This is a Preconstruction Amendment to a Design-Build contract between Tohopekaliga Water Authority and a Design-Build entity for the Lift Station - 05C (Toho East Lakeshore) Rehabilitation Project in Florida. The amendment establishes the preconstruction phase of the project, which involves the rehabilitation or complete replacement of an existing quadplex master lift station currently handling an average flow of 2.2 million gallons per day with peak flows reaching 2.9 million gallons per day. The preconstruction services are intended to support the design and planning phases prior to construction, with project management responsibilities assigned to designated representatives from both Tohopekaliga Water Authority and the Design-Build firm. A Preliminary Design Report has been provided as a technical resource for the project.
The Preconstruction Services Fee shall be paid either as invoice-based monthly reimbursement of actual costs incurred up to a not-to-exceed lump-sum amount or as a fixed monthly amount up to an agreed not-to-exceed lump-sum amount, with both payment structure and amounts to be established in the PCA-1 appendix. The contract is subject to U.S. Department of Labor Wage Determinations if applicable, and the Design-Build firm must provide certification that it does not use coercion for labor or services as defined by Florida Statutes Section 787.06. The amendment incorporates three appendices covering the preconstruction services scope and fee, the preconstruction phase schedule, and applicable wage determinations, with all contract value details to be summarized in the final amendment signature pages.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V.20250612.01
ATTACHMENT 2: PRECONSTRUCTION AMENDMENT
RFQu- 26-003
PRECONSTRUCTION AMENDMENT
to
DESIGN-BUILD
between
TOHOPEKALIGA WATER AUTHORITY
and
DB Entity Name regarding
DB – LIFT STATION – 05C (TOHO EAST LAKESHORE) REHABILITATION
PROJECT
THIS PRECONSTRUCTION AMENDMENT (“Preconstruction Amendment”) is made and entered into between TOHOPEKALIGA WATER AUTHORITY, an independent special district established pursuant to Chapter 189, Florida Statutes, by special act of the Florida Legislature, with its principal place of business located at 951 Martin Luther King Boulevard, Kissimmee, Florida 34741 (“TOHO”), and DB Entity Name, a DB Entity Type of the State of State Name that is authorized to do business in the State of Florida, with its principal place of business located at DB Principal Address (“DB Firm”), in consideration of the mutual covenants contained herein and for other good and valuable considerations, the receipt and sufficiency of which are hereby mutually acknowledged. TOHO and CMAR may be herein referred to individually as the “Party” or collectively as the “Parties”.
Execution This Preconstruction Amendment shall be executed in tandem with the Contract numbered RFQu-26-003 between the Parties (the “Contract”). This Preconstruction Amendment, as well as any appendices and attachments to this Preconstruction Amendment, shall be incorporated into and serve as a material part of the Contract.
Definitions The terms used in this Preconstruction Amendment, unless otherwise defined in this Preconstruction Amendment, shall have the meanings ascribed to them in the Contract.
The documents listed in Table 1: Preconstruction Amendment Appendices are hereby incorporated into the Contract Documents and are made part thereof:
Table 1: Preconstruction Amendment Appendices
Appendix No. Description PCA-1 Preconstruction Services Scope and Fee
PCA-2 Preconstruction Phase Schedule
PCA-3 U.S. Department of Labor Wage Determinations (if applicable)
Preconstruction Services Fee
A. In accordance with Section 6.8: Preconstruction Services Fee of the Contract, Toho and CMAR hereby agree that the Preconstruction Services Fee shall be paid:
Select one of the following:
☐ Invoice-based monthly reimbursement of actual Preconstruction Phase costs incurred by DB up to a not-to-exceed lump-sum amount established by mutual agreement by the Parties in the PCA- 1: Preconstruction Services Scope and Fee; or
☐ As a fixed monthly amount up to a not-to-exceed lump-sum amount, both such amounts as established by mutual agreement by the Parties in the PCA-1: Preconstruction Services Scope and Fee.
Construction Manager Fee TOHO and CMAR hereby agree that the Construction Manager Fee shall be paid for by TOHO in accordance with Section 8.9: Construction Manager Fee of the Contract.
Project Team Representatives
A. In accordance with Section 5.2: Project Managers of the Contract, the following individuals are the Project Managers assigned to this Contract:
1. Toho’s Project Manager (“TOHO PM”) Name: Name Title: Title Phone: Phone Number Email: Email Address
2. DB Firm’s Project Manager (“DB PM”) Name: Name Title: Title Phone: Phone Number Email: Email Address
B. In accordance with Section 5.3: Design Professional Representative, the following individual is the representative of DESIGN PROFESSIONAL that is assigned to this Contract:
Name: Name Title: Title Phone: Phone Number Email: Email Address
DB Firm’s Key Personnel & Staff In accordance with Section 5.4: Key Personnel, and as defined in Section 2.1: General Definitions of the Contract, the following are the Key Personnel that DB Firm has assigned to this Contract, this list shall include any Key Personnel for both the Preconstruction and Construction Phases of the Contract as they were presented by DB Firm in its applicable Solicitation Response:
Table 2: DB Firm’s Key Personnel & Staff
Key Personnel Name Project Role % of Time Assigned
In accordance with Section 28.9: Notices of the Contract, the following shall be the addresses to which any notices required by the Contract or the Contract Documents may be received by each Party:
Notice to TOHO Project Manager “PM” Tohopekaliga Water Authority Attn: Name and/or Title Re: Contract RFQu-26-003 951 Martin Luther King Blvd.
Kissimmee, Florida 34741
COPY TO:
Tohopekaliga Water Authority Attn: Procurement Services Re: Contract RFQu-26-003 951 Martin Luther King Blvd.
Kissimmee, Florida 34741
Notice to DB Firm DB Entity Name Attn:
Address Line #1 Address Line #2
COPY TO:
DB Entity Name Attn:
Address Line #1 Address Line #2
None Applicable
Contractor hereby represents, warrants, and certifies that Contractor does not use coercion for labor or services as defined in Section 787.06, Florida Statutes. Contractor previously has provided to TOHO the affidavit as required by Section 787.06(13), Florida Statutes, and hereby reasserts and reincorporates that affidavit as if fully set forth herein.
Table 3: Contract Value Summary Description Amount
Previous Contract Total Dollars: $
NET Dollars for this Amendment (Addition/Subtraction): $
NET CONTRACT TOTAL DOLLARS: $
DB Firm hereby represents, warrants, and certifies that DB Firm does not use coercion for labor or services as defined in Section 787.06, Florida Statutes. DB Firm previously has provided to TOHO the affidavit as required by Section 787.06(13), Florida Statutes, and hereby reasserts and reincorporates that affidavit as if fully set forth herein.
This document may be electronically executed by the Parties in counterparts up to but not exceeding the number of parties, each of which shall be deemed an original and all of which, taken together, shall constitute one agreement. Each Party may deliver its executed signature page by email transmission to the other Parties at the email addresses set forth herein. Delivery shall be effective and complete upon completion of such email transmission. The Parties agree that electronic signatures may be used in the execution of this document in accordance with Parts I and II of Chapter 668, Florida Statutes.
Except as specifically modified or amended by the terms of this Preconstruction Amendment, the Contract, Contract Documents, and all provisions contained therein shall continue in full force and effect and are hereby ratified and confirmed by the Parties. Wherever the terms of this Preconstruction Amendment and the terms of the Contract Documents are in conflict, the terms of this Preconstruction Amendment shall govern and control.
[ SIGNATURES ON FOLLOWING PAGES ]
IN WITNESS WHEREOF, the Parties have executed this Agreement on the dates set forth below.
INSERT VENDOR LEGAL NAME TOHO WATER AUTHORITY
By: _________________________ By: __________________________ Print Name: __________________ Print Name: Todd Swingle Title: ________________________ Title: Chief Executive Officer Date: ________________________ Date: _________________________
Attest: ______________________ Attest: _______________________ Print Name: __________________ Print Name: Allison Smith
Title: Executive Secretary
STATE OF _____________________________
COUNTY OF ___________________________
The foregoing instrument was acknowledged before me by means of [ ] physical presence or [ ] online notarization, this _______ day of __________________, 202_, by ____________________ as ____________________ of INSERT VENDOR NAME AND TYPE OF ENTITY FROM SUNBIZ, on behalf of the company, who [ ] is personally known to me OR [ ] has produced _______________, as identification.
Notary Signature
Printed Name: ___________________________
My Commission No.:______________________
My Commission Expires:___________________
(Stamp)
PCA-1: Basis of Preconstruction Services Scope and Fee
Enter Basis of Preconstruction Services Fee here.
PCA-2: Preconstruction Phase Schedule
Enter Preconstruction Services Schedule here.
PCA-3: U.S. Department of Labor Wage Determinations
If Applicable, paste all applicable current U.S. Department of Labor Wage Determinations here. If inapplicable, enter “NOT APPLICABLE”.
| Article 1. Execution; Definitions |
| 1.1 Execution |
| 1.2 Definitions |
| Article 2. Incorporation of Appendices |
| Article 3. Negotiated Fees/Costs |
| 3.1 Preconstruction Services Fee |
| A. In accordance with Section 6.8: Preconstruction Services Fee of the Contract, Toho and CMAR hereby agree that the Preconstruction Services Fee shall be paid: |
3.2 Construction Manager Fee
| Article 4. Project Team |
| 4.1 Project Team Representatives |
| A. In accordance with Section 5.2: Project Managers of the Contract, the following individuals are the Project Managers assigned to this Contract: |
| 1. Toho’s Project Manager (“TOHO PM”) |
| 2. DB Firm’s Project Manager (“DB PM”) |
B. In accordance with Section 5.3: Design Professional Representative, the following individual is the representative of DESIGN PROFESSIONAL that is assigned to this Contract:
4.2 DB Firm’s Key Personnel & Staff
| Article 5. Notices |
| 5.1 Notice to TOHO Project Manager “PM” |
| 5.2 Notice to DB Firm |
| Article 6. State and/or Federal Financial Assistance Requirements |
| Article 7. Human Trafficking Affidavit |
| Article 8. Contract Value Summary |
| Article 9. Human Trafficking Affidavit |
| Article 10. Counterparts, Electronic Transactions, and Electronic Signatures. |
| Article 11. Full Force and Effect |