCUMENT SET.
A101
2/16/2026
26-004
ISSUE FOR BID
ROOF PLAN -
EXISITING &
DEMOLITION
ADA COUNTY 400
BENJAMIN ROOF
REPLACEMENT
400 BENJAMIN LANE, BOISE, ID 83704
SCALE: 1/16" = 1'-0"1
ROOF PLAN - EXISITING
MARK DATE DESCRIPTION
A. COORDINATE INSTALLATION OF ROOFING WITH OTHER TRADES.
REPORT ANY CONFLICTS WITH ITEMS INSTALLED BY OTHER TRADES
TO ARCHITECT.
B. ALL ROOF CURBS FOR EXISTING ROOFTOP EXHAUST FANS, HVAC
UNITS AND CONDENSING UNITS SHALL HAVE CURB HEIGHTS THAT
WILL ALLOW FOR A MINIMUM OF 8" BASE FLASHING HEIGHTS FOR
THE ROOF SYSTEM.
C. ALL PLUMBING VENTS SHALL EXTEND ABOVE THE FINISHED SURFACE
OF THE ROOF SYSTEM AS REQUIRED TO PROVIDE FOR A MINIMUM OF
8" BASE FLASHING. PROVIDE FLASHING AROUND VENTS AND ROOF
PENETRATIONS PER ROOFING MANUFACTURER
RECOMMENDATIONS.
D. PROVIDE 36" WIDE WALK PADS AROUND PERIMETER OF ALL
MECHANICAL EQUIPMENT. PROVIDE 36" WIDE WALK PADS AROUND
ALL ROOF HATCHES & 72"X72" PADS AT LADDERS.
E. CONTRACTOR TO VERIFY CONDITION OF ALL EXISTING INCLUDING
AND PROVIDE SCOPE AND COST FOR REPLACEMENT. THIS INLCUDES
THOUGH IS NOT LIMITED TO ROOF COPING, GUTTERS,
DOWNSPOUTS, SCUPPERS, VENTS, PRE-FABRICATED CURBS,
FLASHING, COVERBOARD, VAPOR BARRIERS, DRAIN COVERS, DRAIN
CRICKETS AND ANY ADDITIONAL NON-STRUCURAL ROOF
COMPONENTS.
F. TAPERED INSULATION TO BE 1/4" PER FOOT MIN SLOPE TO DRAIN.
ROOF PLAN SHOWS TAPERED INSULATION FOR GRAPHIC
REPRESENTATION ONLY. CONTRACTOR TO VERIFY INSULATION
REQUIRED TO SLOPE PRIOR TO MEMBRANE INSULATION.
G. PROVIDE TAPERED INSULATION CRICKETS 1/4" PER FOOT MIN. SLOPE
@ HIGH SIDE OF ALL MECHANICAL UNITS AND ROOF HATCHES, TO
SHED WATER AROUND AND MAINTAIN POSITIVE ROOF DRAINAGE.
H. VERIFY ELEVATION OF ROOF DRAIN RELATIVE TO OVERFLOW
SCUPPER PRIOR TO INSTALLATION OF SCUPPER
I. PROVIDE SELF-ADHERING VAPOR RETARDER BETWEEN DECK AND
INSULATION. PROVIDE AIR TIGHT SEAL AROUND ALL DECK
PENETRATIONS AND DECK PERIMETER PRIOR TO INSTALLING VAPOR
BARRIER.
J. ALL WOOD NAILER AND BLOCKING TO BE TREATED. SECURE
NAILERS PER FM GLOBAL 1-49 PERIMETER FLASHING
REQUIREMENTS.
K. INSTALL MANUFACTURE'S RECOMMENDED PRESSURE-SENSITIVE
RUSS STRIP ALONG ENTIRE ROOF PERIMETER AND AT PERIMETER
OF ALL ROOF CURBS.
L. CONTRACTOR TO VERIFY ALL ROOFTOP MECHANICAL, ROOF DRAIN,
ROOF VENT, HATCH AND SKYLIGHT LOCATIONS IN FIELD.
M. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS.
N. CONTRACTOR TO VERIFY ALL DIMENSIONS IN THE FIELD.
GENERAL NOTES
ROOF PLAN LEGEND
EXISTING PARAPET WALL
(48 TOTAL)EXISTING ROOFTOP
MECHANICAL SYSTEMS TO REMAIN
AREA OF ROOF TO BE REPLACED
WITH THE FOLLOWING
• REMOVE EXISTING TPO ROOF
LAYER TO PLYWOOD ROOF
DECKING
• REMOVE ALL FLASHINGS,
ADHESIVES, MECHANICAL
ATTACHMENTS AND EXISTING
ROOF INSTALLATION
MATERIALS
• REPLACE WITH NEW PVC OR
EQUIVALENT ROOF MEMBRANE
INSTALLED OR EXISTING ROOF
DECKING
EXISTING SKYLIGHT TO REMAIN
EXISTING ROOF DRAIN TO REMAIN
KEY NOTES #
LEVEL 1
32,859 SQ.FT.
LEVEL 2
5,408 SQ.FT.
LEVEL 3
20,633 SQ.FT.
Total Roof to be Replaced
59,158 SQ.FT.
LOWER EAST BUMPOUT
258 SQ.FT.
EXSITING LADDER
EXISTING LADDER HATCH TO INTERIOR
EXSITING ROOF CRICKETS
EXSITING ROOF DRAINS
EXSITING ROOF CRICKETS
EXSITING ROOF DRAINS
1 2 3
A
B
C
EXISTING INSULATED ROOF
HATCH
V .I .F
M
IN
NEW PVC OR EQUIVELANT
ROOF MEMBRANE,
ADHERED OVER EXISTING
CURB, INSTALL UP AND
UNDER CAP FLASHING
EXISTING ROOF
ASSEMBLY
3'-0"
EXISTING DRAIN
STRAINER
EXISTING
CLAMP RING.
EXISTING PIPE
EXSITING ROOF
ASSEMBLY
NEW PVC OR EQUIVALENT
ROOF MEMBRANE, ADHERED
OVER EXISTING ROOF DECK,
INSTALLED UNDER EXISTING
CLAMP RING
EXISTING WALL
ASSMEBLY
EXISTING WALL
ASSEMBLY
NEW PVC OR EQUIVALENT ROOF
MEMBRANE, ADHERED OVER
EXISTING INSULATION, INSTALLED
UNDER EXISTING PARAPE
COPING
EXISTING MECHANICAL UNIT
NEW PVC OR EQUIVALENT
ROOF MEMBRANE, ADHERED
OVER EXISTING CURB,
INSTALL UP AND UNDER CAP
FLASHING
EXISITNG
PREFABRICATED CURB
EXISTING ROOF ASSEMBLY
CANT STRIP PER MFR
NEW PVC OR EQUIVALENT ROOF
MEMBRANE, ADHERED OVER
EXISTING CURB, INSTALLED
UNDER SKYLIGHT FLASHING
EXISTING
PREFABRICATED CURB
EXISTING ROOF
ASSEMBLY
CANT STRIP PER MFR
EXISTING METAL FRAME SKYLIGHT
1008 W Main St Boise, Idaho 83702 208.345.1800 colearchitects.com Copyright © 2022 Cole Architects, PLLC
CONSULTANT
STAMP
NOT FOR
CONSTRUCTION
DATE
PHASE
SHEET NUMBER
ISSUES
PROJECT INFORMATION
SHEET NAME
JOB NUMBER
BIDDERS ARE INSTRUCTED TO CAREFULLY REVIEW THE
CONSTRUCTION DOCUMENTS AND THE SITE CONDITIONS.
INFORMATION REGARDING THE COMPLETE WORK OF
SPECIFIC TRADES IS DISPERSED THROUGHOUT THE
ENTIRE DOCUMENT SET AND CANNOT BE ACCURATELY
DETERMINED BY REFERENCE TO OTHER THAN COMPLETE
DOCUMENT SET.
A102
2/16/2026
26-004
ISSUE FOR BID
ROOF PLAN -
PROPOSED
ADA COUNTY 400
BENJAMIN ROOF
REPLACEMENT
400 BENJAMIN LANE, BOISE, ID 83704
SCALE: 1/16" = 1'-0"1
ROOF PLAN - PROPOSED
SCALE: 3/4" = 1'-0"2
ROOF HATCH DETAIL (TYP.)
SCALE: 1 1/2" = 1'-0"3
EXISTING ROOF DRAIN DETAIL (TYP.)
SCALE: 1 1/2" = 1'-0"4
EXISTING ROOF PARAPET DETAIL (TYP.)
SCALE: 1 1/2" = 1'-0"5
EXISTING MECHANICAL CURB DETAIL (TYP.)
SCALE: 1 1/2" = 1'-0"6
EXISTING SKYLIGHT DETAILS (TYP.)
AREA MAP VICINITY MAP
SITE
SITE
PROJECT INFORMATION
ADDRESS:
400 N. BENJAMIN LANE, BOISE, ID 83704
PROPERTY DESCRIPTION:
THE PROJECT INCLUDES REPLACEMENT OF THE EXISITING TPO ROOF
PARCEL NUMBER:
R9316230186
LOT SIZE:
N/A
NUMBER OF STORIES:
N/A
SQUARE FOOTAGE:
59,158 SF
CONSTRUCTION TYPE: V-B
OCCUPANCY:
N/A
LAND USE CODE:
N/A
FIRE SPRINKLERS:
N/A
MATERIALS
CONCRETE (SECTION)
GRANULAR FILL
WOOD - FINISH (SECTION)
COMPOSITE WOOD
STEEL
ACOUSTIC/THERMAL
INSULATION
(SECTION)
NEW WALL (PLAN & SECTION)
EXISTING WALL TO REMAIN
(PLAN & SECTION)
DEMO WALL (PLAN & SECTION)
EARTH
RIGID INSULATION
TEMPERED GLASS
SAND
PLYWOOD SHEATHING
(SECTION)
PLYWOOD SHEATHING
(PLAN/ELEVATION)
GYPSUM SHEATHING
RATED GYPSUM WALLBOARD
ALUMINUM
FROSTED GLASS
DIMENSIONAL LUMBER
CONTINUOUS (SECTION)
DIMENSIONAL LUMBER
BLOCKING (SECTION)
X
COLUMN GRID LINEX
EXISTING GRID LINE
X
X-XXX
SIM
X
X-XXX
SIM
XXXX
X
X
X
X
XXXX
X
X
X
X
BUILDING SECTION
WALL / ELEVATOR / STAIR
SECTION
INTERIOR ELEVATION
EXTERIOR ELEVATION
TRUE
NORTH ARROW
Name Elevation
LEVEL DATUM
SPOT ELEVATION
ELEVATION
x'-x"
XXXX
X
SIM
DETAIL - PLAN
VIEW TITLE
X
X
CENTERLINE
X'-X"
DIMENSION LINE TO FACE OF
STUD, FACE OF CONCRETE,
COLUMN LINE, OR AS NOTED
Name Only
XXX SF
XXX
ROOM TAG
ROOM NAME
ROOM NUMBER
AREA OR VOLUME
WALL TAG
WINDOW TAG
DOOR TAGXXX
VIEW NUMBER
SHEET NUMBER
VIEW NUMBER
SHEET NUMBER
VIEW NUMBER
SHEET NUMBER
VIEW NUMBER
SHEET NUMBER
KEYNOTE SYMBOL
X
X-XXX
SIM
DRAFTING VIEW - DETAIL
VIEW NUMBER
SHEET NUMBER
VIEW NUMBER
SHEET NUMBER
DRAWING NAME
DRAWING SCALE
ARCHITECTURAL SYMBOLS
XW6A
X
View Name
Scale: 1/8" = 1'-0"
A. GENERAL PROJECT NOTES APPLY TO ALL SHEETS & SPECIFICATIONS. CONTRACTOR AND SUB-CONTRACTORS ARE TO REVIEW ALL CONTRACT DOCUMENTS AND COORDINATE THEIR SCOPE OF WORK WITH THE GENERAL CONTRACTOR AND OTHER SUB-CONTRACTORS. INFORMATION COMMON TO SEVERAL DRAWINGS MAY BE NOTED ON ONLY ONE. CONTRACTOR
IS RESPONSIBLE FOR ENTIRE SET OF DOCUMENTS.
B. IF INFORMATION ON SEPARATE SHEETS, DETAILS OR SPECIFICATIONS INDICATE CONFLICTING INFORMATION, THE CONTRACTOR IS TO NOTIFY THE ARCHITECT IMMEDIATELY BEFORE BIDS ARE FINALIZED TO CLARIFY SCOPE OF WORK. IF THE SCOPE OF WORK REMAINS UNCLEAR THEN THE CONTRACTOR OR SUB-CONTRACTOR IS INSTRUCTED TO PRICE AND PROVIDE
THE MOST EXPENSIVE SCOPE OF WORK OPTION IN THEIR BID.
C. COORDINATE CONSTRUCTION ACTIVITY WITH PROJECT SPECIFICATIONS. ALL SPECIFICATIONS, REFERENCED IN DRAWINGS OR NOT, SHALL BE PART THIS PROJECTS SCOPE OF WORK. MIS-NUMBERED (OR MISLABELED) SPECIFICATIONS OR REFERENCES ARE ALSO PART OF THIS PROJECTS SCOPE OF WORK AND SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. THE CONTRACTOR IS RESPONSIBLE TO INCORPORATE ALL SPECIFICATIONS INTO THE PROJECTS SCOPE OF
WORK.
D. ALL BUILDING COMPONENTS & PRODUCTS ARE TO BE INSTALLED PER THE MANUFACTURER INTENDED USE AND WRITTEN RECOMMENDATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO: REQUIRED CLEARANCES, REQUIRED ATTACHMENT TECHNIQUES, FASTENING METHODS & APPROVED SUBSTRATES. CONTACT ARCHITECT IMMEDIATELY BEFORE PROCEEDING WITH INSTALLATION OF COMPONENTS THAT DO NOT MEET THE MANUFACTURER'S RECOMMENDATIONS.
E. WHEN APPLICABLE, PROTECT ITEMS THAT ARE TO BE SALVAGED TO THE OWNER. THESE INCLUDE BUT NOT LIMITED TO:
WINDOWS, FRAMES, LIGHT FIXTURES, CEILING COMPONENTS, EQUIPMENT, MILLWORK, FIRE EXTINGUISHERS, CABINETS, AND CARPET. COORDINATE LOCATION AND TIME OF DELIVERY OF ITEMS TO BE RETURNED WITH THE OWNER.
F. WHERE APPLICABLE, ADJUST AND SUPPLEMENT EXISTING FIRE SPRINKLER SYSTEM AS REQUIRED TO COMPLY WITH APPLICABLE FIRE CODE. FIELD VERIFY EXISTING LOCATIONS PRIOR TO SUBMITTING SHOP DRAWINGS.
G. SCREEN MECHANICAL SYSTEMS FROM TRANSFERRING DUST AND DEBRIS FROM PROJECT AREA TO THE REMAINDER OF THE
BUILDING.
H. DO NOT SCALE DRAWINGS. IF SPECIFIC DIMENSIONS ARE NEEDED CONSULT ARCHITECT. FIGURED DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAWINGS. WHERE DISCREPANCIES OCCUR, THEY SHALL BE REPORTED TO ARCHITECT FOR RESOLUTION. ALL DIMENSIONS ARE FROM GRIDLINE TO FACE OF STUD, FACE OF CONCRETE, CENTER OF COLUMN OR STEEL, ETC. UNLESS NOTED AS CLEAR, CLR OR OTHERWISE.
I. DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE PRECEDENCE OVER SMALLER SCALE DRAWINGS.
J. PROVIDE ADEQUATELY SIZED WALL BACKING, BLOCKING, ATTACHMENT PLATES, ANCHORS OR FASTENERS FOR ALL WALL MOUNTED BUILDING COMPONENTS, SUCH AS BUT NOT LIMITED TO MILLWORK, BATHROOM ACCESSORIES, HANDRAILS, LADDERS, SHELVING & ELECTRONIC DEVICES. WHERE SIZE AND TYPE OF ATTACHMENTS ARE NOT INDICATED, VERIFY SIZE
AND TYPE REQUIRED WITH ARCHITECT FOR LOAD CONDITIONS.
K. THE DRAWINGS INDICATE LOCATION, DIMENSIONS, REFERENCE, AND TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT INDICATE EVERY CONDITION. WORK THAT IS NOT SPECIFICALLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO
PARTS THAT ARE DETAILED.
L. SUBCONTRACTORS FOR EACH TRADE ARE ADVISED THAT INFORMATION PERTINENT TO THEIR WORK MAY OCCUR IN OTHER PORTIONS OF THE CONTRACT DOCUMENTS. ALL NOTES ARE TO BE REVIEWED AND APPLIED TO RELATED BUILDING
DOCUMENTS.
M. WHERE NO MATERIAL NOTES OCCUR, THE GRAPHIC MATERIAL INDICATION SHALL INDICATE MATERIAL TYPES AND ITEMS.
SEE SYMBOL AND MATERIALS LIST ON THIS SHEET.
N. THE U. S. ENVIRONMENTAL PROTECTION AGENCY MUST BE NOTIFIED 10 WORKING DAYS IN ADVANCE FOR ALL RENOVATIONS
THAT DISTURB 260 L.F. /160 SQ. FT. /35 CU. FT. OF ASBESTOS CONTAINING MATERIALS.
O. ALL NEW CONSTRUCTION TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES.
P. UNLESS OTHERWISE INDICATED ALL DRAWINGS, NOTES WHICH DO NOT READ "N.I.C.", "EXISTING", OR "EXISTING TO REMAIN", OR "BY OTHERS" SHALL INDICATE NEW WORK WHICH SHALL BE CONTRACTOR FURNISHED AND CONTRACTOR INSTALLED.
Q. THE CONTRACTOR(S) SHALL KEEP ALL AREAS OF CONSTRUCTION CLEAN AND FREE OF DEBRIS. AFTER CONSTRUCTION IS COMPLETE, THE GENERAL CONTRACTOR SHALL PROVIDE FINAL CLEAN UP. ENFORCE REQUIREMENTS STRICTLY. DISPOSE
OF MATERIALS LAWFULLY.
R. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS FOR ACCURACY PRIOR TO COMMENCING WITH
THE WORK. ANY DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT.
S. FIELD MEASUREMENTS: TAKE FIELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLY. RECHECK MEASUREMENTS BEFORE INSTALLING EACH PRODUCT. WHERE PORTIONS OF THE WORK ARE INDICATED TO FIT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER CONSTRUCTION BY FIELD MEASUREMENTS BEFORE FABRICATION.
COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID DELAYING THE WORK.
T. THIS PROJECT MAY NOT BE OCCUPIED UNTIL IT RECEIVES A CERTIFICATE OF OCCUPANCY AND FIRE DEPARTMENT APPROVAL
FROM GOVERNING JURISDICTION.
U. COORDINATE STRUCTURAL, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION REQUIREMENTS, ROUTING, AND FIELD
VERIFY.
V. WHERE NEW CONSTRUCTION JOINS WITH EXISTING CONSTRUCTION, ALIGN FINISHED SURFACE OF NEW CONSTRUCTION
WITH EXISTING CONSTRUCTION.
W. WHEN REQUIRED PROVIDE COPY OF FIRE-RESISTANCE RATING ASSEMBLIES TO THE STRUCTURAL INSPECTOR FOR VERIFICATION OF TESTING/LISTING COMPLIANCE AND TO INSPECT ASSEMBLY CONSTRUCTION THEREWITH.
X. ALL CONSTRUCTION ADDENDA, CHANGE ORDERS, OR DESIGN CLARIFICATIONS TO THOSE ITEMS REGULATED BY THE CODES MUST BE SUBMITTED TO THE FIELD INSPECTOR FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WITH ANY OF THE
PROPOSED WORK RELATED TO THE PROPOSED FIELD CHANGE.
Y. EXAMINATION AND ACCEPTANCE OF CONDITIONS: BEFORE PROCEEDING WITH EACH COMPONENT OF THE WORK, EXAMINE SUBSTRATES, AREAS, AND CONDITIONS WITH INSTALLER OR APPLICATOR PRESENT WHERE INDICATED, FOR COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION TOLERANCES AND OTHER CONDITIONS AFFECTING PERFORMANCE. RECORD
OBSERVATIONS.
Z. EXAMINE ROUGHING-IN FOR MECHANICAL AND ELECTRICAL SYSTEMS TO VERIFY ACTUAL LOCATIONS OF CONNECTIONS BEFORE EQUIPMENT AND FIXTURE INSTALLATION. EXAMINE WALLS, FLOORS, AND ROOFS FOR SUITABLE CONDITIONS WHERE PRODUCTS AND SYSTEMS ARE TO BE INSTALLED. VERIFY COMPATIBILITY WITH AND SUITABILITY OF SUBSTRATES, INCLUDING
COMPATIBILITY WITH EXISTING FINISHES OR PRIMERS.
AA. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. PROCEEDING WITH
THE WORK INDICATES ACCEPTANCE OF SURFACES AND CONDITIONS.
BB. MAKE JOINTS OF UNIFORM WIDTH. WHERE JOINT LOCATIONS IN EXPOSED WORK ARE NOT INDICATED, ARRANGE JOINTS FOR THE BEST VISUAL EFFECT. FIT EXPOSED CONNECTIONS TOGETHER TO FORM HAIRLINE JOINTS.
CC. GRAPHIC PATTERNS OR HATCHES SHOWN IN DRAWINGS REPRESENT CONSTRUCTION MATERIALS AND ARE NOT TO BE USED AS LITERAL CONSTRUCTION GUIDELINES. CONTRACTOR IS TO COORDINATE ALL MATERIAL LAYOUT PRIOR TO CONSTRUCTION AND PROVIDE WORK BASED ON MANUFACTURES RECOMMENDATIONS AND STANDARD CONSTRUCTION TECHNIQUES. IF QUESTIONS ARISE CONTACT ARCHITECT FOR INTERPRETATION PRIOR TO CONSTRUCTION.
DD. UNLESS NOTED OTHERWISE CONSTRUCT CASEWORK PER STANDARDS ESTABLISHED BY THE ARCHITECTURAL WOODWORK
STANDARDS MOST CURRENT ADDITION. CONSTRUCT PER CUSTOM FINISH DESIGN STANDARDS.
EE. THE CONTRACTOR IS RESPONSIBLE FOR BUILDING PURSUANT TO ALL BUILDING CODES IN EFFECT AND TO THE AUTHORITIES
HAVING JURISDICTION AS OF THE TIME OF PERMIT ISSUANCE.
GENERAL NOTES
ARCHITECT_______ ___ _
COLE ARCHITECTS
404 S. 8TH ST. STE
BOISE, ID 83702
IAN SCHMIDT
208.866.4660 ian@colearchitects.com
CLIENT___________ ___
ADA COUNTY OPERATIONS
11 N LATAH ST.
BOISE, ID 83704
JOSH BROWN
208-287-7614 jbrown@adacounty.id.gov
PROJECT CONTACT INFORMATION
CONTRACTOR_________
TBD
CONTACT NAME
CONTACT NUMBER
SHEET INDEX
GENERAL
G000 COVER SHEET
ARCHITECTURAL
A101 ROOF PLAN - EXISITING & DEMOLITION
A102 ROOF PLAN - PROPOSED
ABBREVIATIONS
ACT ACOUSTIC CEILING TILE
AFF ABOVE FINISH FLOOR
ALUM or AL ALUMINUM
APPROX APPROXIMATELY
BD BOARD
BLDG BUILDING
BM BEAM
CFCI CONTRACTOR-FURNISHED
CONTRACTOR-INSTALLED
CJ CONTROL/CONSTRUCTION JOINT
CL CENTER LINE
CLG or CLNG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CTR CENTER
DBL DOUBLE
DEMO DEMOLISH or DEMOLITION
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
DWG DRAWING
(E) EXISTING
EA EACH
EJ EXPANSION JOINT
ELEV ELEVATION
EQ EQUAL
EXP EXPANSION
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FIN FINISH
FLR FLOOR
FRT FIRE TREATED OR FIRE RETARDANT TREATED
FT FOOT or FEET
GA GAUGE
GALV GALVANIZED
GB or GYP BD GYPSUM BOARD
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIB
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
INSUL INSULATION
MAX MAXIMUM
MECH MECHANICAL
MFR or MANUF MANUFACTURER
MIN MINIMUM
MO MASONRY OPENING
N/A NOT APPLICABLE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED
OFOI OWNER-FURNISHD OWNER-INSTALLED
OH OPPOSITE HAND
OPP OPPOSITE
PT PRESSURE TREATED
RAD RADIUS
RD ROOF DRAIN
REF REFERENCE
RO ROUGH OPENING
SIM SIMILAR
SPEC SPECIFICATION
STRUCT STRUCTURAL
TOC TOP OF CONCRETE
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
WD WOOD
WRB WEATHER RESISTIVE BARRIER
WWF WELDED WIRE FABRIC
1008 W Main St Boise, Idaho 83702 208.345.1800 colearchitects.com Copyright © 2022 Cole Architects, PLLC
CONSULTANT
STAMP
NOT FOR
CONSTRUCTION
DATE
PHASE
SHEET NUMBER
ISSUES
PROJECT INFORMATION
SHEET NAME
JOB NUMBER
BIDDERS ARE INSTRUCTED TO CAREFULLY REVIEW THE
CONSTRUCTION DOCUMENTS AND THE SITE CONDITIONS.
INFORMATION REGARDING THE COMPLETE WORK OF
SPECIFIC TRADES IS DISPERSED THROUGHOUT THE
ENTIRE DOCUMENT SET AND CANNOT BE ACCURATELY
DETERMINED BY REFERENCE TO OTHER THAN COMPLETE
DOCUMENT SET.
G000
2/16/2026
26-004
ISSUE FOR BID
COVER SHEET
ADA COUNTY 400
BENJAMIN ROOF
REPLACEMENT
400 BENJAMIN LANE, BOISE, ID 83704
2/16/2026
ISSUE FOR BID
ADA COUNTY 400 BENJAMIN ROOF REPLACEMENT
26-004
A. GENERAL NOTES APPLY TO ALL DRAWING SETS.
B. SPECIFICATION FOR BID PURPOSES ONLY. SPECIFICATION ARE
GENERAL GUIDELINES FOR COST ESTIMATION PURPOSES AND NOT
FOR CONSTRUCTION OR FINAL BID. CONTRACTOR IS RESPONSIBLE
FOR SPECIFICATION FOR ALL CONSTRUCTION PRODUCTS AND
MATERIAL SELECTIONS FOR FINAL BID.
GENERAL NOTES
• INCLUDED SPECIFICATION IS AN OWNER
PROVIDED PRODUCT SHEET. CONTRACTOR
TO PROVIDE PRICING OR CONTINGENCY IN
BID FOR PRODUCT OF EQUIVALENT
PERFORMANCE SPECIFICATIONS AS TO
OWNER PROVIDED PRODUCT SHEET (A103).
• CONTRACTOR TO INCLUDE PRICING OR
CONTINGENCY IN BID FOR REMOVAL OF
EXISTING ROOFING MATERIALS INCLUDING
BUT NOT LIMITED TO FLASHING, ADHESIVES,
MECHANICAL ATTACHMENTS AND EXISTING
ROOF INSTALLATION MATERIALS
• CONTRACTOR TO INCLUDE PRICING OR
CONTINGENCY IN BID FOR MATERIALS
REQUIRED IN MEANS AND METHODS OF
CONSTRUCTION. THIS INCLUDES BUT IS NOT
LIMITED TO PRIMARY 60 MIL (MIN)
MEMBRANE, SEALANTS, ADHESIVES,
FASTENERS, BRACKETS, CLIPS AND ANY
OTHER NECESSARY COMPONENTS FOR
INSTALLATION
• CONTRACTOR TO INCLUDE PRICING OR
CONTINGENCY IN BID FOR REPLACEMENT OF
DAMAGED OR INADEQUATE ROOFING
COMPONENTS INCLUDING BUT NOT LIMITED
TO ROOF COPING, GUTTERS, DOWNSPOUTS,
SCUPPERS, VENTS, PRE-FABRICATED
CURBS, FLASHING, COVERBOARD, VAPOR
BARRIERS, DRAIN COVERS, DRAIN CRICKETS
AND ANY ADDITIONAL NON-STRUCURAL
ROOF COMPONENTS.
• CONTRACTOR TO PROVIDE PRICING IN BID
FOR 30 YEAR MANUFACTURER WARRANTY.
ROOF PLAN LEGEND
INDICATES OWNER PREFERENCE
1008 W Main St Boise, Idaho 83702 208.345.1800 colearchitects.com Copyright © 2022 Cole Architects, PLLC
CONSULTANT
STAMP
NOT FOR
CONSTRUCTION
DATE
PHASE
SHEET NUMBER
ISSUES
PROJECT INFORMATION
SHEET NAME
JOB NUMBER
BIDDERS ARE INSTRUCTED TO CAREFULLY REVIEW THE
CONSTRUCTION DOCUMENTS AND THE SITE CONDITIONS.
INFORMATION REGARDING THE COMPLETE WORK OF
SPECIFIC TRADES IS DISPERSED THROUGHOUT THE
ENTIRE DOCUMENT SET AND CANNOT BE ACCURATELY
DETERMINED BY REFERENCE TO OTHER THAN COMPLETE
DOCUMENT SET.
A103
2/16/2026
26-004
ISSUE FOR BID
SPECIFICATION FOR
BID
ADA COUNTY 400
BENJAMIN ROOF
REPLACEMENT
400 BENJAMIN LANE, BOISE, ID 83704
| Sheets |
| A101 - ROOF PLAN - EXISITING & DEMOLITION |
| A102 - ROOF PLAN - PROPOSED |
| A103 - SPECIFICATION FOR BID |
| G000 - COVER SHEET |
File details come from the government source that posted it. Updated .