3-82700-100-S-23-LSA NCPS Pump Replacement Plans SS.pdf
PDF 11 MB Posted
- Attached to
- SDCA Naamans Creek Pump Station Upgrades
- Solicitation number
- US.261380
- Issued by
- Delaware County, Gibraltar CDP, Pennsylvania
About this file
This file comprises electrical construction plans and specifications for the SDCA Naamans Creek Pump Station Upgrades project located in Lower Chichester, Pennsylvania, prepared for Southern Delaware County Authority. The project involves replacement of pump equipment with new installations requiring comprehensive electrical work including demolition of existing equipment, installation of new Variable Frequency Drives (VFDs), wiring extensions, junction boxes, and coordination with mechanical, plumbing, and HVAC contractors. The work must comply with the 2021 International Building Code, 2021 International Mechanical Code, 2020 National Electrical Code, 2021 International Fire Code, and 2021 International Energy Conservation Code/ASHRAE 90.1-2019. A mandatory pre-bid conference is scheduled for November 19, 2026 at 10:00 AM at the project site (1500 Naamans Creek Road, Garnet Valley, PA 19060), with sealed bids due online via PennBid by 10:00 AM on Monday, December 7, 2026. The project specifications indicate that all materials and equipment must be new unless otherwise noted, with UL listing and ASME/AGA approvals required, and the successful bidder must provide a one-year guarantee from the date of owner acceptance of substantial completion.
The successful bidder will be required to pay PennBid a fee of one-third percent of the contract award value, with a minimum fee of $150.00 and maximum of $6,000.00. A bid bond equal to ten percent of the total bid amount, payable to Southern Delaware County Authority, must accompany each bid submission. The contractor must provide both a performance bond and payment bond for 100 percent of the contract price and a one-year maintenance bond for 10 percent of the contract price. The project is subject to Pennsylvania Prevailing Wage Rates, Public Works Employment Verification requirements, various insurance provisions, equal opportunity requirements, and nondiscrimination/sexual harassment provisions. Funding for this project was provided in part by a grant from the Commonwealth of Pennsylvania Financing Authority. All work must be coordinated with the architect/engineer, with coordination drawings required prior to commencing work, and the contractor bears sole responsibility for construction means, methods, safety procedures, and completion in accordance with all applicable local, state, and federal codes and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Bidders Package - Required with Bid.pdf | ||
| 2-82700-100-23-LSA Naamans Creek PS Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
SITE
CEA
N
FM FM
FM
FM
CEA
N
GENERAL SPECIFICATIONS ABBREVIATIONS
MUNICIPALITY
USE AND OCC. CLASSIFICATION
APPLICABLE CODES
LOWER CHICHESTER, PA
B (BUSINESS)
CODE SUMMARY
BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE
MECHANICAL CODE: 2021 INTERNATIONAL MECHANICAL CODE
ELECTRICAL CODE: 2020 NATIONAL ELECTRICAL CODE (BY REFERENCE)
FIRE CODE: 2021 INTERNATIONAL FIRE CODE
ENERGY CODE: 2021 INTERNATIONAL ENERGY CONSERVATION CODE/ASHRAE 90.1-2019
1. DRAWINGS AND SPECIFICATIONS FORM COMPLIMENTARY REQUIREMENTS; PROVIDE WORK SPECIFIED AND NOT SHOWN, AND WORK SHOWN BUT NOT SPECIFIED AS THOUGH EXPLICITLY REQUIRED BY BOTH. ALTHOUGH WORK IS NOT SPECIFICALLY SHOWN OR SPECIFIED, PROVIDE SUPPLEMENTARY OR MISCELLANEOUS ITEMS, APPURTENANCES, DEVICES AND MATERIALS
OBVIOUSLY NECESSARY FOR A SOUND, SECURE AND COMPLETE INSTALLATION
2. ANY CONFLICTS BETWEEN THE DRAWINGS, SPECIFICATIONS, AND THE REQUIREMENTS OF THE BUILDING SHALL BE BID USING THE MOST STRINGENT REQUIREMENT, INCLUDING THE GREATER QUANTITY OF WORK AND THE GREATER MATERIAL COST
3. DRAWINGS ARE DIAGRAMMATIC: THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL COMPONENTS NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM. DETERMINE LOCATIONS OF COMPONENTS NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM. DETERMINE LOCATIONS OF SYSTEMS AND COMPONENTS IN FIELD. COORDINATE WITH
ARCHITECTURAL DRAWINGS AND OTHER TRADES.
4. ADDRESS QUESTIONS REGARDING DRAWINGS TO ENGINEER IN WRITING BEFORE AWARD OF CONTRACT. OTHERWISE, ARCHITECT'S INTERPRETATION OF MEANING AND INTENT OF DRAWINGS SHALL BE FINAL
5. THE INTENTION IS FOR INSTALLATION OF COMPLETE AND OPERATING SYSTEMS INSTALLED IN ACCORDANCE WITH THE ASSOCIATED MANUFACTURER'S INSTRUCTIONS. NOT EVERY COMPONENT REQUIRED IS SHOWN. THE CONTRACTOR SHALL INCLUDE ALL COMPONENTS NORMALLY ASSOCIATED WITH THE PARTICULAR SYSTEM AND/OR REQUIRED BY THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE SYSTEM SHALL BE FULLY COMMISSIONED AND SIGNED OFF BY AN
OFFICER OF THE RESPECTIVE CONTRACTOR.
6. PRIOR TO COMMENCING WORK, COORDINATION DRAWINGS MUST BE PREPARED AND SUBMITTED FOR REVIEW AND APPROVAL TO THE ARCHITECT/ENGINEER. EACH TRADE (HVAC, PLUMBING, ELECTRIC, AND FIRE PROTECTION) IS RESPONSIBLE FOR DOCUMENTING THEIR WORK ON THE PLAN ORIGINALLY SUBMITTED AS THE SPRINKLER PIPE FABRICATION DRAWING. LOCATION AND ELEVATION OF THE RESPECTIVE DISCIPLINE'S WORK MUST BE SHOWN ON THE COORDINATION DRAWINGS. SHEETMETAL SHOP DRAWINGS SHALL INCLUDE ALL ELEMENTS OF THE EQUIPMENT, DUCTWORK, AIR DEVICES, AND REFLECTED CEILING PLAN FOR COORDINATION OF CRITICAL DIMENSIONS OF ARCHITECTURAL/STRUCTURAL
COMPONENTS.
7. GIVE NOTICES, FILE PLANS, OBTAIN PERMITS AND LICENSES, PAY FEES AND BACK CHARGES, AND OBTAIN NECESSARY APPROVALS FROM AUTHORITIES THAT HAVE JURISDICTION AS REQUIRED TO PERFORM WORK IN ACCORDANCE WITH ALL
LEGAL REQUIREMENTS AND WITH THE DESIGN DOCUMENTS.
8. MATERIALS AND EQUIPMENT SHALL BE LISTED BY UNDERWRITERS LABORATORIES (UL) AND APPROVED BY ASME AND AGA
FOR INTENDED SERVICE.
9. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES REQUIRED FOR SAFE EXECUTION AND COMPLETION OF WORK, AND FOR INITIATING, MAINTAINING AND
SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.
10. ANY INTERFERENCE SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE, AND SHALL BE RESOLVED
PRIOR TO THE INSTALLATION OF THE WORK INVOLVED.
11. ALL MATERIALS, EQUIPMENT AND METHOD OF INSTALLATION SHALL BE ACCORDANCE WITH THE STANDARDS, REGULATIONS, CODES, ORDINANCES, AND LAW OF LOCAL, STATE, AND FEDERAL GOVERNMENTS, AND OTHER AUTHORITIES THAT HAVE
LAWFUL JURISDICTION.
12. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE HIS WORK WITH THAT OF ALL OTHER TRADES, INCLUDING (BUT NOT LIMITED TO), ELECTRICAL, HVAC, SPRINKLER, PLUMBING, STRUCTURAL AND GENERAL ARCHITECTURE.
OFFSETS IN PIPING AND OFFSETS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
13. DEVIATION FROM CONTRACT DOCUMENTS, OR PROPOSED SUBSTITUTION OF MATERIALS OR EQUIPMENT FOR THOSE SPECIFIED, SHALL BE REQUESTED IN SEPARATE LETTER, WHETHER DEVIATIONS ARE DUE TO FIELD CONDITIONS, STANDARD SHOP PRACTICE OR OTHER CAUSE. SUBSTITUTED PRODUCTS SUBMITTED AND APPROVED FOR USE THAT NECESSITATE CHANGES TO THE WORK OF THAT OR ANY OTHER TRADES OF CONTRACT SHALL BE COORDINATED AND ARRANGED BY THE
CONTRACTOR WHO SUBMITTED THE SUBSTITUTION WITHOUT ADDITIONAL COST TO THE OWNER.
14. EACH CONTRACTOR IS RESPONSIBLE FOR ITS CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF ITS NEW WORK.
CUTTING AND PATCHING SHALL BE COMPLETED IN A NEAT AND WORKMANLIKE MANNER. PATCHING MATERIALS SHALL MATCH EXISTING MATERIALS TO THE GREATEST EXTENT POSSIBLE. PROVIDE TOUCH-UP TO MATCH EXISTING SURROUNDING AREAS
OF CUTTING AND PATCHING WORK.
15. INTERRUPTIONS TO EXISTING SERVICES AND SYSTEMS SHALL BE MINIMIZED AND AT A TIME AND DURATION APPROVED BY THE OWNER. INCLUDE ALL PREMIUM TIME ASSOCIATED WITH INTERRUPTIONS. INTERRUPTIONS SHALL BE SCHEDULED WITH
OWNER 48 HOURS IN ADVANCE.
16. ANY DEMOLITION SHALL BE COORDINATED WITH OWNER, ARCHITECT, GENERAL CONTRACTOR AND ENGINEER. ALL DEBRIS SHALL BE CLEANED UP AND REMOVED FROM THE SITE BY THE END OF THE DAY. PRIOR TO DISPOSAL OF EQUIPMENT AND MATERIALS, TURN OVER TO THE OWNER ANY REMOVED EQUIPMENT AND MATERIALS PER OWNERS REQUEST.
17. ALL MATERIALS AND EQUIPMENT SHALL BE NEW UNLESS NOTED OTHERWISE.
18. MANUFACTURERS' MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLISH STANDARDS OF QUALITY FOR PERFORMANCE
AND MATERIALS.
19. PRODUCT INSTALLATION SHALL ADHERE TO MANUFACTURERS RECOMMENDATIONS.
20. ANY REFERENCE TO ELECTRICAL, PLUMBING AND HVAC CONTRACTORS, NOTED ON THESE DRAWINGS OR STATED IN THE SPECIFICATIONS SHALL NOT BE MISCONSTRUED AS AN INTENTION TO DEFINE SEPARATE CONTRACTORS FOR THE RESPECTIVE WORK. THE GENERAL CONTRACTOR SHALL COORDINATE AND PROVIDE A COMPLETE BUILDING WITH COMPLETE MECHANICAL AND ELECTRICAL SYSTEMS, REGARDLESS OF ANY SPECIFICATION REFERENCES TO OTHER CONTRACTORS.
21. GUARANTEE WORK OF THIS CONTRACTOR IN WRITING FOR ONE YEAR FROM THE DATE OF OWNER'S ACCEPTANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION. PROMPTLY, REPAIR OR REPLACE DEFECTIVE MATERIALS, EQUIPMENT, WORKMANSHIP AND INSTALLATIONS THAT DEVELOP DEFECTS WITHIN THIS PERIOD. OWNER'S SATISFACTION ANY DAMAGE REPLACEMENTS UNDER GUARANTEED AT NO ADDITIONAL COST TO OWNER. SUBMIT GUARANTEE TO ARCHITECT BEFORE FINAL PAYMENT. STATEMENT OF GUARANTEE REQUIREMENTS SHALL NOT BE INTERRUPTED TO LIMIT OWNER'S RIGHTS
UNDER LAW AND THIS CONTRACT.
A
ABV.
A.F.F.
A.F.G.
A.H.U.
C/B
C.H.
CLG.
CONC.
ELEC.
EM
E.P.O.
EXIST.
FU
GEN.
G.F.I.
GND.
HP
IG
JB
KVA
KW
LTG.
AMPS
ABOVE
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AIR HANDLER UNIT
CIRCUIT BREAKER
CABINET HEATER
CEILING
CONCRETE
ELECTRIC
INDICATES LIGHT FIXTURE OR
DEVICE WIRED TO EMERGENCY
CIRCUIT
EMERGENCY POWER-OFF
PUSHBUTTON SWITCH
EXISTING
FUSE (OR FUSED)
GENERAL
GROUND FAULT INTERRUPT
GROUND
HORSE POWER
ISOLATED GROUND
JUNCTION BOX
KILOVOLT-AMPERE
KILOWATT
LIGHTING
L.V.
M.C.
MCB
MECH.
MLO
MOD
MT.
MTD.
MTG.
N.L.
P.C.
PLG
SLD
SP/ST
S/S
SW
T/C
TYP.
U.O.N.
V
WP
XFMR.
(E)
(R)
(RL)
LOW VOLTAGE
MECHANICAL CONTRACTOR
MAIN CIRCUIT BREAKER
MECHANICAL
MAIN LUGS ONLY
MOTOR OPERATED DOOR
MOUNT
MOUNTED
MOUNTING
NIGHT LIGHTING
PLUMBING CONTRACTOR
PLUMBING
SINGLE LINE DIAGRAM
SINGLE POLE/SINGLE THROW
SAFETY SWITCH (DISCONNECT
SWITCH)
SWITCH
TIME CLOCK
TYPICAL
UNLESS OTHERWISE NOTED
VOLTS
WEATHERPROOF
TRANSFORMER
EXISTING TO REMAIN
REMOVE EXISTING
RELOCATED EXISTING
PRICING INSTRUCTIONS - BASE BID
1. BID PRICE SHALL INCLUDE AN ALLOWANCE FOR CONTROL CONNECTIONS FROM
VFD'S TO PLC. ELECTRICAL CONTRACTOR SHALL ALLOW FOR COORDINATION WITH
OWNERSHIP TO FINALIZE THE FULL EXTENT OF THIS SCOPE.
DRAWING NO. DRAWING TITLE
IS
SUE
ISSUED
FO
R PE
RMIT
/27 /20
NAAMAN'S CREEK - DRAWING INDEX
N E
L
TVSS
M
K
E
SURGE PROTECTION DEVICE
POTENTIAL TRANSFORMER
CURRENT TRANSFORMER
AUTOMATIC TRANSFER SWITCH
GROUND CONNECTION
KEY INTERLOCK SWITCH
ELECTRIC INTERLOCK SWITCH
MS
WP
J
PB
GENERAL POWER
P1-3
G
R
SINGLE LINE SYMBOLS
T
AA/FA
SPD
SPD
125V., 20A DUPLEX RECEPTACLE MOUNTED AT 18" AFF UNLESS
OTHERWISE NOTED. "+" INDICATES MOUNTED AT 42" AFF OR 6"
ABOVE COUNTER OR BACKSPLASH.
125V., 20A DUPLEX GFCI RECEPTACLE MOUNTED AT 18" AFF
UNLESS OTHERWISE NOTED. "+" INDICATES MOUNTED AT 42" AFF
OR 6" ABOVE COUNTER OR BACKSPLASH. "WP" INDICATES
WEATHERPROOF ENCLOSURE .
125V., 20A DOUBLE DUPLEX (QUAD) RECEPTACLE, MOUNTED AT
18" AFF UNLESS OTHERWISE NOTED.
JUNCTION BOX, COORDINATE LOCATION, RATING AND SIZE WITH
END DEVICE. PROVIDE FIRE RATED ASSEMBLY WHERE REQUIRED.
COORDINATE JUNCTION BOX TYPE FOR FAN/ PENDANT RATING
WHERE REQUIRED.
PULL BOX. COORDINATE SIZE AS REQUIRED.
MOTOR RATED SWITCH, COORDINATE LOCATION, RATING, AND
SIZE WITH END DEVICE
DISCONNECT SWITCH, COORDINATE LOCATION, RATING AND SIZE
WITH END DEVICE. IF CONCEALED USE GENERAL DUTY, IF
EXPOSED USE HEAVY DUTY.
FUSED DISCONNECT SWITCH, COORDINATE LOCATION, RATING
AND SIZE WITH END DEVICE. IF CONCEALED USE GENERAL DUTY,
IF EXPOSED USE HEAVY DUTY.
COMBINATION MOTOR STARTER AND DISCONNECT; PROVIDED BY
MECHANICAL CONTRACTOR/PLUMBING CONTRACTOR; INSTALLED
BY ELECTRICAL CONTRACTOR
SURGE PROTECTION DEVICE
HOME RUN TO PANEL, "P1" INDICATES PANEL NAME, "3" INDICATES
CIRCUIT BREAKER POSITION.
PANELBOARD, SURFACE MOUNTED.
PANELBOARD, FLUSH MOUNTED.
TRANSFORMER, SIZE, TYPE AND RATING AS INDICATED ON PLAN.
COPPER GROUND BAR, SIZE AS INDICATED ON PLAN.
COPPER GROUND CONDUCTOR, SIZE AS INDICATED ON PLAN.
PLAN NOTE CALLOUT
NEW CONNECTION TO EXISTING
TERMINATION OF DEMOLITION
PANELBOARD; SIZE, TYPE AND RATING AS NOTED
AA = PANEL DESIGNATION;
### = PANEL CAPACITY (AMPERAGE)
MLO = MAIN LUGS ONLY
MCB = MAIN CIRCUIT BREAKER
COORDINATE MFG./TYPE WITH LOCAL UTILITY
METER AND SOCKET. COORDINATE MFG./TYPE WITH LOCAL
UTILITY
TRANSIENT VOLTAGE SURGE SUPPRESSION SYSTEM
PANEL AA
MLO/MCB
MOTOR OR MOTORIZED EQUIPMENT. NUMBER INDICATES
HORSEPOWER (HP)
MOLDED CASE CIRCUIT BREAKER
DRAWOUT CIRCUIT BREAKER
DRAWOUT CIRCUIT BREAKER MEDIUM VOLTAGE
FUSED SWITCH
FUSE
CONTACT
RELAY/CONTACTOR COIL
POWER TRANSFORMER, WITH VOLTAGES AS INDICATED
TRANSFORMER: ### - TRANSFORMER CAPACITY AT
AMBIENT AIR
*** - TRANSFORMER CAPACITY AT FORCED AIR
AA - AMBIENT AIR
FA - FORCED AIR
- Y CONFIGURATION TO GROUND
- DELTA CONFIGURATION
E0.0 ELECTRICAL COVER SHEET
E2.1 ELECTRICAL DEMOLITION AND NEW WORK PLANS
E5.0 ELECTRICAL SINGLE LINE DIAGRAM
5561 Pennell Rd Media, PA 19063 P: 610.361.0700
E0.0
J
J
J
MSB
MSB
MSB
VFD #1
(N)
(BY
OTHERS)
VFD #2
(N)
(BY
OTHERS)
VFD #3
(N)
(BY
OTHERS)
5561 Pennell Rd Media, PA 19063 P: 610.361.0700
CEAE2.0
SCALE - 1/8" = 1'-0"
GROUND LEVEL FLOOR PLAN - NEW WORK
E2.0
SCALE - 1/8" = 1'-0"
GROUND LEVEL FLOOR PLAN - DEMOLITION
PROVIDE NEW WIRING FROM MSB TO VFD, AND FROM VFD TO EACH FLOOR
JUNCTION BOX. FOLLOW SINGLE LINE DIAGRAM FOR WIRING AND CONDUIT SIZING.
ALL CONDUIT TO BE RUN IN RIGID METAL CONDUIT. SPLICE PUMP CONNECTION
WITH JUNCTION BOX IN GROUND FOR CONNECTION TO PUMP MOTOR.
NEW FLOOR MOUNTED CAST IRON FLOOR JUNCTION BOX (NEMA 3R). PUMP
CONDUCTORS TO BE SPLCED WITHIN. SEE SINGLE LINE DIAGRAM FOR MORE
INFORMATION.
NEW WORK NOTES:
DISCONNECT AND REMOVE VFD. COORDINATE PUMP INSTALLATION WITH OTHER
TRADES. LEAVE ALL COMMUNICATION WIRE FOR FUTURE VFD. PROVIDE SPLICE
BOX FOR EXTENSION OF CONTROL WIRE TO NEW VFD LOCATIONS AS SHOWN ON
NEW WORK DRAWINGS.
DEMOLITION NOTES
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE
AND THE LOCAL AUTHORITY HAVING JURISDICTION.
2. COORDINATE OTHER TRADE CONSTRUCTION WITH APPROPRIATE TRADE.
3. CONFIRM ALL DEVICE MOUNTING HEIGHTS AND EXISTING CONDITIONS PRIOR TO
INSTALLATION.
4. NEC 110.26 REQUIRED CLEARANCES SHALL BE MAINTAINED FOR EXISTING AND NEW
ELECTRICAL EQUIPMENT INSTALLED DURING CONSTRUCTION.
5. COORDINATE ALL VFD TO PLC SIGNAL AND CONTROL WIRING INTERCONNECTION
REQUIREMENTS WITH OWNERSHIP PRIOR TO CONSTRUCTION. PLC PROGRAMMING BY
OTHERS. CONTROL AND SIGNAL WIRING BY ELECTRICAL CONTRACTOR
GENERAL NOTES:
E2.1
1. RETAIN EXISTING PUMP BRANCH CIRCUITS AND EXTEND AS REQUIRED TO
CONNECT NEW PUMPS. MATCH CONDUCTOR TYPE AND SIZE.
ALTERNATE
E2.0
SCALE - 1/4" = 1'-0"
ELEVATION
1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE NATIONAL
ELECTRIC CODE AND THE LOCAL AUTHORITY HAVING JURISDICTION.
2. CONFIRM ALL DEVICE MOUNTING HEIGHTS AND EXISTING CONDITIONS PRIOR
TO INSTALLATION.
3. NEC 110.26 REQUIRED CLEARANCES SHALL BE MAINTAINED FOR EXISTING
AND NEW ELECTRICAL EQUIPMENT INSTALLED DURING CONSTRUCTION.
4. COORDINATE ALL VFD SIGNAL AND CONTROL WIRING INTERCONNECTION
REQUIREMENTS WITH OWNERSHIP PRIOR TO CONSTRUCTION.
PROGRAMMING BY OTHERS. CONTROL AND SIGNAL WIRING BY E.C.
5. PROVIDE BONDING & GROUNDING PER NEC.
GENERAL NOTES:
DEMOLISH PUMP EQUIPMENT FEEDER BREAKER.1
DEMO SHEET NOTES
NEW VFD OWNER SUPPLIED AND INSTALLED BY E.C. COORDINATE FINAL
CONTROL REQUIREMENTS WITH MECHANICAL CONTRACTOR.
NEW FLOOR MTD CAST IRON FLOOR JUNCTION BOX (NEMA 3R). PUMP
CONDUCTORS TO BE SPLICED WITHIN. SEE SINGLE FOR MORE INFORMATION.
NEW WORK SHEET NOTES
EXISTING CONDUIT AND CONDUCTORS
TO BE EVALUATED FOR REUSE
3 #4/0 & 1 #1/0 GRD CU IN
RIGID STL CONDUIT
3 #4/0 & 1 #1/0 GRD CU IN
RIGID STL CONDUIT
2 2
1 1
3 #4/0 & 1 #1/0 GRD CU IN
LIQUIDTIGHT FLEX MC
5561 Pennell Rd Media, PA 19063 P: 610.361.0700
CEA
E5.0
SCALE - NO SCALE
ELECTRICAL SINGLE LINE - DEMOLITION
E5.0
SCALE - NO SCALE
ELECTRICAL SINGLE LINE - NEW WORK
E5.0
| Sheets and Views |
| E0.0 Cover - E0.0 |
| E2.1 floor plans - E2.1 |
| E5.0 single line - E5.0 |
File details come from the government source that posted it. Updated .