About this file
This is a bid drawing set for the Route 147 Water Line Punchlist project involving Herndon Borough and Jackson Township in Northumberland County, Pennsylvania. The project encompasses completion of punchlist items from the Route 147 Water Line Replacement, with work extending approximately 100 stations (roughly one mile) along State Route 147. The scope of work includes water line installation with multiple plan and profile views, horizontal outfall (HOP) details, and coordination across nine plan and profile sheets (P101-P109) plus multiple detail sheets covering inlet boxes, service installations, fire hydrant installations, air release valves, and concrete curb and walk installations. The project requires strict compliance with Pennsylvania Act 287 regarding notification timelines, mandating 3 business days' notice during construction and 10 business days' notice during design stages. Contractors must contact PA One Call System 72 hours prior to beginning and completing construction, verify all site conditions and utility locations before work commences, and adhere to traffic control requirements specified in PennDOT Publication 213. Work is restricted from 5:00 PM to 7:00 AM Monday through Friday and on weekends without PennDOT approval.
The project is designed by Owens Professional Solutions, LLC, located at 278 North Main Street, Herndon, Pennsylvania 17830. The drawings utilize State Plane Coordinate System NAD83 Pennsylvania North Zone for horizontal control and National Geodetic Vertical Datum of 1929 (NGVD29) for elevations. All construction activities must remain within public or legal right-of-way and lands under possession, clearance, or easement by the property owner. Contractors bear responsibility for obtaining all required permits, protecting existing utilities from damage with immediate repair at contractor expense, and maintaining uninterrupted service to all users. The work requires compliance with all applicable PennDOT publications and specifications, including traffic control devices, pavement markings, erosion and sediment pollution control plans, and ADA accessibility standards for pedestrian facilities. The existing speed limit on SR 147 is 25 miles per hour, and the legal right-of-way is a minimum of 24 feet based on parcel data and adjacent deed descriptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Bid Specifications.pdf | ||
| 1-Bid Advertisement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
SHEET INDEX
FO
R
BID DRAWINGS
ROUTE 147 WATER LINE PUNCHLIST
3-
HERNDON, PENNSYLVANIA
HERNDON BOROUGH-JACKSON TOWNSHIP J.M.A.
BI
D
D R
AW
IN
G S
R O
U
TE
W
AT
ER
L
IN
E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H -J
AC
KS
O N
T O
W N
SH
IP
J .M
.A
SHEET
NUMBER SHEET NAME
G001 GENERAL INFORMATION
G002 GENERAL INFORMATION
GOO3 KEY PLAN
P101 PLAN AND PROFILE VIEW
P102 PLAN AND PROFILE VIEW
P103 PLAN AND PROFILE VIEW
P104 PLAN AND PROFILE VIEW
P105 PLAN AND PROFILE VIEW
P106 PLAN AND PROFILE VIEW
P107 PLAN AND PROFILE VIEW
P108 PLAN AND PROFILE VIEW
P109 PLAN AND PROFILE VIEW
D103 HOP DETAILS
D104 HOP DETAILS
D105 HOP DETAILS
D106 DETAIL SHEET
D107 DETAIL SHEET
D
ES
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
G001
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
, P
A
PENNSYLVANIA ACT 287 AS AMENDED REQUIRES 3 BUISNESS
DAYS FOR CONSTRUCTION PHASE AND 10 BUISNESS DAYS IN
DESIGN STAGE - STOP CALL
POCS SERIAL NUMBER
xxxxxxxxxxx
1. THE LEGAL RIGHT-OF-WAY FOR THE XXX PROJECT IS VARIABLE AS SHOWN ON THE PLANS.
2. ALL CONSTRUCTION ACTIVITIES AND THE LIMIT OF WORK ASSOCIATED WITH THE XXX CONSTRUCTION AND FINAL XXX ALIGNMENT SHALL BE LIMITED TO WITHIN THE PUBLIC OR LEGAL RIGHT-OF-WAY AND LANDS
OTHERWISE IN POSSESSION OR UNDER CLEARANCE OR EASEMENT BY XXXOWNERXXX.
3. THE CONTRACTOR SHALL CONTACT THE XXX COUNTY CONSERVATION DISTRICT 72 HOURS PRIOR TO THE BEGINNING OF CONSTRUCTION AND 72 HOURS PRIOR TO COMPLETING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR CONSTRUCTION PRIOR TO THE BEGINNING
OF WORK.
4. THREE DAYS PRIOR TO EXCAVATING, THE CONTRACTOR SHALL CONTACT PA ONE CALL SYSTEM, INC., PHONE 1-800-242-1776, SERIAL NO. _______________ FOR PROJECT.
5. HORIZONTAL CONTROL IS TIED TO THE STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NORTH
AMERICAN DATUM (NAD) 1983.
6. ELEVATIONS SHOWN ARE BASED ON THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD29).
PROJECTION: STATE PLANE COORDINATE SYSTEM
ZONE: PENNSYLVANIA NORTH
DATUM: NAD83
PLANAR UNITS: U.S. SURVEY FEET
BASED ON NAD83 PA STATE PLANE COORDINATE SYSTEM - NORTH ZONE
7. THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS PRIOR TO BEGINNING WORK. VERIFY SIZE AND LOCATION OF ALL OVERHEAD AND UNDERGROUND UTILITIES, AND TEST PITS IN AREAS OF POTENTIAL CONFLICT. DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER WELL IN ADVANCE OF CONSTRUCTION START. START OF CONSTRUCTION BY THE CONTRACTOR SHALL CONSTITUTE FULL ACCEPTANCE OF ALL
SITE CONDITIONS BY THE CONTRACTOR.
8. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT EXISTING UTILITIES WHICH ARE TO REMAIN FREE FROM DAMAGE AND MAINTAIN UNINTERRUPTED SERVICE TO ALL USERS. ANY DAMAGE INCURRED DUE TO THE CONTRACTORS OR SUB-CONTRACTORS ACTIONS SHALL BE REPAIRED
IMMEDIATELY AT THE CONTRACTORS EXPENSE.
9. ACCESS TO THE XXX RIGHT-OF-WAY AND CORRIDOR IS AVAILABLE FROM PUBLIC ROADS. THE CONTRACTOR
SHALL CONFIRM RIGHT OF ACCESS WITH XXXOWNERXXX.
10. THE ISSUANCE OF ANY PERMIT OR APPROVAL OF ANY PLANS ARE NOT INTENDED TO CREATE LIABILITY ON THE PART OF THE COUNTY, ITS COMMISSION(S), SUPERVISORS, OFFICERS, OR AGENTS. PARTIES ARE ADVISED TO INDEPENDENTLY INVESTIGATE DEVELOPMENT RIGHTS, IMPROVEMENTS, STRUCTURES, OR COMPONENTS THERE OF ADDITIONAL ZONING AND/OR BUILDING PERMITS AND/OR OCCUPANCY MAY BE NECESSARY. THE OWNER AND ITS SUCCESSORS AND ASSIGNS SHALL INDEMNIFY AND HOLD HARMLESS THE COUNTY, ITS EMPLOYEES, AGENTS, COMMISSION(S), AND SUPERVISORS FROM ALL CLAIMS RELATED TO DEVELOPMENT PLANS AND CALCULATIONS, INCLUDING BUT NOT LIMITED TO STORMWATER DETENTION
AND DISCHARGE.
11. EXISTING PLAN INFORMATION WAS OBTAINED UTILIZING XXX METHOD AND PROPERTY AND RIGHT-OF-WAY BOUNDARY INFORMATION THAT WAS GENERATED USING DEED MOSAICS AND GIS INFORMATION PROVIDED
BY XXX.
12. IF EXISTING SITE CONDITIONS ALONG THE XXX ALIGNMENT DIFFER FROM WHAT IS SHOWN ON THE CONSTRUCTION PLANS, THE XXX CROSS SECTION CAN BE NARROWED WITH THE APPROVAL OF THE ENGINEER. APPROVAL SHALL BE MADE AT MINIMUM 5 DAYS PRIOR TO WORK IN SAID SECTION.
13. CONSTRUCT PROJECT IN ACCORDANCE WITH PENNDOT PUBLICATION 408 (LATEST ADDITION), ALL OF ITS
SUPPLEMENTS AND PROJECT SPECIAL PROVISIONS.
14. THE CONTRACTOR SHALL COMPLY WITH ALL NECESSARY AGENCY APPROVALS, ENVIRONMENTAL PERMITS, AND THE EROSION AND SEDIMENT POLLUTION CONTROL PLANS AND REPORT AS APPROVED BY THE PA
DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE XXX COUNTY CONSERVATION DISTRICT.
15. ALL XXX SURFACE SPECIFICATIONS AND REQUIREMENTS MUST BE ADHERED TO BY THE CONTRACTOR
PRIOR TO, DURING, AND AFTER INSTALLATION OF THE XXX SURFACE.
DRAWING CONVENTIONS
ABBREVIATIONS
EX: EXISTING
PE: PROPOSED
MH: MANHOLE
SMH: SEWER MANHOLE
STMH: STORM MANHOLE
IN: INCH
TBR: TO BE REMOVED
TBA: TO BE ABANDONED
TBD: TO BE DEMOLISHED
GENERAL PROJECT NOTES
C/E
X
FEATURE TEXTFEATURE TEXT
PROPERTY LINE
RIGHT-OF-WAY LINE
EASEMENT LINE
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
BUILDING SETBACK
BUILDING OUTLINE
FENCE LINE
EDGE OF PAVE
EDGE OF GRAVEL
CONCRETE CURB
R/W
C/E
X
FEATURE TEXT
PAVE
GRAVEL
25-YR
50-YR
100-YR
500-YR
DITCH/SWALE
25-YR FLOOD
50-YR FLOOD
100-YR FLOOD
500-YR FLOOD
25-YR
50-YR
100-YR
500-YR
SDSD
SS SS SS SS
W WW W
G G
UE UE
E E
COMM
UE UE
E E
COMM
UCOMMUCOMM
WV WV
DRAINAGE LINE, MANHOLE & INLET
SANITARY SEWER MAIN & MANHOLE
WATER MAIN & VALVE
GAS MAIN & VALVE
OVERHEAD ELECTRIC & UTILITY POLE
UNDERGROUND ELECTRIC
OVERHEAD COMMUNICATION & UTILITY POLE
UNDERGROUND COMMUNICATION
EXISTING PROPOSED
GUIDERAIL
SF
SSF
RCE
SILT FENCE
SUPER SILT FENCE
PERMIT BOUNDARY
LIMIT OF DISTURBANCE
ROCK CONSTRUCTION ENTRANCE
LOD
PERMIT
BENCHMARK
FIRE HYDRANT
GUY WIRE
IRON PIN
TREE (xF = TRUNK DIA.)
SHRUB (xF = SHRUB DIA.)
SINGLE POLE SIGN
UTILITY POLE
GUY POLE
MH
MH
MH
MH
STOCKPILE AREA STOCKPILE
LEGEND
CS-8 CS-8 COMPOST SOCK 8"
CS-12 CS-12 COMPOST SOCK 12"
CS-18 CS-18 COMPOST SOCK 18"
SCALE:
30' 60'0
1" = 30'-0"
VIEW TITLE 21
VIEW TITLE 1
1' 2'
1" = 1'-0" HORZ.
1" = 5'-0" VERT.
5' 10'
SCALE:
SCALE:
VIEW TITLE1
TYP 0
A0.0
A0.0
SIM
ELEV
NOTE
SCALE: 1/8" = 1'-0"
00 1 INCH
GRAPHIC SCALE
VIEW TITLE 1
1 VIEW TITLE 2
VIEW TITLES
PLAN VIEW
PROFILE VIEW
GRAPHIC VIEW
XX
SHEETNUMBER
DETAIL INDICATORS
NORTH ARROWS
N
PLAN
NORTH
SECTION/ELEVATION INDICATORS
G
EN
ER
AL
IN
FO
R M
AT
IO
N
BI
D D
R
AW
IN
G
S
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
1. THE EXISTING SPEED LIMIT ON S.R. 147 IS 25 M.P.H.
2. THE RIGHT-OF-WAY IS FREE ACCESS.
3. ALL WORK IN PA STATE HIGHWAY RIGHT-OF-WAY IS TO BE PERFORMED CONSISTENT WITH THE
FOLLOWING:
3.1. PENNDOT PUBLICATION 13M, DESIGN MANUAL PART 2 - HIGHWAY EDITION
3.2. PENNDOT PUBLICATION NO. 34, APPROVED AGGREGATE PRODUCERS (BULLETIN 14)
3.3. PENNDOT PUBLICATION NO. 35, APPROVED CONSTRUCTION MATERIALS (BULLETIN 15)
3.4. PENNDOT PUBLICATION NO. 41, PRODUCERS OF BITUMINOUS MATERIAL (BULLETIN 41)
3.5. PENNDOT PUBLICATION NO. 46, TRAFFIC ENGINEERING MANUAL
3.6. PENNDOT PUBLICATION NO. 72, STANDARDS FOR ROADWAY CONSTRUCTION
3.7. PENNDOT PUBLICATION NO. 111M, TRAFFIC CONTROL-PAVEMENT MARKINGS
3.8. PENNDOT PUBLICATION NO. 212, OFFICIAL TRAFFIC CONTROL DEVICES
3.9. PENNDOT PUBLICATION NO. 213, TEMPORARY TRAFFIC CONTROL GUIDELINES
3.10. PENNDOT PUBLICATION NO. 408, SPECIFICATIONS
4. PA STATE HIGHWAY RIGHT-OF-WAY MAY NOT BE USED FOR PARKING
5. PERMITTEE IS RESPONSIBLE FOR MAINTENANCE OF ALL AUTHORIZED STRUCTURES, FACILITIES AND
DRAINAGE.
6. PERMITTEE IS RESPONSIBLE FOR MAINTENANCE OF ALL AUTHORIZED SIGNS AND PAVEMENT MARKINGS.
7. THREE TO TEN DAYS WORKING DAYS PRIOR TO EXCAVATION BASED ON THE COMPLEXITY OF THE PROJECT, THE CONTRACTOR MUST CONTACT THE PA ONE-CALL SYSTEM, INC., PHONE 1-800-242-1776, SERIAL NUMBER _______________ FOR HERNDON BOROUGH AND JACKSON TOWNSHIP. ADDITIONAL
INFORMATION IS AVAILABLE AT HTTPS://WWW.PA1CALL.ORG/PA811/PUBLIC/.
8. THE CONTRACTOR IS REQUIRED TO NOTIFY THE DEPARTMENT AND SUBMT AN ALLEGED VIOLATION
REPORT (AVR) TO THE PA PUBLIC UTILITY COMMISSION THROUGH THE PA ONE CALL SYSTEM,
WWW.PA1CALL.ORG, WITHIN TEN (10) BUSINESS DAYS AFTER A UTILITY IS STRUCK, DAMAGED, OR PREVIOUS DAMAGE IS DISCOVERED AS REQUIRED BY PENNSYLVANIA'S UNDERGROUND UTILITY LINE
PROTECTION LAW ACT 50 (P.L. 852, NO. 287 AMENDED OCT. 30, 2017).
9. THIS PERMIT MAY BE RESTRICTED ON WORKING HOURS AND TIMES FOR HOLIDAYS, WEEKENDS AND SPECIAL OR UNFORSEEN EVENTS AND WILL REQUIRE APPROVAL FROM THE COUNTY OFFICE PRIOR TO
WORKING DURING THESE PERIODS.
10. THE PROPOSED UTILITY LOCATION MUST BE AS INDICATED ON THE PLAN OR MATCH THE EXISTING AS
FOUND IN THE FIELD, WHICHEVER IS GREATER.
11. PRIOR TO AN OVERLAY, BITUMINOUS OR CONCRETE BASE REPAIR OR JOINT REPLACEMENT MAY BE REQUIRED. REPAIR/REPLACEMENT WILL BE AT THE DISCRETION OF THE INSPECTOR-IN-CHARGE.
12. ALL EXISTING PAVEMENT MARKING WHICH ARE NO LONGER APPROPRIATE SHALL BE ERADICATED BY THE
PERMITTEE. THE PERMITTEE SHALL PLACE ALL REQUIRED NEW PAVEMENT MARKINGS.
13. ALL PAVEMENT MARKINGS OTHER THAN LONGITUDINAL LINES TO BE HOT THERMOPLASTIC (PENNDOT
PUBLICATION 111, TC-8600).
14. MATCH EXISTING PAVEMENT MARKINGS AT THE LIMITS OF WORK.
15. MATERIAL CERTIFICATION MUST BE PROVIDED, BY AN APPROVED MANUFACTURER LISTED IN THE DEPARTMENT'S PUBLICATION 35 (BULLETIN 15), FOR ALL MATERIALS AND STRUCTURES WITHIN PENNDOT
RIGHT-OF-WAY.
16. ALL PROPOSED PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, INCLUDING THOSE THAT ARE
OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, SHALL BE CONSTRUCTED TO COMPLY WITH THE
REQUIREMENTS OF THE U.S. ACCESS BOARD, PUBLIC RIGHT-OF-WAY ACCESSIBILITY GUIDELINES OF BUILDINGS (PROWAG) OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG).
PENNDOT DESIGN MANUAL PART 2, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY
CONSTRUCTION (PENNDOT PUBLICATION 72M, RC-67M) PROVIDE GUIDANCE ON ADA ACCESSIBLE DESIGN
FOR PEDESTRIAN FACILITIES AND CAN BE UTILIZED FOR REFERENCE.
17. CONSTRUCT ALL PROPOSED PEDESTRIAN FACILITIES ON THEE PLANS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT, PUBLIC RIGHT-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG), AND THE 2010 ADA
STANDARDS.
18. ALL SLOPE MEASUREMENTS WILL BE INSPECTED/VERIFIED WITH A 2-FOOT SMART LEVEL.
19. IT IS THE RESPONSIBILITY OF THE PERMITTEE TO REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND
NEW STORM DRAINAGE WITHIN THE PROJECT LIMITS A THE COMPLETION OF CONSTRUCTION.
20. MODIFICATIONS TO EXISTING DRAINAGE STRUCTURES MAY RESULT IN THE NEED TO REPLACE THE
STRUCTURE. REPLACEMENT WILL BE AT THE DISCRETION OF THE INSPECTOR-IN-CHARGE.
21. STRUCTURAL STEEL BICYCLE SAFE GRATES MUST BE PROVIDED FOR ALL INLETS WITHIN THE ROADWAY PAVEMENT OR THOSE THAT MAY RECEIVE BICYCLE TRAFFIC (PENNDOT PUBLICATION 72M, RC-45M).
22. THE RESPONSIBILITY FOR ENSURING THAT ALL UTILITY POLES WITHIN THE PROPOSED PAVING ARE RELOCATED OUTSIDE OF PAVED AREAS AND SHOULDERS SHALL BE THAT OF THE PERMITTEE. THE
UTILITY POLES MUST BE RELOCATED BEFORE THE START OF PAVING OPERATIONS.
23. THE PERMITTEE IS RESPONSIBLE FOR THE COORDINATION OF RELOCATING ANY CONFLICTING UTILITIES
WHICH ARE A RESULT OF THESE IMPROVEMENTS.
24. ALL UTILITY RELOCATION PERMITS TAKE PRECEDENE OVER THE UTILITY RELOCATION POSITIONS SHOWN
THE HOP PLANS.
25. A LIST OF PUBLIC UTILITIES IN ACCORDANCE WITH ACT 287-1974 IS PROVIDED ON THE COVER SHEET.
26. THE LEGAL RIGHT-OF-WAY ON SR 147 IS A MINIMUM OF 24-FEET BASED ON THE PARCEL DATA AND
ADJACENT DEED DESCRIPTIONS. THERE IS NO OTHER PUBLIC RECORD.
27. DO NOT INTERFERE WITH THE OPERATION OF ANY FIRE HYDRANT, FIRE CALL BOX OR POLICE CALL BOX.
GENERAL PERMIT NOTES
1. THIS WORK CONSISTS OF THE MAINTENANCE AND PROTECTION OF TRAFFIC AND THE PROTECTION OF
THE PUBLIC WHEN APPROACHING AND DEPARTING THE CONSTRUCTION AREA AND WITHIN THE LIMITES
OF CONSTRUCTION.
2. FURNISH, ERECT, PLACE, AND MAINTAIN TRAFFIC CONTROL SIGNS AND DEVICES, MAINTAIN TRAFFIC
DURING HOURS OF CONSTRUCTION AND AT ALL OTHER TIMES CONSISTENT WITH THE METHODS
INDICATED ON THESE DRAWINGS AND THE FOLLOWING:
2.1. PENNDOT PUBLICATION 35, APPROVED CONSTRUCTION MATERIALS (BULLETIN 15)
2.2. PENNDOT PUBLICATION 46, TRAFFIC ENGINEERING MANUAL
2.3. PENNDOT PUBLICATION 72M, STANDARDS FOR ROADWAY CONSTRUCTION
2.4. PENNDOT PUBLICATION 111, PAVEMENT MARKINGS AND SIGNING STANDARDS
2.5. PENNDOT PUBLICATION 212, OFFICIAL TRAFFIC CONTROL DEVICES
2.6. PENNDOT PUBLICATION 213, TEMPORARY TRAFFIC CONTROL GUIDELINES
2.7. PENNDOT PUBLICATION 236, HANDBOOK OF APPROVED SIGNS
2.8. PENNDOT PUBLICATION 408, SPECIFICATIONS
2.9. MUTCD, CURRENT EDITION
3. REMOVE THESE DEVICES IMMEDIATELY UPON COMPLEATION OF THE WORK, PENNDOT WILL REMOVE ANY
TRAFFIC CONTROL DEVICES ERECTED BY DEPARTMENT FORCES.
4. PERMITTEE MUST ARRANGE FOR INSPECTION OF ALL TRAFFIC CONTROL DEVICES PRIOR TO START OF
WORK.
5. COVER OR REMOVE ALL CONFLICTING SIGNS AND ERADICATE ALL CONFLICTING PAVEMENT MARKINGS.
6. MOUNT ALL LONG-TERM ADVANCE WARNING SIGNES ON TYPE 111 BARRICADES UNLESS OTHERWISE
NOTED OR INSTRUCTED BY THE DISTRICT OFFICE.
7. ALL SIGNS AND DEVICES TO BE MAINTAINED IN NEW OR LIKE NEW CONDITION.
8. DRIVEWAYS WILL BE KEPT ACCESSIBLE AT ALL TIMES. LOCATE ALL SIGNS SO THAT SIGHT DISTANCES
WILL NOT BE OBSTRUCTED AT DRIVEWAYS AND LOCAL ROADS.
9. ALL CHANNELIZING DEVICES, BARRICATEDS, AND SIGNS SHALL HAVE TYPE 111 OR BETTER PRISMATIC
RETROREFLECTIVE SHEETING. SHEETING WALL SHALL BE APPROVED AND LISTED IN PENNDOT
PUBLICATION 35 (BULLETIN15).
10. PERMITTEE SHALL NOTIFY LOCAL EMERGENCY AUTHORITIES (E.G., POLICE, FIRE, MEDICAL), AFFECTED BUSINESSES, SCHOOL DISTRICT(S), THE GENERAL PUBLIC, THE DISTRICT PERMIT MANAGER AND THE DISTRICT APRAS COORDINATOR AT LEAST FOURTEEN (14) DAYS PRIOR TO ANY SIGNIFICANT TRAFFIC
IMPACTS (E.G., LATERAL WIDTH RESTRICTIONS LESS THAN 16 FEET, DETOURS).
11. MAINTENANCE AND PROTECTION OF TRAFFIC CONTROL DURING CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE PATA DRAWING(S) GENERAL FIGURES 1-1, 2-4, 6-1 THRU 6-22, 10-17, 10-25, 10-26, 10-28 THRU 10-30, 10-33, 10-35, 10-39, 10-41, 10-49, 10-53, 11-1 THRU 11-10, 12-1, 12-2, 12-4, 12-10, 13-1, 14-1, 14-2, PATA FIGURES 101-A, 102, 106, 107, 302, IN THE CURRENT PENNDOT PUBLICATION 213, "TEMPORARY TRAFFIC CONTROL GUIDELINES".
12. DROPOFFS CREATED BY CONSTRUCTION OPERATIONS SHALL BE TREATED CONSISTENT WITH
PUBLICATION 408, SECTION 901.3(J).
13. REMOVE ALL SHORT-TERM WORK ZONE TRAFFIC SIGNING UPON COMPLETION OF THAT DAY'S WORK
PERIOD.
14. RESTRICTING TRAFFIC FLOW WITHIN THE WORK AREA SHALL BE MINIMIZED TO PREVENT TRAFFIC
CONGESTION AND UNSAFE TRAFFIC CONDITIONS.
15. NOTIFY THE LOCAL MUNICIPALITY WHERE SIGNALIZED INTERSECTIONS FALL WITHIN THE WORK ZONE. DO NOT FLAG A SIGNALIZED INTERSECTION WITHOUT THE MUNICIPALITY PLACING THE SIGNAL ON FLASH.
16. THE CONTRACTOR SHALL COMPLY WITH ACT 229 OF DECEMBER 2002 DURING CONSTRUCTION ACTIVITIES
WITHIN PENNDOT'S REIGHT-OF-WAY.
17. UTILIZE PENNDOT PUBLICATION 213, WORK ZONE TRAFFIC CONTROL PATA DRAWING NUMBERS PROVIDED IN NOTE 11 FOR BOTH SHORT-TERM TRAFFIC CONTROL OPERATIONS AND LONG-TERM TRAFFIC CONTROL
OPERATIONS.
18. UTILIZE PENNDOT PUBLICATION 213, WORK ZONE TRAFFIC CONTROL PATA DRAWING NUMBERS PROVIDED
IN NOTE 11 FOR SIGNAGE AND DEVICE SETUP/REMOVAL.
19. DAILY ADJUSTMENTS TO TEMPORARY TRAFFIC CONTROL DEVICES SHALL OCCUR TO ADJUST FOR
LOCATION OF DAILY EXTENT OF WORK.
20. MAINTAIN EXISTING PEDESTIRAN FACILITIES/ACCESS THROUGHOUT THE PROJECT DURATION. UTILIZE PENNDOT PUBLICATION 213, WORK ZONE TRAFFIC CONTROL PATA DRAWINGS PROVIDED IN NOTE 11 FOR
BOTH SHORT-TERM AND LONG TERM DURATIONS.
21. ALL FLAGGERS TO WEAR YELLOW/GREEN (ANSI 11) APPAREL AND LEGGINGS. ANSI 111 APPAREL IS
REQUIRED DURING HOURS OF DARKNESS FOR ALL HIGHWAY WORKERS.
WORK RESTRICTION:
1. NO TRAFFIC RESTRICTION OR LANE CLOSURES ARE PERMITTED AFTER 0500 PM AND BEFORE 0700 AM
MONDAYS THROUGH FRIDAYS OR ON LEGAL HOLIDAYS AND WEEKENDS ASSOCIATED WITH LEGAL
HOLIDAYS. ALL RESTRICTIONS AND CLOSURES ARE TO BE REMOVED BY NOON ON THE DAY PRIOR OT THE
LEGAL HOLIDAY.
2. NO PAVING, LANE RESTRICTIONS, OR CLOSURES ON WEEKENDS WITHOUT PENNDOT APPROVAL.
3. NO LANE RESTRICTIONS OR CLOSURE ALONG SR147 WILL BE PERMITTED ON DATES IDENTIFIED BY JACKSON TOWNSHIP AND/OR HERNDON BOROUGH. CONTRACTOR TO VERIFY DATES WITH THE TOWNSHIP
AND BOROUGH PRIOR TO CONSTRUCTION.
GENERAL SEQUENCE NOTES:
1. MOBILIZE FOR CONSTRUCTION.
2. INSTALL LONG-TERM SIGNING AND TEMPORARY TRAFFIC CONTROL DEVICES
3. INSTALL E&SPC MEASURES AS INDICATED AND IN ACCORDANCE WITH THE APPROVED E&SPC PLAN.
4. PERFORM CONSTRUCTION ACTIVITIES.
5. REMOVE E&SPC MEASURES
6. REMOVE TRAFFIC CONTROL SIGNING AND DEVICES
DAILY SEQUENCE NOTES:
1. MOBILIZE TO SITE
2. INSTALL DAILY TEMPORARY TRAFFIC CONTROL DEVICES
3. PERFORM DAILY CONSTRUCTION ACTIVITIES
4. REMOVE TEMPORARY TRAFFIC CONTROL DEVICES
5. DEMOBILIZE
MAINTENANCE AND PROTECTION OF TRAFFIC (MPT ) NOTES
GENERAL SEQUENCE OF CONSTRUCTION AND TRAFFIC CONTROL
1. FROM STA. 0+00 TO STA. 0+25, NO TRAFFIC CONTROL NEEDED, WORK PERFORMED OUT OF PENNDOT
RIGHT-OF-WAY.
2. FROM STA. 0+25 TO STA. 5+50, FIGURES 1-1, 2-1, 6-21, PATA 107
3. FROM STA. 5+50 TO STA. 6+50, FIGURES 1-1,2-1, 6-17(INTERSECTION WITHIN THE ACTIVITY AREA), PATA
107 (HERNDON ROAD INTERSECTION).
4. FROM STA. 6+50 TO STA. 20+25, FIGURES 1-1, 2-1, 6-21, PATA 107.
5. FROM STA. 20+25 TO STA. 20+75, FIGURES1-1, 6-18, PATA 107 (CHESTNUT STREET INTERSECTION).
6. FROM STA. 20+75 TO STA. 26+50, FIGURES 1-1, 2-1, PATA 107.
7. FROM STA. 26+50 TO STA. 27+50, FIGURES 1-1,2-1, 6-17(INTERSECTION WITHIN THE ACTIVITY AREA), PATA 107 (UPPER ROAD INTERSECTION).
8. FROM STA. 27+50 TO STA. 30+00, FIGURES 1-1, 2-1, PATA 107.
9. FROM STA. 30+00 TO STA. 31+50, FIGURES 1-1, 2-1, 6-21, PATA 107.
10. FROM STA. 31+50 TO STA. 37+75, FIGURES 1-1, 2-1, PATA 107.
11. FROM STA. 37+75 TO STA. 38+50, FIGURES 1-1, 2-1, 6-21, PATA 107.
12. FROM STA. 38+50 TO STA. 41+50, FIGURES 1-1, 2-1, PATA 107.
13. FROM STA. 41+50 TO STA. 48+50, FIGURES 1-1, 2-1, 6-21, PATA 107.
14. FROM STA. 48+50 TO STA. 49+50, FIGURES 1-1,2-1, 6-19 (INTERSECTION WITHIN THE ACTIVITY AREA), PATA 107 (POTSVILLE STREET INTERSECTION).
15. FROM STA. 49+50 TO STA. 50+75, FIGURES 1-1, 2-1, 6-21, PATA 107.
16. FROM STA. 50+75 TO STA. 51+75, FIGURES 1-1,2-1, 6-18 (INTERSECTION WITHIN THE ACTIVITY AREA), PATA 107 (FERRY STREET INTERSECTION).
17. FROM STA. 51+75 TO STA. 55+50, FIGURES 1-1, 2-1, 6-21, PATA 107.
18. FROM STA. 55+50 TO STA. 56+25, FIGURES 1-1, 2-1, 6-22, (INTERSECTION WITHIN THE ACTIVITY AREA), PATA 107 (READING AVENUE INTERSECTION).
19. FROM STA. 56+25 TO STA. 58+25, FIGURES 1-1, 2-1, 6-21, PATA 107.
20. FROM STA. 58+00 TO STA. 59+00, FIGURES 1-1, 2-1, 6-18, (INTERSECTION WITHIN THE ACTIVITY AREA), 6-21, PATA 107(READING STREET INTERSECTION).
21. FROM STA. 59+00 TO STA. 62+25, FIGURES 1-1, 2-1, 6-21, PATA 107.
22. FROM STA. 62+25 TO STA. 63+25, FIGURES 1-1,2-1, 6-18 (INTERSECTION WITHIN THE ACTIVITY AREA), PATA 107(SECOND STREET INTERSECTION).
23. FROM STA. 63+25 TO STA. 64+75, FIGURES 1-1, 2-1, 6-21, PATA 107.
24. FROM STA. 64+75 TO STA. 65+75, 1-1,2-1, 6-19 (INTERSECTION WITHIN THE ACTIVITY AREA), PATA 107
(THIRD STREET AND FORTH STREET INTERSECTION).
25. FROM STA. 65+75 TO STA. 91+75, FIGURES 1-1, 2-1, 6-21, PATA 107.
26. FROM STA. 91+75 TO STA. 96+25, FIGURES 1-1, 2-1, PATA 107.
27. FROM STA. 95+25 TO STA. 96+25, FIGURES 1-1,2-1, 6-17(INTERSECTION WITHIN THE ACTIVITY AREA), PATA 107 (RESERVOIR ROAD INTERSECTION).
28. FROM STA. 96+25 TO STA. 100+13, NO TRAFFIC CONTROL NEEDED, WORK PERFORMED OUTSIDE OF
PENNDOT RIGHT-OF-WAY.
MAINTENANCE AND PROTECTION OF TRAFFIC (MPT ) NARRATIVE
D
ES
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
G002
G
EN
ER
AL
IN
FO
R M
AT
IO
N S
H
EE
T
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
, P
A
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
G003
PL
AN
A N
D P
R O
FI
LE
V
IE
W
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
, P
A
BI
D
D R
AW
IN
S
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P101
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P102
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P103
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P104
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P105
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P106
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P107
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P108
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
P109
PL
AN
A N
D P
R O
FI
LE
V
IE
W
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
D103
H O
P D
ET
AI
LS
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
SCALE: N.T.S.
TYPICAL SECTION DETAILS1
SCALE: N.T.S.
TYPICAL SECTION DETAILS2
SCALE: N.T.S.
TYPICAL ROADWAY CROSS SECTION NOTES3 SCALE: N.T.S.
TYPICAL ROADWAY CROSS SECTION NOTES4
D
ES
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
D104
H O
P D
ET
AI
LS
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
, P
A
N L
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
SCALE: N.T.S.
FIGURE 1-11
SCALE: N.T.S.
FIGURE 2-12
SCALE: N.T.S.
FIGURE 6-173
SCALE: N.T.S.
FIGURE 6-184
SCALE: N.T.S.
FIGURE 6-195
SCALE: N.T.S.
PATA 1-76 SCALE: N.T.S.
PATA 1-77
D
ES
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
D105
H O
P D
ET
AI
LS
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
D106
D
ET
AI
L
SH
EE
T
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
, P
A
SCALE: N.T.S.
FOR INLET BOXES1
TYPICAL STEP CONFIGURATION
SCALE: N.T.S.
SERVICE INSTALLATION PROFILE2 SCALE: N.T.S.
FIRE HYDRANT INSTALLATION3
SCALE: N.T.S.
TYPICAL AIR RELEASE VALVE4
AIR RELEASE VALVE
DRAIN VALVE
SHUT OFF VALVE
WATER PIPELINEPIPELINE RISER
OUTLET
SCALE: N.T.S.
AIR RELEASE VALVE IN MANHOLE PROFILE5
SCALE: N.T.S.
FLOW METER IN MANHOLE6
C R
IP
TI
O N
M
AR
K
D R
AW
IN
G S
C
AL
E:
D
AT
E
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
PROJECT NO:
Th is d ra w in g se t a nd ac co m pa ny in g do cu m en ts a re ow ne d by
O w en s
Pr of es si on al
So lu tio ns
, L
LC
a nd a re in te nd ed fo r u se o nl y by th e in te nd ed pa rti es w ho h av e a co nt ra ct ua l ag re em en t w ith
O w en s
Pr of es si on al
S ol ut io ns , L
LC
C op yr ig ht
O w en s Pr of es si on al S ol ut io ns
, L
LC
D107
D
ET
AI
L
SH
EE
T
BI
D D
R
AW
IN
G
S
R O
U
TE
W
AT
ER
LI
N E
PU
N
C H
LI
ST
H
ER
N D
O N
B O
R O
U G
H , J
AC
KS
O N
T O
W N
SH
IP
J M
A
N
O R
TH
M
AI
N
S
TR
EE
T
H
ER
N D
O N
, P A
(5
) 7
EB
I
JC
O
AS
S
H O
W N
08003 - 013
H
ER
N D
O N
B O
R O
U G
H , N
O R
TH
U
M
BE
R
LA
N D
C O
U N
TY
, P
A
SCALE: N.T.S.
CONCRETE CURB INSTALLATION1
SCALE: N.T.S.
ADJACENT TO BUILDING2
CONCRETE SLAB/WALK SCALE: N.T.S.
CONCRETE CURB END TAPER3
SCALE: N.T.S.
PLAIN CEMENT CONCRETE CURB4 SCALE: N.T.S.
CONCRETE WALK5 SCALE: N.T.S.
CONCRETE CURB AND WALK7 SCALE: N.T.S.
ISOLATION AND CONTROL JOINTS7
| 001_COVER |
| 001_G001 |
| 001_G002 |
| 001_G003 |
| D101 |
| D102 |
| ES101 |
| ES102 |
| ES103 |
| ES104 |
| ES105 |
| ES106 |
| ES107 |
| P101 |
| P102 |
| P103 |
| P104 |
| P105 |
| P106 |
| P107 |
| P108 |
| P109 |
| D103 |
| D104 |
| D104 |
| D105 |
| D105 |
File details come from the government source that posted it. Updated .