3-Bid Schedule 26-12-5211 REBID.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Big Creek Greenway Boardwalk Maintenance and Repairs As Needed REBID
Solicitation number
26-12-5211 REBID
Issued by
Fayette County, Georgia

About this file

This document is a Bid Schedule for Forsyth County, Georgia, specifically for the Big Creek Greenway Boardwalk Maintenance and Repairs As Needed (Rebid) contract. The bid covers a three-year period from 2026 to 2028, with unit pricing for various maintenance and repair services for greenway boardwalks. The bid includes detailed line items for labor-related repairs such as boardwalk repairs, sealcoating, line striping, and emergency repairs, as well as a comprehensive list of materials and installation services including lumber, stone, soil, drainage pipes, concrete, and other construction-related items.

The bid schedule allows for flexible pricing across three years, with unit prices to be determined for each line item. No specific quantities are guaranteed, and payment will be based on actual items used and quantified. The contract includes provisions for miscellaneous material cost markups (not to exceed 10%), consultant services, and requires bidders to list staff certifications. The document provides a framework for ongoing maintenance and repair work, with bidders expected to provide unit pricing for various potential services needed for the Big Creek Greenway boardwalk infrastructure. A warranty on work and materials is also part of the bid requirements, with space provided for the authorized signature, company name, and date of submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Forsyth County
Bid Schedule 26-12-5211 REBID
Greenway Boardwalk Maintenance and Repairs As Needed
No quantities are guaranteed and unit pricing will be paid for items actually used and quantified.
LINE ITEMITEM DESCRIPTIONUnitYEAR 2026
(Unit Price)YEAR 2027
(Unit Price)YEAR 2028

(Unit Price)

LABOR
1Boardwalk RepairsLF$$$
2Sealcoating (refer to bid specificiations)LF$$$
3Line Striping (refer to bid specificiations)LF$$$
4Emergency RepairLF$$$
MATERIALS - INCLUDING INSTALLATION
5Pressure treated lumber per Materials and WorkmanshipEach$$$
6Rip Rap Type 3Ton$$$
7River Rock 6-9 inchTon$$$
8#57 StoneTon$$$
9Clean compactable soil - imported to siteCubic Yard$$$
10Non-woven filter fabricSY$$$
11Type-C Pop Silt Fence - installation & removalLF$$$
12Orange mesh tree protection - installation & removalLF$$$
13Slope stabilization matRoll$$$
14Wheat straw bales staked in place- 12 inchEach$$$
15Wheat straw wattles staked in place - 12 inchEach$$$
16HDPE drainage pipe - 12 inch X 20 feetEach$$$
17Geo Grid 9 feet X 27 feet panel X 4 inch tallSY$$$
18Geo Grid 9 feet X 27 feet panel X 4 inch tallSY$$$
196 inch GABTSY$$$
202000 PSI Concrete with fiberSY$$$
21White strip (4" wide)LF$$$
22Miscellaneious materials, cost mark up (not to exceed 10%)%%%%
23Consultant servicesHour$$$
24(Consultant services) List Certifications of Firm/Staff:
25Warranty on work & Materials

Authorized Signature:

Company Name:

Printed Name and Title:

Date: