3-Attachment 10 Conceptual Design Documents and Narrative.pdf
PDF 27 MB Posted
- Solicitation number
- Solicitation119
- Issued by
- Hennepin County, Minnesota
About this file
This is a conceptual design document and request for qualifications (RFQ) for the 2027 Terminal 1 Boiler and Chiller Replacement and Energy Management Center (EMC) Expansion project at Minneapolis-Saint Paul (MSP) International Airport, managed by the Metropolitan Airports Commission (MAC). The project encompasses the demolition of the existing EMC structure, which has operated since approximately 1962 and currently serves over three million square feet of conditioned building space at Terminal 1, and the construction of an expanded EMC facility with modernized heating and cooling generation systems. The scope of work includes upgrades to the existing steam boiler plant, complete replacement of the chilled water plant, installation of an industrial heat-recovery chiller system, a new heating-water distribution system, and potential installation of a geothermal system with approximately 28 wells located north of Runway 12L/30R. Additionally, the project involves deconstruction of approximately 183,400 square feet of existing concourse space and construction of approximately 309,990 square feet of new concourse facilities, including gate holds, food and beverage areas, restrooms, mechanical and electrical spaces, and exterior envelope systems. The mechanical, electrical, plumbing, fire protection, communications, and security systems scopes are anticipated to be comprehensive, with schematic design commencing in Quarter 2, 2026.
The project is currently in the concept design phase with the attached materials representing preliminary design documentation for heating and cooling systems intended to serve all of Terminal 1 through 2050. The document presents three design options (Option 1, Option 2A, and Option 2B) for the EMC expansion with varying programmatic layouts and spatial configurations across multiple levels, including basement, boiler, chiller, main, roof, and penthouse levels. The new concourse will feature composite wide flange floor framing and load-bearing concrete shear walls for lateral resistance, while utility services and airport operations are expected to remain uninterrupted during construction through phasing strategies and temporary equipment. The project includes airside and landside utility rerouting, jet bridge modifications, mechanical penthouse reconstruction, and critical electrical infrastructure relocation. Haul routes, construction access points, and horizontal and vertical control points are identified in the design documents, with primary construction access via Gate #121 and an alternate route via Gate #269. The materials are provided as exhibits to the RFQ package for Construction Manager at Risk (CMAR) procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2027 Terminal 1 Boiler and Chiller Replacement and EMC Expansion Project Description – RFQ draft
Airport description
MSP Terminal 1’s central utility plant, called the Energy Management Center (EMC), began operating approx.
1962 and serves more than three million square feet of conditioned building space at Terminal 1: the terminal head house, all concourses, various support buildings, and parking structures. EMC houses the main heating and cooling generation and distribution systems for the campus. These existing systems are a high-pressure steam boiler plant for heating and a water-cooled chiller for air conditioning. Once generated within the EMC, both critical utilities are distributed through a vast network of piping to mechanical equipment rooms and penthouses distributed across the terminal providing heating, cooling, as well as domestic water heating.
These systems are not without substantial age, and their continued operations no longer align with long-term Owner goals. Over the decades, Concourse C expanded entirely surrounding the original EMC structure constraining renovation and growth. This project will demolish the existing EMC structure and adjacent concourse areas and construct an expanded EMC, air service gates and support areas providing a modernized and adaptable central utility plant and improved air service for MSP.
Both the concourse and the EMC are currently primarily independent structures of one another. The EMC itself has multiple partial levels that limit daily operations and severely constrain potential modernization.
Concourse C wraps around the EMC limiting large equipment and renovation access to the plant. Adjacent concourse areas also have multiple levels and cramp hold rooms that restrict air service and complicate daily airport operations. The EMC project intends to dismantle the existing structures and construct a new, larger EMC facility in its current location with larger floor areas, taller vertical clearances, improved circulation for daily operations and occasional large capital improvements. Concourse C areas will be rebuilt with optimized gate hold spaces, improved food and beverage areas, and restrooms, replanned apron operations, airline support spaces, and renovations affecting a landside service road.
The existing EMC building foundation consists of a combination of drilled piers and concrete columns on spread footings, both supported by bedrock. Perimeter concrete and masonry basement walls are constructed integrally with the boiler and chiller level concrete framing systems on which steel framing for subsequent levels is supported, with lateral support provided by steel braced frames. The surrounding Concourse C floor framing consists of non-composite steel joists and composite wide flange beam framing, with both non-composite beam and joists at roof levels. The existing lateral systems include both steel moment frames, and steel braced frames. Composite wide flange floor and non-composite wide flange steel roof framing is proposed for the expanded Concourse and EMC, with load bearing concrete shear walls providing lateral resistance and separation between Concourse and EMC spaces.
MEP-AV/IT PROJECT SCOPE DESCRIPTION
Overall, the intent of this project is to upgrade and reuse the existing boiler infrastructure and replace the entire chilled water plant. The area for the boiler system within the existing EMC is intended to remain and continue to be utilized as the “boiler plant”. An expansion of the EMC is planned to house a new chiller plant.
As mentioned previously, this expansion is intended to be built around the existing EMC, with the aim that the existing systems within the EMC may remain online to some extent during new construction. This includes continued use of the central plant's existing electrical infrastructure during the expansion. As the new EMC is constructed, utility services and airport operations are expected to remain uninterrupted. Maintaining consistent operations may require phasing, temporary equipment, or a combination of both.
The new EMC scope of work is anticipated to include improvements to the existing steam boiler plant, an entirely new chilled-water plant, and an industrial heat-recovery chiller system to produce chilled and heated water simultaneously. In addition to construction within and around the existing EMC for the described systems, a new heating-water distribution system will be constructed, as part of this project, to make beneficial use of the heating water produced by the heat-recovery chiller system. A geothermal system in conjunction with the aforementioned systems is also under consideration With this understanding, the fire protection, plumbing, and mechanical portions of the project are anticipated to include the following within the project area:
a. Fire Protection:
i) Fire protection demolition
ii) Main fire sprinkler service entrances and fire risers.
iii) Sprinkler system installation
b. Plumbing:
i) Plumbing demolition.
ii) Domestic cold-water service(s) and distribution.
iii) Domestic hot water generation and distribution.
iv) Sanitary drain, waste, and vent systems
v) Internal storm drainage.
vi) Plumbing piping and fixture installation
vii) Compressed air generation and distribution within the EMC.
viii) Water treatment systems (chemical treatment, softened water, etc.) required for the new EMC plant systems.
ix) Natural gas distribution systems within the EMC and on the roof of the concourse.
x) Heating oil (Jet A) distribution systems within the EMC.
c. Mechanical:
i) Demolition of existing HVAC systems.
(1) Demolition of existing and construction of new gate hold, concourse, and tenant spaces will require the installation of temporary HVAC systems to ensure existing spaces not directly within the project construction area can remain functional.
ii) Demolition of existing boiler #4 in the EMC.
iii) Demolition of the existing steam boiler feedwater system within the EMC.
iv) Demolition of all existing chilled water system infrastructure within the existing EMC.
v) Installation of HVAC systems for new gate hold, concourse, and tenant spaces. Gate hold and concourse spaces may use displacement ventilation. Tenant spaces are expected to be a traditional mixed-forced-air system.
(1) The above will require HVAC construction to account for the removal of the penthouse immediately west of the EMC and the raising of the floor of the penthouse immediately east of the EMC. For the west penthouse, the existing air-handling equipment is to be removed and reinstalled in a new location, For the east penthouse, a new air handling unit is planned to replace the existing unit.
vi) Installation of HVAC systems for the new EMC, which will include HVAC systems for program spaces, plant floor, and boiler system combustion air.
vii) Installation of a new steam feedwater system, which is anticipated to include two (2) deaerators and feedwater pumping skids installed in the existing location of boiler #4.
viii) Upgrades to the condensate surge tank and condensate transfer pumping system may be required.
ix) Installation of a new EMC chiller plant, which is anticipated to include:
(1) Traditional water-cooled chillers
(2) Heat recovery chillers to simultaneously produce chilled water and 160F heating water
(3) Cooling tower system
(4) Chilled water pumping system
x) Installation of a new heating water distribution system to make use of the heating water produced from the new heat recovery chillers. This will include heating water pumping and piping within the EMC and distribution piping within T1. This will also include installation of building and domestic hot water heat exchangers in or near existing mechanical rooms within T1.
The total scope of the T1 distribution piping and heat exchanger installations has not yet been determined.
xi) Potential for the installation of an aquifer based geothermal system for use with the new EMC chiller plant. Whether or not this will be included in the project along with the system’s capacity and location have not yet been determined
The new electrical, communications, safety, and security systems within the project area will be constructed as part of the project. The current electrical system consists of 13.8kV main power fed from the electrical utility into the EMC. The utility voltage is then transformed to both 4160V and 480V (and below) for use within the EMC. The electrical, communications, safety, and security systems project scope is anticipated to include:
a. Electrical:
i) Demolition of existing electrical systems, including relocation of existing infrastructure to remain.
ii) Installation of power distribution systems.
(1) Two new 13.8kV service entrance locations, each with two 13.8kV service laterals. Gear configured in main-tie-tie-main set-ups. The gear may or may not include a central bus for on-site energy production equipment.
(2) 5kV distribution at the EMC. Gear configured in the main-tie-tie-main set-up.
(3) 600V distribution at the EMC. Gear configured in the main-tie-tie-main set-up.
(4) 600V distribution at the concourse, gate hold, and tenant spaces.
iii) Installation of lighting and lighting control systems, including emergency lighting.
iv) Installation of back-up power systems (including optional stand-by and emergency).
(1) This may or may not include the installation of generators.
v) Installation of convenience and equipment power outlets/connections.
(1) UPS for communication equipment.
(2) Master control center.
(3) General convenience receptacles.
(4) Technology displays and computer receptacles.
(5) Mechanical system equipment connections (motors, control panels, etc.).
(6) Elevator connections.
(7) Motor-operated door connections.
(8) Illuminated signage connections.
(9) Electrochromatic glass connections (if applicable).
(10) Furniture power receptacles.
vi) Installation of lightning protection system modifications and new lightning protection.
vii) Installation of grounding systems (including counterpoise).
b. Electronic Communication Systems (Division 27) is anticipated to include the following:
i) Telecommunications room buildouts
(1) Passive network equipment, including plywood backing, racks, cable runway, patch panels, etc.
(2) Rack-mounted ATS and PDU.
(3) Servers and switches are expected to be Owner-provided.
ii) Structured cabling distribution
(1) Backbone cabling distribution to new telecommunications rooms
(2) Horizontal Ethernet cabling distribution to work with outlets, equipment, and wireless access points (WAP)
(3) Horizontal POTS distribution, including punch down blocks.
(4) Wireless access point cabling.
(5) Cabling pathways (cable tray, conduits, boxes, etc.)
iii) Public address system.
(1) Modifying and extending the existing system.
iv) Assisted listening system
(1) Induction loop system at the concourse and gate area.
v) Distributed antenna system
(1) Extending the Verizon distributed antenna system throughout the EMC.
vi) Digital signage
(1) Displays and digital signage in the Master Control room.
(2) Concourse EVIDS system.
c. Electronic Safety and Security Systems (Division 28) to include:
i) Fire alarm system
(1) Modify and extend the system.
ii) Electronic access control and door monitoring system (SAACS)
iii) Emergency responder communication enhancement system (ERCES)
iv) Video surveillance system
These fire protection, plumbing, mechanical, electrical, communications, safety and security improvements will greatly improve the overall efficiency, sustainability, and operational resiliency of the T1 and create a project in alignment with long-term Owner goals.
The concourse work will include deconstruction of approximately 183,400 SF of existing steel framed concourse, excavation of regions under the existing concourse, landside utilities adjacent to the project area, replanning and construction of apron operations adjacent to the concourse construction area including:
aircraft parking, GSE parking and charging areas, passenger boarding bridges and fixed links. The proposed concourse consists of approximately 309,990 SF of construction will include service bays and enclosed parking, tenant spaces, food and beverage spaces, restrooms, mechanical and electrical spaces, gate holds, concourse corridors, vertical transportation, stairs and ramps, food and beverage, exterior envelope and curtain wall, interior storefront systems, a/v and SAACS, and roofing.
Expansion and modernization of EMC will require multiple efforts including enabling work, expanding the EMC and concourses, and new hot water and heat recovery distribution networks. Enabling work may include interior renovations to improve serviceability of several existing gates, replanning their apron areas and rerouting airside utilities, including fuel lines, tanks and pits, watermain, electrical and communication duct banks, and storm sewer, and will likely include tenant relocations to temporary and permanent offices. The work will also require jet bridge modifications including installing new foundations, installing fixed walkways, and relocating or replacing existing aircraft jet bridges. The EMC and concourse expansions will require landside utility rerouting, phased deconstruction and reconstruction of areas of the base building, structural reinforcement, maintaining existing steam and chilled water system operation throughout construction, construction of mechanical, electrical, and plumbing systems, reconstruction of mechanical penthouses and relocation of critical electrical infrastructure. Distribution work will include selective interior and exterior renovations affecting operating spaces to distribute the new heating water systems.
The Terminal 1 Boiler and Chiller Replacement and EMC Expansion Project pre-design effort has validated MAC operations goals through 2050 and begun preliminary design for heating and cooling systems intended to serve all of Terminal 1. Concept design for the project proceeds currently with Schematic Design commencing Quarter 2, 2026. Materials are attached as Exhibit ___. Scope and quality represented are under development.
Geothermal Text
The proposed airside geothermal system will include approximately 28 wells—21 in one area and 7 in another—located north of Runway 12L/30R within the air operations area. Each well site will require a structure housing the electrical and mechanical equipment for the well pumps, and both locations will require 13.8 kV power service.
Connecting the well sites to the EMC will require roughly 6,700 feet of trenching for the installation of HDPE piping with inside diameters ranging from 12 to 24 inches. Additionally, four 30 inch steel casings must be horizontally bored beneath Runway 12L/30R for approximately 300 feet to allow piping to cross between the well sites and the EMC.
General Technical Facility Descriptions. To be included for RFQ if requested.
The existing EMC building foundation consists of a combination of drilled piers and concrete columns on spread footings, both supported by bedrock. Perimeter concrete and masonry basement walls are constructed integrally with the boiler and chiller level concrete framing systems on which steel framing for subsequent levels are supported, with corrugated metal and asbestos siding, and a combination of built-up bituminous and adhered thermoplastic membrane roof systems. Concourse C is a steel frame building on drilled piers to bedrock with insulated metal panel siding, built-up roof, and in some places laterally supported to the EMC.
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
12/09/25
RFQ PACKAGE
TITLE
SCALE: NTS
Northeast Perspective
SCALE: NTS
02/03/2026
RFQ PACKAGE
RFQ PACKAGE
TITLE
SCALE: NTS
Center Perspective
SCALE: NTS
02/03/2026
RFQ PACKAGE
TITLE
SCALE: NTS
Northwest Perspective
RFQ PACKAGE
TITLE
SCALE: NTS
Northwest Perspective
RFQ PACKAGE
TITLE
SCALE: NTS
Northwest Perspective
RFQ PACKAGE
TITLE
SCALE: NTS
Northwest Perspective
RFQ PACKAGE
TITLE
SCALE: NTS
Northwest Perspective x0.0012/09/25
RFQ PACKAGE
TITLE
SCALE: NTS
TKDA - LOCATION PLAN & AIRSIDE HAUL ROUTE
SCALE: AS SHOWN
02/04/2026
NATIONAL CEMETERY
SNELLING
LAKE
GUN CL
LAKE
PRIMARY
HAUL ROUTE
ARFF STATION
NO.1
AIRSIDE
HAUL ROUTE
RUNWAY 12R-30L
East 66th Street
TAXIWAY A
RUNWAY 4-
TAXIW
AY M
TE
RM
IN
AL
Service Road W
Service R oad L
Service R oad K
TW
Y
W
TA
XI
W
AY
Y
R U
N W
AY 17-35
TAXIW
AY L
TAXIW
AY K
East 70th Street th
A ve
. S o.
T2 A
PRON
Serv ice
R oa d M
TAXIWAY S
TAXIWAY S
Serv ice
Roa d D
C ed ar A ve nu e / S ta te
H w y
Lo ng fe llo w A ve nu e
Infield Apron
RUNWAY 12L-30R
TAXIW
AY M
TAXIW
AY DTAXIW
AY C
TAXIW
AY C
TAXIW
AY D
Signature Apron
Y B
TAXIWAY B
TERMIN
AL 2
TAXIWAY W
TAXIWAY W
TAXIWAY A
Post Road
Inbound Roadway
Blue ParkingRamp
Red ParkingRamp
Concourse C GreenParkingRamp
Gold ParkingRamp
PostOffice
Apron Roadway
No rth we st
D riv e
Outbound Roadway
Runway 30R Deicing Pad
State H w
y. 5 (W estbound)
State Hwy. 5 (Eastbound)
Apron Roadway
Delta
Service R oad L
I-494 (Westbound) I-494 (Eastbound)
77th Street
TWY M6
TWY C6
RUNWAY 12R-30L
TAXIWAY Q
Delta
TKDA-154
PRIMARY CONSTRUCTION
ACCESS GATE #121
PROJECT
LOCATION
Chipotle
Depot
Target
ALTERNATE CONSTRUCTION
ACCESS GATE #269 ALTERNATE
HAUL ROUTE
Concourse G
Silver ParkingRamp
TKDA-71
HORIZONTAL AND VERTICAL CONTROL POINTS
POINT
DESCRIPTION
COORDINATES
ELEVATION DESCRIPTION
NORTH EAST
TKDA-71 133046.124 548422.250 815.830 BRASS DISK STAMPED
TKDA-71
TKDA-154 134410.726 546077.004 820.388 BRASS DISK STAMPED
TKDA-154
MSP A 138379.050 541516.099 848.417 MNDOT FLANGED
ENCASED ROD
NOTE: MSP HORIZONTAL CONTROL COORDINATE SYSTEM
IS BASED UPON NAD83 (2007) GEOID 09.
HENNEPIN COUNTY (GRID)
GPS NTRIP DATA SOURCE: MNVRS, CMRX-NAD83 (NSRS 2007)
DATUM NOTE:
ELEVATIONS SHOWN ON THIS PLAN DIFFER FROM THE BUILDING VERTICAL DATUM BY APPROXIMATELY ONE (1)
INCH.
AN EXAMPLE OF THE RELATIONSHIP BETWEEN THE "BUILDING" VERTICAL DATUM AND THE "HENNEPIN COUNTY"
VERTICAL DATUM IS AS FOLLOWS:
"HENNEPIN COUNTY" VERTICAL DATUM ELEVATION OF 823'-09" = "BUILDING" VERTICAL DATUM ELEVATION OF 823'-10". CONTRACTOR TO COORDINATE VERTICAL DATUMS. COORDINATE WITH CIVIL DRAWINGS.
NORTHSCALE IN FEET
0 250 500 1000 p1.1002/11/2026
RFQ PACKAGE
EXTERIOR AXON VIEW - EXISTING
p1.1102/11/2026
RFQ PACKAGE
EXTERIOR AXON VIEW - PROPOSED
C47C48C49C50C51C52C53C54C55C56C57C58C59C60C61C62C63C64C65C66C67C68C69C70C71C72C73C74C75C76C77
CMU VENEER
CURTAIN WALL
INSULATED MTL PANEL
CLEARSTORY
SKYLIGHT BEYOND
PENTHOUSE BEYOND
CMU VENEER WAINSCOTT
INSULATED MTL PANEL
SOLAR SHADE AT CURTAIN WALL
CAST STONE PILASTER
EAA EB DAA DBB DB DC DCC CUC.XXXX C.XXX C.XX C.X
CLEARSTORY
SKYLIGHT
CMU VENEER
INSULATED METAL PANEL
CURTAIN WALL
CJCMCQCRCTCUCV C.XXXXC.XXXC.XXC.X
CLEARSTORY
CMU VENEER
CURTAIN WALL
INSULATED MTL PANEL
PENTHOUSE BEYOND
OVERALL EXTERIOR ELEVATION - EAST
0' 10' 20' 40'
SCALE: 1"=20'-0"
OVERALL EXTERIOR ELEVATION - NORTH
0' 10' 20' 40'
SCALE: 1"=20'-0"
OVERALL EXTERIOR ELEVATION - WEST
0' 10' 20' 40'
SCALE: 1"=20'-0"
27 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
RFQ PACKAGE
01/28/2026
OVERALL EXTERIOR ELEVATIONS
SCALE: AS SHOWN
01/28/2026
OVERALL EXTERIOR ELEVATIONS
SCALE: AS SHOWN
OVERALL EXTERIOR ELEVATIONS
PROGRAMMING -
SCALE: 1" = 30'-0"
SCALE: AS SHOWN
01/28/2026
RFQ PACKAGE
TITLE
SCALE: NTS
TKDA - CONCOURSE C PROPOSED LAYOUT
SCALE: AS SHOWN
02/04/2026
STOP
STOP
C12 C11C3 C4
C9
C6 C7
C5
C8 C10
C13
C6 C7 C8
C9 C10
C11 C12
C5 C4
C3
C7 C8 C9 C10 C11
C12 C13
C4 C5
C6
15' 15'
15'
15' 15'
15' 15'
15' 15'
5'
TY
P
15'
15'
32.5'
32.5'
EXISTING C12
DOOR 'C12-A'
THRESHOLD = 833.7
EXISTING C5
DOOR 'C5-A'
THRESHOLD = 829.2
EXISTING C4
DOOR 'C4-A'
THRESHOLD = 829.2
C12: NEW A3-58/110 PBB
ROTUNDA ELEV: 828.12
PVMT ELEV: 817.98
Δ = 10.14'
C11: NEW A3-58/110 PBB
ROTUNDA ELEV: 829.85
PVMT ELEV: 817.62
Δ = 12.23'
C10: REUSE A3-60/119
PBB
ROTUNDA ELEV: 829.85
PVMT ELEV: 816.93
Δ = 12.92'
C9: NEW A3-60/119 PBB
ROTUNDA ELEV: 829.85
PVMT ELEV: 816.80
Δ = 13.05'
C8: REUSE A3-60/119
PBB
ROTUNDA ELEV: 829.85
PVMT ELEV: 817.40
Δ = 12.45'
C7: REUSE A3-60/119
PBB
ROTUNDA ELEV: 828.29
PVMT ELEV: 817.82
Δ = 10.47'
C6: REUSE A3-64/131
PBB
ROTUNDA ELEV: 829.85
PVMT ELEV: 818.40
Δ = 11.45'
C5: NEW A3-58/110 PBB
ROTUNDA ELEVATION: 828.91
PVMT ELEVATION: 818.94
Δ = 9.97'
C4: NEW A3-58/110 PBB
ROTUNDA ELEVATION: 829.20
PVMT ELEVATION: 819.53
Δ = 9.67'
737 MAX 10 737 MAX 10
737 MAX 10 737 MAX 10 737 MAX 10
737 MAX 10 737 MAX 10 737 MAX 10 737 MAX 10
737 MAX 10
A320
BUILDING EXPANSION
FFE = 833.7'
EX
.4 7%
2.
0%
2.
0%
0.
5%
0.
5%
0.0%
0.0%
8.0%
FWW LANDING ELEV: 829.85
PVMT ELEV: 817.99
Δ = 11.86'
19.5'
FWW LANDING ELEV: 829.72
PVMT ELEV: 818.54
Δ = 11.86'
FWW LANDING ELEV: 829.20
PVMT ELEV: 819.85
Δ = 9.35'
FWW LANDING ELEV: 829.06
PVMT ELEV: 819.42
Δ = 9.64'
CONCOURSE C
Apron Roadway
TAXIWAY Q
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
A320-200
A320-200
F Fo
NORTHSCALE IN FEET
0 20 40 80
TITLE
SCALE: NTS
ESTIMATE PACKAGE
p2.XX
DISTRIBUTION ROUTING INFORMATION
PROPOSED DISTRIBUTION ROUTE AT ROOF
LEVEL OF C-G CONNECTOR IN AN UNUSED
SERVICE SPACE ORIGINALLY PLANNED FOR
BHS INSTALLATION. AREA IS STRUCTURED FOR
EQUIPMENT WEIGHT AND CLEAR OF MEP
CONFLICTS WITH CONCRETE FLOOR.
DISTRIBUTION RUN, EAST OF C-G
CONNECTOR, NOT YET SURVEYED.
PROPOSED DISTRIBUTION ROUTE,
WEST OF C-G CONNECTOR, TO BE AT
ROOF LEVEL, NOT YET SURVEYED
PROPOSED DISTRIBUTION ROUTE,
WEST OF EMC, TO BE AT GROUND
LEVEL, ABOVE 'D' STREET, THROUGH
EXPANSION OF EXTERIOR SOFFIT.
FURTHER COORDINATION WITH
EXISTING SYSTEMS TO BE CONDUCTED.
PROPOSED DISTRIBUTION ROUTE,
SOUTH OF CONCOURSE C TO TERMINAL
1 TO BE AT ROOF LEVEL, ON WEST SIDE
OF MECH. PENTHOUSES.
EXTENT OF ROUTE NOT YET SURVEYED.
PROPOSED DISTRIBUTION ROUTE,
ACROSS TERMINAL 1 (N-S) TO BE AT
MEZZANINE LEVEL.
FULL EXTENT OF ROUTE NOT YET SURVEYED.
PROPOSED DISTRIBUTION ROUTE, WEST OF
C-G CONNECTOR, TO BE AT GROUND LEVEL,
ABOVE 'A' STREET, THROUGH INTERGRATION
WITH 2024 G-INFILL PROJECT.
PROPOSED DISTRIBUTION ROUTE, AT
SOUTH END OF C-G CONNECTOR, TO
TURN DOWN VERTICALLY TO GROUND
LEVEL, PER COORDINATION WITH 2020
G-INFILL PROJECT EXTENT AND ROOMS.
PROPOSED DISTRIBUTION ROUTE,
AT WEST END OF CONCOURSE G,
TO TURN UP VERTICALLY TO ROOF LEVEL.
FULL EXTENT OF ROUTE NOT YET SURVEYED.
PROPOSED DISTRIBUTION ROUTE,
FROM TERMINAL 1 TO CONCOURSE E AND
TO CONCOURSE F, TO BE AT ROOF LEVEL.
EXTENT OF ROUTE NOT YET SURVEYED.
DN
F E
DN
F E
F E F E
FEFE
F E
FEF
E
FE
F E
F E
R E
F
FE F
E
F E
FE
FE FE
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C65 C66 C67 C68 C69 C70 C71 C72 C73 C73.2 C73.9C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DC.6
E..
CJ
CM
CR
CV
CK
DELTA
2,682 SF
GARAGE
959 SF
GARAGE
972 SF
EMC ACCESS
972 SF
RESTROOM
336 SF
ELEV LOBBY
101 SF
DELTA
3,328 SF
OPEN PROGRAM
629 SF
OPEN PROGRAM
5,223 SF
OPEN PROGRAM
3,022 SF
ENDEAVOR AIR
5,568 SF OPEN PROGRAM
2,698 SF
SKYWEST
378 SF
RESTROOM
529 SFTR
318 SF
MECH / ELEC
935 SF
CIRCULATION
4,763 SF
CIRCULATION
2,318 SF
ELEC SUB STATION
1,765 SF
RESTROOM
240 SF
TR
293 SF
RESTROOM
891 SF
OPEN PROGRAM
1,030 SF
MECH
957 SF
OPEN PROGRAM
789 SF
BREAK ROOM/ TRAINING
1,443 SF
JANITOR
107 SF
LOCKER ROOM
3,015 SF
SHIFT STORAGE
116 SF
CIRCULATION
1,116 SF
EMC SHOP
1,367 SF
RECEIVING/ STAGING
1,269 SF
HOISTWAY
400 SF
FREIGHT ELEVATOR
165 SF
STAIR
318 SF
ELEVATOR
136 SF
STAIR
360 SF
MSP ARTS FOUNDATION
1,948 SF
ELEV LOBBY
103 SF
STAIR
366 SF
STAIR
323 SF
STAIR
335 SF
STAIR
367 SF
ELEVATOR
145 SF
ELEVATOR
152 SF
ELEVATOR
128 SF
SECURE STORAGE
861 SF
ELEV LOBBY
115 SF
STAIR
316 SF
PROPOSED PROGRAM
BREAK ROOM/ TRAINING
CHASE
CIRCULATION
DELTA
ELEC SUB STATION
ELEV LOBBY
ELEVATOR
EMC ACCESS
EMC SHOP
ENDEAVOR AIR
FREIGHT ELEVATOR
GARAGE
HOISTWAY
JANITOR
LOCKER ROOM
MECH
MECH / ELEC
MSP ARTS FOUNDATION
OPEN PROGRAM
RECEIVING/ STAGING
RESTROOM
SECURE STORAGE
SHIFT STORAGE
SKYWEST
STAIR
TR
BOILERS
CU
SIDA LINE
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C65 C66 C67 C68 C69 C70 C71 C72 C73 C73.2 C73.9 C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DC.6
E..
CJ
CM
CR
CV
CK
RESTROOMS
564 SF
ENDEAVOR AIR
1,305 SF
DELTA
1,615 SF
MAC CONFERENCE ROOM
837 SF
TR
200 SF
DELTA
711 SF
MECH
508 SF
DELTA
368 SF
DELTA
459 SF
DELTA
334 SF
ENDEAVOR AIR
1,308 SF
QUIET ROOM
211 SF
CONFERENCE
104 SF
DELTA BREAKROOM
356 SF
UNIFI
1,285 SF
MAC STORAGE
221 SF
MAC STORAGE
798 SF
MAC STORAGE
771 SF
MAC IT STORAGE
1,061 SF
MAC STORAGE
584 SF
DELTA SKYCLUB STORAGE
693 SF
TR
223 SF
ELECTRICAL SUBSTATION
834 SF
S T
O R
A G
E
S
F
ELEV EQUIP
98 SF
ELEV EQUIP
204 SF
TR
191 SFMAC STORAGE
304 SF
FREIGHT ELEVATOR
247 SF
MECH
131 SF
ELEV EQUIP
74 SF
ELEV 12
77 SFELEV 06
77 SF
STORAGE
608 SF
VALVE
159 SF
STAIR 22
219 SF
STAIR 26
307 SF
STAIR 32
196 SF
STAIR 34
206 SF
STAIR
361 SF
ELEC
216 SF
STAIR
568 SF
ELEC
22 SF
CORRIDOR
1,608 SF
RESTROOMS
162 SF
CORRIDOR
590 SF
DELIVERY NODE
3,084 SF
STAIR 40
317 SF
RESTROOMS
452 SF
DELTA STORAGE
286 SF
DELTA LOCKERS
909 SF
DELTA OFFICE
138 SF
DELTA OPEN OFFICE
1,267 SF
DELTA
142 SF
DELTA LOCKERS
576 SF
DELTA HONOR GUARD
212 SF
CORRIDOR
665 SF
DELTA
343 SF
DELTA
286 SF
CORRIDOR
280 SF
CORRIDOR
249 SF
DELTA OFFICE
138 SF
DELTA BREAK ROOM / LOCKERS
399 SF
PARTS STORAGE
1,224 SF
OFFICE
106 SF
OFFICE
162 SF
OFFICE
221 SF
OFFICE
134 SF
STORAGE / TR
62 SF
OFFICE
106 SF
STORAGE
105 SF
STORAGE / COMM
47 SF
OFFICE
393 SF
OFFICE
103 SF
OFFICE
101 SF
OFFICE
103 SF
OFFICE
103 SF
OFFICE
97 SF
ENDEAVOR AIR
276 SF
MAC STORAGE
258 SF
MAC STORAGE
215 SF
MAC STORAGE
560 SF
MAC STORAGE
750 SF
STORAGE
194 SF
OFFICE
133 SF
OFFICE
205 SF
VESTIBULE
390 SF
CART WASH
212 SF
MAC STORAGE
84 SF
ST26
LOCKER ROOM
1,511 SF
EMC SHOP
640 SF
SHIFT STORAGE
420 SF
JANITOR
84 SF
EMC
17,014 SF
EXISTING PROGRAM
CART WASH
DELIVERY NODE
DELTA
DELTA SKYCLUB STORAGE
ELECTRICAL
ELEV EQUIP
ENDEAVOR AIR
KA
MAC
MAC EMC
MAC IT STORAGE
MAC STORAGE
MECHANICAL
STORAGE
TR
UNIFI
CU
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
2/5/2026
PROGRAMMING - GROUND LEVEL
SCALE: 1" = 30'-0"
p1.01
GROUND LEVEL PROPOSED
GROUND LEVEL EXISTING
0' 15' 30' 60'
SCALE: 1"=30'-0"
0' 15' 30' 60'
SCALE: 1"=30'-0"
RESTROOM
240 SF
DN
MECH / ELEC
935 SF
SIDA LINE
FE FE
TR
200 SF
ELECTRICAL SUBSTATION
834 SF
S T
O R
A G
E
S
F
STAIR
219 SF
RESTROOMS
162 SFRS
DELTA LOCKERS
576 SF
CORRIDOR
665 SF
OFFICE
205 SF
VESTIBULE
390 SF
LOCKER R
1,511 S
EM
84 SF
DN
FE
OR AIR
SF
UNIFI
1,285 SF
MAC STORAGE
221 SF
MAC STORAGE
798 SF
MAC STORAGE
771 SF
ELEV EQUIP
204 SF
TR
191 SFE
FREIGHT ELEVATOR
247 SF
MECH
131 SF
77 SF
STOR
VALV
159 S
STAIR
361 SF
STAIR
568 SF
CORRIDOR
1,608 SF
CORRIDOR
590 SF
DELIVERY NODE
3,084 SF
317 SFF
FICE
SF
FICE
SF
OFFICE
103 SF
OFFICE
103 SF
OFFICE
97 SF
OR AIR
F
MAC STORAGE
258 SF
MAC STORAGE
215 SF
MAC STORAGE
560 SF
MAC STORAGE
750 SF
STORAGE
194 SF
CART WASH
212 SF
MAC STORAGE
84 SF
GFrenzel Snapshot
DN
E
DN
F E
F E F E
FEFE
F E
FEF
E
FE
F E
F E
R E
F
FE F
E
F E
FE
FE FE
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71 C72 C73 C73.2 C73.9C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DC.6
E..
CJ
CM
CR
CV
CK
DELTA GARAGE
1,628 SF
GARAGE
965 SF
GARAGE
981 SF
EMC ACCESS
1,112 SF
D E
L T
A ,0
S
F
MECH. - PHASING OPTION 1
2,173 SF
UNASSIGNED
6,115 SF
UNASSIGNED
1,504 SF
ENDEAVOR AIR
6,308 SF
ARTS FOUNDATION
1,800 SF
MAC
4,498 SF
UNASSIGNED
571 SFTR
339 SF
MECH / ELEC
974 SF
CIRCULATION
5,548 SF
CIRCULATION
2,583 SF
E L
E C
S U
B S
T A
T
IO
N ,7
S
F
TR
305 SF
RESTROOM
719 SF
UNASSIGNED
2,073 SF
BREAK ROOM/ TRAINING
1,454 SF
JANITOR
121 SF
LOCKER ROOM
3,015 SF
SHIFT STORAGE
116 SF
CIRCULATION
1,095 SF
RECEIVING/ STAGING
1,269 SF
HOISTWAY
400 SF
FREIGHT ELEVATOR
165 SF
STAIR
318 SF
ELEVATOR
136 SF
STAIR
360 SF
STAIR
384 SF
STAIR
329 SF
STAIR
331 SF
STAIR
381 SF
ELEVATOR
152 SF
ELEVATOR
165 SF ELEVATOR
146 SF
SECURE STORAGE
862 SF
STAIR
337 SF
BOILERS
CU
DC.8
CONCOURSE MECHANICAL
1,495 SF
C65
UNASSIGNED
1,351 SF
DELTA CLUB STORAGE
818 SF
RESTROOM
1,512 SF
UNIFI
1,474 SF
PRIMARY USE
CIRCULATION
EMC
MAC
RESTROOM
TENANT
UNASSIGNED
DELTA
567 SF
UNASSIGNED
511 SF
MAC
712 SF
DELTA PARTS
1,365 SF
CONFERENCE ROOM
921 SF
VESTIBULE
345 SF
RESTROOMS
254 SF
DELTA
633 SF
DELTA
515 SF
UNASSIGNED
718 SF
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71 C72 C73 C73.2 C73.9 C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DC.6
E..
CJ
CM
CR
CV
CK
RESTROOMS
564 SF
ENDEAVOR AIR
2,528 SF
DELTA
1,615 SF
MAC CONFERENCE ROOM
837 SF
TR
200 SF
DELTA
1,804 SF
MECH
508 SF DELTA
459 SF
DELTA
872 SF
ENDEAVOR AIR
2,025 SF
ENDEAVOR
422 SF
CONFERENCE
104 SF
BREAKROOM
356 SF
UNIFI
1,479 SF
STORAGE
854 SF
MAC IT STORAGE
1,061 SF
MAC STORAGE
584 SF
DELTA SKYCLUB STORAGE
693 SF
TR
223 SF
ELECTRICAL SUBSTATION
834 SF
S T
O R
A G
E S
F
ELEV EQUIP
98 SF
ELEV EQUIP
204 SF
TR
191 SFSTORAGE
304 SF
MECH
131 SF
ELEV EQUIP
74 SF
ELEV 12
77 SFELEV 06
77 SF
STAIR 22
219 SF
STAIR 26
307 SF
STAIR 32
196 SF
STAIR 34
206 SF
ELEC
22 SF
CORRIDOR
1,608 SF
RESTROOMS
162 SF
STAIR 40
317 SF
DELTA LOCKERS
576 SF
DELTA HONOR GUARD
212 SF
CORRIDOR
665 SF
CORRIDOR
280 SF
CORRIDOR
249 SF
PARTS STORAGE
1,224 SF
STORAGE
1,254 SF
OFFICE
205 SF
VESTIBULE
390 SF
ST26
LOCKER ROOM
1,511 SF
EMC SHOP
640 SF
SHIFT STORAGE
420 SF
JANITOR
84 SF
CU
SIDA LINE
DC.8
C65
EMC
17,014 SF
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
PROGRAMMING - GROUND LEVEL
2/19/2026 p1.01
GROUND LEVEL PROPOSED
GROUND LEVEL EXISTING
0' 15' 30' 60'
SCALE: 1"=30'-0"
0' 15' 30' 60'
SCALE: 1"=30'-0"
Existing Program - Ground Level
Primary Use Department Existing Area
CIRCULATION CIRCULATION 5699 SF
EMC EMC 19896 SF
MAC MAC 8166 SF
RESTROOM RESTROOMS 726 SF
TENANT DELTA 6588 SF
TENANT ENDEAVOR 6302 SF
TENANT UNIFI 1479 SF
Grand total 48857 SF
Proposed Program - Ground Level
Primary Use Department Proposed Area
CIRCULATION CIRCULATION 10355 SF
EMC EMC 13971 SF
MAC ARTS FOUNDATION 1800 SF
MAC MAC 13549 SF
RESTROOM RESTROOMS 2484 SF
TENANT DELTA 6596 SF
TENANT ENDEAVOR 6308 SF
TENANT UNIFI 1474 SF
UNASSIGNED UNASSIGNED 12841 SF
Grand total 69378 SF
DNDN
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
F E
DNDN
DNDN
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
ADA
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
ADA
ADA
A D
A
A D
A
A D
A
A D
A
A D
A
ADA
A D
A
A D
A A
D A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71 C72 C73 C73.2 C73.9 C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DCC
E..
CJ
CM
CR
CV
CK
CIRCULATION
23,049 SF
RESTROOMS
5,762 SF
BOH
514 SF
CONCESSION
4,528 SF
C8 C7
C6 C9
C10 C11
GATEHOLD
3,000 SF
RAMP
551 SF
STAIR
368 SF
ELEVATOR
131 SF
RAMP
576 SF
GATEHOLD
3,000 SF
SOFT SEATING
655 SF
GATEHOLD
3,000 SF
CONCESSIONS
1,259 SF CONCESSION
591 SF
CONCESSIONS
1,009 SF
BOH
925 SF
GATEHOLD
3,000 SF
GATEHOLD
3,000 SF
SOFT SEATING
1,423 SF
GATEHOLD
3,000 SF
CONCESSION
1,606 SF
STAIR
390 SF
RAMP
558 SF
MECHANICAL
322 SF
STAIR
314 SF
ELEVATOR
163 SF
RAMP
561 SF
STAIR
390 SF
RAMP
561 SF
STAIR
371 SF
ELEVATOR
128 SF
RAMP
564 SF
SOFT SEATING
1,198 SF
MECHANICAL EQUIPMENT
10,453 SF
CONCOURSE MECHANICAL
3,971 SF
MECHANICAL EQUIPMENT
4,039 SF
MASTER CONTROL
2,166 SF
ELECTRICAL
2,213 SF
E M
C M
E C
H A
N
IC
A L
,5
S
F
O F
F
IC
E S
U
IT
E ,2
S
F
LOBBY
595 SF
HOISTWAY
607 SF
STAIR
330 SF
ELE. MECH.
111 SF
ELEVATOR
132 SF
CHEMICAL STORAGE
346 SF
LAB
284 SF
JANITOR
84 SF
STAIR
360 SF
FREIGHT ELEVATOR
164 SF
DELTA SKYCLUB
DELTA
BOILER
PLATFORMS
CU
SIDA LINE
DC.8
C65
PRIMARY USE
CIRCULATION
CONCESSIONS
EMC
GATEHOLD
MAC
RESTROOM
CONCESSIONS
672 SF
POTENTIAL CONCESSIONS
1,573 SF
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71 C72 C73 C73.2 C73.9C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DCC
E..
CJ
CM
CR
CV
VINO VOLO
2,014 SF
ELECTRICAL
140 SF
STORAGE
227 SF
STAIR 22
190 SF
MECHANICAL
837 SF
ELECTRICAL
92 SF
STAIR 26
215 SF
VALVE
96 SF
RESTROOMS
1,984 SF
TWINS GRILL
6,051 SF
RESTROOMS
1,595 SF
STAIR 34
213 SF
GATE 11
1,527 SF
GATE C10
1,991 SF
GATE C6
2,302 SF
GATE C7
1,821 SF
VERDI MARKET
1,093 SF
GATE C8
1,735 SF GATE C9
2,022 SF
CIRCULATION
15,631 SF
STAIR 32
214 SF
ART VITRINE
102 SF
ART VITRINE
159 SF
ART VITRINE
102 SF
ELEV 06
77 SF
DELTA SKYCLUB
BOTTLE ROCKET
CU
DC.8
C65
RAMP
243 SF
RAMP
211 SF
RAMP
429 SF
RAMP
717 SF
CONCESSIONS
852 SF
BOH
525 SF
MOVING WALKWAY
ELEV 12
88 SF
EMC
17,041 SF
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
PROPGRAMMING - MAIN LEVEL
2/12/2026 p1.02
MAIN LEVEL PROPOSED
0' 15' 30' 60'
SCALE: 1"=30'-0"
MAIN LEVEL EXISTING
0' 15' 30' 60'
SCALE: 1"=30'-0"
Existing Program - Main Level
User Department Area
CIRCULATION CIRCULATION 18754 SF
CONCESSIONS RETAIL 852 SF
CONCESSIONS SOLO VINO 2014 SF
CONCESSIONS TWINS GRILL 6051 SF
CONCESSIONS VERDI MARKET 1093 SF
EMC EMC 17041 SF
GATEHOLD GATEHOLD 11398 SF
MAC ARTS FOUNDATION 364 SF
MAC MAC 1883 SF
RESTROOM RESTROOMS 3671 SF
Grand total 63121 SF
Proposed Program - Main Level
User Department Proposed Area
CIRCULATION CIRCULATION 30115 SF
CONCESSIONS LEASABLE 11238 SF
EMC EMC 33784 SF
GATEHOLD GATEHOLD 18001 SF
MAC GATEHOLD 2078 SF
MAC MAC 1520 SF
RESTROOM RESTROOMS 5762 SF
Grand total 102498 SF
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71 C72 C73 C73.2 C73.9 C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DCC
E..
CJ
CM
CR
CV
CK
PENTHOUSE 3448
5,768 SF
STAIR 22
234 SF
CONCOURSE MECHANICAL
7,685 SF
STORAGE
725 SF
HMS HOST
1,885 SFDEARATOR CLEARSTORY
671 SF
PRIMARY USE
CIRCULATION
EMC
MAC
TENANT
MAC IT DELTA
ENDEAVOR
AIR
STOR
TR
CU
DC.8
C65
ARTS FOUNDATION
1,881 SF
EMC
16,469 SF
C33 C34 C35 C36 C37 C38 C39 C40 C41 C42 C43 C44 C45 C46
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
C72 C73 C73.2 C73.9 C74 C75 C76 C77
C78 C79 C80
EAA
EB
DBB
DB
DC
DCC
E..
CJ
CM
CR
CV
CK
MECHANICAL
5,836 SF
CONCOURSE CLERESTORY
EMC BELOW
HMS
1,705 SF
STORAGE
691 SF
MAC IT DELTA
ENDEAVOR
AIR
TR
BOILERS
CU
DC.8
C65
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
PROGRAMMING - PENTHOUSE LEVEL
2/19/2026 p1.03
PENTHOUSE LEVEL PROPOSED
PENTHOUSE LEVEL EXISTING
0' 15' 30' 60'
SCALE: 1"=30'-0"
0' 15' 30' 60'
SCALE: 1"=30'-0"
Proposed Program - Penthouse Level
User Department Area
MAC MAC 5836 SF
TENANT HMS 2396 SF
Grand total: 3 8232 SF
Existing Program - Penthouse Level
Primary User Department Area
CIRCULATION CIRCULATION 234 SF
EMC EMC 17139 SF
MAC ARTS FOUNDATION 1881 SF
MAC MAC 13584 SF
TENANT HMS 2611 SF
Grand total 35449 SF
RFQ PACKAGE
TITLE
SCALE: NTS
KHA - EMC & D-STREET IMPACTS - ROADWAY
SCALE: AS SHOWN
01/28/2026
EMC 66
EMC 69 EMC 70
EMC 67 EMC 68
EMC 71 EMC 72 EMC 73
EMC 74 EMC 75 EMC 76 EMC 77
EMC 78 EMC 79 EMC 80
EMC
EMC
EMC
EMC
EMC
EMC
EMC
EMC
88 C 89 C 90
EMC
D STREET
GRAPHIC SCALE IN FEET
5 10 20
NORTHEMC & D-STREET IMPACTS
Metropolitan Airports Commission
767 EUSTIS STREET, SUITE 100
SAINT PAUL, MINNESOTA 55114
Ph: 651-645-4197 www.kimley-horn.com
Existing wall moved, impacts to existing exit stairs and parking stalls along D Street
D Street Closures should be kept to one lane if possible to allow access to various maintenance locations along D Street and to Airside Gate
- ROADWAY
RFQ PACKAGE
TITLE
SCALE: NTS
cwetherington Text Box
KHA - EMC HAUL ROUTE
cwetherington Text Box
SCALE: AS SHOWN
cwetherington Text Box 02/04/2026 cwetherington Snapshot cwetherington Snapshot
W
S
A D
A
A D
A
ADA
A D
A
A D
A
ADA
ADA
A D
A
A D
A
A D
A
A D
A
A D
A
ADA
A D
A
A D
A A
D A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
A D
A
F E
C44 C45 C46 C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71 C72 C73C73.2 C73.9C74 C75 C76 C77 C78 C79 C80
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1AEMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
CV
CG
CH
CK
CN
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
OVERALL - CONCOURSE C MAIN LEVEL
833' - 8 3/8"
EMC - EXISTING PROGRAM
p1.30
0' 10' 20' 40'
SCALE: 1"=20'-0"
FE FE
FE
FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
BOILER EQUIPMENT
5,044 SF
F R
E
IG
H T
E L
E V
A T
O R
S F
EXISTING PROGRAM
AIR COMPRESSORS
BOILER EQUIPMENT
CHILLER EQUIPMENT
CHILLER LAB
ELECTRICAL
FREIGHT ELEVATOR
GLYCOL
JET FUEL SWITCH
LAUNDRY
OXYGON 103 STORAGE
RECEIVING/ STAGING
STAIR
TELECOMMUNICATION
TUNNEL ENTRANCE
UNEXCAVATED
WATER SOFTENERS
WELL BASIN PUMP ROOM
WELL BASIN PUMP ROOM
117 SF
CHILLER LAB
78 SF
GLYCOL
933 SF
ELECTRICAL
1,495 SF
TELECOMMUNICATION
100 SF JET FUEL SWITCH
84 SF
WATER SOFTENERS
247 SF
AIR COMPRESSORS
187 SF
LAUNDRY
61 SF
CHILLER EQUIPMENT
3,028 SF
ELECTRICAL
220 SF
EMERGENCY
POWER
STORAGE OF
PARTS &
EQUIPMENT
UNDERNEATH
PIPES
BOILER PUMP
FEED
MOTORS
CONDENSATE
TAMK
FLASH TANK
BOILER WATER
TREATMENT EWS
OXYGON 103 STORAGE
88 SF
UNEXCAVATED
UNEXCAVATED UNEXCAVATED
RECEIVING/ STAGING
229 SF
CONDENSER PUMPS
TRANSFORMER
AUTOMATIC TRANSFER
SWITCHES
REFRIGERATION
PUMPS
ELEV.
EQUIP.
H
IG
H V
O
LT
A G
E
T R
A N
S F
O R
M E
R
F
LA
M M
A B
LE
S T
O R
A G
E
CONDENSER PUMPS
TUNNEL ENTRANCE
95 SF
UNEXCAVATED
790 SF
STAIR
87 SF
STAIR
95 SF
STAIR
107 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC BASEMENT LEVEL
810' - 2"
EMC - EXISTING PROGRAM
p1.31
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger Text Box Building Section - EMC - N-S Section
FE
F E
FE
FE
FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
CV
CHILLER 1
2,469 SF
EXISTING PROGRAM
CHILLER 1
ELECTRICAL - HIGH VOLTAGE
EMC SHOP 1
FASTENAL
STAIR
EMC SHOP 1
721 SF
FASTENAL
255 SF
C H
IL
LE
P
O W
E R
CHILLER 6
POWER
AIR
COMPRESSOR
CHILLER 6 WITH
REFRIGERANT TANK
CHILLER 5 WITH
REFRIGERANT TANK
CHILLER
PUMPS
CHILLER PUMP
POWER
EWS
UTILITY
SINK
HIGH VOLTAGE
ENCASED IN
CONCRETE
COLUMN
FLAMMABLE
STORAGE
S T
O R
A G
E
STORAGE
DELIVERIES/ TRASH
STAIR
205 SFSTAIR
57 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC - GROUND
816' - 6"
EMC - EXISTING PROGRAM
p1.32
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
F
FE
F E
FE
F E
FE
FE
FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
CV
CIRCULATION
114 SF
BOILER
3,348 SF
LOBBY
223 SF
EXISTING PROGRAM
BOILER
BOILER LAB
CIRCULATION
ELECTRICAL
LOBBY
RESTROOM
STAIR
BOILER LAB
88 SF
BOILER 2
BOILER 3
BOILER 1
BOILER 4
FLOOR
HATCH
SAFETY
LOCKSHARNESSES
E W
S
EMPLOYEE BOARD
RESTROOM
177 SF
2 TON CRANE
ELECTRICAL
140 SF
SAFETY STORAGESTORAGE
S T
O R
A G
E
ENTRANCE
BOILER
953 SF
STORAGE
92 SF
UPS
STAIR
110 SF
STAIR
135 SF
STAIR
97 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC BOILER LEVEL
819' - 6"
EMC - EXISTING PROGRAM
p1.33
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
FEF
E
F E
F E
R E
F
FE
F E
F E
FE
F E
FE
FE
FE
FE FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
S H
IF
T
S T
O R
A G
E
S F
EMC SHOP
640 SF
EXISTING PROGRAM
ELEC
EMC SHOP
FASTENAL
FREIGHT ELEVATOR
JANITOR
LAUNDRY
LOCKER ROOM
PARTS STORAGE
RESTROOMS
SHIFT STORAGE
STAIR
JANITOR
84 SF
LAUNDRY
48 SF
FASTENAL
30 SF
FASTENAL
52 SF
F A
S T
E N
A L
S
F
UNIFIRST LOCKERS
UNIFIRST LOCKERS
ADA
SHOWER
ADA
SHOWER
MEN'SWOMEN'S
LOCKER ROOM
1,511 SF
MEN'S
RESTROOM
WOMEN'S
RESTROOM
UNISEX
RESTROOM
ELECTRICAL SUBSTATION
TOOLS
LOCKERS
PLANS
TOOLS
LOCKERS
(2) 12,000 JET FUEL TANKS
STAIR
58 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC CONCOURSE C EXISTING GROUND LEVEL
820' - 7"
EMC - EXISTING PROGRAM
p1.34
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
FEF
E
F E
R E
F
F E
FE
FE
FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
CHILLER
3,987 SF
MASTER CONTROL
682 SF
CHASE
110 SF
BREAKROOM
651 SF
LOBBY
330 SF
OFFICES
1,060 SF
EXISTING PROGRAM
BREAKROOM
CHASE
CHILLER
ELECTRICAL
JANITOR
LOBBY
MASTER CONTROL
MECHANICAL
OFFICES
SECURE STORAGE
STAIR
SECURE STORAGE
248 SF
ELECTRICAL
233 SF
S T
O R
A G
E
S
F
MECHANICAL
126 SF
HATCH OVER
STAIR OPENING
CHILLER 4 WITH
REFRIGERANT TANK
CHILLER 3 WITH
REFRIGERANT TANKCHILLER 2 WITH
REFRIGERANT TANK
CHILLER 1 WITH
REFRIGERANT TANK
CHECK-
IN
LOCKERS
2 TON CRANE
2 TON CRANE
2 TON CRANE
2 TON CRANE
2 TON CRANE
TANK
MOP
SINK
JANITOR
97 SF
STAIR
114 SF
SEPARATOR
& FILTRATION
SYSTEM
8 WORKSTATIONS
PRINTER
EXECUTIVE
OFFICE
FILE STORAGE
'-0
GLYCOL
TANKSSTAIR
121 SF
STAIR
66 SF
STAIR
120 SF
STAIR
15 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC - CHILLER LEVEL
825' - 10"
EMC - EXISTING PROGRAM
p1.35
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
S
F E
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
PUMP ROOM
2,364 SF
EXISTING PROGRAM
ELECTRICAL
MECHANICAL
PUMP ROOM
STAIR
H
IG
H V
O L
T A
G E
E N
C A
S E
D I
N
C O
N C
R E
T E
C O
LU
M
N
ELECTRICAL
1,129 SF
MECHANICAL
279 SF AHU
CONDENSER
TANK
C O
N D
E N
S E
R
C O
N D
E N
S E
R
C O
N D
E N
S E
R
CENTRIFUGAL PUMP
FOR CHILLED WATER
DISTRIBUTION
GLYCOL PUMPS
EXPANSION
TANK
FLOOR
HATCH
EMERGENCY
POWER
1 TON MOBILE
CRANE
STAIR
122 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC UPPER LEVEL
834' - 0"
EMC - EXISTING PROGRAM
p1.36
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
S
F E
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
DEAERATOR
383 SF
ELECTRICAL
1,274 SF
EXISTING PROGRAM
BOILER PLATFORM
DEAERATOR
ELECTRICAL
MECHANICAL
STAIR
MECHANICAL
420 SF
REMOVABLE
SECTION OF
FLOOR
1 TON CRANE
TRANSFORMER, MAIN DISCONNECT, BREAKERS
COOLING
TOWER
POWER
DEAERATOR TANK
BOILER PLATFORM
3,785 SF
1 TON CRANE
1 TON CRANE
1 TON CRANE
STAIRS
1 TON CRANE
MECHANICAL
320 SF
AHU
AHU
+12'-0" ABOVE CHILLER
LEVEL
+10'-7" ABOVE BOILER
LEVEL
S H
IP
S
LA
D D
E R
STAIR
128 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC EXISTING DEAERATOR LEVEL
834' - 6 1/4"
EMC - EXISTING PROGRAM
p1.37
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
CV
EXISTING PROGRAM
BOILER EQUIPMENT
COOLING TOWER
EMC ROOF
STAIR
EMC ROOF
5,622 SF
CONDENSERS
RTU
RTU
STAIR
127 SF
BOILER EQUIPMENT
5,063 SF
COOLING TOWER
5,180 SFCOOLING TOWER
1,193 SF
COOLING TOWER
1,240 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC EXISTING ROOF
847' - 1 1/2"
EMC - EXISTING PROGRAM
p1.38
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
PENTHOUSE
7,685 SF
AHU
AHU
EXISTING PROGRAM
CIRCULATION
DEARATOR CLEARSTORY
ELECTRICAL
EMC ROOF
FREIGHT ELEVATOR
MECHANICAL
PENTHOUSE
STAIR
DEARATOR CLEARSTORY
671 SF
STAIR 22
234 SF
CU
DA
DC.8
LEGEND
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
- EMC EXPANSION
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
CONCOURSE C PENTHOUSE LEVEL
850' - 8 3/8"
EMC - EXISTING PROGRAM
p1.39
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
EMC - BASEMENT
EL 810' - 2"
EMC - BOILER
EL 819' - 6"
EMC - CHILLER
EL 825' - 10"
CONCOURSE C - MAIN
(GRIDS 56-73.2)
EL 831' - 0 3/8"
CONCOURSE C - MAIN
(GRIDS 36-68)
EL 833' - 8 3/8"
CONCOURSE C - TO
METAL DECK (GRIDS
56-68)
EL 845' - 3 1/4"
EMC EAST ROOF - TO
METAL DECK
EL 849' - 1 1/2"
DC.6EMCDEMCCEMCBEMCA.3EMCAE..
CONCOURSE C -
GROUND (GRIDS
61-73.9)
EL 817' - 8 3/8"
TUNNEL
EL 805' - 3 3/8"
CUDA
COOLING
TOWERS
CHILLERS
CHILLER
EQUIPMENT
ELEC.
EXECUTIVE
OFFICE
ELEC.
STAIRS
STORAGE
EMC - BASEMENT
EL 810' - 2"
EMC - BOILER
EL 819' - 6"
EMC - CHILLER
EL 825' - 10"
CONCOURSE C - MAIN
(GRIDS 36-68)
EL 833' - 8 3/8"
EMC - DEAERATOR
EL 834' - 6 1/4"
EMC WEST ROOF - TO
METAL DECK
EL 847' - 1 1/2"
EMC EAST ROOF - TO
METAL DECK
EL 849' - 1 1/2"
CONCOURSE C -
PENTHOUSE (GRIDS
37-86)
EL 850' - 8 3/8"
EMC PENTHOUSE
ROOF - TO METAL
DECK
EL 854' - 9"
C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68
EMC3A EMC2A EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
CONCOURSE C -
GROUND (GRIDS
61-73.9)
EL 817' - 8 3/8"
CONCOURSE C -
GROUND (GRIDS
37-87)
EL 820' - 7"
EMC - UPPER
EL 834' - 0"
EMC - GROUND
EL 816' - 6"
TUNNEL
EL 805' - 3 3/8"
PUMP ROOM
CHILLERS
TELECOMM
BOILER EQUIPMENT
BOILERS
MASTER
CONTROL
CHILLER EQUIPMENT
CIRC
TUNNEL
ENTRANCE
ELECTRICAL
STORAGE
ELECTRICAL
CHILLERS
COOLING TOWERSDEARATOR
STORAGE
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/10/2026
BUILDING SECTIONS - EXISTING EMC
SCALE: 1/16" = 1'-0"
p3.54
Building Section - EMC - Existing N-S Section
Building Section - EMC - Existing E-W Section
ChristinaJaeger Cloud
FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
EXIST TELECOMMUNICATION
92 SF
EXIST JET FUEL SWITCH
80 SF
EXIST BOILER EQUIPMENT
5,246 SF
EXIST ELECTRICAL
220 SF
PROPOSED PROGRAM
CIRCULATION
CONCOURSE MECHANICAL
ELECTRICAL
ELEVATOR
EMC MECHANICAL
EXIST AIR COMPRESSORS
EXIST BOILER EQUIPMENT
EXIST ELECTRICAL
EXIST JET FUEL SWITCH
EXIST TELECOMMUNICATION
EXIST WATER SOFTENERS
FREIGHT ELEVATOR
HOISTWAY
LOW CLEARANCE
MECHANICAL EQUIPMENT
STAIR
TUNNEL ENTRANCE
EXIST AIR COMPRESSORS
176 SF
EXIST WATER SOFTENERS
233 SF
HOISTWAY
400 SF
MECHANICAL EQUIPMENT
10,155 SF
STAIR
323 SF
STAIR
294 SF
ELEVATOR
130 SF
LOW CLEARANCE
9,919 SF
FREIGHT ELEVATOR
164 SF
EMC MECHANICAL
1,014 SF
STAIR
68 SF
TUNNEL ENTRANCE
91 SF
ELECTRICAL
2,265 SF
CONCOURSE MECHANICAL
2,550 SF
MECHANICAL EQUIPMENT
2,291 SF
CIRCULATION
3,313 SF
DA
DC.8
+4'-6"
LEGEND
- PROPOSED CAST IN PLACE WALL
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC - BASEMENT
810' - 2"
OPTION 1 - EMC - PROPOSED PROGRAM
p1.40
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
FE
FE
FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
EMC ACCESS
972 SF
HOISTWAY
400 SF
PROPOSED PROGRAM
ARTS FOUNDATION
BREAK ROOM/ TRAINING
CHASE
CIRCULATION
ELEVATOR
EMC ACCESS
EMC SHOP
FREIGHT ELEVATOR
GARAGE
HOISTWAY
JANITOR
LOCKER ROOM
OPEN PROGRAM
RECEIVING/ STAGING
RESTROOM
SECURE STORAGE
SHIFT STORAGE
STAIR
LOCKER ROOM
3,015 SF
STAIR
318 SF
STAIR
360 SF
CIRCULATION
1,116 SF
EMC SHOP
1,367 SF
SHIFT STORAGE
116 SF
BREAK ROOM/ TRAINING
1,443 SF
ELEVATOR
136 SF
JANITOR
107 SF
FREIGHT ELEVATOR
165 SF
GARAGE
959 SF
GARAGE
972 SF
RECEIVING/ STAGING
1,269 SF
CHASE
127 SF
SECURE STORAGE
861 SF
STAIR
74 SF
DA
DC.8
LEGEND
- PROPOSED CAST IN PLACE WALL
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC - CONCOURSE C GROUND
817' - 9 3/8"
OPTION 1 - EMC - PROPOSED PROGRAM
p1.41
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
FE
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
EXIST RESTROOMS
182 SF
DEAERATOR
983 SF
EXIST BOILERS
3,794 SF
BOILER 2
BOILER 3
BOILER 1
E W
S
PROPOSED PROGRAM
CIRCULATION
DEAERATOR
ELEVATOR
EXIST BOILERS
EXIST RESTROOMS
FREIGHT ELEVATOR
HOISTWAY
LAB
STAIR
STORAGE
HOISTWAY
400 SF
STAIR
345 SF
STAIR
330 SF
LAB
113 SF
ELEVATOR
134 SF
CIRCULATION
215 SF
FREIGHT ELEVATOR
164 SF
STORAGE
77 SF
DA
DC.8
LEGEND
- PROPOSED CAST IN PLACE WALL
- EMC SPACE NOT ON LEVEL
- GATE EXPANSION
- NOT IN SCOPE
2027 T1 BOILER & CHILLER REPLACEMENT & EMC EXPANSION
02/12/2026
EMC - BOILER LEVEL
819' - 6"
OPTION 1 - EMC - PROPOSED PROGRAM
p1.42
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
ChristinaJaeger PolyLine
ChristinaJaeger PolyLine
ChristinaJaeger Text Box Building Section - EMC - E-W Section
ChristinaJaeger
C47 C48 C49 C50 C51 C52 C53 C54 C55 C56 C57 C58 C59 C60 C61 C62 C63 C64 C66 C67 C68 C69 C70 C71
EAA
EB
DAA
DBB
DB
DC
DCC
DC.6
EMCD
C 1/2
EMCC
EMCB
EMCA.3
EMCA
EMC3A EMC2A
EMC1A EMC1 EMC2 EMC3 EMC4 EMC5 EMC6 EMC7 EMC8 EMC9 EMC10
E..
EA
DA.8
CA.6
CA..
CJ
CM
CQ
CR
CT
HOISTWAY
607 SF
MECHANICAL EQUIPMENT
10,453 SF
CONCOURSE MECHANICAL
3,971 SF
STAIR
360 SF
STAIR
330 SF
PROPOSED PROGRAM
CHEMICAL STORAGE
CIRCULATION
CONCOURSE MECHANICAL
ELE. MECH.
ELECTRICAL
ELEVATOR
EMC MECHANICAL
FREIGHT ELEVATOR
HOISTWAY
JANITOR
LAB
LOBBY
MASTER CONTROL
MECHANICAL EQUIPMENT
OFFICE SUITE
RESTROOMS
STAIR
FREIGHT ELEVATOR
164 SF
OFFICE SUITE
2,262 SF
LOBBY
595 SF
ELEVATOR
132 SF
LAB
284 SF
CHEMICAL STORAGE
346 SF
MASTER CONTROL
2,166 SF
CIRCULATION
4,104 SF
ELE. MECH.
111 SF
EMC MECHANICAL
1,565 SF
JANITOR
84 SF
CONFERENCE
ROOM
RESTROOMSTORAGE
ASSISTANT
OFFICE
ASSISTANT
OFFICE
CHIEF OFFICE
ASSISTANT
OFFICE
ASSISTANT
OFFICE COPY STATION
SUPPLIES
RECEPTION
WAITING
MECHANICAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .