3-Bid Schedule 26-12-5211 REBID.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 26-12-5211 REBID
- Issued by
- Fayette County, Georgia
About this file
This document is a Bid Schedule for Forsyth County, Georgia, specifically for the Big Creek Greenway Boardwalk Maintenance and Repairs As Needed (Rebid) contract. The bid covers a three-year period from 2026 to 2028, with unit pricing for various maintenance and repair services for greenway boardwalks. The bid includes detailed line items for labor-related repairs such as boardwalk repairs, sealcoating, line striping, and emergency repairs, as well as a comprehensive list of materials and installation services including lumber, stone, soil, drainage pipes, concrete, and other construction-related items.
The bid schedule allows for flexible pricing across three years, with unit prices to be determined for each line item. No specific quantities are guaranteed, and payment will be based on actual items used and quantified. The contract includes provisions for miscellaneous material cost markups (not to exceed 10%), consultant services, and requires bidders to list staff certifications. The document provides a framework for ongoing maintenance and repair work, with bidders expected to provide unit pricing for various potential services needed for the Big Creek Greenway boardwalk infrastructure. A warranty on work and materials is also part of the bid requirements, with space provided for the authorized signature, company name, and date of submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| Forsyth County |
| Bid Schedule 26-12-5211 REBID |
| Greenway Boardwalk Maintenance and Repairs As Needed |
| No quantities are guaranteed and unit pricing will be paid for items actually used and quantified. |
| LINE ITEM | ITEM DESCRIPTION | Unit | YEAR 2026 | ||
| (Unit Price) | YEAR 2027 | ||||
| (Unit Price) | YEAR 2028 |
(Unit Price)
| LABOR | |||||
| 1 | Boardwalk Repairs | LF | $ | $ | $ |
| 2 | Sealcoating (refer to bid specificiations) | LF | $ | $ | $ |
| 3 | Line Striping (refer to bid specificiations) | LF | $ | $ | $ |
| 4 | Emergency Repair | LF | $ | $ | $ |
| MATERIALS - INCLUDING INSTALLATION | |||||
| 5 | Pressure treated lumber per Materials and Workmanship | Each | $ | $ | $ |
| 6 | Rip Rap Type 3 | Ton | $ | $ | $ |
| 7 | River Rock 6-9 inch | Ton | $ | $ | $ |
| 8 | #57 Stone | Ton | $ | $ | $ |
| 9 | Clean compactable soil - imported to site | Cubic Yard | $ | $ | $ |
| 10 | Non-woven filter fabric | SY | $ | $ | $ |
| 11 | Type-C Pop Silt Fence - installation & removal | LF | $ | $ | $ |
| 12 | Orange mesh tree protection - installation & removal | LF | $ | $ | $ |
| 13 | Slope stabilization mat | Roll | $ | $ | $ |
| 14 | Wheat straw bales staked in place- 12 inch | Each | $ | $ | $ |
| 15 | Wheat straw wattles staked in place - 12 inch | Each | $ | $ | $ |
| 16 | HDPE drainage pipe - 12 inch X 20 feet | Each | $ | $ | $ |
| 17 | Geo Grid 9 feet X 27 feet panel X 4 inch tall | SY | $ | $ | $ |
| 18 | Geo Grid 9 feet X 27 feet panel X 4 inch tall | SY | $ | $ | $ |
| 19 | 6 inch GAB | TSY | $ | $ | $ |
| 20 | 2000 PSI Concrete with fiber | SY | $ | $ | $ |
| 21 | White strip (4" wide) | LF | $ | $ | $ |
| 22 | Miscellaneious materials, cost mark up (not to exceed 10%) | % | % | % | % |
| 23 | Consultant services | Hour | $ | $ | $ |
| 24 | (Consultant services) List Certifications of Firm/Staff: | ||||
| 25 | Warranty on work & Materials |
Authorized Signature:
Company Name:
Printed Name and Title:
Date: