3-5-C-009-26 Bid Tab.pdf
PDF 84 KB Posted
- Attached to
- Olathe Well Field Streambank Stabilization
- Solicitation number
- 5-C-009-26
- Issued by
- Johnson County, Kansas
About this file
This is a bid tabulation document for the City of Olathe's Vertical Well Field Streambank Stabilization project in Kansas. The project involves repair and stabilization of erosion in a drainage ditch adjacent to the Kansas River within the city's well field. Work includes grading, placement of riprap stone for slope protection, and turf reinforcement. The project encompasses ten line items ranging from mobilization and construction staking through permanent seeding, with quantities including 904 cubic yards of unclassified excavation, 1,211 cubic yards of contractor-furnished embankment, 927 cubic yards of 1/4-ton riprap stone, 1,460 cubic yards of 1/2-ton riprap stone, 500 square yards of turf reinforcement mat, and 0.2 acres of permanent seeding.
Four contractors submitted bids for the project: Black Fox Services, LLC with a total cost of $750,039.50; Kansas Heavy Construction, LLC with $487,000.00; Leavenworth Excavating and Equipment Co. Inc. with $509,167.85; and Wiedenmann, Inc. with $535,645.00. Bid prices vary significantly across line items, with Kansas Heavy Construction, LLC submitting the lowest overall bid. Unit pricing differences are particularly notable in excavation work, where quoted prices per cubic yard range from $12.60 to $76.07, and in riprap stone placement, where prices vary from $126 to $175.46 per cubic yard for 1/4-ton stone and $129 to $167.98 for 1/2-ton stone.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-5-C-009-26 Project Manual Issued for Bid.pdf | ||
| 2-5-C-009-26 Drawings Issued for Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Items Unit QuantityRequired UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost #0-1 Mobilization LS 1 $68,661.90 $68,661.90 $48,895.50 $48,895.50 $34,800.00 $34,800.00 $28,000.00 $28,000.00 #0-2 Construction Staking LS 1 $15,990.81 $15,990.81 $15,565.00 $15,565.00 $3,800.00 $3,800.00 $10,000.00 $10,000.00 #0-3 Clearing and Grubbing LS 1 $33,105.18 $33,105.18 $29,000.00 $29,000.00 $19,300.00 $19,300.00 $20,000.00 $20,000.00 #0-4 Temporary Erosion Control LS 1 $20,878.98 $20,878.98 $5,500.00 $5,500.00 $13,100.00 $13,100.00 $17,000.00 $17,000.00 #0-5 Unclassified Excavation CY 904 $76.07 $68,767.28 $12.60 $11,390.40 $28.80 $26,035.20 $45 $40,680.00 #0-6 Embankment (Contractor Furnished) CY 1211 $91.97 $111,375.67 $51.10 $61,882.10 $48.15 $58,309.65 $50 $60,550.00 #0-7 Slope Protection (1/4 Ton Riprap Stone) CY 927 $175.46 $162,651.42 $126 $116,802.00 $144 $133,488.00 $145 $134,415.00 #0-8 Slope Protection (1/2 Ton Riprap Stone) CY 1460 $167.98 $245,250.80 $129 $188,340.00 $145 $211,700.00 $150 $219,000.00 #0-9 Turf Reinforcement Mat (Class II Type G) SY 500 $35.10 $17,550.00 $13.75 $6,875.00 $9.75 $4,875.00 $10 $5,000.00 #0-10 Permanent Seeding AC 0.2 $29,037.32 $5,807.46 $13,750.00 $2,750.00 $18,800.00 $3,760.00 $5,000.00 $1,000.00
Total Cost $750,039.50 $487,000.00 $509,167.85 $535,645.00
Black Fox Services, LLC Kansas Heavy
Construction, LLC Leavenworth Excavating and Equipment Co. Inc. Wiedenmann, Inc.