3_30241PR260000012SOW.docx
DOCX document 11 MB Posted
- Attached to
- REMOVE AND REPLACE EXISTING FAILED BOILER SYSTEM, USCG STATION SHINNECOCK, HAMPTON BAYS, NY 11946-3223
- Solicitation number
- 70Z02426Q0000012
About this file
This is a Statement of Work (SOW) for a Request for Quote (RFQ) issued by the U.S. Coast Guard for boiler equipment replacement at Station Shinnecock in Hampton Bays, New York. The project involves removing a failed Burnham V-911 oil-fired hydronic boiler (Serial Number 7601038) that exhibits smoke emissions, corrosion, deterioration, and end-of-service-life conditions, and replacing it with new oil-fired hydronic boiler equipment of equal or greater capacity. The scope includes disposal of existing equipment, furnishing and installing the replacement boiler, reconnecting to existing piping, fuel, venting, electrical and control connections, inspecting and cleaning venting equipment, replacing the recirculation pump, and performing testing and startup. This is characterized as a direct 1-for-1 in-kind equipment replacement and facility sustainment project with no modernization, redesign, relocation, fuel conversion, capacity increase, or reconfiguration involved.
The RFQ solicitation number is 70Z02426Q0000012, with quotes due by 8/13/2026 and should be submitted as firm fixed price quotes with detailed breakdowns and boiler lead time information. Service Contract Labor Standards (FAR 52.222-41) apply to this project. The Contracting Officer's Representative is CWO2 Coyet A. Carter of the U.S. Coast Guard Sector Long Island Sound Facilities Engineering Division. The contractor must provide a minimum one-year warranty on all labor, workmanship, and installed equipment, properly dispose of all waste per Federal, State, Local, and EPA requirements, work Monday through Friday from 0800-1500 excluding Federal Holidays, and provide all warranty documentation, equipment manuals, startup reports, and maintenance recommendations prior to final acceptance. Site visits are highly encouraged and should be coordinated through the COR. Questions should be directed to Beverly.a.primm@uscg.mil, and quotes should be emailed to the same address.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7_30241PR260000012WR.pdf | ||
| 12_30241PR260000012SF18.pdf | ||
| SF1413REVOCT2023.pdf | ||
| 12_330241PR260000012RFQ CLAUSES.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
REQUEST FOR QUOTE (RFQ) 70Z02426Q0000012
Boiler Equipment Replacement (In-Kind Sustainment Project) U.S. Coast Guard Station Shinnecock 100 Foster Avenue Hampton Bays, NY 11946-3233
1. Purpose The purpose of this project is to provide all labor, materials, equipment, supervision, transportation, and disposal necessary to remove and replace existing failed boiler equipment located at U.S. Coast Guard Station Shinnecock.
This project is a direct 1-for-1 in-kind equipment replacement and facility sustainment action. No modernization, redesign, relocation, fuel conversion, capacity increase, or reconfiguration is included.
2. Existing Conditions Existing equipment consists of a Burnham V-911 oil-fired hydronic boiler (S/N 7601038) exhibiting smoke emissions, corrosion, deterioration, and end-of-service-life conditions. Existing recirculation pump and venting equipment require inspection and restoration.
3. Scope of Work Remove and dispose of existing boiler equipment. Furnish and install new oil-fired hydronic boiler equipment of equal or greater capacity. Reconnect to existing piping, fuel, venting, electrical, and control connections. Inspect, clean, and repair existing venting equipment. Replace recirculation pump equipment. Perform testing and startup.
4. Site Visit A site visit is highly encouraged for all interested offerors prior to submission of quotations. Site visits shall be coordinated through the Contracting Officer’s Representative (COR).
5. Environmental Requirements Contractor shall properly dispose of all removed equipment and waste in accordance with Federal, State, Local, and EPA requirements.
6. Warranty The Contractor shall provide a minimum one (1) year warranty on all labor, workmanship, and installed equipment beginning upon Government acceptance.
Any defects identified during the warranty period shall be corrected at no additional cost to the Government. Manufacturer warranties shall be transferred to the Government upon project completion. The Contractor shall provide all warranty documentation, equipment manuals, startup reports, and maintenance recommendations prior to final acceptance.
7. Hours of Work Monday through Friday, 0800–1500, excluding Federal Holidays unless otherwise approved by the COR.
8. COR
Coyet A. Carter, CWO2, USCG
COR
Facilities Engineering Division U.S. Coast Guard Sector Long Island Sound 120 Woodward Avenue New Haven, CT 06512
9. Non-Complex Construction Determination This project is a direct in-kind replacement of existing failed boiler equipment. No building footprint changes, engineering design services, modernization, major upgrades, reconfiguration, fire protection modifications, or lead/asbestos abatement are included.
Attached Photographs Figure 1
Figure 2
Figure 3
Figure 4 image2.jpeg image3.jpeg image4.jpeg image1.jpeg