AM26-54 Pre-Built Plug-and-Play Dry Cabin
Solicitation number
AM26-54
Issued by
Utah

About this file

This is a Scope of Work document for an Invitation for Bid (IFB) issued by the State of Utah Division of Purchasing on behalf of the Division of State Parks for the procurement and delivery of one fully finished, "dry" pre-built cabin designated AM26-57. The cabin must be a turn-key structure with dimensions of 12' to 14' wide by 20' to 30' in length, designed to accommodate 5-6 person sleeping capacity with an integrated front covered porch and single entry door. The structure must feature a center pitch metal roof in green, wood siding with mid-to-dark tone stain on the exterior, and a fully finished interior with light-toned wood siding. The cabin requires full insulation suitable for mid-altitude climates, a wall-mounted HVAC unit (PTAC or Mini-split) pre-installed and wired, standard electrical panel with dedicated outlets, and LED interior lighting. No bathroom or plumbing fixtures are required. The project includes professional transport and precision placement on a prepared pad, with delivery completion required no later than June 20, 2026. A mandatory site visit is not required, and the award will be made to the lowest cost responsive and responsible vendor.

The procurement methodology is lowest cost, and vendors must guarantee pricing through project completion. Pad preparation consisting of gravel or concrete will be completed by the end user prior to delivery. The cabin must meet or exceed Utah Mountain Zone snow load requirements of a minimum 90+ lbs/sq. ft. for Wasatch County, ensuring structural compliance with regional environmental conditions. The scope specifies an open floor plan to accommodate bunks or lofts and includes a dedicated kitchenette area with space for a small refrigerator and microwave, with exterior junction box or pylon connection for plug-and-play site setup.

View the file

Other files

File Type Posted
2-Attachment A-PO Terms and Conditions.docx DOCX document
1-Vendor Prerequisites - IFB Agency.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B-Scope of Work:

AM26-57 Pre-Built Plug-and-Play Dry Cabin

1. Project Overview The objective is the procurement and delivery of one (1) fully finished, "dry" pre-built cabin. The unit must be delivered as a turn-key structure ready for immediate electrical hookup upon placement.

2. Structural Dimensions & Layout

· Footprint: 12’ – 14’ Wide x 20’ – 30’ Total Length.

· Entry: Single front entry door.

· Porch: Integrated front covered porch (included in total length).

· Occupancy: Interior layout optimized for 5–6 person sleeping capacity.

· Roof: Center pitch metal roof, Green in color.

· Engineering: Structure must meet or exceed Utah Mountain Zone snow load requirements minimum 90+ lbs/sq. ft. for Wasatch County.

3. Exterior Specifications

· Siding: Wood siding with a Mid-to-Dark tone stain.

· Roofing: Insulated metal roofing system.

· Lighting: Weatherproof exterior porch lighting installed near entry.

· Windows: Energy-efficient windows placed to maximize natural light while allowing for bed/furniture placement.

4. Interior Specifications

· Finish: Fully finished interior with Light-toned wood siding (e.g., Pine or Whitewash finish).

· Insulation: Full floor, wall, and ceiling insulation suitable for mid-altitude climates.

· HVAC: Wall-mounted all-in-one HVAC unit (PTAC or Mini-split) pre-installed and wired.

· Floor Plan Requirements:

· Open floor plan to accommodate beds (bunks/lofts) for 5–6 people.

· Dedicated area for a small "kitchenette" footprint (space for a small fridge and microwave).

· No bathroom or plumbing fixtures required.

5. Electrical Requirements

· System: Standard for HVAC load electrical panel.

· Outlets: Standard interior power supply layout, including dedicated outlets for the fridge and microwave areas.

· Lighting: Standard interior overhead LED lighting.

· Connection: Exterior junction box or pylon for "plug-and-play" site connection.

6. Delivery & Logistics

· Preparation: Pad preparation (gravel/concrete) will be completed by the End User.

· Delivery: Must include professional transport and precision placement on the prepared pad.

· Deadline: Delivery must be completed and site-set no later than June 20, 2026.