3-Addendum1 StaforeEstsStormSewerExtension.pdf
PDF 1015 KB Posted
- Attached to
- Stafore Estates Storm Sewer Extension
- Solicitation number
- US.222312
- Issued by
- Luzerne County, Arona Borough, Pennsylvania
About this file
This is Addendum 1 to the Bid Form and Agreement documents for the Stafore Estates Storm Sewer Extension project, a municipal construction contract issued by Hanover Township in Northampton County, Pennsylvania, with engineering services provided by Hanover Engineering Associates, Inc. The project encompasses storm sewer infrastructure installation on Gaspar Avenue and Kim Street within the Stafore Estates Development, including 15-inch and 24-inch reinforced concrete pipe (RCP) or high-density polyethylene (HDPE) pipe installation totaling approximately 2,160 linear feet, nine storm manholes, 26 storm inlets, 3,255 linear feet of vertical concrete curb, tree removal and installation (21 each), water main relocation, mailbox relocation, and associated site restoration. Bid documents were to be submitted electronically via PennBid by 1:00 PM prevailing time on March 18, 2026, with final questions due by 4:00 PM on March 10, 2026, and a final addendum issued by 4:00 PM on March 13, 2026. The Notice to Proceed was anticipated for April 2026, with work completion required within 120 calendar days for substantial completion and 150 calendar days for final completion.
The contract is structured as a unit price stipulated price agreement with six bid alternatives allowing the Township to select various combinations of pipe materials (RCP or HDPE), project scope expansions on Kim Street, and full-width pavement restoration options. A bid bond or certified check equal to 10 percent of the total base bid is required with submission. Progress payments will be made monthly at 90 percent of completed work until 50 percent completion is achieved, thereafter at 95 percent with retainage, with no payment for materials not yet incorporated into the work. Upon substantial completion, payment increases to 100 percent less 150 percent of the Engineer's estimate for remaining punch list items. Liquidated damages of $2,685 per day apply for failure to achieve substantial completion by the contract deadline and for incomplete remaining work after substantial completion. The contract is subject to Davis-Bacon Act wage requirements, the Federal Occupational Safety and Health Act, Pennsylvania Act 287 (prevailing wage), the Public Works Employment Verification Act, Pennsylvania Human Relations Act, and non-discrimination employment compliance regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-StaforeEstates StormSewerExtension Plans.pdf | ||
| 2-StaforeEstates StormSewerExtension ProjectManual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
252 Brodhead Road Suite 100 Bethlehem, PA 18017-8944
Phone: 610.691.5644 Fax: 610.691.6968 HanoverEng.com
Envisioning and Engineering sustainable, cost-effective, and environmentally responsible projects since 1971
March 2, 2026
All Prospective Bidders RE: Stafore Estates Storm Sewer Extension Project
Addendum 1 Hanover Township, Northampton County Hanover Project H24-22
Bidders:
ADDENDUM 1
This Notice constitutes Addendum 1 for Stafore Estates Storm Sewer Extension Project. This addendum is to update and respond to Vendor questions.
1. Document 00 41 00 – Bid Form – Section 6.04 has been added.
2. Document 01 20 00 – Price and Payment Procedures – Part 1, 1.5, G.2 has been revised.
3. Document 00 52 15 – Agreement – Article 6, Payment Procedures
A. 6.02.A.1.a has been revised.
B. 6.02.B has been revised.
4. Clarification – RCP to be Class III.
Bidders are required to acknowledge receipt of this Addendum in Section 3 of the Bid Form.
END OF ADDENDUM 1
brk:ay/djn S:\Projects\Municipal\HanoverTwp\H24-22-StaforeEstatesStormSewerExtension\PennBid\Upload\Addendum_01\Addendum1_StormSewer.doc
Stafore Estates Hanover Township
Storm Sewer Extension Project H24-22
Hanover Engineering Bid Form
Associates, Inc. 00 41 00 - 1 Revised 03.02.2026
DOCUMENT 00 41 00
BID FORM
Project Identification: Stafore Estates Storm Sewer Extension
Project No.: H24-22
Name of Owner: Hanover Township
Name of Bidder:
1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
Agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid price and within the Bid times indicated in this Bid and in accordance with all other terms and conditions of the Contract Document.
2. Bidder accepts all of the terms and conditions of the Advertisement for Bids and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security.
This Bid will remain subject to acceptance for 60 days after the day of Bid opening or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
Bidder will sign and deliver the required number of counterparts of the Agreement with the
Bonds and other documents required by the bidding requirements within 15 days after the date of the OWNER’S Notice of Award.
3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged:
Addendum No. Addendum Date
B. Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, and performance of the
Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site
(except underground facilities) which have been identified in the Supplementary
Conditions as provided in paragraph 5.03 of the Standard General Conditions, and
(2) reports and drawings of a hazardous environmental condition, if any, which has
Associates, Inc. 00 41 00 - 2 Revised 03.02.2026 been identified in the Supplementary Conditions as provided in paragraph 5.06 of the Standard General Conditions.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done
so) all such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which may relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incidental thereto.
F. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents.
G. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and Drawings identified in the
Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformance with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
Bidder has not solicited or induced any individual or entity to refrain from bidding; and
Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
5.01 Bidder will complete the Work in accordance with the Contract Documents for the Bid items described in Section 01 22 00 of the Contract Documents, for the following price(s):
Associates, Inc. 00 41 00 - 3 Revised 03.02.2026
UNIT PRICE WORK ITEMS
Item No.
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 1 – RCP
1-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
1-2 Maintenance & Protection of Traffic LS 1
1-3 Filter Bags EA 27
1-4 Tree Removal EA 21
1-5 Remove Existing Curb & Storm Run LS 1
1-6 Remove & Reset Mailboxes LS 1
1-7 6” Water Main Relocation EA 3
1-8 8” Water Main Relocation EA 3
1-9 15” RCP LF 530
1-10 24” RCP LF 1630
1-11 Storm Manholes EA 9
1-12 Storm Inlets EA 26
1-13 Trench Pavement Restoration LS 1
1-14 Driveway Restoration EA 16
1-15 Vertical Concrete Curb LF 3255
1-16 Lawn Restoration LS 1
1-17 Tree Installation EA 21
Contingency Items*
*1-18 Water Service Relocation EA 10
TO BE COMPLETED ON
PENNBID
*1-19 Sanitary Sewer Lateral Relocation EA 5
*1-20 Soft Spot Repair CY 50
*1-21 Sinkhole Repairs CY 10
*1-22 Geotextile Material, Class 4, Type C SY 50
*1-23 Extra 2A Aggregate Stone TON 20
*1-24 Extra Rock Excavation CY 10
* Contingency item to be used only at direction of Owner or Engineer
Associates, Inc. 00 41 00 - 4 Revised 03.02.2026
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 2 – HDPE
2-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
2-2 Maintenance & Protection of Traffic LS 1
2-3 Filter Bags EA 27
2-4 Tree Removal EA 21
2-5 Remove Existing Curb & Storm Run LS 1
2-6 Remove & Reset Mailboxes LS 1
2-7 6” Water Main Relocation EA 3
2-8 8” Water Main Relocation EA 3
2-9 15” HDPE LF 530
2-10 24” HDPE LF 1630
2-11 Storm Manholes EA 9
2-12 Storm Inlets EA 26
2-13 Trench Pavement Restoration LS 1
2-14 Driveway Restoration EA 16
2-15 Vertical Concrete Curb LF 3255
2-16 Lawn Restoration LS 1
2-17 Tree Installation EA 21
Contingency Items*
*2-18 Water Service Relocation EA 10
TO BE COMPLETED ON
PENNBID
*2-19 Sanitary Sewer Lateral Relocation EA 5
*2-20 Soft Spot Repair CY 50
*2-21 Sinkhole Repairs CY 10
*2-22 Geotextile Material, Class 4, Type C SY 50
*2-23 Extra 2A Aggregate Stone TON 20
*2-24 Extra Rock Excavation CY 10
Associates, Inc. 00 41 00 - 5 Revised 03.02.2026
Item No.
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 3 – Kim Street Storm Sewer Extension (RCP)
3-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
3-2 Maintenance & Protection of Traffic LS 1
3-3 Filter Bags EA 7
3-4 Tree Removal EA 4
3-5 Remove Existing Rolled Curb LS 1
3-6 Remove & Reset Mailboxes LS 1
3-7 15” RCP LF 77
3-8 24” RCP LF 422
3-9 Storm Manholes EA 1
3-10 Storm Inlets EA 7
3-11 Trench Pavement Restoration LS 1
3-12 Driveway Restoration EA 3
3-13 Vertical Concrete Curb LF 1295
3-14 Lawn Restoration LS 1
3-15 Tree Installation EA 4
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 4 – Kim Street Storm Sewer Extension (HDPE)
4-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
4-2 Maintenance & Protection of Traffic LS 1
4-3 Filter Bags EA 7
4-4 Tree Removal EA 4
4-5 Remove Existing Rolled Curb LS 1
4-6 Remove & Reset Mailboxes LS 1
4-7 15” HDPE LF 77
4-8 24” HDPE LF 422
4-9 Storm Manholes EA 1
4-10 Storm Inlets EA 7
Associates, Inc. 00 41 00 - 6 Revised 03.02.2026
Item No.
Description Unit Est Qty
Unit Price Total Price
4-11 Trench Pavement Restoration LS 1
TO BE COMPLETED ON
PENNBID
4-12 Driveway Restoration EA 3
4-13 Vertical Concrete Curb LF 1295
4-14 Lawn Restoration LS 1
4-15 Tree Installation EA 4
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 5 – Full Width Pavement
5-1 Full Width Pavement SY 6198 TO BE COMPLETED ON
PENNBID
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 6 – Full Width Pavement (Kim Street)
6-1 Full Width Pavement SY 2086 TO BE COMPLETED ON
PENNBID
5.02 Unit prices have been computed in accordance with paragraph 13.03.B of the Standard
General Conditions.
5.03 Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for unit price Bid items will be based on actual quantities provided, as determined in the Contract Documents.
6.01 Bidder agrees that the Work will be complete and ready for final payment in accordance with paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.
6.03 Bidder acknowledges that the Township anticipates issuing the Notice to Proceed for the work to begin in April 2026 and Bidder agrees to have work force available to complete the project in accordance with Section 6.01 above.
6.04 Bidder acknowledges that the award will be based on the lowest total of the Bid Alternative items selected by the Township. Hanover Township reserves the right at its option to award as part of the contract, none, some, or all of the Alternative Items. If any or all of the Alternative Items are awarded, they must be constructed within the Contract Time specified in the Agreement.
Associates, Inc. 00 41 00 - 7 Revised 03.02.2026
7.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid Security (10% of the BID) in the form of:
B. Statement of Bidder’s Qualifications (Document 00 45 13).
C. Non-Collusion Affidavit (Document 00 45 19).
D. Certification of Non-Segregated Facilities (Document 00 45 33).
E. Nondiscrimination/Sexual Harassment Clause (Document 00 45 36).
8.01 The terms used in this Bid are defined in the Instructions to Bidders, Standard General
Conditions and Supplementary Conditions.
9.01 Communications concerning this Bid shall be addressed to the address of Bidder indicated below.
SUBMITTED on ___________________________________________, 2026.
Associates, Inc. 00 41 00 - 8 Revised 03.02.2026
If Bidder is:
An Individual
By: (SEAL)
(Individual's Name) doing business as
Business Address:
Phone No.: ( ) Fax No.: ( )
A Partnership *
(Name of Partnership)
Witness:
By:
Partner
*All Partners must execute this Bid
Address of Partnership Bidder:
Contact Person:
Associates, Inc. 00 41 00 - 9 Revised 03.02.2026
A Corporation
(Name of Corporation)
ATTEST:
By: By:
(Assistant) Secretary (Vice) President
[CORPORATE SEAL]
(or, if appropriate)
(Name of Corporation)
Witness:
**By:
(Authorized Representative)
** Attach appropriate corporate resolution evidencing authority to execute the Bid on behalf of the corporation.
Address of Corporation Bidder:
Contact Person:
Associates, Inc. 00 41 00 - 10 Revised 03.02.2026
A Joint Venture
(Name)
(Address)
(Name)
(Address)
Address for Receipt of Official Communications:
(Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.)
END OF DOCUMENT
Hanover Engineering Price and Payment Procedures
Associates, Inc. 01 20 00 - 1 Revised 03.02.2026
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Applications for payment.
B. Change procedures.
C. Defect assessment.
D. Unit prices.
1.2 APPLICATIONS FOR PAYMENT
A. Submit three copies of each application directly to Engineer.
B. Content and Format: Utilize EJCDC C-620 schedule of values, or approved Contractor's electronic media driven form for listing items in Application for Payment.
C. Submit an updated construction progress schedule with each Application for Payment.
D. Include Statement of Compliance and all supporting wage rate and payroll documentation for each week covered by the payment application.
E. Submit proof to Engineer, with each Progress Payment Application, that adequate notes and measurements have been made for all work covered by that payment application, to permit the subsequent completion of the required Project Record Documents.
F. Payment Period: Submit monthly.
1.3 CHANGE PROCEDURES
A. Submittals: Submit name of individual authorized to receive change documents, and be responsible for informing others in Contractor's employ or Subcontractors of changes to the Work.
B. The Engineer will advise of minor changes in the Work not involving an adjustment to
Contract Price or Contract Time by issuing supplemental instructions in a Field Order.
C. The Engineer may issue a Proposal Request which includes a detailed description of a proposed change with supplementary or revised Drawings and/or specifications, a change in Contract Time for executing the change (if any) and the period of time during which the requested price will be considered valid. Contractor will prepare and submit an estimate within seven (7) days.
D. The Contractor may propose changes by submitting a request for change to the Engineer, describing the proposed change and its full effect on the Work. Include a statement
Associates, Inc. 01 20 00 - 2 Revised 03.02.2026 describing the reason for the change, and the effect on the Contract Price and Contract
Time with full documentation.
E. Unit Price Change Order: For contract unit prices and quantities, the Change Order will be executed on a fixed unit price basis. For unit costs of work items which are not pre-determined, execute Work under a Work Change Directive; changes in Contract Price or
Contract Time will be computed as specified for Force Account Change Order.
F. Work Change Directive: Engineer may issue a directive, on EJCDC C-940 Work Change
Directive form signed by the Owner, instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. Document will describe changes in the Work, and designate method of determining any change in Contract Price or Contract Time. Promptly execute the change.
G. Force Account Change Order: Submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract.
Engineer will determine the change allowable in Contract Price and Contract Time as provided in the Contract Documents. Payment to be based on Contractor's direct costs for products, delivery, installation, labor, and equipment, plus 15% markup for Contractor’s overhead and profit. If Force Account work is performed by a Subcontractor, pay that
Subcontractor for direct costs plus 15% markup, as described above, and Contractor will be paid Subcontractor’s invoiced amount plus an administrative fee of 5%.
H. Maintain and submit detailed records of work done on Force Account basis. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work.
I. Document each quotation for a change in cost or time with sufficient data to allow evaluation of the quotation.
J. Change Order Forms: EJCDC C-941 Change Order.
K. Execution of Change Orders: Engineer will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.
L. Correlation of Contractor Submittals:
1. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item; adjust the Contract Price.
2. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by the change, and resubmit.
3. Promptly enter changes in Project Record Documents.
1.4 DEFECT ASSESSMENT
A. Replace the Work, or portions of the Work, not conforming to specified requirements.
1. If, in the opinion of the Engineer, it is not practical to remove and replace the
Work, the Engineer will direct an appropriate remedy or adjust payment.
2. When defective Work is to remain, the lump sum or unit price will be reduced 50 percent, at the discretion of the Engineer.
3. The authority of the Engineer to assess defects and identify payment adjustments is final.
Associates, Inc. 01 20 00 - 3 Revised 03.02.2026
B. Non-Payment For Rejected or Unacceptable Products: Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products delivered but not yet incorporated in the Work.
4. Products placed beyond the lines and levels of the required Work.
5. Products remaining on hand after completion of the Work.
6. Loading, hauling, and disposing of rejected products
1.5 UNIT PRICES (IF NEEDED FOR ADDITIONAL WORK)
A. Authority: Measurement methods delineated in the individual specification sections (if any) complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern.
B. Take measurements and compute quantities. The Engineer will verify measurements and quantities.
C. Unit Quantities: Quantities and measurements indicated in the Bid Form are for contract purposes only. Actual quantities provided shall determine payment.
1. If the actual Work requires more or fewer quantities than those quantities indicated, provide the required quantities at the unit prices contracted.
2. If the actual Work requires a change in quantity, the Owner or Contractor may claim for a Contract Price adjustment, in accordance with and subject to the terms and limitations noted in the Standard and Supplementary Conditions, Article 13.
D. Payment Includes: Full compensation for required labor, products, tools, equipment, plant and facilities, transportation, services and incidentals, temporary relocations and protection; erection, application or installation of an item of the Work; overhead and profit.
E. Final payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities accepted by the Engineer multiplied by the unit Price for
Work which is incorporated in or made necessary by the Work.
F. Measurement of Quantities:
1. Weigh Scales: Inspected, tested and certified by the applicable County Weights and Measures department within the past year.
2. Platform Scales: Of sufficient size and capacity to accommodate the conveying vehicle.
3. Metering Devices: Inspected, tested and certified by applicable State department within past year.
4. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness, or by standard volume of liquid measure.
5. Measurement by Area: Measured by square dimension using mean length and width or radius.
6. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord.
7. Lump Sum or Stipulated Price: Items measured by volume, area, or linear means or combination, as appropriate, as a completed item or unit of the Work.
Associates, Inc. 01 20 00 - 4 Revised 03.02.2026
G. DESCRIPTION OF PAY ITEMS
1. The individual pay items of this Project include all labor, materials, equipment, supplies, delivery, storage, disposal, traffic control, erosion control, protection, overhead and profit to provide the Work, complete in-place as required by the specifications and described below:
a. Section 01 22 00 – Payment Items
2. Hanover Township reserves the right at its option to award as part of the contract, none, some, or all of the Bid Alternatives. If any or all of the Bid Alternatives are awarded, they must be constructed within the Contract Time specified in the
Agreement. Bidder acknowledges that the award will be based on the lowest total of the Bid Alternative items selected by the Township.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
END OF SECTION
Revised 03.02.2026 – Addendum 1
EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 15 - Page 1 of 7
DOCUMENT 00 52 15
AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
THIS AGREEMENT is by and between Hanover Township (“Owner”) and
(“Contractor”).
Owner and Contractor hereby agree as follows:
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
(Check One): General Contract Electrical Contract
ARTICLE 2 – THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Stafore Estates Storm Sewer Extension, Project H24-22, in Hanover Township, Northampton County, PA.
ARTICLE 3 – ENGINEER
3.01 The Project has been designed by Hanover Engineering Associates, Inc.
3.02 The Owner has retained Hanover Engineering Associates, Inc. (“Engineer”) to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 – CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Times: Days
A. The Work will be substantially completed within 120 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 150 days after the date when the Contract Times commence to run.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 15 - Page 2 of 7
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the Contract. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner $2,685.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $2,685.00 for each day that expires after such time until the Work is completed and ready for final payment.
3. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently.
ARTICLE 5 – CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract:
A. For all Unit Price Work, an amount equal to the sum of the extended prices (established for each separately identified item of Unit Price Work by multiplying the unit price times the actual quantity of that item):
Unit Price Work
Item No.
Description Unit Estimated Quantity
Unit Price
Extended Price
See 5.01.B
Total of all Extended Prices for Unit Price Work (subject to final adjustment based on actual quantities)
The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer.
B. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an exhibit.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 15 - Page 3 of 7
ARTICLE 6 – PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on or about the 30th day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract
a. 90 percent of Work completed (with the balance being retainage). If the Work has been 50 percent completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage payments will be made in the amount of 95 percent of Work completed (with the balance being retainage);
and
b. Zero percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage) i.e., Owner will NOT pay for materials or equipment not yet incorporated in the Work.
B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions, and less 150 percent of Engineer’s estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment.
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 15.06.
ARTICLE 7 – INTEREST
7.01 All amounts not paid when due shall bear interest at the rate of 0 percent per annum.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 15 - Page 4 of 7
ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS
8.01 In order to induce Owner to enter into this Contract, Contractor makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents, and any data and reference items identified in the Contract Documents.
B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
E. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Site-related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and (3) Contractor’s safety precautions and programs.
F. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
J. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 15 - Page 5 of 7
ARTICLE 9 – CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (inclusive).
2. Performance bond (inclusive).
3. Payment bond (inclusive).
4. Maintenance Bond in amount of 15% of Final Adjusted Contract Cost
(to be submitted at the end of the project).
5. General Conditions (inclusive).
6. Supplementary Conditions (inclusive).
7. Specifications as listed in the table of contents of the Project Manual.
8. Drawings listed on the attached sheet index.
9. Addenda (inclusive).
10. Exhibits to this Agreement (enumerated as follows):
a. Contractor’s Bid (inclusive).
11. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto:
a. Notice to Proceed.
b. Work Change Directives.
c. Change Orders.
d. Field Orders.
B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in the General Conditions.
ARTICLE 10 – MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions.
10.02 Assignment of Contract
Unless expressly agreed to elsewhere in the Contract, no assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, money that may become due and money that is due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 15 - Page 6 of 7 by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its successors, assigns, and legal representatives to the other party hereto, its successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
10.05 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
10.06 Other Provisions
A. Owner stipulates that if the General Conditions that are made a part of this Contract are based on EJCDC® C-700, Standard General Conditions for the Construction Contract, published by the Engineers Joint Contract Documents Committee®, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or “track changes” (redline/strikeout), or in the Supplementary Conditions.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 52 15 - Page 7 of 7
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.
This Agreement will be effective on , 20_____ (which is the Effective Date of the Contract).
OWNER: CONTRACTOR:
By: By:
Title: Title:
(If Contractor is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest: Attest:
Title: Title:
Address for giving notices: Address for giving notices:
Hanover Township
3630 Jacksonville Rd
Bethlehem, PA 18017
(If Owner is a corporation, attach evidence of authority to sign. If Owner is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of this Agreement.)
File details come from the government source that posted it. Updated .