This is a Scope of Work document for the Utah Department of Transportation (UDOT) Region 4, issued under Solicitation #UDOT270068CN for an Invitation for Bid (IFB) to repair a bump on Interstate 15 at Milepost 42. The project requires removal of thin bonded polymer overlay from the north approach slab of the NB Exit 42 structure, rotomilling, filling a low spot with hot mix asphalt to correct the identified bump, and correcting the cross slope of a portion of the northbound roadway. The contract must be completed by November 1, 2026. The State will award the contract to the lowest responsive and responsible bidder, which may result in a Purchase Order issuance.

The solicitation documents provide bidders with sufficient information to determine capability and compliance with outlined requirements. Bidders must submit documentation demonstrating compliance with stated specifications and requirements. This project is governed by the State of Utah Procurement Code and Utah Administrative Code, with those authorities taking precedence in case of any conflicts with the IFB terms.

View the file

Other files

File Type Posted
5-Attachment D Plans.pdf PDF
1-7. Submittal Form- Vendor Set Up Form 2024-06-27 .pdf PDF
4-Attachment C Cost Sheet.xlsx XLSX spreadsheet
2-Agency-Contract-GoodsServices-Combined-9.16.24 (2).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT CONTRACT NO._______________

Table of Contents

I. Instructions to Bidders

II. Bidding Schedule

III. Applicable Standards

IV. Measurement and Payment

V. Special Provisions

I. Instructions to Bidders

I-15; Exit 42 NB Bump Repair

SECTION I For Construction

Horrocks

UDOT

SECTION I - INSTRUCTIONS TO BIDDERS

PART 1 - GENERAL

1.1 PROJECT GENERAL INFORMATION

A. Project Location: I-15 Exit 42 NB MP 42.13 to 42.48

B. Project Owner: Utah Department of Transportation, Region 4.

Project Description: The Work consists of removing thin bonded polymer overlay from the north approach slab of the NB Exit 42 structure, rotomilling, filling a low spot with HMHMA to correct a bump, and correcting the cross slope of a portion of the NB roadway.

C. See SECTION 00725M SCOPE OF WORK and the Contract Documents for additional description of work.

D. Construction Documents: Prepared by Horrocks dated September 18, 2026

1.2 QUESTIONS DURING BIDDING PERIOD

A. Questions during the bid period must be submitted through the JAGGAER web portal.

Questions asked in any other format will not be addressed. Any inadvertent information obtained from unauthorized questions will not be considered the official position of the

State. Relying on such information is at the bidder’s risk. Only questions and answers posted on JAGGAER, and any final addendum issued on JAGGAER will be considered

(with the original bid documents) as official parts of this bid document.

1.3 BID SUBMISSION

A. All bids shall be submitted electronically through the JAGGAER web portal. When submitting a bid electronically through JAGGAER, bidders shall allow sufficient time to complete the online forms and upload documents. The solicitation will end at the closing time listed in the RFP. If you are in the middle of uploading your bid at the closing time, the system will stop the process and your bid will not be received by the system.

B. Electronic bids may require uploading of electronic attachments. The JAGGAER web portal will accept a wide variety of document types as attachments. However, the submission of documents containing embedded documents (zip files), mov, wmp, and mp3 files are prohibited. All documents should be attached as separate files.

Horrocks

1.4 BID LIMITATIONS

A. MODIFICATIONS AND ALTERNATIVE BIDS: Unauthorized conditions, limitations, or provisions attached to a Bid may render it non-responsive and may cause its rejection.

The completed Bid forms shall be without interlineations, alterations, or erasures.

Alternative Bids will not be considered unless called for. Oral, telegraphic, or facsimile

Bids or modifications will not be considered.

B. DISCREPANCIES IN BIDS: In the event there is more than one bid item in a bid schedule, the Bidder shall furnish a price for all bid items in the schedule; failure to do so may render the Bid non-responsive and subject to rejection. In the event there are unit price bid items in a bid schedule and the "amount" indicated for a unit price bid item does not equal the product of the unit price and quantity, the unit price shall govern and the "amount" will be corrected accordingly, and the Bidder shall be bound by said correction. In the event there is more than one bid item in a bid schedule and the total indicated for the schedule does not agree with the sum of the prices bid on the individual items, the prices bid on the individual items shall govern and the total for the schedule will be corrected accordingly, and the Bidder shall be bound by said correction. In the event that there is a conflict between the written and the numerical amount, the written amount shall supersede the numerical amount.

1.5 BIDDER'S EXAMINATION OF CONTRACT DOCUMENTS AND SITE

A. It is the responsibility of each Bidder before submitting a Bid, to:

1. Examine the Contract Documents thoroughly.

2. Visit the site to become familiar with local conditions that may affect cost, progress, performance, or furnishing of the WORK.

3. Consider federal, state and local laws and regulations that may affect cost, progress, performance or furnishing of the WORK.

4. Study and carefully correlate the Bidder's observations with the Contract

Documents.

5. Notify the ENGINEER of all conflicts, errors, or discrepancies in the Contract

Documents.

B. Information and data reflected in the Contract Documents with respect to underground facilities at/or contiguous to the site are based upon information and data furnished to the OWNER and the ENGINEER by the owners of such underground facilities or others.

The OWNER has no responsibility for the accuracy or completeness thereof including any damages whatsoever that may be incurred by the Bidder through its reliance thereon unless it is expressly provided otherwise in the Supplementary General Conditions.

C. Before submitting a Bid, the Bidder shall conduct such examination, investigations, studies and tests as are necessary to satisfy itself as to: the nature and location of the physical conditions, (surface, subsurface and underground facilities), the general and local conditions particularly those bearing upon transportation, disposal, handling and storage of materials, availability of labor, availability of utilities, local weather conditions, the character of equipment and facilities required preliminary to and during

Horrocks the prosecution of the WORK; any and all other conditions that may in any way affect the cost, progress, performance or furnishing of materials in accordance with the

Contract Documents. All such examination, investigation, studies, tests and the like shall be at the Bidder's expense.

D. The submission of a Bid hereunder shall be considered prima facie evidence that the

Bidder has made such examination as is set forth in the above paragraph and is knowledgeable as to the location and site conditions surrounding the WORK and the conditions to be encountered in performing the WORK and as to the requirements, conditions and terms of the Contract Documents.

E. The OWNER has no responsibility for: (1) any oral representations made by any of its officers, employees or agents during or prior to the execution of the Agreement; (2) information contained in any reports, subsurface studies, or other information which may be made available for the Bidder's information and which are not included as Contract Documents; or (3) any understanding or representations by the OWNER or by others which are not expressly stated in the Contract Documents, unless such responsibility is expressly assumed by the OWNER or its representatives in the Contract Documents.

Such information shall be deemed to be for the information of the Bidder and the Bidder shall have the obligation of evaluating any such information as to its accuracy and effect.

The OWNER will not be liable or responsible for any such information or any conclusions that may be drawn therefrom by the Bidder.

F. The lands upon which the WORK is to be performed, right-of-ways and easements for access thereto, together with other lands designated for use by the Bidder in performing the WORK, are identified in the Contract Documents. All additional lands and access thereto that are required for temporary construction facilities or storage of materials and equipment are to be provided by the Bidder. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by the OWNER unless otherwise provided in the Contract Documents.

G. The submission of a Bid shall constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this section, and that without exception the Bid is premised upon performing and furnishing the work required by the

Contract Documents in compliance with such techniques, sequences, or procedures of construction as may be indicated in or required by the Contract Documents; and that such techniques, sequences or procedures described in the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing the WORK.

1.6 QUANTITIES OF WORK:

A. The quantities of WORK or material stated in the Bid Schedule are supplied only to give an indication of the general scope of the WORK; the OWNER does not expressly or by implication agree that the actual amount of WORK or material will correspond therewith.

The OWNER reserves the right after award of the contract to increase or decrease the quantities of any unit price item of the WORK by an amount up to and including twenty five percent (25%) of the quantity of any bid item, or to omit portions of such WORK as

Horrocks may be deemed necessary or expedient by the ENGINEER or OWNER, without a change in the unit price. Such right to revise and omit shall include the right to delete any bid item in its entirety, or to add additional bid items in quantities up to and including an aggregate total amount not to exceed twenty five percent (25%) of the total Contract Price.

B. Neither the Bidder nor the ultimate CONTRACTOR on the Project shall at any time after the submittal of a Bid make or have any claim for damages or anticipated profits or loss of profit or otherwise because of any difference between the quantities of WORK actually done and material furnished and those stated in said unit price items of the Bid.

PART 2 - NOT USED

PART 3 - NOT USED

END OF SECTION I

II. Bidding Schedule

I-15; Exit 42 NB Bump Repair SECTION II For Construction

Horrocks

SECTION II – BIDDING SCHEDULE

PART 1 - GENERAL

1.1 BIDDER

A. Name and Address

B. Telephone Number

C. Facsimile Number

D. Tax Identification Number

E. Bidder holds license number issued by the

F. Utah State Department of Commerce, Occupational and Professional Licensing

G. Division, on the day of , 20 .

H. Bidder is licensed to practice as a contractor.

I. License renewal date is the day of , 20 .

1.2 Procurement Contract No. ____________________

A. Name of Project: I-15; Exit 42 NB Bump Repair

1.3 SCHEDULES TO BE ADDED TO THE AGREEMENT

A. This Bidding Schedule contains the schedules of prices which will be incorporated into the Agreement by reference.

1.4 BASIS OF AWARD

A. Award of the contract, if it be awarded, shall be made to the lowest qualified, responsible, and responsive bidder subject to UDOT's contract policy, and whose Bid complies with all of the requirements prescribed. The lowest overall cost to the project will be based on the Total Bid Amount.

I-15; Exit 42 NB Bump Repair SECTION II For Construction

Horrocks

1.5 SCHEDULE OF PRICES

A. Base Bid Schedule

Line No.

Item Number Description Qty Unit Unit Price Amount

ROADWAY

1 015017010 Mobilization 1 Lump $ $

2 01554701* Traffic Control 1 Lump $ $

3 017217010 Survey 1 Lump $ $

4 02221713* HMHMA - 1/2 Inch 715 Ton $ $

5 027487030 Emulsified Asphalt (Tack) 4 Ton $ $

6 027617035 Conventional Continuous Longitudinal Rumble Strip - Asphalt

950 Ft $ $

7 027657050 Pavement Marking Paint 45 Gal $ $

8 029617030 Rotomilling - 2 Inch 350 Sq Yd $ $

9 029637010 Profile Rotomilling 1,829 Sq Yd $ $

10 02982701* Bridge Concrete Grinding 159 Sq Yd $ $

11 033727030 Polymer Overlay Removal 1,496 Sq Ft $ $

12 039347010 Structural Pothole Patching 80 Sq Ft $ $

13 058307010 Asphaltic Plug Joint 62 Ft $ $

TOTAL BID AMOUNT $

Dollars

END OF SECTION II - BIDDING SCHEDULE

III. Applicable Standards

Statement of Applicable Standards

The Utah Department of Transportation 2026 Standard Specifications and Standards Drawings for Road and Bridge Construction books found at: http://udot.utah.gov/go/2026standards

Refer to “Special Provisions” for other project specific specifications.

Materials Minimum Sampling and Testing Requirements

Follow the requirements of the Materials Minimum Sampling and Testing Requirements:

http://www.udot.utah.gov/go/mstr https://drive.google.com/drive/folders/1N9yXr7OJmtYVG3nNtpxoo3vMEP6b0QXi?usp=drive_link http://www.udot.utah.gov/go/mstr

IV. Measurement and Payment

Measurement and Payment

Measurement and Payment - Page 1 of 1

Item Number Item Name Unit of Measure

ROADWAY

015017010 Mobilization Lump

Amount Paid- 25% of the bid item amount. When Paid- with first estimate.

Amount Paid- remaining portion of bid item paid as a percentage of the contract completed. When Paid- with each subsequent estimate.

01554701* Traffic Control Lump

Amount Paid- 25% of the bid item amount. When Paid- with first estimate.

Amount Paid- remaining portion of bid item paid as a percentage of the contract completed. When Paid- with each subsequent estimate.

017217010 Survey Lump

Amount Paid- 25% of the bid item amount. When Paid- with first estimate.

Amount Paid- remaining portion of bid item paid as a percentage of the contract completed. When Paid- with each subsequent estimate.

02740705* HMHMA - 1/2 Inch Ton

027487030 Emulsified Asphalt (Tack) Ton

027617035 Conventional Continuous Longitudinal Rumble Strip - Asphalt Ft

027657050 Pavement Marking Paint Gal

029617030 Rotomilling - 2 Inch Sq Yd

Measurement: Calculated from length multiplied by the average finished width of rotomilled surface

029637010 Profile Rotomilling Sq Yd

02982701* Bridge Concrete Grinding Sq Yd

033727030 Polymer Overlay Removal Sq Ft

039347010 Structural Pothole Patching Sq Ft

Payment: The department retains 10 percent of the bid item amount until the Structural Pothole Patching as-builts have been submitted to the Engineer.

058307010 Asphaltic Plug Joint Ft

Measurement: Along the centerline of the joint from parapet face to parapet face.

V. Special Provisions

Section No. Title – Type (current date)

1. 00555M Prosecution and Progress – Project Special Provision (09/17/26)

2. 00725M Scope of Work – Project Special Provision (09/17/26)

3. 01554M Traffic Control – Project Special Provision (07/18/25)

4. 01556S Night Work Lighting – Construction Special Provision (2026, Version 1)

5. 02740S Highly Modified Asphalt Mix – Materials Special Provision (2027, Version 2)

6. 02982M Bridge Concrete Grinding – Project Special Provision (09/18/24)

Prosecution and Progress 00555M – Page 1 of 3

September 17, 2026

SPECIAL PROVISION

PROCUREMENT CONTRACT NO. ________________

SECTION 00555M

PROSECUTION AND PROGRESS

Delete Article 1.7 and replace with the following:

1.7 NOTICE TO PROCEED

A. Proceed with work after receipt of written notice from the Department.

B. Notify the Engineer of start date within one day of receipt of Notice to

Proceed.

Add the following to Article 1.9, paragraph A:

1. No restrictions are permitted in the southbound direction of I-15.

2. Maintain two lanes of unrestricted traffic in the northbound direction of mainline I-15 at all times except as noted in Table 1M below.

3. Maintain minimum 11-ft traffic lanes and 2-ft shoulders

4. No mainline traffic is permitted on rotomilled surfaces.

00555M – Page 2 of 3

TABLE 1M

I-15 LANE CLOSURE SCHEDULE

Start Time Sunday - Wednesday Thursday - Saturday

NB SB NB SB

12:00 AM

1:00 AM

2:00 AM 1 1

3:00 AM LANE 1 LANE 1

4:00 AM OPEN LANE OPEN LANE

5:00 AM OPEN OPEN

6:00 AM

7:00 AM

8:00 AM

9:00 AM

10:00 AM

11:00 AM

12:00 PM 2 2

1:00 PM LANES 2 LANES

2:00 PM OPEN LANES OPEN 2

3:00 PM OPEN LANES

4:00 PM OPEN

5:00 PM

6:00 PM

7:00 PM

8:00 PM 1 1

9:00 PM LANE LANE 1 1

10:00 PM OPEN OPEN LANE LANE

11:00 PM OPEN OPEN

Delete Article 1.9, paragraph C, subparagraph 1 and replace with the following:

1. Do not perform any work without written approval except for repairing or servicing equipment, protecting work, maintaining or curing concrete, and maintaining traffic on Category II holidays as defined in Section 00570 and as listed below:

a. Friday, October 2nd, 2026 12:01 am to Sunday, October 4th, 2026 11:59 pm (St. George Marathon & Las Vegas NASCAR weekend)

Delete Article 1.9, paragraph D and replace with the following:

D. Nighttime Construction Work

1. Provide adequate lighting for safely performing satisfactory inspection and construction operations. Refer to Section 01556S.

00555M – Page 3 of 3

2. Minimize noise during Nighttime Construction Work.

a. Obtain required temporary noise permits for:

1) Activities outside of the project limits such as off-site batch plants and gravel pits.

Add the following to Article 1.9:

E. Clean up and remove waste daily, including excess asphalt and rotomill tailings.

F. Document the type, location, and offset of the existing pavement marking paint and messages with survey prior to covering or removing them with any construction activities. Establish new pavement marking paint with survey to ensure that the new pavement marking paint matches the type and location of existing paint. Place any changes to the pavement marking paint or messages according to the plan set.

G. Rotomill tailings become property of the contractor and are to be removed and disposed of by the contractor as per UDOT specifications. No Rotomill tailings are allowed to be placed on the job site, other than those specifically outlined in the plans and specifications.

Delete Article 1.12, paragraph A and replace with the following:

A. Contract time begins on first day of work.

1. All Paving to be completed by October 15, 2026

2. All work to be completed by the end of the 2026 Calendar year.

Add the following to Article 1.12:

C. Coordinate timing of second pavement marking paint application with the Engineer (See Section 02765, Article 3.2, paragraph D for paint waiting period)

Scope of Work

00725M - Page 1 of 1

September 17, 2026

SECTION 00725M

SCOPE OF WORK

Add the following to Article 1.6:

B. The major purpose for this project is to improve the ride quality as vehicles transition off Structure C 1055 to the roadway by leveling the profile with HMHMA, and improve roadway surface drainage by correcting approximately 950 ft of roadway cross slope to more efficiently direct water off the pavement during rain events.

Traffic Control 01554M – Page 1 of 4

July 18, 2025

SECTION 01554M

TRAFFIC CONTROL

Delete Article 1.2 and replace with the following:

1.2 RELATED SECTIONS

A. Section 00555: Prosecution and Progress

B. Section 01556S: Night Work Lighting

C. Section 01558: Temporary Pavement Markings

D. Section 02844: Concrete Barrier

E. Section 02890: Retroreflective Sheeting

Delete Article 1.3 and replace with the following:

1.3 REFERENCES

A. AASHTO Roadside Design Guide

B. AASHTO Manual for Assessing Safety Hardware (MASH)

C. American National Standards Institute (ANSI)

D. Americans with Disabilities Act

E. American Traffic Safety Services Association (ATSSA)

F. ASTM C 1107: Packaged Dry, Hydraulic-Cement Grout (Nonshrink)

G. ASTM D 6690; Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavement

H. Institute of Transportation Engineers (ITE) Standard on Vehicle Traffic

Control Signal Heads

I. International Safety Equipment Association (ISEA) https://pwdocs.udot.utah.gov/GmailPWLinks/PWURL.asp?pw://udot-pw.bentley.com:udot-pw-01/Documents/D%7B7af062b8-1ab5-4310-9da6-d4cd8f22de32%7D https://pwdocs.udot.utah.gov/GmailPWLinks/PWURL.asp?pw://udot-pw.bentley.com:udot-pw-01/Documents/D%7B7af062b8-1ab5-4310-9da6-d4cd8f22de32%7D https://pwdocs.udot.utah.gov/GmailPWLinks/PWURL.asp?pw://udot-pw.bentley.com:udot-pw-01/Documents/D%7B7af062b8-1ab5-4310-9da6-d4cd8f22de32%7D

01554M – Page 2 of 4

J. National Electrical Manufacturers Association (NEMA) TS 5: Portable

Traffic Signal Systems (PTSS) Standard

K. NCHRP Report 350: Recommended Procedures for the Safety

Performance Evaluation of Highway Features

L. UDOT Flagger Training Handbook

M. UDOT Guidelines for Crash Cushions and Barrier End Treatments

N. UDOT Quality Guidelines for Temporary Traffic Control Devices

O. Utah Manual on Uniform Traffic Control Devices (Utah MUTCD)

P. UDOT Sign Manual

Q. UDOT Standard Highway Signs Supplement

Delete Article 1.5, paragraph E and replace with the following:

E. ATSSA or Department approved flagger certification for information

Delete Article 1.10, paragraph A and replace with the following:

A. Flaggers must have a current ATSSA or Department approved flagging certificate and must present proof of certification upon request by the Department.

1. Refer to http://www.udot.utah.gov/go/standardsreferences for a list of acceptable courses taught by certified instructors.

Delete Article 1.8, paragraph A, subparagraph 7 and replace with the following

7. Incorporate TPRS during working hours as advance warning for vehicles entering a work zone with impacts to the width, alignment, or number of travel lanes.

a. While TPRS is in use, the traffic control maintainer or other observer must be present to adjust TPRS when they shift under traffic.

b. Only one work zone set up of Temporary Portable Rumble Strips, as shown in the project details, is required per direction of travel, as long as work zones are not spaced greater than 5 miles apart. Place series prior to the first work zone with impacts to travel lanes when multiple work zones exist in the same direction of travel.

01554M – Page 3 of 4

c. Work zones in the same direction of travel spaced greater than 5 miles apart will require a separate Temporary Portable Rumble Strip set up.

Delete Article 2.3, paragraphs C and D, and replace with the following:

C. Precast Concrete Barrier

1. Stabilization pins for temporary precast concrete barrier may be used in any pavement surface.

a. Comply with BA Series Standard Drawings.

b. Comply with Section 02844.

D. Temporary Steel Barrier

1. Stabilization pins for temporary steel barrier may be used in any pavement surface.

a. MASH Compliance

b. Comply with manufacturer’s instructions and procedures.

Add the following to Article 2.3:

F. Provide, install, and maintain 1 variable message board 3 calendar days prior to beginning any construction on the project and throughout the major items of work that will impact traffic. Inform the public of the date construction will start and the lane restrictions that will be in place during the project. Prior to placing VMS board, coordinate messages with the Engineer. Coordinate duration and location of the board with the Engineer.

After initial 3 days, incorporate the VMS board use into the traffic control plan. Any relocation necessary for construction activities will be done at no cost to the Department.

Add the following to Part 2:

2.9 CRACK SEAL

A. Meet the requirements of ASTM D 6690

2.10 NON-SHRINK GROUT

A. Use packaged dry, hydraulic-cement grout (non-shrink) according to

ASTM C 1107.

Add the following to Article 3.1:

F. Fill holes in pavement created by use of temporary barrier stabilization pin installation flush with the pavement surface. 1. Use crack seal for asphalt pavements 2. Use non-shrink grout for concrete pavements.

01554M – Page 4 of 4

G. Implement the Night Work Lighting plan as required. Refer to Section

01556S

Delete Article 3.2, paragraph E, subparagraph 1 and replace with the following:

1. Relocate traffic control devices from roadway a distance twice that of the Work Clear Zone if they will be used within 96 hours of the daily work stoppage and are not required for immediate traffic control. Refer to the TC Series Standard Drawings.

a. Obtain written permission from property owner prior to storing traffic control devices on private property.

Delete Article 3.5, paragraph A and replace with the following:

A. Obtain approval for regulatory and advisory speed reductions.

1. Use speed reductions only during impacted times and areas.

2. Restore preconstruction regulatory speed limit at locations where traffic is not being impacted by work activities.

3. Refer to http://www.udot.utah.gov/go/standardsreferences for policy information.

4. Refer to TC Series Standard Drawings.

5. Use speed reduction only when construction activities impact traffic.

6. Submit request for any speed reduction a minimum of 3 days prior to use.

Night Work Lighting 01556S – Page 1 of 3

2026, Version 1

SECTION 01556S

NIGHT WORK LIGHTING

Add Section 01556:

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Lighting for nighttime work.

1.2 RELATED SECTIONS Not Used

A. FHWA Nighttime Lighting Guidelines for Work Zones

1.4 DEFINITIONS

A. Foot-Candle – A unit of illumination equal to that given by a source of one candela at a distance of one ft (equivalent to one lumen per sq ft or 10.764 lux).

1.5 SUBMITTALS

A. Submit a Lighting Plan to the Engineer for review. Refer to this Section, Article 1.6.

1. Include at least the following:

a. Layout drawing and narrative of all the work activities that require lighting including stationary and all mobile work areas.

b. List of all lighting equipment and the lighting that will be used to illuminate working areas, including pavers, trucks, shuttle buggies, testing and sampling equipment, concrete cleanout, support vehicles, and any other required equipment or vehicles.

c. Include a list of all nighttime Personal Protective Equipment that will be used.

01556S – Page 2 of 3

d. Include a table of daily sunrise and sunset times to be used as start and stop times to use the lighting plan.

2. Revisions that are needed to the lighting plans.

3. Lighting plan inspection reports weekly for information.

a. Include at least verification for adequate foot-candles as specified in the lighting plan.

1.6 LIGHTING PLAN REQUIREMENTS

A. Include at least the following:

1. Utilize applicable aspects of the FHWA Nighttime Lighting

Guidelines for Work Zones. Refer to http://www.udot.utah.gov/go/standardsreferences.

2. Provide a lighting intensity of at least 5 foot-candle for all work operations areas; setup and takedown of lane or road closures and at flagging stations.

3. Provide a lighting intensity of at least 10 foot-candles for areas on and around construction equipment and where work is underway.

4. Provide a lighting intensity of at least 20 foot-candles for pavement or structural crack sealing, pothole filling, joint repair, pavement patching and repairs, installation of signal, electrical, and mechanical equipment.

5. Provide lighting that reaches at least 25 ft in front and back and 5 ft on each side of moving equipment.

6. Utilize glare control to avoid glare that interferes with traffic, workers, inspection personnel, and adjacent properties.

7. Use VMS boards to inform the public of lighted construction zones ahead.

1.7 NIGHTWORK COORDINATION MEETING

A. Hold this meeting within 7 days of the start of night work at a time and location determined by the Engineer. Include at least the following:

1. Contractor’s Nightwork lighting plan designer.

2. Contractor’s lighting inspector

3. Department Level III Project Inspector

1.8 EQUIPMENT

A. Portable Generator and Inverter Generator

1. Verify the fuel tank capacity and availability of fuel on site is sufficient to permit uninterrupted operation throughout the planned shift.

2. Equipped with a ground-fault circuit interrupter

3. Place or temporarily mount on the equipment without obstructing access onto the equipment or the view of the operator.

01556S – Page 3 of 3

PART 2 PRODUCTS

2.1 LIGHT METER

A. Provide a light meter for use by the Engineer and meets the following:

1. Has a digital display calibrated to NIST Standards.

2. Is cosine and color corrected with an accuracy of +/- 5 percent.

B. The light meter will remain the property of the Contractor after physical completion of the project.

PART 3 EXECUTION

3.1 GENERAL

A. Comply with the authorized lighting plan.

3.2 INSPECTION OF LIGHTING

A. Join the Engineer in a joint initial inspection of the project to verify the authorized lighting plan is correctly implemented at the beginning of each setup.

1. Evaluate the effectiveness of the plan.

a. The inspection must also include measurements with a light meter.

b. Evaluate glare impacts and verify light spillage is limited and not disturbing adjacent properties.

c. Document and correct and deficiencies identified in the inspection.

d. Document any needed changes to the lighting plan by redlining the lighting plan and follow the redlined lighting plan in the next shift.

e. All changes to the plan require an additional inspection to identify any deficiencies and a correction plan.

END OF SECTION

Highly Modified Asphalt Mix 02740S – 1 of 22

2027, Version 2

PROCUREMENT CONTRACT NO. _________________

SECTION 02740S

HIGHLY MODIFIED ASPHALT MIX

Add Section 02740:

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Flexible pavement consisting of one or more layers of a high-performance asphalt mixture comprised of aggregate, asphalt binder, hydrated lime, and other additives.

B. An option to incorporate Recycled Asphalt Pavement (RAP) materials into

Asphalt Mix.

1.2 RELATED SECTIONS

A. Section 02701: Pavement Smoothness

B. Section 02745: Asphalt Material

C. Section 02746: Hydrated Lime

D. Section 02748: Prime Coat/Tack Coat

E. Section 02790S: Asphalt Polymer Treatment

A. AASHTO R 35: Superpave Volumetric Design for Asphalt Mixtures

B. AASHTO T 11: Materials Finer Than 75 μm (No. 200) Sieve in Mineral Aggregates by Washing

C. AASHTO T 19: Bulk Density (“Unit Weight”) and Voids in Aggregate

D. AASHTO T 27: Sieve Analysis of Fine and Coarse Aggregates

E. AASHTO T 89: Determining the Liquid Limit of Soils

02740S – 2 of 22

F. AASHTO T 90: Determining the Plastic Limit and Plasticity Index of Soils

G. AASHTO T 96: Resistance to Degradation of Small-Size Coarse

Aggregate by Abrasion and Impact in the Los Angeles Machine

H. AASHTO T 104: Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate

I. AASHTO T 112: Clay Lumps and Friable Particles in Aggregate

J. AASHTO T 176: Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test

K. AASHTO T 195: Determining Degree of Particle Coating of Asphalt Mixtures

L. AASHTO T 209: Theoretical Maximum Specific Gravity (G mm) and

Density of Asphalt Mixtures

M. AASHTO T 255: Total Evaporable Moisture Content of Aggregate by Drying

N. AASHTO T 278: Surface Frictional Properties Using the British Pendulum

Tester

O. AASHTO T 279: Accelerated Polishing of Aggregates Using the British

Wheel

P. AASHTO T 304: Uncompacted Void Content of Fine Aggregate

Q. AASHTO T 305: Determination of Draindown Characteristics in Uncompacted Asphalt Mixtures

R. AASHTO T 324: Hamburg Wheel-Track Testing of Compacted Asphalt

Mixtures

S. AASHTO T 335: Determining the Percentage of Fracture in Coarse Aggregate

T. AASHTO T 383: Evaluation of Asphalt Release Agents (ARAs)

U. UDOT Materials Manual

V. UDOT Minimum Sampling and Testing Requirements (MS&TR)

02740S – 3 of 22

W. UDOT Materials Quality Management Plan

1.4 DEFINITIONS

A. Lane-Leveling – Variable depth paving to correct minor rutting and longitudinal variations in the roadway.

1. Depth varies from the maximum aggregate size to the depth needed to correct variations.

B. Longitudinal Joint – Any new asphalt lift abutting an existing paving lift.

This includes joints created by echelon paving and new asphalt placed against a milled asphalt edge or to concrete elements.

C. Lot – The amount of Asphalt Mix placed in a single Production Day.

D. Minimum Lift Thickness – A compacted thickness at least three times greater than the nominal maximum aggregate size of the Asphalt Mixture except for lane leveling applications.

E. Minor Target Change – A change from the verified mix design gradation target on a maximum of two sieves with the following limitations.

1. The maximum change from the verified target gradation on the No.

8 or any coarser sieve is limited to 3 percent passing per sieve.

2. The maximum change from the verified target gradation on the No.

16 or No. 50 sieves is 2 percent passing per sieve.

3. The maximum change from the verified target gradation on the No.

200 sieve is 0.5 percent passing.

4. No target change may violate the mix design requirements in this section.

F. Overband – an 8-inch wide asphalt polymer treatment sealing the longitudinal joint.

G. Production Day – A 24-hour period in which Asphalt Mix is being placed.

H. Profile leveling - Variable depth paving to correct minor profile variations in the roadway.

I. Thin Overlay Pavement – New Asphalt Mix design for a placement lift less than 2 inches.

J. Warm Mix Asphalt (WMA) – Asphalt produced and placed at reduced temperatures using chemical admixtures to facilitate mixing and compaction.

02740S – 4 of 22

1.5 SUBMITTALS

A. Mix design that has been verified according to UDOT Materials Manual Section 2.1, for information.

B. Authorized Products List (APL) Compliance form for information for the following products:

1. Warm Mix Asphalt (WMA), refer to this Section, paragraph 2.3.

2. Asphalt Release Agent, refer to this Section, paragraph 2.8.

C. Changes in job mix design for review.

1. Submit a written request for any proposed change in the job-mix design

a. Allow 12 hours for a Department response to a minor target change.

b. Allow 7 calendar days for:

1) Mix design verification.

2) A Department response to any other change.

2. Include documentation supporting correlation between suggested target changes, admixtures, or admixture dosages and mix design volumetric requirements.

a. Acceptable documentation may include Department or

Contractor testing data.

3. Submit samples according to the UDOT Materials Manual of

Instruction for anything other than minor target changes.

D. Quality adjustment plan for information according to this Section, paragraph 3.3C2.

E. Laboratory correlation results for information according to this Section, paragraph 3.4.

F. Longitudinal joint layout plan for review. Refer to this Section, paragraph 3.6C.

1.6 ACCEPTANCE

A. The Engineer samples and tests the materials according to the MS&TR for specification 02741 and specification 02745 with the following modification.

1. One binder sample (set of 3 cans) minimum per each day’s mix production up to 2000 tons.

a. Take one additional binder sample (set of 3 cans), for each additional 2000 tons of mix, or portion thereof, in the same paving day.

02740S – 5 of 22

2. Take one additional mix sample for each 500 additional tons starting at 2000 mix tons per paving day.

B. Gradation and Asphalt Binder Content

1. The Engineer evaluates a lot on the test results of four or more samples, except when only three samples can be taken.

C. Density and Thickness

1. Obtain cores from the mat and longitudinal joint within two calendar days after the pavement is placed and according to UDOT Materials Manual of Instruction, Section 984.

a. The Engineer marks the coring locations for in-place mat density and longitudinal joint density cores.

1) The core must be taken within the 12-inch diameter marked location.

b. The Engineer witnesses the coring operation, and takes possession of the Department cores immediately, and begins testing the cores within 24 hours.

2. Density requirements

a. The target for in-place density for the top three inches of paving layer is 96.0 percent of Theoretical Maximum Specific Gravity.

1) Take the remaining lower portion of the core if it is two inches or more and test and report the density, percent of Theoretical Maximum Specific Gravity, for information only.

b. The target for in-place density for the longitudinal joint is

94.0 percent of the Theoretical Maximum Specific Gravity (G mm).

c. The target for in-place density is 96.0 percent of theoretical maximum specific gravity for thin overlay pavements.

1) Do not take longitudinal joint cores for thin overlay pavements

3. Thickness is evaluated with mat density cores. The thickness requirement may be waived when matching up to existing pavement, curb and gutter, or for pavement in or next to intersections.

a. The Engineer accepts a lot for thickness when:

1) The average thickness is not more than ½ inch greater or ¼ inch less than the total design thickness specified.

2) No individual core shows a deficient thickness of more than ⅜ inch.

02740S – 6 of 22

b. Excess thickness – The Engineer may allow excess thickness to remain in place or may order its removal.

1) The Department pays for 50 percent of the mix in excess of the +½ inch tolerance when that excess is allowed to remain in place.

c. Deficient thickness – Place additional material where lots or sublots are deficient in thickness. Place the material with the minimum lift thickness.

1) The Department pays for the material necessary to reach the specified thickness and for 50 percent of any additional material.

d. Thickness tolerances established above do not apply to leveling courses.

1) Check final surfaces in staged construction.

D. The Engineer calculates and applies one incentive or disincentive for the lowest dollar value for gradation and asphalt content, one incentive or disincentive for in-place mat density, and one incentive or disincentive for longitudinal joint density for each lot as follows:

1. The incentive or disincentive for gradation and asphalt binder and

In-place Mat Density and Longitudinal Joint Density will be calculated according to Table 1.

a. The incentive or disincentive will be based on the percent within limits (PT) computation using Tables 1, 2, 3, and 4.

b. The lowest single PT value combined for gradation (each of the sieves) and asphalt binder content for calculating the gradation and asphalt binder content incentive or disincentive will be used.

2. Tables 1, 2, 3, and 4 to determine PT for in-place mat density and longitudinal joint density will be used.

3. The in-place mat density must have a PT of at least 88 for there to be any incentives for longitudinal joint density or gradation and asphalt binder content.

4. The longitudinal joint density incentive/disincentive will be calculated based on the tonnage of asphalt mix placed adjacent to, and on the hot side of the longitudinal joint for each lift:

a. The incentive or disincentive will be calculated from the core densities taken from all abutting joints if the asphalt mix has a longitudinal joint on more than one side.

E. Refer to Section 02701 for smoothness requirements.

02740S – 7 of 22

F. Nonconforming lots:

1. If the PT for any individual gradation measurement is less than 52 percent as shown in Table 1.

2. If the PT for asphalt binder content or mat density measurement is less than 60 percent as shown in Table 1.

3. If the nonconforming lot is accepted, a price reduction of 35 percent of the lot will be assessed.

4. The nonconforming lot will not be eligible for any incentive.

02740S – 8 of 22

Table 1

Incentive/Disincentive for Asphalt Binder Content, and Mat Density

PT Based on Min. Four Samples Incentive/Disincentive (Dollars/Ton) >99

96-99 92-95 88-91 84-87 80-83 76-79 72-75 68-71 64-67 60-63 <60

4.00 3.00 2.00 0.00 -0.50 -1.20 -1.90 -2.50 -3.20 -3.90 -4.50

Non-Conforming

Incentive/Disincentive for Gradation

PT Based on Min. Four Samples Incentive/Disincentive (Dollars/Ton) >99

96-99 92-95 88-91 84-87 80-83 76-79 72-75 68-71 64-67 60-63 56-59 52-55 <52

4.00 3.00 2.00 0.00 -0.50 -1.20 -1.90 -2.50 -3.20 -3.90 -4.50

-10.00 -20.00

Non-Conforming

Incentive/Disincentive for Longitudinal Joint Density

PT Based on Min Four Samples Incentive/Disincentive (Dollars/Ton) >99

96-99 92-95 88-91 84-87 80-83 76-79 72-75 68-71 64-67 60-63 56-59 52-55 <52

4.00 3.00 2.00 0.00 -0.50 -1.20 -1.90 -2.50 -3.20 -3.90 -4.50 -5.20

-10.00 Apply a $10 per ton penalty and overband the longitudinal joints on all lifts in the lot.

02740S – 9 of 22

Table 2

Upper and Lower Limit Determination

Parameter UL and LL

⅜ inch sieve for ½ inch Asphalt Mix No. 4 sieve for ⅜ inch Asphalt Mix

Target Value 6.0%

No. 8 sieve Target Value 5.0%

No.50 sieve Target Value 3.0%

No. 200 sieve Target Value 2.0%

Asphalt Binder Content Target Value 0.35%

In-Place Mat Density Lower Limit Target Value - 2.0% Upper Limit Target Value+3.0%

Longitudinal Joint Density Lower Limit Target Value - 2.0% Upper Limit Target Value + 5.0%

Table 3 Use the appropriate “number of tests” column and round down to the nearest value.

Quality Index Values (QU or QL) for Estimating Percent Within Limits

PU/PL n=3 n=4 n=5 n=6 n=7 n=8 n=10 n=12 n=15 n=20

100 1.16 1.50 1.75 1.91 2.06 2.15 2.29 2.35 2.47 2.56

99 1.16 1.47 1.68 1.79 1.89 1.95 2.04 2.09 2.14 2.19

98 1.15 1.44 1.61 1.70 1.77 1.80 1.86 1.89 1.93 1.97

97 1.15 1.41 1.55 1.62 1.67 1.69 1.74 1.77 1.80 1.82

96 1.15 1.38 1.49 1.55 1.59 1.61 1.64 1.66 1.69 1.70

95 1.14 1.35 1.45 1.49 1.52 1.54 1.56 1.57 1.59 1.61

94 1.13 1.32 1.40 1.44 1.46 1.47 1.49 1.50 1.51 1.53

93 1.12 1.29 1.36 1.38 1.40 1.41 1.43 1.43 1.44 1.46

92 1.11 1.26 1.31 1.33 1.35 1.36 1.37 1.37 1.38 1.39

91 1.10 1.23 1.27 1.29 1.30 1.31 1.32 1.32 1.32 1.33

90 1.09 1.20 1.23 1.24 1.25 1.25 1.26 1.26 1.27 1.27

89 1.08 1.17 1.20 1.21 1.21 1.21 1.21 1.21 1.22 1.22

88 1.07 1.14 1.16 1.17 1.17 1.17 1.17 1.17 1.17 1.17

87 1.06 1.11 1.12. 1.12 1.12 1.13 1.13 1.13 1.13 1.13

86 1.05 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08

85 1.03 1.05 1.05 1.05 1.05 1.04 1.04 1.04 1.04 1.04

84 1.02 1.02 1.02 1.01 1.01 1.01 1.00 1.00 1.00 1.00

83 1.00 0.99 0.98 0.97 0.97 0.96 0.96 0.96 0.96 0.96

82 0.98 0.96 0.95 0.94 0.94 0.93 0.93 0.92 0.92 0.92

81 0.96 0.93 0.92 0.91 0.90 0.90 0.89 0.89 0.89 0.88

02740S – 10 of 22

Table 3 Continued

PU/PL n=3 n=4 n=5 n=6 n=7 n=8 n=10 n=12 n=15 n=20

80 0.94 0.90 0.88 0.87 0.86 0.86 0.85 0.85 0.85 0.85

79 0.92 0.87 0.85 0.84 0.83 0.83 0.82 0.82 0.82 0.81

78 0.89 0.84 0.82 0.81 0.80 0.79 0.79 0.78 0.78 0.78

77 0.87 0.81 0.79 .0.78 0.77 0.76 0.76 0.75 0.75 0.75

76 0.84 0.78 0.76 0.75 0.74 0.73 0.72 0.72 0.72 0.72

75 0.82 0.75 0.73 0.72 0.71 0.70 0.69 0.69 0.69 0.68

74 0.79 0.72 0.70 0.68 0.67 0.67 0.66 0.66 0.66 0.65

73 0.77 0.69 0.67 0.65 0.64 0.64 0.62 0.62 0.62 0.62

72 0.74 0.66 0.64 0.62 0.61 0.61 0.60 0.59 0.59 0.59

71 0.71 0.63 0.60 0.59 0.58 0.58 0.57 0.56 0.56 0.56

70 0.68 0.60 0.58 0.56 0.55 0.55 0.54 0.54 0.54 0.53

69 0.65 0.57 0.55 0.54 0.53 0.52 0.51 0.51 0.51 0.50

68 0.62 0.54 0.52 0.51 0.50 0.50 0.48 0.48 0.48 0.48

67 0.59 0.51 0.49 0.48 0.47 0.47 0.46 0.45 0.45 0.45

66 0.56 0.48 0.46 0.45 0.44 0.44 0.43 0.42 0.42 0.42

65 0.53 0.45 0.43 0.42 0.41 0.41 0.40 0.40 0.40 0.39

64 0.49 0.42 0.40 0.39 0.38 0.38 0.37 0.37 0.37 0.37

63 0.46 0.39 0.37 0.36 0.35 0.35 0.35 0.34 0.34 0.34

62 0.43 0.36 0.34 0.33 0.33 0.33 0.32 0.31 0.31 0.31

61 0.39 0.33 0.31 0.30 0.30 0.30 0.29 0.29 0.29 0.28

60 0.36 0.30 0.28 0.27 0.26 0.26 0.25 0.25 0.25 0.25

59 0.32 0.27 0.25 0.25 0.24 0.24 0.24 0.23 0.23 0.23

58 0.29 0.24 0.23 0.22 0.21 0.21 0.21 0.21 0.21 0.20

57 0.25 0.21 0.20 0.19 0.19 0.19 0.18 0.18 0.18 0.18

56 0.22 0.18 0.17 0.16 0.16 0.16 0.16 0.16 0.15 0.15

55 0.18 0.15 0.14 0.14 0.13 0.13 0.13 0.13 0.13 0.13

54 0.14 0.12 0.11 0.11 0.11 0.11 0.10 0.10 0.10 0.10

53 0.11 0.09 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

52 0.07 0.06 0.06 0.05 0.05 0.05 0.05 0.05 0.05 0.05

51 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

02740S – 11 of 22

Table 4

Definitions, Abbreviations, and Formulas for Acceptance

Term Explanation

Target Value (TV) The target values for gradation and asphalt binder content are given in the approved mix design. See this Section, Article 1.6 for density target values.

Average (AVE) The sum of the lot’s test results for a measured characteristic divided by the number of test results–the arithmetic mean.

Standard Deviations (s)

The square root of the value formed by summing the squared difference between the individual test results of a measured characteristic and AVE, divided by the number of test results minus one.

Upper Limit (UL) The value above the TV of each measured characteristic that defines the upper limit of acceptable production.

(Table 2)

Lower Limit (LL) The value below the TV of each measured characteristic that defines the lower limit of acceptable production.

(Table 2)

Upper Quality Index (QU) QU = (UL - AVE)/s

Lower Quality Index (QL) QL = (AVE - LL)/s

Percentage of Lot Within

UL (PU)

Determined by entering Table 3 with QU.

Percentage of Lot Within

LL (PL)

Determined by entering Table 3 with QL.

Total Percentage of Lot Within UL and LL (PT)

PT = (PU + PL) – 100

Incentive/Disincentive Determined by entering Table 1 with PT or PL.

G. The Engineer may elect to accept material on visual inspection according to the MS&TR.

1. Incentives and disincentives are not applied to material accepted visually.

2. Tests may be performed to determine if the material and workmanship meets the project requirements.

PART 2 PRODUCTS

2.1 ASPHALT BINDER

A. Use performance graded binder, PG 76-34 Highly Modified Binder.

02740S – 12 of 22

B. Asphalt Material – Refer to Section 02745.

C. Use a minimum total asphalt binder content according to Table 5.

Table 5 Minimum Total Asphalt Binder Content

Combined Aggregate Bulk Specific Gravity

Including Lime (Gsb)

1/2 Inch Mix, Minimum Asphalt Binder Content %*

3/8 Inch Mix, Minimum Asphalt Binder Content %*

2.375 - 2.424 6.7 6.8

2.425 - 2.474 6.6 6.7

2.475 - 2.524 6.5 6.6

2.525 - 2.574 6.4 6.5

2.575 - 2.624 6.3 6.4

2.625 - 2.674 6.2 6.3

2.675 - 2.724 6.1 6.2

> 2.724 6.0 6.1

* Percent of total mix.

2.2 AGGREGATE

A. Crusher produced virgin aggregate material consisting of crushed stone, gravel, or slag.

B. Refer to Table 6 to determine the suitability of the aggregate.

1. Coarse aggregates

a. Retained on No. 4 sieve, AASHTO T 27

2. Fine aggregates

a. Clean, hard grained, and angular

b. Passing the No. 4 sieve, AASHTO T 27

C. Meet the gradation requirements in Table 7. (AASHTO T 11, AASHTO T

27)

02740S – 13 of 22

Table 6

Aggregate Properties

Test Method Test No. Criteria

One Fractured Face AASHTO T 335 95% minimum

Two Fractured Faces AASHTO T 335 90% minimum

Fine Aggregate

Angularity

AASHTO T 304 45% minimum

Flakiness Index UDOT MOI 933 (Based on ⅜ inch sieve and above)

17% maximum

L.A. Wear AASHTO T 96 35% maximum

Sand Equivalent AASHTO T 176, alternate method 2, pre-wet method (test the sample in the wet condition).

60 minimum

Plasticity Index AASHTO T 89 and T 90 0

Unit Weight AASHTO T 19 75 lb/ft3 minimum

Polishing AASHTO T 278 and T 279 31 minimum

Soundness (sodium sulfate)

AASHTO T 104 16% maximum loss with five cycles

Clay Lumps and

Friable Particles

AASHTO T 112 2% maximum

Natural Fines N/A 0%

Table 7

Aggregate Gradations (Percent Passing by Dry Weight of Aggregate)

Sieve Size ½ inch ⅜ inch

Control Sieves ¾ inch 100.0

½ inch 90.0 – 100.0 100.0

⅜ inch < 90 90.0 - 100.0

No. 4 < 90

No. 8 28.0 - 58.0 32.0 - 67.0

No. 200 2.0 – 10.0 2.0 – 10.0

02740S – 14 of 22

2.3 ADDITIVES, STABILIZERS

A. Hydrated Lime:

1. Meet the requirements of Section 02746.

B. Warm Mix Asphalt (WMA) Additive:

1. Use a Warm Mix Asphalt (WMA) admixture listed and compliant with AASHTO Product Evaluation and Audit Solutions showing:

a. No change in the PG grade range compared to the control.

b. No decrease in TSR results compared to the control.

C. Notify the Engineer of all changes to additives and dosages that vary from the current mix design.

2.4 RECYCLED ASPHALT PAVEMENT (RAP)

A. RAP may be used at the Contractors option.

B. Do not adjust the asphalt binder grade.

C. Do not use more than 15 percent RAP.

D. RAP aggregate is required to meet Table 6 with the exception of the Sand Equivalent. Refer to AASHTO T 176.

2.5 VOLUMETRIC MIX DESIGN

A. Perform Superpave Volumetric Mix Design according to UDOT Materials Manual of Instruction and the following:

1. Incorporate hydrated lime into all designs. Refer to Section 02746.

2. Comply with Table 8 and Table 9.

Table 8

Volumetric Design Gyrations

Compaction Parameters Voids Filled with

Asphalt

(VFA) (%)

Ninitial /% of Gmm*

Ndesign /% of Gmm*

Nmax /% of Gmm*

3 / 91.5 50 /≥ 99.0 75 / 100.0 90.0 – 95.0

* Gmm: Theoretical maximum specific gravity of the mix.

Refer to AASHTO T 209.

02740S – 15 of 22

Table 9

Mix Design Requirements

Asphalt Mix design mixing and compaction temperatures

Provided by the approved mix design

Dust Proportion Range 0.6 - 1.40

Voids in Mineral Aggregate (VMA) at Ndesign AASHTO R 35.9.2 using Gsb Oven Dry.

Equation based on percent of total mix.

15.0% - 17.0% for ½ inch

16.0% - 18.0% for ⅜ inch

Air voids at Ndesign 1.00% maximum

Voids Filled Asphalt (VFA) at Ndesign 90.0% – 95.0%

Hamburg Wheel Tracker

AASHTO T 324

UDOT MMOI 990, Slab and or puck air voids 3.5 – 4.5%; must be able to pass with or without any chemical or warm mix additive

Water temperature: 54⁰ C

< 7.0 mm at 20,000 Passes

No visible stripping during the test as in dirty water or visible stripping inflection point.

Draindown (AASHTO T 305) 0.3% maximum

2.6 CONTRACTOR INITIATED CHANGES TO MIX DESIGN

A. The Engineer performs up to two volumetric mix design verifications per project, per mix design.

1. The Engineer deducts $3,000 from contractor payments for each additional laboratory or field verification required, including all laboratory or field volumetric mix design verifications required due to contractor-initiated target changes.

B. The Engineer may allow two minor target changes to the most current verified mix design per project, per mix design.

1. The Engineer charges the contractor $1,000 for each additional minor target change.

2.7 TACK COAT

A. Refer to Section 02748.

2.8 RELEASE AGENTS

A. Use a product listed and compliant with AASHTO Product Evaluation and Audit Solutions showing no stripping in the 7-day stripping test according to AASHTO T 383 in either the full-strength or diluted product.

02740S – 16 of 22

2.9 ASPHALT POLYMER TREATMENT

A. Refer to Section 02790S.

PART 3 EXECUTION

3.1 HIGHLY-MODIFIED ASPHALT MIX

A. Use a UDOT-qualified asphalt mix plant, according to our Materials Quality Management Plan.

B. Dry aggregate to an average moisture content of not more than 0.2 percent by weight.

1. Verify by AASHTO T 255.

2. Adjust burners to avoid damage or soot contamination of the aggregate.

C. Treat aggregate with hydrated lime. Refer to Section 02746.

1. Method A or B

D. Coat with asphalt binder 100 percent of the particles passing the No. 4 sieve, and 98 percent of the particles retained on the No. 4 sieve.

1. Verify by AASHTO T 195.

2. Discontinue operation and make necessary corrections if material is not properly coated.

E. Maintain temperature of the Asphalt Mix between the limits identified on the Volumetric Mix Design Verification Letter for mixing and compacting.

1. Materials heated over the identified limits are non-conforming.

2. Remove all non-conforming materials.

3.2 ASPHALT MIX PLANT

A. Provide the following:

1. Positive means to determine the moisture content of aggregate on a daily basis.

2. Positive means to sample all material components.

3. Sensors to measure the temperature of the Asphalt Mix at discharge.

4. The ability to maintain discharge temperature of the mix according to the mix design.

B. Asphalt Binder Storage Tanks

1. Provide a positive means for separating and identifying asphalt grades when multiple products are used in mix production.

02740S – 17 of 22

2. Provide a positive means of determining the quantity of material in the tank at any time.

3. Provide…