3-AttachmentB Drawing ITB2026-08 4.24.26.pdf

PDF 1 MB Posted

Attached to
Computing Services Center West Wing Roof Replacement
Solicitation number
2026-08
Issued by
Jackson County, Amity City, Oregon

About this file

This is a bid drawing attachment for a roof replacement project at Southern Oregon University's Computing Services Center West Wing, located at 480 University Way in Ashland, Oregon. The project scope encompasses the complete replacement of existing single-ply EPDM membrane roofing and clay tile roofing with new 60-mil PVC membrane and 22-gauge standing seam metal roofing. The membrane replacement work covers approximately 9,000 square feet, while the metal roof area encompasses approximately 3,400 square feet. Key work items include demolition and disposal of all existing ballast, EPDM membrane, clay tile, wood cleats, blocking, and underlayment; installation of new mechanically-fastened 60-mil PVC membrane with a 20-year NDL warranty over 1.5-inch DensDeck on low-slope roofs; installation of new 22-gauge pre-finished standing seam metal roofing at pitched roof sections; replacement of nine roof drains and drain guards; removal of two CATV antennas and associated equipment; installation of new walk pads and a Guardian CB-12 fall protection anchor; and removal and replacement of metal parapet copings. Bidders are required to field verify all dimensions and quantities prior to submitting bids, with the drawing dated April 24, 2026, and designated as Bid #ITB2026-08.

The drawing specifies detailed construction requirements including membrane installation methods, material specifications, and coordination requirements referenced in Attachment A Project Manual. The existing tapered insulation system is to remain in place on low-slope roof areas. All work must protect the JPR antenna during demolition and construction activities, with a 20-foot by 20-foot "No Access" zone established using delineators and caution tape, as the antenna will be permanently relocated by Southern Oregon University following roof completion. Interior parapet walls require either full adhesion or mechanical fastening to prevent billowing, and roof warranties extend to the outside face-of-wall.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEYED NOTES

GENERAL ROOF WORK SCOPE: PITCHED ROOFS - EXISTING CONSTRUCTION: LOW SLOPE ROOFS - EXISTING CONSTRUCTION:

Revisions:

AutoCAD SHX Text

WALKWAY BELOW

AutoCAD SHX Text

PITCHED TILE ROOF

AutoCAD SHX Text

PITCHED TILE ROOF

AutoCAD SHX Text

FLAT ROOF

AutoCAD SHX Text

MECH RM ROOF

AutoCAD SHX Text

FLAT ROOF BELOW

AutoCAD SHX Text

HIGH FLAT ROOF

AutoCAD SHX Text

FLAT ROOF

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text 2" V

AutoCAD SHX Text

2" ELEC

AutoCAD SHX Text

HATCH

AutoCAD SHX Text 2" V

AutoCAD SHX Text

EF

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

GEN EXH

AutoCAD SHX Text

EF

AutoCAD SHX Text 2" V

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text REMOVE METAL PARAPET COPINGS FOR MEMBRANE REPLACEMENT. EITHER RE-INSTALL EXISTING METAL OR INSTALL NEW (CONTRACTOR'S OPTION). ROOF WARRANTY EXTENDS TO OUTSIDE FACE-OF-WALL. MEMBRANE TO BE FULLY ADHERED AT INSIDE OF PARAPET WALLS. DEMO AND DISPOSE OF ALL BALLAST AND EXISTING EPDM MEMBRANE. INSTALL NEW MECHANICALLY-FASTENED 60-MIL PVC MEMBRANE PER SPECIFICATIONS. DEMO AND DISPOSE OF ALL EXISTING CLAY TILE, WOOD CLEATS, BLOCKING AND UNDERLAYMENT DOWN TO PLYWOOD DECK. INSTALL NEW 22-GAUGE STANDING SEAM METAL ROOFING PER SPECIFICATIONS. REMOVE AND DISPOSE OF METAL CAP FLASHINGS AT THIS INTERIOR WALL. THE NEW MEMBRANE CAN WRAP OVER THIS PARTITION. REMOVE AND DISPOSE OF SHEET METAL ON INSIDE OF PARAPET WALLS. INSIDE OF ALL PARAPET WALLS TO BE EITHER FULLY ADHERED OR MECHANICALLY FASTENED (CONTRACTOR OPTION) TO PREVENT BILLOWING. THROUGH-WALL SCUPPER. LINE WITH NEW SINGLE-PLY AND SEAL PER MANUFACTURER'S REQUIREMENTS. EXISTING SHEET METAL CAPS AND SKIRTING REMAIN IN PLACE AT UPPER ROOF END WALLS INSTALL NEW WALK PADS AT LOCATIONS SHOWN. PROVIDE (4) 4 FT. X 6 FT. WALK PADS TO PLACE UNDER THE BALLAST SKIDS AT THE NEW JPR ANTENNA LOCATION. INSTALL NEW GUARDIAN CB-12 FALL PROTECTION ANCHOR, SECURE TO CONCRETE SLAB WITH (40) #14 X 3" LONG STEEL DECK SCREWS. INFILL AROUND NEW ANCHOR WITH RIGID INSULATION. VERIFY LOCATION WITH SOU PRIOR TO INSTALLATION. DEMO AND DISPOSE OF (2) CATV ANTENNAS AND ASSOCIATED RACKING AND BALLAST. PROTECT JPR ANTENNA DURING DEMO AND NEW WORK. PROVIDE 20 FT. X 20 FT. "NO ACCESS" ZONE AROUND ANTENNA USING DELINEATORS AND CAUTION TAPE. ANTENNA WILL BE PERMANENTLY MOVED BY SOU AFTER NEW ROOF IS COMPLETED WEST OF THE EXISTING LOCATION REPLACE EXISTING ROOF DRAINS AND DRAIN GUARDS WITH NEW ASSEMBLIES MEETING THE MEMBRANE MANUFACTURER'S SPECIFICATIONS. TYPICAL FOR (9) LOCATIONS. NEW 22 GAUGE METAL CAP AT TRANSITION FROM METAL ROOF TO UPPER FLAT ROOF. ADD 2 X PT WOOD SHIMS IF REQUIRED FOR METAL CAP BACKING.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

1. REMOVE & DISPOSE OF ALL BALLAST (PAVERS AND REMOVE & DISPOSE OF ALL BALLAST (PAVERS AND ROCK) AND THE EXISTING EPDM MEMBRANE. 2. REMOVE AND DISPOSE OF ALL THE CLAY TILE AND THE REMOVE AND DISPOSE OF ALL THE CLAY TILE AND THE CLEATS, BLOCKING, AND UNDERLAYMENT. 3. EXISTING TAPERED INSULATION SYSTEM REMAINS IN EXISTING TAPERED INSULATION SYSTEM REMAINS IN PLACE. 4. INSTALL NEW MECHANICALLY FASTENED, 60-MIL PVC INSTALL NEW MECHANICALLY FASTENED, 60-MIL PVC OVER INCH DENSDECK ON LOW-SLOPE ROOFS 14 INCH DENSDECK ON LOW-SLOPE ROOFS (20-YEAR NDL WARRANTY) 5. INSTALL NEW 22-GAUGE, PRE-FINISHED STANDING SEAM INSTALL NEW 22-GAUGE, PRE-FINISHED STANDING SEAM METAL ROOFING AT PITCHED ROOFS. 6. REFER TO ATTACHMENT A PROJECT MANUAL FOR REFER TO ATTACHMENT A PROJECT MANUAL FOR DETAILED SPECIFICATIONS AND COORDINATION REQUIREMENTS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. STRUCTURAL STEEL DECK STRUCTURAL STEEL DECK 2. 4 INCHES RIGID INSULATION WITH WOOD BLOCKING 4 INCHES RIGID INSULATION WITH WOOD BLOCKING 3. PLYWOOD SHEATHING PLYWOOD SHEATHING 4. WATER & ICE SHIELD WATER & ICE SHIELD 5. CLAY TILE FASTENED WITH WIRE HANGERS CLAY TILE FASTENED WITH WIRE HANGERS

AutoCAD SHX Text

1. STRUCTURAL STEEL DECK STRUCTURAL STEEL DECK 2. VAPOR BARRIER VAPOR BARRIER 3. TAPERED INSULATION - MINIMUM 4 INCHES THIVCK TAPERED INSULATION - MINIMUM 4 INCHES THIVCK 4. EPDM MEMBRANE EPDM MEMBRANE 5. BALLAST (EITHER CONCRETE PAVERS OR GRAVEL)BALLAST (EITHER CONCRETE PAVERS OR GRAVEL)

AutoCAD SHX Text Scale: " = 1'-0" (24 x 36)18" = 1'-0" (24 x 36)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Date:

AutoCAD SHX Text Project #: ITB2026-08

AutoCAD SHX Text Southern Oregon University

AutoCAD SHX Text Facilities Management & Planning 351 Walker Avenue Ashland, Oregon 97520 phone: 541 552 6231 www.fmp.sou.edu

AutoCAD SHX Text

480 UNIVERSITY WAY, ASHLAND, OR

AutoCAD SHX Text A301

AutoCAD SHX Text

ROOF PLAN

AutoCAD SHX Text 4.24.2026

AutoCAD SHX Text

COMPUTING SERVICES CENTER WEST WING ROOF REPLACEMENT

AutoCAD SHX Text

BID DRAWING

AutoCAD SHX Text No.

AutoCAD SHX Text Date

AutoCAD SHX Text Description

James McNamara Typewritten Text

ATTACHMENT B

ITB 2026-08

Sheets and Views
CS-R_B-W_TEST2-24x36

File details come from the government source that posted it. Updated .