This is a Statement of Work (SOW) for cleaning the machinery ventilation system and HVAC duct system aboard the United States Coast Guard Boat 1152 (CGC Maurice Jester) located at 427 Commercial Street, Boston, MA. The contractor must be a certified member of the National Air Duct Cleaners Association (NADCA) and technically competent with the Novenco FRC-515-P1 marine ventilation system or equivalent. The scope of work includes site preparation with lock-out/tag-out procedures, removal of registers and vents, cutting access ports into ductwork per industry standards, agitation and brushing of interior surfaces, compressed air washing, and HEPA filtration vacuum collection of contaminants. Specific cleaning requirements include Variable Air Velocity (VAV) boxes, reheat coils with EPA-approved coil cleaner treatment, and comprehensive cleaning of the Air Handling Unit (AHU) including plenum, condensing coils, filter racks, blower chamber and blades. Post-cleaning operations require sealing access ports with airtight plates, reinstalling all components, general cleanup, and a final walk-through inspection with before-and-after photographs.
The contractor must comply with NADCA ACR 2021 standards and OSHA requirements including hazard communication, lock-out/tag-out, respirator protection, confined space procedures, and appropriate personal protective equipment. Required insurance includes Commercial General Liability of $2,000,000 aggregate and Excess Liability (Umbrella) of $5,000,000 aggregate. Work hours are 0600 to 1430 Monday through Friday, with site visits available 0700-1300 by contacting Mr. Curtis LeFever at 857-416-3376. The period of performance will be mutually agreed upon based on vessel availability. This procurement is being conducted as a local area small business set-aside under NAICS code 238990 (Small business size standard: $19 million). Quote submissions are due by 5:00pm EST on July 6, 2026, with questions due by 5:00pm EST on July 1, 2026, both submitted to the Contracting Officer at beverly.a.primm@uscg.mil. Evaluation factors include technical experience, relevant experience on similar projects, and price reasonableness.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12_52030PR260000213HVAC1.pdf | ||
| 12_52030PR260000213HVAC4.pdf | ||
| 12_52030PR260000213HVAC3.pdf | ||
| 12_52030PR260000213HVAC2.pdf | ||
| 12_52030PR260000213RFQSF30A.pdf | ||
| 7_52030PR260000213WR.pdf | ||
| 12_52030PR260000213RFQ CLAUSES.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
STATEMENT OF WORK (SOW) FOR
Machinery Ventilation System, Clean
AND
HVAC Duct System, Clean CGC Maurice Jester
REQUEST FOR QUOTE (RFQ) 70Z02426Q0000213
427 COMMERCIAL ST.
BOSTON, MA 02109
STATEMENT OF WORK (SOW)
FOR AIR CONVEYANCE SYSTEM CLEANING
UNITED STATES COAST GUARD BOAT 1152 CGC M. JESTER
1. Introduction/Background This Statement of Work (SOW) outlines the requirements for the cleaning of the air conveyance system(s) aboard the United States Coast Guard Boat 1152, located at 427 Commercial St, Boston, MA. The work will be performed by a certified member of the National Air Duct Cleaners Association (NADCA). The purpose of this work is to ensure the cleanliness and operational efficiency of the vessel's HVAC systems.
2. Scope of Work The contractor shall provide all necessary labor, materials, and equipment to perform the cleaning of the vessel's air conveyance systems. Technically competent with experience with Novenco FRC-515-P1, single piping, ABS, 3 phase X 450 V, 60HZ marine ventilation system or equivalent. The scope includes, but is not limited to, the following procedures:
2.1. Site Preparation:
Lock-Out/Tag-Out: Exhaust fans will be locked out by the Ships Engineering Watchstander and the Customer.
· Protective Covering: Cover all machinery, office equipment, furniture, and other components with plastic or drop cloths.
2.2. Gaining Access to Ductwork:
· Removal of all registers, vents, grilles, and diffusers.
· Removal of drop ceiling sections as needed.
· Cutting off exterior insulation where necessary.
· Cutting of various sized access ports into the ductwork in adherence with industry standards (NFPA, NAIMA, NADCA, SMACNA, UL).
2.3. Cleaning Process:
· Agitation and Brushing: Use of industrial brushes (hard and soft bristle) and other agitation devices to loosen dust and dirt build-up within the ductwork.
· Compressed Air Washing: Use of compressed air to loosen and move debris.
· Vacuum Collection: Employ High Efficiency Particulate Air (H.E.P.A.) filtration vacuum systems to remove contaminants. H.E.P.A. filters are rated as removing 99.97% of particles down to 0.3 microns.
· Specific Components:
· Variable Air Velocity (VAV) Boxes: Accessed via ports, HEPA vacuumed.
· Reheat Coils: Accessed via ports, fins HEPA vacuumed or brushed, treated with EPA approved coil cleaner, and rinsed.
· Air Handling Unit (AHU): Thorough cleaning of interior surfaces, plenum, condensing coils, filter racks, blower chamber and blades, dampers, and louvers.
2.4. Post-Cleaning Operations:
· Sealing Access Ports: All access ports created will be covered with removable airtight plates or doors in accordance with industry standards.
· Reinstallation: Reinstall all registers, grilles, diffusers, and ceiling tiles.
· Clean-Up: Remove all protective coverings, sweep floors, and vacuum carpets.
· Final Inspection: A walk-through of the service area with the customer and service coordinator to ensure completion and satisfaction.
· ELECTRONIC COPY OF BEFORE AND AFTER PHOTGRAPHS DOCUMENTING THE WORK
3. Administrative and Safety Requirements
· Standards Compliance: All work shall be performed in strict adherence to industry standard NADCA ACR 2021, Assessment, Cleaning & Restoration of HVAC Systems.
· Safety Program: The contractor will follow a comprehensive safety program in accordance with OSHA standards, including:
· Hazard Communication (OSHA 3111)
· Lock-out / Tag-out (OSHA 3120)
· Respirator Protection (OSHA 29CFR 1910.134)
· Confined Space Program (OSHA 3138)
· Use of Personal Protective Equipment (PPE) such as eye, head, and hearing protection.
· Insurance: The contractor shall maintain the following insurance coverage:
· Commercial General Liability: $2,000,000 Aggregate
· Excess Liability (Umbrella): $5,000,000 Aggregate
· Worker's Compensation: Statutory limits On-site Coordination:
Site visit:
Monday through Friday 0700-1300. Contact POC Mr. Curtis LeFever at 857-416-3376 or curtis.d.lefever@uscg.mil to schedule a site visit. A service coordinator will always be on the job site.
Contracting Officer Representative (COR): LT Ryan Weeks @ 505-508-6329 or ryan.t.weeks@uscg.mil
Workers will be escorted on Base. Passport or real id required
Work Hours: 0600 to 1430
4.The period of Period of Performance for this work shall be mutually agreed upon by the United States Coast Guard and The Awarded Vendor. The schedule will be based on the availability of the vessel and the contractor. All service work will be performed when the serviced areas are unoccupied.
5. Miscellaneous
• Customer Responsibilities: The USCG will be responsible for providing access to the vessel and for supplying shipboard services such as water and electricity.