2-StaforeEstates StormSewerExtension ProjectManual.pdf
PDF 8 MB Posted
- Attached to
- Stafore Estates Storm Sewer Extension
- Solicitation number
- US.222312
- Issued by
- Luzerne County, Arona Borough, Pennsylvania
About this file
This is a Project Manual for the Stafore Estates Storm Sewer Extension project prepared by Hanover Engineering Associates, Inc. for Hanover Township in Northampton County, Pennsylvania. The project involves construction of a storm sewer extension in the existing Stafore Estates Development primarily on Gaspar Avenue and Kim Street, including installation of reinforced concrete pipe (RCP) or high-density polyethylene (HDPE) pipe, storm structures, vertical concrete curb, trench restoration, erosion and sediment control facilities, and miscellaneous restoration work. Bid proposals will be received online via the PennBid Program until 1:00 PM prevailing time on March 18, 2026, with final questions due by 4:00 PM on March 10, 2026, and a final addendum issued by 4:00 PM on March 13, 2026. The contract includes four primary bid alternatives (RCP pipe, HDPE pipe for the main project, and two options for Kim Street extension), plus two full-width pavement alternatives. The work is organized as unit price items with estimated quantities provided for bid comparison purposes, and final payment will be based on actual quantities as determined by the Engineer. The contract time is 120 days for substantial completion and 150 days for final completion.
Each proposal must be accompanied by a Bid Bond, certified check, or other acceptable security in the amount of 10 percent of the total Base Bid. Bids will remain effective for 60 calendar days from the opening date and may not be withdrawn during this period. The successful bidder must execute the Agreement and furnish required bonds and insurance within 15 calendar days of receiving the Notice of Award. Performance and Payment Bonds, each in the amount of 100 percent of the contract price, and a Maintenance Bond in the amount of 15 percent of the final adjusted contract cost are required. The project is subject to Davis-Bacon Act prevailing wage requirements, OSHA conditions, Pennsylvania Act 287 (Underground Utility Line Protection Law), the Public Works Employment Verification Act, and Pennsylvania Human Relations Act conditions. Liquidated damages for failure to achieve substantial completion are set at $2,685.00 per day, and progress payments will be made at 90 percent of completed work with 10 percent retainage until substantial completion. Hanover Township reserves the right to reject any or all bids and to waive informalities not involving price, time, or changes in the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-StaforeEstates StormSewerExtension Plans.pdf | ||
| 3-Addendum1 StaforeEstsStormSewerExtension.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
STAFORE ESTATES
STORM SEWER EXTENSION
HANOVER TOWNSHIP
NORTHAMPTON COUNTY, PENNSYLVANIA
FEBRUARY 2026
Prepared for:
Hanover Township 3630 Jacksonville Road
Bethlehem, PA 18017-9302
Prepared by:
252 Brodhead Road Suite 100 Bethlehem, PA 18017-8944
Phone: 610.691.5644 Fax: 610.691.6968 HanoverEng.com
Hanover Project H24-22
Stafore Estates Hanover Township
Storm Sewer Extension Project H24-22
Hanover Engineering
Associates, Inc. 00 01 10 - 1 Table of Contents
DOCUMENT 00 01 10
TABLE OF CONTENTS
INTRODUCTORY INFORMATION
DOCUMENT TITLE
00 00 01 Title Page
00 01 10 Table of Contents
00 01 15 List of Drawings
BIDDING REQUIREMENTS
DOCUMENT TITLE
00 11 13 Advertisement for Bids
00 21 13 Instructions to Bidders
00 41 00 Bid Form
00 43 13 Bid Bond
00 45 13 Statement of Bidder's Qualifications
00 45 19 Non-Collusion Affidavit
00 45 33 Certification of Non-Segregated Facilities
00 45 36 Nondiscrimination/Sexual Harassment Clause
CONTRACT FORMS AND CONDITIONS OF THE CONTRACT DOCUMENTS
DOCUMENT TITLE
00 51 00 Notice of Award
00 52 15 Agreement
00 55 00 Notice to Proceed
00 61 14 Performance Bond
00 61 15 Payment Bond
00 61 50 Maintenance Bond
00 62 17 Worker’s Compensation Affidavit
00 62 18 CDL Program – Statement of Compliance
00 62 26 Public Works Employment Verification Form
00 62 43 Non-Collusion Affidavit of Subcontractors
00 72 15 General Conditions – EJCDC C-700, 2013
00 73 14 Supplementary Conditions
Associates, Inc. 00 01 10 - 2 Table of Contents
00 85 00 Davis Bacon Wages
GENERAL SPECIFICATIONS
SECTION TITLE
01 10 00 Summary of Work
01 20 00 Price and Payment Procedures
01 22 00 Payment Items
01 30 00 Administrative Requirements
01 33 00 Submittals
01 40 00 Quality Requirements
01 50 00 Temporary Facilities
01 55 26 Traffic Control
01 57 13 Erosion and Sediment Control
01 60 00 Product Requirements
01 70 00 Execution and Closeout Requirements
TECHNICAL SPECIFICATIONS
SECTION TITLE
03 10 00 Concrete Forms and Accessories
03 20 00 Concrete Reinforcing
03 30 00 Cast-in-Place Concrete
31 01 00 Restoration
31 05 13 Soils for Earthwork
31 05 16 Aggregates for Earthwork
31 23 18 Rock Removal
31 23 33 Trenching
31 40 00 Sinkhole Remedial Procedure
32 12 16 Asphalt Paving
32 16 00 Curbs, Gutters, Sidewalks, and Driveways
32 91 19 Landscape Grading
32 92 19 Seeding and Soil Supplements
33 05 14 Manholes and Structures
33 41 13 Storm Drainage Piping
Associates, Inc. 00 01 10 - 3 Table of Contents
APPENDICES
APPENDIX A City of Bethlehem, PA – Specifications for Laying Water Mains
APPENDIX B City of Bethlehem, PA – Excavation, Trenching and Backfilling for Utility
Systems
END OF DOCUMENT
Hanover Engineering Associates, Inc. 00 01 15 - 1 List of Drawings
DOCUMENT 00 01 15
LIST OF DRAWINGS
1. Stafore Estates Storm Sewer Extension Project Plans, Sheets 1 - 10 of 10, dated February 16, 2026.
Associates, Inc. 00 11 13 - 1 Advertisement to Bid
DOCUMENT 00 11 13
ADVERTISEMENT FOR BIDS
Bid Form and electronic copy of Bid Security for the Stafore Estates Storm Sewer Extension will be received online via the PennBid Program until 1:00 PM prevailing time on March 18, 2026. The bid tabulations from the PennBid website will be publicly opened online the same day.
Final questions are due no later than 4:00 PM on March 10, 2026. A final addendum will be issued by 4:00 PM on March 13, 2026.
The project consists of a storm sewer extension in the existing Stafore Estates Development mainly on Gaspar Avenue and Kim Street. Work includes installation of RCP, storm structures, vertical concrete curb, trench restoration, as well as installation of erosion and sediment control facilities and miscellaneous restoration. Bid alternates are also include for this project, such as utilizing HDPE pipe instead of RCP, extending the storm sewer system further on Kim Street, and milling/overlaying the full width of the road within the project limits.
All Bid Documents and details are available at no cost online at https://pennbid.bonfirehub.com
Each proposal shall be accompanied by a Bid Bond in the required form, certified check, bank cashier’s check, or other security acceptable, to the Owner in the amount of 10% of the total Base Bid. Bids will be effective for 60 calendar days from the Bid opening date except as permitted by law, and may not be withdrawn during this period.
This Project is subject to the Davis Bacon Act conditions.
This Project is subject to the Federal Occupational Safety & Health Act of 1970 (OSHA) conditions.
This Project is subject to Pennsylvania Act 287 of 1974, as amended by Act 172 of 1986, as amended by Act 38 of 1991, as amended by Act 187 of 1996.
This Project is subject to the Public Works Employment Verification Act.
This Contract is subject to Pennsylvania Human Relations Act 222 conditions.
This Contract is subject to the Non-discrimination in Employment/Contract Compliance Regulations Conditions.
Hanover Township reserves the right at its option to waive any informalities, irregularities, defects, errors or omissions in any or all of Bids and to accept or reject any or all parts of the Bids which in its judgment is in the best interest of Hanover Township.
Hanover Township Board of Supervisors https://pennbid.bonfirehub.com/
Associates, Inc. 00 21 13 - 1 Instructions to Bidders
DOCUMENT 00 21 13
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page Number
Article 1. DEFINED TERMS 2
Article 2. COPIES OF BIDDING DOCUMENTS 2
Article 3. QUALIFICATIONS OF BIDDERS 2
Article 4. EXAMINATION OF CONTRACT DOCUMENTS, OTHER RELATED DATA AND SITE 3
Article 5. PRE-BID CONFERENCE 5
Article 6 SITE AND OTHER AREAS 6
Article 7. INTERPRETATIONS AND ADDENDA 6
Article 8. BID SECURITY 6
Article 9. CONTRACT TIME 7
Article 10. LIQUIDATED DAMAGES 7
Article 11. SUBSTITUTE OR AND "OR-EQUIVALENT" ITEMS 7
Article 12. SUBCONTRACTORS, SUPPLIERS AND OTHERS 7
Article 13. BID FORM 8
Article 14. BASIS OF BID; EVALUATION OF BIDS 8
Article 15. SUBMITTAL OF BIDS 9
Article 16. MODIFICATION AND WITHDRAWAL OF BIDS 9
Article 17. OPENING OF BIDS 9
Article 18. BIDS TO REMAIN SUBJECT TO ACCEPTANCE 9
Article 19. AWARD OF CONTRACT 9
Article 20. CONTRACT SECURITY AND INSURANCE 10
Article 21. SIGNING OF AGREEMENT 10
Article 22. SALES AND USE TAX 10
Article 23. RETAINAGE 10
Article 24. NON-COLLUSION 11
Article 25. EMPLOYMENT VERIFICATION ACT 11
Associates, Inc. 00 21 13 - 2 Instructions to Bidders
INSTRUCTIONS TO BIDDERS
Article 1. DEFINED TERMS
1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instruction to Bidders have the meanings indicated below which are applicable to both singular and plural thereof:
A. "Bidder" - The individual or entity who submits a Bid directly to OWNER as distinct from a sub-bidder, who submits a Bid to a Bidder.
B. "Issuing Office" - the office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
C. "Successful Bidder" - the lowest, qualified, responsible and responsive Bidder to whom OWNER, on the basis of OWNER'S evaluation as hereinafter provided, makes an award.
D. "Bidding Documents" - includes the Advertisement for Bids, Instructions to Bidders, the Bid Form, and the proposed Contract Documents, including all Addenda issued prior to receipt of Bids.
E. PennBid Program - Online Electronic Procurement program (https://pennbid.bonfirehub.com) containing all Bidding Documents and where sealed bids and proposals must be submitted.
Article 2. COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents are available on the Documents tab within PennBid.
2.02 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor ENGINEER assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 OWNER and ENGINEER in making Bidding Documents available on the above terms do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
Article 3. QUALIFICATIONS OF BIDDERS
3.01 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit, within five days after Bid opening upon OWNER'S request, all that information as OWNER requires in determining the successful Bidder. Consideration will be given to, but will not be limited to, the following conditions.
Whether the Bidder:
1. Maintains a permanent place of business;
https://pennbid.bonfirehub.com/
Associates, Inc. 00 21 13 - 3 Instructions to Bidders
2. Has adequate equipment to do the Work properly and expeditiously;
3. Has suitable financial status to meet obligations incident to the Work;
4. Has had experience on projects of similar character and magnitude;
5. Has qualification to do business in the state where the project is located; and,
6. Is PennDOT pre-qualified if required in the Advertisement for Bids.
3.02 The OWNER may require the Bidder to furnish written evidence of the foregoing.
3.03 No Bid will be accepted from anyone who is in arrears to the OWNER upon debt or contract, or who is a defaulter on surety or otherwise upon any obligations, or whose work heretofore has been unsatisfactory or dilatory, or currently under suspension or debarment by the Commonwealth, any other State, or the federal government.
Article 4. EXAMINATION OF CONTRACT DOCUMENTS, OTHER RELATED DATA
AND SITE
4.01 Subsurface and Physical Conditions
The Supplementary Conditions identify:
Those reports of explorations and tests of subsurface conditions at or contiguous to the site that the ENGINEER has used in preparing the Bidding Documents.
Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the site (except underground facilities) that the ENGINEER has used in preparing the Bidding Documents.
Copies of reports and drawings referenced in paragraph 4.01 will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which Bidder is entitled to rely as provided in paragraph 5.03 of the General Conditions has been identified and established in paragraph 5.03 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any technical data or any other data, interpretations, opinions or information contained in such reports or shown or indicated on such drawings.
4.02 Underground Facilities
Information and data shown or indicated in the Bidding Documents with respect to existing underground facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such underground facilities, including OWNER or others.
Associates, Inc. 00 21 13 - 4 Instructions to Bidders
4.03 Hazardous Environmental Conditions
The Supplementary Conditions identify those reports and drawings relating to a hazardous environmental condition identified at the site, if any, that ENGINEER has used in preparing the Bidding Documents.
Copies of reports and drawings referenced in paragraph 5.03.A will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which Bidder is entitled to rely as provided in paragraph 5.06 of the General Conditions has been identified and established in paragraph 5.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any technical data or any other data, interpretations, opinions or information contained in such reports or shown or indicated on such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and underground facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 5.03, 5.04, and 5.05 of the General Conditions.
Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to an hazardous environmental condition at the site, if any, and possible changes in the Contract Documents due to any hazardous environmental conditions uncovered or revealed at the site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 5.06 of the General Conditions.
4.05 On request, OWNER will provide Bidder access to the site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.06 Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work that is to be performed at the site by OWNER or others (such as utilities and other prime contractors) that relates to the Work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination prior to or copies of Contract Documents (other than portions thereof related to price) for such other work.
4.07 It is the responsibility of each Bidder before submitting a Bid:
A. To thoroughly examine the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to below);
B. To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work;
To become familiar with and satisfy Bidder as to all federal, state and local laws and regulations that may affect cost, progress or performance of the Work.
Carefully study all reports of exploration and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been
Associates, Inc. 00 21 13 - 5 Instructions to Bidders identified in the Supplementary Conditions as provided in paragraph 5.03 of the General Conditions, and carefully study all reports and drawings of a hazardous environmental condition, if any, at the site which have been identified in the Supplementary Conditions as provided in paragraph 5.06 of the General Conditions.
Obtain and carefully study (or assume responsibility for doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the site, which may affect cost, progress or performance of construction to be employed by Bidder, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs thereof.
Agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
Become aware of the general nature of the work to be performed by OWNER and others at the site that relates to the Work as indicated in the Bidding Documents.
Correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
Promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder.
Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Contract Documents and the written resolutions thereof by the ENGINEER is acceptable to Bidder, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
4.09 The provisions of paragraphs 4.01 through 4.08 do not apply to asbestos, polychlorinated biphenyls (PCBs), petroleum, hazardous waste or radioactive material covered by paragraph 5.06 of the General Conditions.
Article 5. PRE-BID CONFERENCE
5.01 A pre-bid conference, if stated in the Advertisement for Bids, will be held at the date and time noted in the Advertisement for Bids. Representatives of OWNER and ENGINEER will be present to discuss the project. Bidders are required to attend and participate in any such conference. ENGINEER will transmit all prospective Bidders of record such Addenda as
Associates, Inc. 00 21 13 - 6 Instructions to Bidders
ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. Bids submitted by Bidders not attending any such conference may be rejected at OWNER'S discretion.
Article 6 SITE AND OTHER AREAS
6.01 The lands upon which Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.
Article 7. INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Contract Documents are to be submitted in writing via PennBid’s Questions tab. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda, electronically posted within PennBid’s Documents tab, and all parties recorded as having received the Bidding Documents will be notified via email. Questions must be submitted by the Question cutoff date and time as indicated in PennBid’s Questions tab. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or ENGINEER.
Article 8. BID SECURITY
8.01 Each Bid must be accompanied by Bid Security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price, unless otherwise modified in the Advertisement for Bids, and in the form of a certified or bank check or a Bid Bond issued by a surety company meeting the requirements of paragraphs 6.01 and 6.02 of the General Conditions. The Bid Security is required as assurance that the Bidder will, upon acceptance of the bid, execute such contractual documents as may be required within the time specified.
8.02 The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required Contract security within 15 calendar days after the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom the OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of Agreement or the sixtieth day after the Bid opening, whereupon Bid Security furnished by such Bidders will be returned provided, however, that if the award of the Contract is delayed by required approval of another governmental agency, the sale of bonds, or the award of a grant, the OWNER may retain Bid securities until 120 days after the date of Bid opening.
Associates, Inc. 00 21 13 - 7 Instructions to Bidders
8.03 Bid Security with Bids which are not competitive will be returned within seven calendar days after the Bid opening.
8.04 Bid securities that are forfeited will be paid to the OWNER as liquidated damages.
Article 9. CONTRACT TIME
9.01 The numbers of days within which, or the dates by which, the Work is to be substantially completed and also completed and ready for final payment (the Contract time) are set forth in the Bid Form and the Agreement.
Article 10. LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement and Supplementary Conditions.
Article 11. SUBSTITUTE OR AND "OR-EQUIVALENT" ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or "or approved equivalent" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or approved equivalent" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the effective date of the Agreement.
The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in paragraphs 7.04 and 7.05 of the General Conditions and may be supplemented in the General Requirements.
Article 12. SUBCONTRACTORS, SUPPLIERS AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain subcontractors, suppliers, individuals or entities to be submitted to OWNER in advance of specified date prior to the effective date of the Agreement, the apparent successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to OWNER a list of all such subcontractors, suppliers, individuals or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualifications for each such subcontractor, supplier, individual or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed subcontractor, supplier, individual or entity, OWNER may, before Notice of Award is given request apparent successful Bidder to submit a substitute.
12.02 If successful Bidder declines to make any substitutions, OWNER may award the Contract to the next lowest Bidder that proposes to use acceptable subcontractors, suppliers, individuals or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any subcontractor, supplier, individual or entity so listed and against which OWNER or ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in paragraph 7.06 of the General Conditions.
12.03 CONTRACTOR shall not be required to employ any subcontractor, supplier, individual or entity against whom the CONTRACTOR has reasonable objection.
Associates, Inc. 00 21 13 - 8 Instructions to Bidders
Article 13. BID FORM
13.01 The Bid Form is included within PennBid’s Bid tab.
13.02 All blanks containing an asterisk (*) on the Bid Form must be completed
13.03 Bids by corporations must be executed in the corporate name by the president or vice president, or other corporate officer with authority to submit bids on behalf of their company.
13.04 Bids by partnerships must be executed in the partnership and submitted by person with authority to submit bids on behalf of their company.
13.05 A Bid by a limited liability company shall be executed in the name of the firm and submitted by person with authority to submit bids on behalf of their company.
13.06 A Bid by an individual shall show the Bidder(s) name.
13.07 A Bid by a joint venture shall be executed by and submitted by person with authority to submit bids on behalf of the joint venture.
13.08 The Bid shall contain an acknowledgment of receipt by all Addenda, the numbers of which must be filled in on the Bid Form.
13.10 The address and telephone number for communications regarding the Bid must be shown.
13.11 The Bid shall contain evidence of the Bidder(s) authority and qualification as an out of state corporation to do business in the state where the project is located or covenant to obtain such qualification prior to award of the Contract.
Article 14. BASIS OF BID; EVALUATION OF BIDS
14.01 Unit Price
Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid Form. The total of all estimated prices will be determined as the sum of the products of the estimated quantity of each item and the unit price bid for the item. The final quantities and Contract price will be determined in accordance with paragraph 13.03 of the General Conditions.
14.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in paragraph 13.02 of the General Conditions.
14.03 Bid prices will be compared after adjusting for differences in time designated by Bidders for substantial completion. The adjusting amount will be determined at the rate set forth in the Contract Documents for liquidated damages for failing to achieve substantial completion for each day before or after the desired date appearing in Article 9.
Associates, Inc. 00 21 13 - 9 Instructions to Bidders
Article 15. SUBMITTAL OF BIDS
15.01 Bids shall be submitted online via PennBid by the date and time indicated in the Advertisement for Bids, and shall include all required Bid Documents and an electronic copy of the Bid Security.
Article 16. MODIFICATION AND WITHDRAWAL OF BIDS
16.01 Bids may be modified or withdrawn via PennBid at any time prior to the bid due date and time.
16.02 OWNER will not consider, for any reason, any claim by the Bidder of any mistakes or omission in the Bid. Negligence of the Bidder in preparing the Bid shall not confer, or be deemed to confer, any right of the Bidder to withdraw such Bid after the time has passed, as fixed in the Invitation to Bid, for receiving Bids, except as permitted by law.
Article 17. OPENING OF BIDS
17.01 Bids will be opened as indicated in the Advertisement for Bids.
Article 18. BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for 60 days after the day of the Bid opening, unless indicated otherwise in the Advertisement for Bids; but OWNER may, in its sole discretion, release any Bid and return the Bid Security prior to that date, provided, however, that if the award of the Contract is delayed by required approval of financing, the sale of bonds, or the award of a grant, all Bids will remain subject to acceptance for 120 days after the day of the Bid opening.
Article 19. AWARD OF CONTRACT
19.01 OWNER reserves the right to reject any and all Bids, including without limitation the rights to reject any or all non-conforming, non-responsive, unbalanced or unconditional Bids and to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. OWNER also reserves the right to waive all informalities not involving price, time or changes in the Work and to negotiate Contract terms with the successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
19.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause of disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
Associates, Inc. 00 21 13 - 10 Instructions to Bidders
19.04 OWNER may consider the qualifications and experience of subcontractors, suppliers and other persons and organizations proposed for those portions of the Work as to which the identity of subcontractors, suppliers and other persons and organizations must be submitted as provided in the Supplementary Conditions. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantee of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice to Award.
19.05 OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of the Bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to OWNER'S satisfaction within the prescribed time.
19.06 If the Contract is to be awarded, it will be awarded to the lowest Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interests of the project.
19.07 If the Contract is to be awarded, OWNER will give the successful Bidder a Notice of Award within 60 calendar days or as otherwise stipulated in the Advertisement for Bids, after the day of the Bid opening.
Article 20. CONTRACT SECURITY AND INSURANCE
20.01 Article 6.01 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth OWNER'S requirements as to the Performance Bond and Payment Bond, each in an amount of 100 percent (100%) of the contract price, and insurances. The Performance Bond is executed in connection with the contract to secure fulfillment of all of the contractor’s obligations under such contract. The Payment Bond is executed in connection with the contract to assure payment as required by law of all persons supplying labor and materials in the execution of the work provided in the contract. When the successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the required Performance Bond and Payment Bond.
Article 21. SIGNING OF AGREEMENT
21.01 When OWNER gives a Notice of Award to the successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement. Within 15 days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and certificates of insurance to OWNER with the required bonds. Thereafter, OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of Drawings with appropriate identification.
Article 22. SALES AND USE TAX
22.01 OWNER may be exempt from certain sales and use taxes.
Article 23. RETAINAGE
23.01 Provisions concerning retainage and CONTRACTOR'S rights to deposit securities in lieu of retainage are set forth in the Agreement and the Supplementary Conditions.
Associates, Inc. 00 21 13 - 11 Instructions to Bidders
Article 24. NON-COLLUSION
24.01 Upon request by OWNER, all Bidders may be required to complete a Non- Collusion Affidavit. This affidavit may be required on all projects involving public funding as provided in Section 7 of the Pennsylvania Anti-Bid-Rigging Act. The Non-Collusion Affidavit, if required, must be submitted with the Bid.
Article 25. EMPLOYMENT VERIFICATION ACT
25.01 The Bidder’s attention is directed to the Public Works Employment Verification Act of November 3, 2022, P.L. 2048, No. 141, 71 P.S., Section 656.1-656.11, which requires that public works contractors and every subcontractor performing work under a public works contract shall utilize the United States Department of Homeland Security EVP system to verify the employment eligibility of each new employee hired after January 1, 2013. As a precondition to the award of a contract for public work, a public works contractor shall submit a completed EVP Form to the public body that is bidding and awarding the public work contract. During a public works contract, a new employee hired by a public works contractor, regardless of whether he will be working onsite or offsite of a public work or otherwise, shall be verified within five (5) business days of his start date.
Subcontracts between a public works contractor and its subcontractors are required to contain notification of the applicability of the act, information regarding the use of EVP and reference to the Department's web site at www.dgs.state.pa.us to obtain a copy of the Form. Prior to beginning either onsite or offsite work on a public works project, every subcontractor shall submit a completed EVP Form to the contracting public body. During a public works contract, a new employee hired by a public works subcontractor, regardless of whether he will be working onsite or offsite of a public work or otherwise, shall be verified within 5 business days of his start date.
Subcontracts between a subcontractor and its subcontractors are required to contain notification of the applicability of the act, information regarding the use of EVP and reference to the Department's web site at www.dgs.state.pa.us to obtain a copy of the Form.
http://www.dgs.state.pa.us/ http://www.dgs.state.pa.us/
Associates, Inc. 00 41 00 - 1 Bid Form
DOCUMENT 00 41 00
BID FORM
Project Identification: Stafore Estates Storm Sewer Extension
Project No.: H24-22
Name of Owner: Hanover Township
Name of Bidder:
1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
Agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid price and within the Bid times indicated in this Bid and in accordance with all other terms and conditions of the Contract Document.
2. Bidder accepts all of the terms and conditions of the Advertisement for Bids and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security.
This Bid will remain subject to acceptance for 60 days after the day of Bid opening or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
Bidder will sign and deliver the required number of counterparts of the Agreement with the
Bonds and other documents required by the bidding requirements within 15 days after the date of the OWNER’S Notice of Award.
3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:
A. Bidder has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged:
Addendum No. Addendum Date
B. Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, and performance of the
Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site
(except underground facilities) which have been identified in the Supplementary
Conditions as provided in paragraph 5.03 of the Standard General Conditions, and
(2) reports and drawings of a hazardous environmental condition, if any, which has
Associates, Inc. 00 41 00 - 2 Bid Form been identified in the Supplementary Conditions as provided in paragraph 5.06 of the Standard General Conditions.
E. Bidder has obtained and carefully studied (or assumes responsibility for having done
so) all such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which may relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incidental thereto.
F. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents.
G. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and Drawings identified in the
Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.
I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to Bidder.
J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on the behalf of any undisclosed individual or entity and is not submitted in conformance with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
Bidder has not solicited or induced any individual or entity to refrain from bidding; and
Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
5.01 Bidder will complete the Work in accordance with the Contract Documents for the Bid items described in Section 01 22 00 of the Contract Documents, for the following price(s):
Associates, Inc. 00 41 00 - 3 Bid Form
UNIT PRICE WORK ITEMS
Item No.
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 1 – RCP
1-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
1-2 Maintenance & Protection of Traffic LS 1
1-3 Filter Bags EA 27
1-4 Tree Removal EA 21
1-5 Remove Existing Curb & Storm Run LS 1
1-6 Remove & Reset Mailboxes LS 1
1-7 6” Water Main Relocation EA 3
1-8 8” Water Main Relocation EA 3
1-9 15” RCP LF 530
1-10 24” RCP LF 1630
1-11 Storm Manholes EA 9
1-12 Storm Inlets EA 26
1-13 Trench Pavement Restoration LS 1
1-14 Driveway Restoration EA 16
1-15 Vertical Concrete Curb LF 3255
1-16 Lawn Restoration LS 1
1-17 Tree Installation EA 21
Contingency Items*
*1-18 Water Service Relocation EA 10
TO BE COMPLETED ON
PENNBID
*1-19 Sanitary Sewer Lateral Relocation EA 5
*1-20 Soft Spot Repair CY 50
*1-21 Sinkhole Repairs CY 10
*1-22 Geotextile Material, Class 4, Type C SY 50
*1-23 Extra 2A Aggregate Stone TON 20
*1-24 Extra Rock Excavation CY 10
* Contingency item to be used only at direction of Owner or Engineer
Associates, Inc. 00 41 00 - 4 Bid Form
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 2 – HDPE
2-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
2-2 Maintenance & Protection of Traffic LS 1
2-3 Filter Bags EA 27
2-4 Tree Removal EA 21
2-5 Remove Existing Curb & Storm Run LS 1
2-6 Remove & Reset Mailboxes LS 1
2-7 6” Water Main Relocation EA 3
2-8 8” Water Main Relocation EA 3
2-9 15” HDPE LF 530
2-10 24” HDPE LF 1630
2-11 Storm Manholes EA 9
2-12 Storm Inlets EA 26
2-13 Trench Pavement Restoration LS 1
2-14 Driveway Restoration EA 16
2-15 Vertical Concrete Curb LF 3255
2-16 Lawn Restoration LS 1
2-17 Tree Installation EA 21
Contingency Items*
*2-18 Water Service Relocation EA 10
TO BE COMPLETED ON
PENNBID
*2-19 Sanitary Sewer Lateral Relocation EA 5
*2-20 Soft Spot Repair CY 50
*2-21 Sinkhole Repairs CY 10
*2-22 Geotextile Material, Class 4, Type C SY 50
*2-23 Extra 2A Aggregate Stone TON 20
*2-24 Extra Rock Excavation CY 10
Associates, Inc. 00 41 00 - 5 Bid Form
Item No.
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 3 – Kim Street Storm Sewer Extension (RCP)
3-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
3-2 Maintenance & Protection of Traffic LS 1
3-3 Filter Bags EA 7
3-4 Tree Removal EA 4
3-5 Remove Existing Rolled Curb LS 1
3-6 Remove & Reset Mailboxes LS 1
3-7 15” RCP LF 77
3-8 24” RCP LF 422
3-9 Storm Manholes EA 1
3-10 Storm Inlets EA 7
3-11 Trench Pavement Restoration LS 1
3-12 Driveway Restoration EA 3
3-13 Vertical Concrete Curb LF 1295
3-14 Lawn Restoration LS 1
3-15 Tree Installation EA 4
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 4 – Kim Street Storm Sewer Extension (HDPE)
4-1 Mobilization & Demobilization LS 1
TO BE COMPLETED ON
PENNBID
4-2 Maintenance & Protection of Traffic LS 1
4-3 Filter Bags EA 7
4-4 Tree Removal EA 4
4-5 Remove Existing Rolled Curb LS 1
4-6 Remove & Reset Mailboxes LS 1
4-7 15” HDPE LF 77
4-8 24” HDPE LF 422
4-9 Storm Manholes EA 1
4-10 Storm Inlets EA 7
Associates, Inc. 00 41 00 - 6 Bid Form
Item No.
Description Unit Est Qty
Unit Price Total Price
4-11 Trench Pavement Restoration LS 1
TO BE COMPLETED ON
PENNBID
4-12 Driveway Restoration EA 3
4-13 Vertical Concrete Curb LF 1295
4-14 Lawn Restoration LS 1
4-15 Tree Installation EA 4
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 5 – Full Width Pavement
5-1 Full Width Pavement SY 6198 TO BE COMPLETED ON
PENNBID
Description Unit Est Qty
Unit Price Total Price
BID ALTERNATE 6 – Full Width Pavement (Kim Street)
6-1 Full Width Pavement SY 2086 TO BE COMPLETED ON
PENNBID
5.02 Unit prices have been computed in accordance with paragraph 13.03.B of the Standard
General Conditions.
5.03 Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for unit price Bid items will be based on actual quantities provided, as determined in the Contract Documents.
6.01 Bidder agrees that the Work will be complete and ready for final payment in accordance with paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.
6.03 Bidder acknowledges that the Township anticipates issuing the Notice to Proceed for the work to begin in April 2026 and Bidder agrees to have work force available to complete the project in accordance with Section 6.01 above.
7.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid Security (10% of the BID) in the form of:
B. Statement of Bidder’s Qualifications (Document 00 45 13).
Associates, Inc. 00 41 00 - 7 Bid Form
C. Non-Collusion Affidavit (Document 00 45 19).
D. Certification of Non-Segregated Facilities (Document 00 45 33).
E. Nondiscrimination/Sexual Harassment Clause (Document 00 45 36).
8.01 The terms used in this Bid are defined in the Instructions to Bidders, Standard General
Conditions and Supplementary Conditions.
9.01 Communications concerning this Bid shall be addressed to the address of Bidder indicated below.
SUBMITTED on ___________________________________________, 2026.
Associates, Inc. 00 41 00 - 8 Bid Form
If Bidder is:
An Individual
By: (SEAL)
(Individual's Name) doing business as
Business Address:
Phone No.: ( ) Fax No.: ( )
A Partnership *
(Name of Partnership)
Witness:
By:
Partner
*All Partners must execute this Bid
Address of Partnership Bidder:
Contact Person:
Associates, Inc. 00 41 00 - 9 Bid Form
A Corporation
(Name of Corporation)
ATTEST:
By: By:
(Assistant) Secretary (Vice) President
[CORPORATE SEAL]
(or, if appropriate)
(Name of Corporation)
Witness:
**By:
(Authorized Representative)
** Attach appropriate corporate resolution evidencing authority to execute the Bid on behalf of the corporation.
Address of Corporation Bidder:
Contact Person:
Associates, Inc. 00 41 00 - 10 Bid Form
A Joint Venture
(Name)
(Address)
(Name)
(Address)
Address for Receipt of Official Communications:
(Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.)
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
00 43 13 Page 1 of 2
DOCUMENT 00 43 13 - BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
3630 Jacksonville Road
Bethlehem, PA 18017-9302
BID
Bid Due Date:
Description: The project involves construction of storm sewer and roadway reconstruction on the Stafore
Estates Storm Sewer Extension in Hanover Township, Northampton County, PA.
BOND
Bond Number:
Date:
Penal sum $
(Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
00 43 13 Page 2 of 2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested,…