3-26-003 Plan Set.pdf
PDF 40 MB Posted
- Attached to
- CTH-H - George St. to E. Geneva Square
- Solicitation number
- 26-003
- Issued by
- Winnebago County, Wisconsin
About this file
This is a plan set document for Wisconsin Department of Transportation Project 26-003, a county highway improvement project administered by Walworth County Public Works in coordination with the City of Lake Geneva. The project encompasses roadway resurfacing, reconstruction, and modernization of CTH H (County Trunk Highway H) extending approximately 0.75 miles from George Street to E. Geneva Square, with a total centerline length of approximately 41.55 miles of project work. The scope includes asphaltic milling, HMA pavement placement, manhole and inlet adjustments, removal and replacement of curb and gutter, concrete sidewalk and ramp construction, erosion control measures, staged traffic control implementation across three construction phases, pavement markings, and all incidental restoration work. The project begins at station 97+30 and ends at station 138+85.27, involving intersection improvements at CTH H with George Street/Williams Street, Gardner Street, Center Street, and E. Sheridan Springs Road. The design speed is 25-35 mph with an annual average daily traffic (AADT) of 300 vehicles and 930,000 equivalent single axle loads (ESALs). The plan set comprises 96 total sheets including general notes, typical sections, construction details, intersection details, curb ramp details, erosion control plans, pavement marking and signing specifications, traffic control plans organized by three construction stages, alignment details, and cross-sections at multiple stations.
Key project contacts include the roadway design consultant Baxter & Woodman (Jason Atchison, PE), Walworth County Public Works (Joe Kroll, PE, PLS), and City of Lake Geneva Public Works (Tom Earle). Utility coordination is required with Alliant Energy, Charter Communications, AT&T, and WE Energies for electric, communications, gas, and water services. The contractor must maintain continuous weekday work progression, provide ten calendar days' notice before commencing work, protect all existing utilities, maintain driveway access at all times except during adjacent construction, notify affected property owners 24 hours before access closures, and coordinate with SEWRPC regarding survey monuments. Contractor-performed construction staking is required with electronic CADD files available upon request. All construction shall conform to Wisconsin Standard Specifications for Highway and Structure Construction and WISDOT/CADDS requirements. The plan set includes detailed specifications for typical pavement sections (4-inch total thickness HMA pavement with 2.25-inch lower layer and 1.75-inch upper layer MT 58-28 S), concrete sidewalk specifications (5-inch concrete on 4.5-inch base aggregate), curb and gutter removal and replacement details, inlet protection specifications, and comprehensive traffic control plans accommodating three construction stages with lane closures, temporary signage, and drum placement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-26-003 List of Subcontractors.pdf | ||
| 2-26-003 Proposal Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Springfield
Lake Geneva
Como
White Cr.
BIG FOOT
BEACH
E
WALWORTH COUNTY
PUBLIC WORKS - HIGHWAY DIVISION
PLAN OF PROPOSED IMPROVEMENT
ORDER OF SHEETS
PROJECT NUMBER
LAYOUT
SCALE
ESALS =
DESIGN SPEED
TOTAL NET LENGTH OF CENTERLINE =
CORPORATE LIMITS
PROPERTY LINE
LOT LINE
EXISTING RIGHT OF WAY
SLOPE INTERCEPT
COMBUSTIBLE FLUIDS
POWER POLE
TELEPHONE POLE
ORIGINAL GROUND
MARSH OR ROCK PROFILE
UTILITY PEDESTAL
GAS
ELECTRIC
G
E
T
PROPOSED OR NEW R/W LINE
CAUTION
WOODED OR SHRUB AREA
MARSH AREA
EXISTING CULVERT
PROPOSED CULVERT
(Box or Pipe)
CULVERT (Profile View)
CONVENTIONAL SYMBOLS
ROCK
(To be noted as such)
SS
W
SANSANITARY SEWER
STORM SEWER
WATER
COUNTY:
W
ITH:
PROJECT ID:
PLOT NAME : P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\010101-TI.DWGFILE NAME : 2/10/2026 1:19 PMPLOT DATE : PLOT BY : NATHAN HARVEY
FOFIBER OPTIC
UTILITIESREFERENCE LINE
GRADE LINE
PROFILE
TELEPHONE
SPECIAL DITCH LABELLIMITED HIGHWAY EASEMENT
GRADE ELEVATION 95
.3
PLAN
A.A.D.T.
DESIGN DESIGNATION
300'EB'
26-003
N/A W
ALW
ORTH
WALWORTH COUNTY
(GEORGE STREET TO E. GENEVA SQUARE)
CTH H
26-003
1 MI
0.75 MILES
15,677
25-35 MPH
930,000
ORIGINAL PLAN PREPARED BY:
PROJECT MANAGER
COORDINATES ON THIS PLAN ARE REFERENCED TO THE WISCONSIN STATE
PLANE COORDINATE SYSTEM NAD83 SOUTH ZONE, WALWORTH COUNTY
ELEVATIONS ARE REFERENCED TO NAVD 88 (2007)
Title
General Notes
Project Overview
Typical Sections
Construction Details
Intersection Details
Curb Ramp Details
Erosion Control
Pavement Marking and Permanent Signing
Traffic Control
Miscellaneous Quantities
4 - 5
6 - 7
8 - 9
10 - 13
14 - 17
18 - 21
22 - 23
35 - 43
TOTAL SHEETS = 96
Plan44 - 47
Cross Sections: George St86 - 87
BEGIN PROJECT
STA 97+30
X: 2389649.1359 Y: 222853.2517
Standard Detail Drawings48 - 85
Alignment Detail33 - 34
Maintenance of Traffic CTH H (Stage 1)24 - 27
Maintenance of Traffic CTH H (Stage 2)28 - 31
Cross Sections: Center St88 - 96
Maintenance of Traffic CTH H (Stage 3C)32
END PROJECT
STA 138+85.27
X: 2392186.8320 Y: 225086.1769
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\020101-GN.DWGFILE NAME : 2/10/2026 1:19 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1" = 1'
26-003 CTH H WALWORTH GENERAL NOTES
LAYOUT NAME - 01
1. ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH THE DETAILS IN THE PLANS, THE PROJECT SPECIFICATIONS, THE LATEST EDITION OF THE STATE OF WISCONSIN "STANDARD SPECIFICATIONS FOR
HIGHWAY AND STRUCTURE CONSTRUCTION", AND THE WISCONSIN DEPARTMENT OF NATURAL
RESOURCES REQUIREMENTS.
2. THE CONTRACTOR SHALL NOTIFY THE COUNTY AND CITY AT LEAST TEN CALENDAR DAYS PRIOR TO
STARTING WORK. ONCE WORK ON THIS PROJECT COMMENCES, THE CONTRACTOR SHALL, ON A
WEEKDAY BASIS, CONTINUOUSLY PURSUE COMPLETION OF THE WORK. THE CONTRACTOR SHALL NOT
SUSPEND WORK FOR ANY REASON OTHER THAN CONDITIONS BEYOND THEIR DIRECT CONTROL.
3. THE LOCATIONS OF PUBLIC OR PRIVATE UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. THERE MAY BE OTHER UTILITY INSTALLATIONS WITHIN THE PROJECT AREA THAT ARE NOT SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UNDERGROUND OR SURFACE UTILITIES. THE CONTRACTOR SHALL VERIFY THE DEPTHS OF THE EXISTING UTILITIES IF NECESSARY TO VERIFY THAT
GRADE CONFLICTS WILL NOT OCCUR WITH ANY PROPOSED PIPES OR OTHER EXCAVATION. ANY
RELOCATION OR LOWERING OF UTILITIES SHALL BE COORDINATED BY THE CONTRACTOR. THE COST OF THIS EXPLORATION SHALL BE INCLUDED IN THE COST OF THE PROPOSED CONSTRUCTION. CONTACT DIGGERS HOTLINE FOR UTILITY LOCATES AT LEAST 3 WORKING DAYS PRIOR TO CONSTRUCTION.
4. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER, BUSINESS OWNERS, RESIDENTS, AND THE OWNER WHEN ACCESS TO DRIVEWAYS WILL BE TEMPORARILY CLOSED DUE TO CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL DISTRIBUTE NOTICES AT LEAST 24 HOURS PRIOR TO PLANNED CLOSURE. EVERY EFFORT SHALL BE MADE TO ACCOMMODATE ACCESS TO THESE PROPERTIES
INCLUDING KNOCKING ON DOORS WHEN ACCESS WILL BE LIMITED.
5. ACCESS TO PRIVATE DRIVEWAYS SHALL BE PROVIDED AT ALL TIMES EXCEPT DURING ACTUAL CONSTRUCTION ADJACENT THERE TO. TEMPORARY RAMPS SHALL BE CONSTRUCTED AS NEEDED TO
PROVIDE SUCH ACCESS, UTILIZING STONE OR CRUSHED GRAVEL.
6. REMOVE AND REPLACE ANY MAIL BOXES IN CONFLICT WITH PROPOSED CONSTRUCTION OR DAMAGED BY THE CONTRACTOR IN ACCORDANCE WITH U.S. POSTAL SERVICE REQUIREMENTS. THIS WORK SHALL BE
INCIDENTAL TO CONSTRUCTION.
7. NO TREES (AND/OR SHRUBS) ARE TO BE REMOVED WITHOUT THE APPROVAL OF THE ENGINEER.
8. DO NOT STORE MATERIALS, STRUCTURES, OR MACHINES WHERE THEY WILL OBSTRUCT STREET CROSSING
OR DRIVEWAY SIGHT LINES.
9. EXCEPT AS OTHERWISE INDICATED, WHERE NEW PAVEMENT ABUTS EXISTING PAVEMENT TO REMAIN IN PLACE, SAW CUT THE EXISTING PAVEMENT TO PROVIDE A NEAT VERTICAL FACE BETWEEN THE NEW AND
EXISTING SURFACES.
10. INLET PROTECTION ARE PROVIDED FOR INSTALLATION ON ANY INLETS EXPECTED TO ACCEPT CONSTRUCTION RUNOFF. TYPE B IS PROVIDED FOR ALL OPEN-LID STRUCTURES WITHOUT A CURB BOX.
TYPE C IS PROVIDED FOR STRUCTURES WITH A CURB BOX.
11. THE CONSTRUCTION STAKING WILL BE BY THE CONTRACTOR. ELECTRONIC (CADD) FILES CAN BE
PROVIDED TO THE CONTRACTOR UPON REQUEST.
12. ACCESS FOR MAIL SERVICE, GARBAGE COLLECTION, SCHOOL BUSES, AND EMERGENCY VEHICLES SHALL BE
MAINTAINED AT ALL TIMES.
13. THE COST OF MAKING ANY CONNECTIONS TO EXISTING STORM STRUCTURES SHALL BE INCLUDED IN THE
COST OF THE NEW PIPE OR STRUCTURE.
14. CONTRACTOR MUST CONTACT SEWRPC (ANDY TRAEGER (262) 953-4296 OFFICE, (262) 853-8463 CELL, ATRAEGER@SEWRPC.ORG) AT LEAST TWO WEEKS PRIOR TO WORK NEAR ANY SURVEY MONUMENTS.
SEWRPC WILL LOCATE, MARK, AND TIE-OFF ALL US PUBLIC LAND SURVEY MONUMENTS PRIOR TO
CONSTRUCTION WORK NEAR THE MONUMENTS. CONTRACTOR SHALL REMOVE ANYTHING THAT
CONFLICTS WITH PROPOSED WORK, INCLUDING HANDHOLES AND, IF NECESSARY, THE MONUMENT ITSELF. CONTRACTOR SHALL COORDINATE WITH SEWRPC DURING THE PAVING PROCESS. PRIOR TO PLACING SURFACE COURSE, ALLOW SEWRPC AT LEAST 3 WORKING DAYS TO MOBILIZE ITS CREWS TO SET, RESET, AND/OR CHECK THE MONUMENT(S). SEWRPC WILL FILL THE HOLE AND/OR SET A NEW HANDHOLE TO THE BOTTOM OF THE NEW ASPHALT. THE CONTRACTOR WILL BE RESPONSIBLE FOR FILLING THE REMAINDER OF THE HOLE AND/OR SET HANDHOLE TO FINISH ELEVATION UPON COMMENCEMENT OF
SURFACE COURSE. THIS WORK IS INCIDENTAL TO THE CONTRACT.
ABUT ABUTMENT
AC ACRE
AGG AGGREGATE
AH AHEAD
ANGLE
AADT ANNUAL AVERAGE DAILY TRAFFIC
AEW APRON ENDWALL
ASPH ASPHALTIC
BK BACK
BC BACK OF CURB
BAD BASE AGGREGATE DENSE
BL OR B/L BASE LINE
BM BENCH MARK
CB CATCH BASIN
CL OR C/L CENTER LINE
Δ CENTRAL ANGLE OR DELTA
CE COMMERCIAL ENTRANCE
CONC CONCRETE
CSW CONCRETE SIDEWALK
CONST CONSTRUCTION
CP CONTROL POINT
CO COUNTY
CTH COUNTY TRUCK HIGHWAY
CY CUBIC YARD
CP CULVERT PIPE
CPCA CULVERT PIPE CORRUGATED ALUMINUM
CPCPE CULVERT PIPE CORRUGATED POLYETHYLENE
CPCPP CULVERT PIPE CORRUGATED POLYPROPYLENE
CPCS CULVERT PIPE CORRUGATED STEEL
CPCSAC CULVERT PIPE CORRUGATED STEEL ALUMINUM COATED
CPCSPC CULVERT PIPE CORRUGATED STEEL POLYMER COATED
CPRC CULVERT PIPE REINFORCED CONCRETE
CPRCHE CULVERT PIPE REINFORCED CONCRETE HORIZONTAL ELLIPTICAL
CPS CULVERT PIPE SALVAGED
CPT CULVERT PIPE TEMPORARY
C & G CURB AND GUTTER
D DEGREE OF CURVE
DHV DESIGN HOUR VOLUME
DIA DIAMETER
DD DIRECTIONAL DISTRIBUTION
DE DRAINAGE EASEMENT
DWY DRIVEWAY
EA EACH
EB EASTBOUND
EL OR ELEV ELEVATION
EMB EMBANKMENT
EW ENDWALL
EAT ENERGY ABSORBING TERMINAL
ESALS EQUIVALENT SINGLE AXLE LOADS
EXC EXCAVATION
EBS EXCAVATION BELOW SUBGRADE
EXIST EXISTING
FERT FERTILIZER
FE FIELD ENTRANCE
FL OR F/L FLOW LINE
FT FOOT
FTMS FREE TRAFFIC MANAGEMENT SYSTEM
HES HIGH EARLY STRENGTH
HE HIGHWAY EASEMENT
CWT HUNDRED WEIGHT
IN DIA INCH DIAMETER
INL INLET
ID INSIDE DIAMETER
INTERS INTERSECTION
IH INTERSTATE HIGHWAY
INV INVERT
JT JOINT
LT LEFT
LHF LEFT HAND FORWARD
L LENGTH OF CURVE
LF LINEAR FOOT
LC LONG CHORD OF CURVE
LS LUMP SUM
MGAL ONE THOUSAND GALLONS
MH MANHOLE
ML OR M/L MATCH LINE
NOM NOMINAL
NC NORMAL CROWN
NB NORTHBOUND
NO NUMBER
OD OUTSIDE DIAMETER
PAVT PAVEMENT
PLE PERMANENT LIMITED EASEMENT
PC POINT OF CURVATURE
PI POINT OF INTERSECTION
PT POINT OF TANGENCY
PCC PORTLAND CEMENT CONCRETE
LB POUND
PSI POUNDS PER SQUARE INCH
PE PRIVATE ENTRANCE
PROJ PROJECT
PL PROPERTY LINE
PRW PROPOSED RIGHT OF WAY
R RADIUS
RL OR R/L REFERENCE LINE
REQD REQUIRED
RT RIGHT
RHF RIGHT HAND FORWARD
R/W RIGHT OF WAY
RD ROAD
RDWY ROADWAY
SHLDR SHOULDER
SW SIDEWALK
SB SOUTHBOUND
SPECS SPECIFICATIONS
SF SQUARE FEET
SY SQUARE YARD
SDD STANDARD DETAIL DRAWINGS
STH STATE TRUNK HIGHWAY
STA STATION
SSPC STORM SEWER PIPE COMPOSITE
SSCPE STORM SEWER PIPE CORRUGATED POLYETHYLENE
SSCPP STORM SEWER PIPE CORRUGATED POLYPROPYLENE
SSPNRC STORM SEWER PIPE NON-REINFORCED CONCRETE
SSPRC STORM SEWER PIPE REINFORCED CONCRETE
SSPRC STORM SEWER PIPE REINFORCED CONCRETE
SSPRCHE STORM SEWER PIPE REINFORCED CONCRETE HORIZONTAL ELLIPTICAL
SE SUPERELEVATION
SL OR S/L SURVEY LINE
TEMP TEMPORARY
TI TEMPORARY INTEREST
TLE TEMPORARY LIMITED EASEMENT
TC TOP OF CURB
TL OR T/L TRANSIT LINE
T TRUCKS (PERCENT OF)
TYP TYPICAL
USH UNITED STATES HIGHWAY
VAR VARIABLE
VC VERTICAL CURVE
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
W WEST
WB WESTBOUND
STANDARD ABBREVIATIONS
DIGGERS HOTLINE
Dial or (800)242-8511 www.DiggersHotline.com
OTHER ABBREVIATIONS
EX EXISTING
PR PROPOSED
CPP CORRUGATED POLYPROPYLENE
GRVL GRAVEL
QTR QUARTER POINT
MID MIDDLE POINT
ROADWAY DESIGN CONTACT
BAXTER & WOODMAN
ATTN: JASON ATCHISON, PE
115 SOUTH 84th STREET, SUITE 220
MILWAUKEE, WI 53214
PHONE: (815) 444-3279
EMAIL: jatchison@baxterwoodman.com
COUNTY CONTACT
JOE KROLL PE, PLS
WALWORTH COUNTY
W4097 COUNTY ROAD NN
ELKHORN, WI 53121
PHONE: (262) 741-3114
FAX: (262) 741-3195
EMAIL: jkroll@co.walworth.wi.us
CITY CONTACT
CITY OF LAKE GENEVA - DIRECTOR OF PUBLIC WORKS
ATTN: TOM EARLE
1065 CAREY STREET
LAKE GENEVA, WI 53147
PHONE: (262) 248-6644
EMAIL: tearle@cityoflakegeneva.com
LAKE GENEVA UTILITY COMMISSION
CITY OF LAKE GENEVA - UTILITY DIRECTOR
ATTN: JOSH GAJEWSKI
361 W MAIN STREET
LAKE GENEVA, WI 53147
PHONE: (262) 248-2311 (EXT: 403)
EMAIL: jgajewski@lgutilities.org
UTILITY CONTACTS
ALLIANT ENERGY - ELECTRIC
AUSTIN KROHN
400B KOOPMAN LANE
ELKHORN, WI, 53121
PHONE: (262) 741-0905
EMAIL: AustinKrohn@alliantenergy.com
CHARTER - COMMUNICATIONS
CODY THOMPSON
1340 PLAINFIELD AVE
JANESVILLE, WI 53545
P: (608) 921-8282 E: cody.thompson@charter.com
GENERAL NOTES
AT&T - COMMUNICATIONS
NATHAN GILBERT
411 7TH STREET
RACINE, WI 53403
P: (262) 720-8235 E: ng952@att.com
WE ENGERIES (GAS)
RYAN ROCK
P: (262) 446-9821 E: Ryan.Rock@we-energies.com
115 120
PC: 108+75.88
PT
: 1
+5
0.
PC
: 1
+3
8.
PT: 125+85.63
PI: 134+77.36
PI: 140+42.46
EP: 144+07.46
IP
IP
IP
IPIP
IP
IP
IP
IP
IP
IP
IP
IP
IP IP
IP
IP
IP
IP
IP IP
IP
IP
IPIP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP IP
IP
IP
IP
IP
IP IP
IP
IP
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\020201-PO.DWGFILE NAME : 2/10/2026 1:19 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:400 FT
26-003 CTH H WALWORTH PROJECT OVERVIEW
LAYOUT NAME - 020201-po
HENRY ST
CTH H
(GEORGE ST)
GARDNER ST
ROGERS CT
WALKER ST
MILWAUKEE ST
GRANT ST
WALWORTH ST
C
EN
TE
R
S T
SA
G
E
ST
GROVE ST
HASKINS ST
C R
AW
FO
R D
S T
SPRING ST
W
AV
ER
LY
S T
AL
LE
N D
AL
E
AV
E
W
IL
LI
AM
S
ST
W
IL
LI
AM
S
ST
CTH H
(E SHERIDAN SPRINGS RD)
C
EN
TE
R
S T
E SHERIDAN SPRINGS RD
CTH H
(IN
TERCHANGE N)
M
IN
AH
AN
R D
E GENEVA SQUARE
BEGIN PROJECT
STA 97+30
X: 2389649.1359 Y: 222853.2517
END PROJECT
STA 138+85.27
X: 2392186.8320 Y: 225086.1769
STH 120
BEGIN RESURFACING
STA 99+28.29 INTERSECTION
IMPROVEMENTS
INTERSECTION
IMPROVEMENTS
SIGNALIZED
INTERSECTION
SIDEWALK
EXTENSION
C
IT
Y O
F
LA
KE
G
EN
EV
A
TO
W
N O
F G
EN
EV
A
SPEED
LIMIT
SPEED
LIMIT
SIGNALIZED
INTERSECTION
STH 120/
USH 12
RAMPS
http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/rseries/R2-1.pdf
EX R/W EX R/W60'
5'
REMOVE ASPHALTIC SURFACE MILLING - 4" DEPTH*
CONSTRUCT:
LOWER LAYER - 2.25" HMA PAVEMENT 3 MT 58-28 S
UPPER LAYER - 1.75" HMA PAVEMENT 4 MT 58-28 S
(4" TOTAL PAVEMENT THICKNESS)
EXISTING AGGREGATE
BASE THICKNESS
VARIES 6" - 7"
5'
EXISTING ASPHALT
VARIES 3" - 9.5"
FINISHED TYPICAL SECTION
STA 99+28.29 TO STA 113+50
9'-9.5' 9'-9.5'1212'
2 %2 % 2 %2 %
DRIVING LANEDRIVING LANE
EXISTING CONCRETE CURB & GUTTER TO
REMAIN - SEE PLANS FOR SPOT REPAIRS
EX R/W EX R/WVARIES (60'-80')
FINISHED TYPICAL SECTION
STA 113+50 TO STA 118+92.6
12' 12' 12'
TURN LANE DRIVING LANEDRIVING LANE
EXISTING AGGREGATE
BASE THICKNESS
VARIES 6" - 7"
REMOVE ASPHALTIC SURFACE MILLING - 4" DEPTH*
CONSTRUCT:
LOWER LAYER - 2.25" HMA PAVEMENT 3 MT 58-28 S
UPPER LAYER - 1.75" HMA PAVEMENT 4 MT 58-28 S
(4" TOTAL PAVEMENT THICKNESS)
EXISTING ASPHALT
VARIES 3" - 5"
5.5'
EXISTING CONCRETE
SIDEWALK TO
REMAIN
BASE PATCHING ASPHALTIC
OR EBS AS DETERMINED BY
ENGINEER IN THE FIELD
EBS AS DETERMINED BY
ENGINEER IN THE FIELD
*NOTE:
WHERE EXISTING PAVEMENT DEPTH IS LESS THAN 6" REMOVE FULL PAVEMENT
SECTION TO AVOID SCABBING.
APPROXIMATE STATION RANGES OF THINNER PAVEMENT:
BEGIN PROJECT TO STA 118+92.6
STA 120+00 TO STA 134+00
5'
2.5' 2.5'
2.5' 2.5'
1.5%
5" CONCRETE SIDEWALK
ON 4.5" OF BASE AGGREGATE DENSE 34 INCH
AS SHOWN ON PLANS
1.5%
EXISTING CONCRETE CURB & GUTTER TO
REMAIN - SEE PLANS FOR SPOT REPAIRS
2%2% 2%
5" CONCRETE SIDEWALK
ON 4.5" OF BASE AGGREGATE DENSE 34 INCH
AS SHOWN ON PLANS
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\020301-TS.DWGFILE NAME : 2/10/2026 5:08 PMPLOT DATE : PLOT BY : JASON A. ATCHISON
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:10 FT
26-003 CTH H WALWORTH TYPICAL SECTIONS
LAYOUT NAME - 020301-ts
EX R/W EX R/W100'
FINISHED TYPICAL SECTION
STA 124+25 TO STA 138+85.27
REMOVE ASPHALTIC SURFACE MILLING - 4" DEPTH*
CONSTRUCT:
LOWER LAYER - 2.25" HMA PAVEMENT 3 MT 58-28 S
UPPER LAYER - 1.75" HMA PAVEMENT 4 MT 58-28 S
(4" TOTAL PAVEMENT THICKNESS)
EXISTING AGGREGATE
BASE THICKNESS
VARIES 6" - 7"
EXISTING ASPHALT
VARIES 6" - 9"
12' 12' 12' 12'
VARIES
2 %2 % 2 %
EX R/W EX R/WVARIES (80')
FINISHED TYPICAL SECTION
STA 118+92.6 TO STA 124+25
12' 12' 12' 0' - 12'
DRIVING LANE DRIVING LANEDRIVING LANE DRIVING LANE
EXISTING AGGREGATE
BASE THICKNESS
VARIES 6" - 7" REMOVE ASPHALTIC SURFACE MILLING - 4" DEPTH*
CONSTRUCT:
LOWER LAYER - 2.25" HMA PAVEMENT 3 MT 58-28 S
UPPER LAYER - 1.75" HMA PAVEMENT 4 MT 58-28 S
(4" TOTAL PAVEMENT THICKNESS)
EXISTING ASPHALT
VARIES 5" - 6"
5'
5'
2'
2'
EXISTING CONCRETE
SIDEWALK TO REMAIN
5'
EXISTING CONCRETE CURB & GUTTER TO
REMAIN - SEE PLANS FOR SPOT REPAIRS
2.5'
2.5'
*NOTE:
WHERE EXISTING PAVEMENT DEPTH IS LESS THAN 6" REMOVE FULL PAVEMENT
SECTION TO AVOID SCABBING.
APPROXIMATE STATION RANGES OF THINNER PAVEMENT:
BEGIN PROJECT TO STA 118+92.6
STA 120+00 TO STA 134+00
EXISTING CONCRETE CURB &
GUTTER TO REMAIN - SEE PLANS FOR
SPOT REPAIRS
1.5% 2 % 2 %2.5% 2.5%
DRIVING LANE DRIVING LANEDRIVING LANE DRIVING LANE
4:13:1
2 %
BASE PATCHING ASPHALTIC
OR EBS AS DETERMINED BY
ENGINEER IN THE FIELD
BASE PATCHING ASPHALTIC
OR EBS AS DETERMINED BY
ENGINEER IN THE FIELD
5" CONCRETE SIDEWALK
ON 4.5" OF BASE AGGREGATE DENSE 34 INCH
AS SHOWN ON PLANS
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\020301-TS.DWGFILE NAME : 2/10/2026 5:08 PMPLOT DATE : PLOT BY : JASON A. ATCHISON
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:10 FT
26-003 CTH H WALWORTH
LAYOUT NAME - 020302-ts
TYPICAL SECTIONS 5
CURB AND GUTTER DETAIL
AP
PR
O X.
A
A
RESTORE DISTURBED AREAS BEHIND REPLACED
CURB AND GUTTER WITH TOPSOIL, SEED, FERTILIZER,
AND MULCH OR HYDRO SEED (INCLUDED)
BACKFILL WITH SAND OR
SUITABLE EXCAVATED MATERIAL
(INCLUDED)
RESHAPE AND COMPACT EXISTING BASE
AGGREGATE OR REMOVE AND REPLACE
UNSUITABLE MATERIAL WITH 4" MIN. BASE
AGGREGATE DENSE 1 1/4"
EXISTING MILLED
PAVEMENT
EXISTING CURB AND
GUTTER TO REMAIN
DRILLED & EPOXIED #6 TIE BAR
1 FT. LENGTH CENTERED ON
JOINT 3" BELOW SURFACE
(TYP) (INCLUDED)
REMOVE EXISTING CURB AND GUTTER
INSTALL NEW CONCRETE CURB AND GUTTER
SHAPE TO MATCH EXISTING
FULL DEPTH SAWCUT AT
REMOVAL LIMITS (TYP)
(INCIDENTAL)
RESTORE DISTURBED AREAS BEHIND REPLACED
CURB AND GUTTER WITH TOPSOIL, SEED, FERTILIZER,
AND MULCH OR HYDROSEED (INCLUDED)
8" -1
0" 8"
-1 0"
4" M
IN
4" M
IN
CURB AND GUTTER REMOVAL AND REPLACEMENT DETAIL
NOTES:
1. REMOVAL LIMITS SHALL MATCH EXISTING
JOINTS WHENEVER POSSIBLE, UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
2. IF ONE OF THE REMOVAL LIMITS IS AN
EXPANSION JOINT, REPLACE WITH A
3/4-INCH EXPANSION JOINT.
3. REMOVAL AND REPLACEMENT SHALL BE
DONE IN ACCORDANCE WITH APPLICABLE
PARTS OF SECTIONS 204 AND 601 OF
THE WISDOT SPECS.
1'
SECTION A-A
NOT TO SCALE
NOT TO SCALE
CONCRETE CURB & GUTTER
30-INCH, TYPE D
12"
4" TOPSOIL, SEED,
AND FERTILIZER
SAWCUT EDGE
OF EXISTING PAVEMENT
BASE AGGREGATE DENSE 1 1/4-INCH (MAX LIFT 6")
24" (MIN)
.5
4" HMA PAVEMENT
EXCAVATION BELOW SUBGRADE (EBS) DETAIL
LIMITS OF PAY ITEM
"REMOVING ASPHALTIC
SURFACE BUTT JOINTS"
BUTT JOINT DETAIL
CONST. TEMP. ASPHALT WEDGE UNLESS
ASPHALT PAVEMENT OVERLAY IS CONSTRUCTED
IMMEDIATELY AFTER BUTT JOINT CONST.
REMOVING ASPHALTIC SURFACE MILLING
HMA PAVEMENT
* IF TRANVERSE MILLING IS USED
SAWCUT IS OPTIONAL
NOTE: SAW CUTTING IS INCIDENTAL
TO CONSTRUCTION.
NOT TO SCALE
NOT TO SCALE
8"
TOP OF EXPOSED
AGGREGATE BASE
BASE AGGREGATE DENSE
1 1/4-INCH (TWO LIFTS)
BREAKER RUN
EXCAVATE AREAS DETERMINED
THROUGH PROOF ROLLING TO
CLEAN AND STRAIGHT LINES,
PAID AS COMMON EXCAVATION
EXIST. PAVEMENT
BUTTED JOINT
EXIST. ASPH. PAVEMENT
HMA PAVEMENT
5' (MIN) MILL DEPTH - SAWING ASPHALT REQ'D.*
WHEN ABUTTING ASPHALT PAVEMENT.
NO SAWCUT ABUTTING EXISTING
CONCRETE PAVEMENT
MILL DEPTH
(TYP)
6" MIN
GEORGE ST SW QUADRANT
GARDNER ST NE & SE QUADRANT
CTH H STA 113+50 TO STA 116+95
CENTER STREET SW, SE, AND NE QUADRANT
VARIES
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021001-CD.DWGFILE NAME : 2/10/2026 1:19 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:10 FT
26-003 CTH H WALWORTH CONSTRUCTION DETAILS
LAYOUT NAME - 021001-cd(1)
SD-8.2
STORM
MANHOLE
ADJUSTMENT
CITY OF LAKE GENEVA
STANDARD DETAIL
SD-8.3
ADJUSTING
STORM
INLET
STORM
SEWER
DRAWN BY: BB N.T.S.
DATE:09/22/2025
DRAWN BY: BB N.T.S.
DATE:09/22/2025SD-8.1
CITY OF LAKE GENEVA
STANDARD DETAIL
CONNECTING
PIPE TO
EXISTING
STRUCTURE
DRAWN BY: BB N.T.S.
DATE:09/22/2025
NEW STORM SEWER
EXISTING STORM SEWER
CITY OF LAKE GENEVA
STANDARD DETAIL
EXISTING
STORM
STRUCTURE
WATERTIGHT
JOINTS
ADJUSTED TO OR
WITHIN 1" BELOW
FINAL GRADE OF
PAVEMENT
LID & FRAME
NEENAH FOUNDRY
R-1580
TYPE "B" SELF
SEALING LIDS
NON-ROCKING
ADJUSTMENT RINGS
CONCRETE UNLESS
RUBBER SPECIFIED
FOR THE TOP RING
SUBJECT TO TRAFFIC
AS MANUFACTURED
BY ADAPTOR INC.,
WEST ALLIS, WI (8"
MAX)
CHIMNEY SEALS
CRETEX OR EQUAL
PAVED AREAS-INTERNAL SEAL
LAWN AREAS-EXTERNAL SEAL
STRUCTURE STATION & OFFSET
SHOWN ON PLANS
REFERS TO THIS POINT-
CENTER OF STRUCTURE
ADJUSTED TO OR
WITHIN 1" BELOW
FINAL GRADE OF
PAVEMENT
RIM ELEVATION SHOWN
ON PLSND REFERS TO THIS
POINT - EXCEPT IN CROSS
SECTIONS WHERE TOP
BACK OF CURB IS NOTED
CONCRETE
ADJUSTMENT
RINGS
NOTES:
1. INLETS SHALL BE INSPECTED PRIOR TO CORING TO DETERMINE
CONDITION OF STRUCTURE
2. STORM WATER STRUCTURES THAT ARE CRACKED, MADE OF BRICK,
OR OTHERWISE DAMAGED SHALL BE REPLACED
3. NEW PIPE OPENING SHALL BE CORED AWAY FROM ANY STEPS OR
RISER JOINTS IN THE STRUCTURE
4. PIPE TO MANHOLE CONNECTION 3.5.7 OF STANDARD
SPECIFICATIONS FOR SEWER AND WATER CONSTRUCTION IN
WISCONSIN
NOTES:
1. MANHOLES SHALL BE INSPECTED PRIOR TO ADJUSTMENT TO DETERMINE
CONDITION OF ADJUSTMENT RINGS
2. ADJUSTMENT RINGS THAT ARE CRACKED OR OTHERWISE DAMAGED, MADE OF
BRICK, OR IMPROPERLY SEALED SHALL BE REPLACED.
3. IF EXISTING ADJUSTMENT RINGS TOTAL OVER 8", MANHOLE SHALL BE INSPECTED
FOR COMPATIBILITY WITH RISERS OR REPLACED IN ITS ENTIRETY
4. MANHOLES TO BE ADJUSTED TO ELEVATION IN ACCORDANCE WITH 3.5.10
STANDARD SPECIFICATIONS FOR WATER AND SEWER CONSTRUCTION
NOTES:
1. INLETS SHALL BE INSPECTED PRIOR TO ADJUSTMENT TO DETERMINE
CONDITION OF ADJUSTMENT RINGS
2. ADJUSTMENT RINGS THAT ARE CRACKED OR OTHERWISE DAMAGED,
MADE OF BRICK, OR IMPROPERLY SEALED SHALL BE REPLACED
3. IF EXISTING ADJUSTMENT RINGS TOTAL OVER 6". INLET SHALL BE
INSPECTED FOR COMPATIBILITY WITH RISERS OR REPLACED IN ITS
ENTIRETY.
6"
8"
INLET COVER TYPE BH
NEENAH R-2560-E5 OR APPROVED EQUAL
35 12"
26 12"
24 18" 6"
25 3 4"
B
REVISIONS
LIGHTS
WARNING
TURN ON
BUTTON TO
PUSH
2" SQUARE TELESPAR
YELLOW PUSH BUTTON KIT
24"X12" W16-7PL STATIC SIGN
BACK TO BACK
RRFB LIGHT BARS
BACK TO BACK
30" W11-2 STATIC SIGNS
12V/30W SOLAR PANEL/CONTROL CABINET
TOP OF POLE MOUNTED
24"X12" W16-7PR STATIC SIGN
7"
REV.
A
B
DESCRIPTION
UPDATE TO SW2020
UPDATE SOLAR PANEL NOTE FROM
20W TO 30W. UPDATE DESCRIPTION
DATE ECN# AUTHOR/APPROVED
5/7/2018
12/02/2022
N/A
CC-692 SR
A.K./JP.
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021001-CD.DWGFILE NAME : 2/10/2026 1:19 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:10 FT
26-003 CTH H WALWORTH CONSTRUCTION DETAILS
LAYOUT NAME - 021001-cd(2) http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf http://wisconsindot.gov/dtsdManuals/traffic-ops/manuals-and-standards/signplate/wseries/W11-2.pdf
O H
OH
OH
OH
OH
OH OH OH
SS SSSS SS SS
SS
SS
SS
SS
SS SS SS
G
G G
G G
G G G G
G
G V
WVS
W V
MH
W V
G U
Y
G U
Y
PO
ST
CONC
CONC
5" STEEL POST
3' TALL
CO
N
C
CO
N
C
CO
N
C
CONC
CONC
CONC
CO
N
C
27' 15"
LANDSCAPING
W/WOOD SIGN
"KAISER CHIROPRACTIC"
BM#58
17"
99+00 100+00 101+00
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X X X
X X XXXXX XX XXX XXX XX XXXX X XX XXX XXXXX XX XX X X X XX X XX X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XX
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
XX
XX
XX
XX
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXX
X X
X
X X X X X X X
X X
X
X X
X X
X X
X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X XX X XXXXX XXX X XX XXXXX XXX XXXXXXX
XX895.14 EOP
22.2' LT PT+33.1
896.66 EOP (EX)
64.4' LT PC+78.9
896.17 EOP
51.3' LT +15.4
896.11 EOP
6.3' LT PC +50.4
895.97 EOP
16.4' LT MID +26.0
896.29 EOP
21.7' RT PT +85.2
895.85 EOP
42.1' RT PC +64.6
896.07 EOP
27.6' RT MID +70.7
895.81 EOP
42.4' RT PT+42.6
895.97 EOP
21.8' RT PC HP+22.2
895.92 EOP
27.9' RT MID+36.7
42.2' RT +85.1
42.3' RT
+22.1
895.14 EOP (EX)
22.2' LT+28.3
896.51 EOP (EX)
64.9' LT +15.1
896.36 EOP
6.3' LT +99.1
895.88 (EX)
21.7' RT+07.0
895.74 EOP
52.3' RT+42.5
895.73 EOP
52.2' RT +64.5
896.42 EOP
21.8' RT +01.5
IP
C/L CTH H (WILLIAMS ST) STA 99+96.85
C/L CTH H (GEORGE ST)
C/L CTH H (WILLIAMS ST) STA 100+53.61
C/L GARDNER ST
N0°16'53"W
2012.19'
895.65 EOP
35.7' LT MID+65.4
67.7' LT
+33.0
41.4' LT +51.0
895.94 EOP
40.8' LT PT +15.5
895.65 EOP (EX)
64.8' RT+40.7
895.64 EOP (EX)
64.7' RT +66.5
MATCH EXISTING
22.2' LT+41.1
895.86 EOP
37.4' LT LP +15.8
ADJUST STORM
MANHOLE COVER
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021101-ID.DWGFILE NAME : 2/10/2026 1:39 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:20 FT
26-003 CTH H WALWORTH INTERSECTION DETAILS: CTH H (WILLIAMS ST) AT GEORGE ST & GARDNER ST
LAYOUT NAME - George St & Gardner St
WILLIAMS ST
CTH
H
(G
EO
RG
E ST)
G
AR
DN
ER
S T
R45'
50'
50'
EX R/W
EX R/WEX R/W
EX R/W
EX
R
/W
EX
R
/W
EX
R
/W
EX
R
/W
SEE CURB RAMP
DETAIL SHT 10 SEE CURB RAMP
DETAIL SHT 10
SEE CURB RAMP
DETAIL SHT 11
SEE CURB RAMP
DETAIL SHT 11
89°59'34"'
BEGIN RESURFACING
STA 97+30
Y: 222853.2517 X: 2389649.1359
MATCH EXISTING
BUTT JOINT REQ'D
36'
PROJECT LIMITS
BUTT JOINT
64.7' LT.
SAW CUT OPTIONAL
90°11'33"'
BENCHMARKS
NAME NORTHING EASTING ELEVATION DESCRIPTION
BM#58 223000.839 2389624.138 898.01 SPIKE IN POWER POLE AT NORTHWEST
CORNER OF CTH H AND GEORGE ST
BUTT JOINT
64.7' RT
SAW CUT OPTIONAL
R 35'
5'
5'
5'
5'5'
R 20.5'
R 20.5'
5'
5'
REMOVE EXISTING INLET
STRUCTURE
CAP AND ABANDON EXISTING
CONCRETE PIPE IN PLACE
4'
5'
SLOPE INTERCEPT
(TYP)
4'
4' 4'
4'
4'
22'
DRIVEWAY APRON REMOVAL
PAID FOR AS REMOVING
CONCRETE SIDEWALK
6.
3'2'
(T
YP
ADJUST INLET
COVER
ADJUST STORM
MANHOLE COVER ADJUST INLET
COVER
ADJUST VALVE
OH OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
O H
O H
OH
OH
OH
OH
SSSS SS SS
SS
SS
SS
SS SS SS SS SS
SS
SS SS SS
SAN
SAN
SAN SAN SAN SAN
SAN
SAN
O H
O H
O H
W W W W
W W
W W
SAN SAN SAN SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN
W W W W W W
SA
N
SA
N
W W W W W W W W W W W W W
SANSAN SAN SAN SAN
G G G G G G
G G
G
G
G
G G
GGGG
G
G G
G G
G
G
G G G G G
G
G G G G G G G G
W
W
W W
W
W W
W
W
SS
SS SS
MH
SS
SS
TEL
W V
W V
SAN
GV
WVS
SA
N
WVS
SAN
GV
W V
SAN
WVS
GUY
GUY
GUY
GTST
MPM
P
R TIME WARNER
CONC
24" 26"
CONC
CONC
ONLY
SPLICER CABINET
8"
15"
5" 6"
5" 10"
TREE LINE
AT&T FIBER MARKER
GAS TEST STATION
BM#57
CONC
ASPH
AT&T FIBER
MARKER
116+00 117+00 118+00 119+00
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X XX X X XXX XX XX XXX XX XXX XX XX XX X X X X XX XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
888.02 EOP
43.2' RT PT
+23.3
889.19 EOP
13.8' RT PC
+93.4
888.35 EOP
22.4' RT MID
+14.3
0.15 EOP
55.6' RT
+23.6
887.55 EOP
43.5' RT PC +58.9
887.48 EOP
14.0' RT PT +88.6
887.78 EOP
22.7' RT MID HP+67.8
887.43 EOP
56.0' RT +58.7
43.8' RT+93.3 44.0' RT +88.9
887.23 EOP
22.0' LT PC +95.9
888.08 EOP
28.2' LT MID +76.7
55.0' LT +96.0
886.14 EOP
14.1' RT +50.7
885.37 EOP
26.2' RT LP
+92.6
IP
IP
IP
IP
885.86 EOP
21.9' LT +52.4
888.92 EOP
38.3' LT +67.5
889.81 EOP
25.2' LT PT +10.7889.86 EOP
22.7' LT PT +64.9890.68 EOP
22.3' LT PT +03.7
890.24 EOP
22.5' LT PT +36.6
C/L CTH H (SHERIDAN SPRINGS RD) STA 117+42.51
C/L CENTER ST
WISDOT/CADDS SHEET 42
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021101-ID.DWGFILE NAME : 2/10/2026 1:39 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:20 FT
26-003 CTH H WALWORTH INTERSECTION DETAILS: CTH H (SHERIDAN SPRINGS RD) AT CENTER ST
LAYOUT NAME - Center St
CE
N
TE
R
ST
CE
N
TE
R
ST
CTH H (SHERIDAN SPRINGS RD)
R 33'
60'
60'
EX R/W
EX R/W
EX
R
/W
EX
R
/W
EX
R
/W
EX
R
/W
EX R/W
EX R/W
BENCHMARKS
NAME NORTHING EASTING ELEVATION DESCRIPTION
BM#57 224214.669 2390333.906 890.97
SPIKE IN POWER POLE W/LIGHT AT
NORTHEAST CORNER OF CENTER ST
AND CTH H
BUTT JOINT
55.8' RT
SAW CUT OPTIONAL
BUTT JOINT
37.1' LT
SAW CUT OPTIONAL
CURB & GUTTER REMOVAL
AND REPLACEMENT 39 LF
CURB & GUTTER REMOVAL
AND REPLACEMENT 33 LF
4'
5'
5'
4'
GRADING AND SHAPING
DITCHES - 512 LF
SEE CURB RAMP SHEET
SEE CURB RAMP SHEET
1.41%
1.
0%
4.41%
5'
5'R 30'
REMOVE EXISTING INLET STRUCTURE
CAP AND ABANDON EXISTING
CONCRETE PIPE IN PLACE
REMOVE EXISTING INLET STRUCTURE
CAP AND ABANDON EXISTING
CONCRETE PIPE IN PLACE
1.42%
R 30'
ADJUSTING MANHOLE WITH
NEW INLET COVER TYPE A
SANITARY WORK
DONE BY OTHERS
89°11'55"'
ADJUST SANITARY
MANHOLE COVER
ADJUST WATER
MANHOLE COVER
ADJUST STORM
MANHOLE COVER
100+00
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
X X X
XX
XXXX
XX X
X X X X X XX XXX X XX X XXX X XXX XXXX X XX X XX X XXXX XXX XXXX XXX XXXX X XX XX XX XXX XXXX XXXXXXX X X X X X XX X XXX XXX XXX X X X X X X XX X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXX
7.
0%
8.
0%
8.
0%
0.5%
1.5%
7.
2%
1.0%
1.5%
5.0%
1.
5%
4.7%
1.
5%
1.
0%
1.
3%
1.6%
1.3%
0.3%
1.5%
897.098
896.434
896.377 896.293895.906
896.111
896.368
896.748
897.042
896.673
895.907
895.807
895.846
895.937
895.899
895.970
896.041
895.832
895.855
895.955
1.5% 1.2%
0.
1%
896.174
895.840
SS
G G
G
WVS
W V
MH
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X XX X X X X X X X XX X XX XX X X XX XXXX X XX X XXXX XX XX XXXXXXXXXXXXXXXX XXXXXXXXXXXXX
XXXXXX
6.
8%
0.3%
6.
8%
1.2%4.4%
2.6%
0.2% 0.
3%
1.
5%
2.6%
2.6%
895.997
895.777 895.796
895.298
895.731 895.716
895.455 895.147
896.662
895.138
895.802
895.218
895.180
895.287
895.471
SS
WISDOT/CADDS SHEET 42
ECOUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021301-CR.DWGFILE NAME : 2/10/2026 1:21 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET HWY:
PLOT SCALE : 1 IN:10 FT
26-003 10WALWORTH CURB RAMP DETAILS: GEORGE ST
LAYOUT NAME - George St
CTH H
NOTES:
1. CONTRACTOR TO FIELD VERIFY ELEVATION, GRADES, SLOPES, LENGTHS,
AND MATCH POINTS PRIOR TO CURB RAMP AND SIDEWALK CONSTRUCTION.
2. THE ENGINEER MAY ADJUST ELEVATIONS TO FIT FIELD CONSTRUCTION.
3. SEE THE STANDARD DETAIL DRAWINGS FOR COMPLETE CURB RAMP
REQUIREMENTS.
4. ALL RESTORATION SHALL BE 4" TOPSOIL, SEED, AND FERTILIZER.
CURB RAMP TYPE
RESTORATION (SEE NOTES)
CONCRETE SIDEWALK 5-INCH
CONCRETE CURB PEDESTRIAN
LEGEND
RES
SW5
PED
P6 6:1 PAVED FLARE (NON-WALKABLE SURFACE)
LANDINGL
C
TH
H (G
EO
R
G E
ST
CTH H (WILLIAMS ST)
L 4B1
5'
4'
5'
4'
5'
CTH H (WILLIAMS ST)
C
TH
H (G
EO
R
G E
ST
4'
PED
PED
PED
SLOPE INTERCEPT
(TYP)
L
RES
RES
RES
RES
PED
PED
EX
R
/W
EX
R
/W
EX R/W
G G G
W V
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XXX
XXX
XX
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XX
XX
X
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X
IP
4.
0%
1.7%
3.6%
1.5%
1.5%
1.5%
2.
0%
0.
6%
1.
2%
0.
6%
1.5%
1.
5%
0.
7%
0.
6%
1.8%
0.
6%
1.
5%
0.3%
0.1%
0.
6%
1.5%
0.
8%
0.
8%
0.
8%
0.
8%
0.
8%
0.7%
0.3%
3.
0%
0.1%
0.7%0.7%
0.9%
1.5%
1.5%
7.5%
1.5%
1.5% 2.
7%
1.
1%
3.2%
1.
5%
0.
9%
1.
0%
1.
5%
1.4%
7.5%
1.
1%
1.
3%
1.5% 4.
2%
1.
3%
1.
1%
1.5%
0.
6%
1.
2%
1.
5%
1.
6%
7.4%
896.482
896.283
895.865
895.973
895.917
895.809
895.742
895.657
896.319 896.355 896.391
896.394 896.407
896.421
896.280
895.804
895.762
896.284
896.190
896.265
896.325
896.228
896.260
896.292
896.116
896.190
896.250
896.217 896.185 896.081
896.229
7.5%
7.4%
895.645
895.729
895.845
896.067
896.289
896.179
895.957
896.195
896.162
895.824
895.904
896.281
896.194
896.666
896.815
896.976
896.743
1.5%
1.
5%
5.0%
5.3%0.9%
896.823 896.744
896.319 896.273
896.198
896.236
896.275
896.314
896.248
896.303
896.394
896.200
896.239
896.266 896.415
2.0%
896.307
1.4%
1.3%
896.173
896.228
1.5%
.4
896.263 896.330
895.865
895.830 895.881 895.881
.1
895.846
896.399
1.
7%
896.275
1.3%
3.
1%
1.
1%
G
G G
G G
G
1.
0%
101+00
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
0.7%
0.7% 0.7% 0.7% 0.7%
2.
5%
2.
5%
2.
5%
0.7%0.7%
1.
5%
1.
5%
15.7% 16.8%
1.0%
0.5%
1.
5% 3.
1%
0.6%
0.5%
2.
4%
0.5%
5.
0%
0.7% 0.7% 0.2%
0.7% 0.7% 0.7%
1.
5%
1.
5%
1.
5%
896.780
0.7%
1.
5%
0.7%
0.7%
1.
5%
5.
0%
0.7%
896.813
896.846 896.879
896.912
896.945
896.978 897.011
897.044
896.926 896.936896.903896.870
896.837 896.804 896.682 896.555
896.736
896.233896.678 896.208
896.530
896.653
896.771
896.738
896.705
896.360
896.304896.278
2.
5%
896.747
896.653
G G
G G G G G
G G
WISDOT/CADDS SHEET 42
ECOUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021301-CR.DWGFILE NAME : 2/10/2026 1:21 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET HWY:
PLOT SCALE : 1 IN:10 FT
26-003 11WALWORTH CURB RAMP DETAILS: GARDNER ST
LAYOUT NAME - Gardner St
CTH H
G
AR
D N
ER
S
T
NOTES:
1. CONTRACTOR TO FIELD VERIFY ELEVATION, GRADES, SLOPES, LENGTHS, AND
MATCH POINTS PRIOR TO CURB RAMP AND SIDEWALK CONSTRUCTION.
2. THE ENGINEER MAY ADJUST ELEVATIONS TO FIT FIELD CONSTRUCTION.
3. SEE THE STANDARD DETAIL DRAWINGS FOR COMPLETE CURB RAMP
REQUIREMENTS.
4. ALL RESTORATION SHALL BE 4" TOPSOIL, SEED, AND FERTILIZER.
CURB RAMP TYPE
RESTORATION (SEE NOTES)
CONCRETE SIDEWALK 5-INCH
CONCRETE CURB PEDESTRIAN
LEGEND
RES
SW5
PED
P6 6:1 PAVED FLARE (NON-WALKABLE SURFACE)
LANDINGL
CTH H (WILLIAMS ST)
CTH H (WILLIAMS ST)
3 3
7B
L
L
PED
RES
6'
4'
5'
L
P6
P6
4'5'
5'
4'
5'
4'
5'
RES
L
P6
SW5SW5
SW5
4'
SLOPE INTERCEPT
(TYP)
SLOPE INTERCEPT (TYP)
RES
RES
PED SW5
P10
ONLY
XXX X X XX XX X X XXXXX XX XXX XXX X XXX XXXXXXX XXX XXX XXXX XX X XXX X X XX X XX X XX X X XX X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
1.
5%
1.5%
3.1%
1.
5%
1.
5%
0.8%
1.5%
6.
1%
3.5%
1.9%
888.295
888.004
887.247
888.918
887.988
887.696
887.771
887.988888.062
887.911
887.988
887.864
888.079
887.905
3.4%
WISDOT/CADDS SHEET 42
ECOUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021302-CR.DWGFILE NAME : 2/10/2026 1:22 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET HWY:
PLOT SCALE : 1 IN:10 FT
26-003 12WALWORTH CURB RAMP DETAILS: CENTER ST NORTHEAST
LAYOUT NAME - Center St North
CTH H
NOTES:
1. CONTRACTOR TO FIELD VERIFY ELEVATION, GRADES, SLOPES, LENGTHS,
AND MATCH POINTS PRIOR TO CURB RAMP AND SIDEWALK CONSTRUCTION.
2. THE ENGINEER MAY ADJUST ELEVATIONS TO FIT FIELD CONSTRUCTION.
3. SEE THE STANDARD DETAIL DRAWINGS FOR COMPLETE CURB RAMP
REQUIREMENTS.
4. ALL RESTORATION SHALL BE 4" TOPSOIL, SEED, AND FERTILIZER.
CURB RAMP TYPE
RESTORATION (SEE NOTES)
CONCRETE SIDEWALK 5-INCH
CONCRETE CURB PEDESTRIAN
LEGEND
RES
SW5
PED
P6 6:1 PAVED FLARE (NON-WALKABLE SURFACE)
LANDINGL
CTH H (E SHERIDAN SPRINGS RD)
CTH H (E SHERIDAN SPRINGS RD)
C
EN
TE
R
S T
RES
RES
L
5'
EX R/W
EX
R
/W
EX
R
/W
PED
SW5
SLOPE INTERCEPT
(TYP)
EX R/W
GRADING AND SHAPING
DITCHES - 512 LF
P6
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XXX
XXXX
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
XX
X
XX
XX
XX
X
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
2.4%
2.
4%2.
3%
6.2%
1.
0%
0.
2%
1.0% 6.5% 1.2%
3.0%
1.6%
7.
9%
0.
6%
7.
9%
3.4%
2.
4%
1.
0%0.
8%
1.1%
0.
3%
0.
3%
0.8%
3.0%
1.
0%3.
2%
0.9
2.
0%
3.5%
2.8%
2.8% 3.3%
3.0%
1.
5%
1.
3%
889.169
888.861
888.671
888.320
888.831 888.270
888.214
0.149
888.022
888.623
887.433
887.553
887.481
886.932 887.101
887.811
887.026 887.176
887.996
888.070
887.976
887.907
887.857
887.815
887.971
887.772
887.934
887.886
887.987 887.681
887.728
887.606
887.528
887.873
887.861
887.819
887.937
887.556 1.0%
3.
8%
888.255
888.349
887.779
887.714
887.661
887.586
0.6
3.
8%
5.2%
887.715
1.
5%
1.0%
1.4%
887.191
WISDOT/CADDS SHEET 42
ECOUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\021302-CR.DWGFILE NAME : 2/10/2026 1:22 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET HWY:
PLOT SCALE : 1 IN: 10 FT
26-003 13WALWORTH CURB RAMP DETAILS: CENTER ST SOUTH
LAYOUT NAME - Center St South
CTH H
NOTES:
1. CONTRACTOR TO FIELD VERIFY ELEVATION, GRADES, SLOPES, LENGTHS, AND
MATCH POINTS PRIOR TO CURB RAMP AND SIDEWALK CONSTRUCTION.
2. THE ENGINEER MAY ADJUST ELEVATIONS TO FIT FIELD CONSTRUCTION.
3. SEE THE STANDARD DETAIL DRAWINGS FOR COMPLETE CURB RAMP
REQUIREMENTS.
4. ALL RESTORATION SHALL BE 4" TOPSOIL, SEED, AND FERTILIZER.
CURB RAMP TYPE
RESTORATION (SEE NOTES)
CONCRETE SIDEWALK 5-INCH
CONCRETE CURB PEDESTRIAN
LEGEND
RES
SW5
PED
P6 6:1 PAVED FLARE (NON-WALKABLE SURFACE)
LANDINGL
CTH H (E SHERIDAN SPRINGS RD)
CTH H (E SHERIDAN SPRINGS RD)
C
EN
TE
R
S T
4B1 2
P6
P6
RES
5'
4'
4'
5'
RES
RES
PED
SW5
SW5
SW5
L
SLOPE INTERCEPT
(TYP)
PED
PED
PED
PO
ST
POST
G G
WVS
W
VMH
W V
WVS2" WE ENERGIES (GAS)
G U
Y
G U
Y G U
Y
PO
ST
CONC
CONC
5" STEEL POST
3' TALL
CO
N
C
CO
N
C
CO
N
C
CONC
CONC
CONC
CO
N
C
27' 15"
LANDSCAPING
W/WOOD SIGN
"KAISER CHIROPRACTIC"
BM#58
17"
50' 35"
LANDSCAPE BLOCK
RAISED PLANTER
CONC
CONC
CONC
CONC
50' 20"
CONC
ASPH
BM#59
CO
N
C 1"
IP
IP
IP
IP
IP
BELARDI FAMILY
INVESTMENTS LLC
ZK 00014
#924
MICHAEL J SEICK
ZG 00010
#919 #923
DSC HOLDINGS LLC
ZG 00008
#790
BONNIE B. MILLER TRUST
ZK 00001
#1004
LAKE GENEVA LUXURY RENTAL
ZG 00007
#1003
#1016
JULIETA CHRISTINA AZICRI
ZYUP 00024
#1022
LAKE GENEVA
\LUXURY RENTAL
ZG 00006
#1015
WILLIAMS ROBERS
ZRG 00004
#1025
RICHARD DAMMER
ZRG 00003
#1033
#1028 #1032
MICHAEL A SCHECHTMAN
ZYUP 00022
#1036
ZWTC 00001
#1102
SAMANTHA ADAMIK
ZRG2 00004
#1101
JACK D HINZ
ZRG2 00003
#1107
99+00 100+00 101+00 102+00 103+00 104+00 105+00
X X
X X
X X
X X
X X
X X
X X
X X X X
X
XX
X X XX X XX XX XX XX X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
X
X X X
X
X X
X
X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X XX XX XX XX XXX
X
2" WE ENERGIES (GAS)2" WE ENERGIES (GAS)SS SS
G G
G G G G G G G
G
G G
G G
G G
G
GG
G
SAN
M
AT
CH
L
IN
E
4+
FLAG
WVS
W
VS
W
VS
WVS
SS
W V
W
VW
VS
WVS
W
VSWV CH
IS
G U
Y PO
ST
GUYPO
ST
50' 35"
CONC
CONC
50' 20"
CONC
ASPH
BM#59
CO
N
C
CO
N
C
CO
N
C
CO
N
C
CONC
CONC
CONC STOOP W/ STEPS
WOOD ROOF OVERHANG
CONC
GRVL
1"
CONC
CONC
CONC
CONC
CONC
CONC
BM#50
27" 20" 35'
18"
2-7"
36" 17" 15"
13"
2-13"
CO
N
C
CO
N
C
CONC
CONC
CONC
CONC
CO
N
C
CO
N
C
RETAINING WALL
IP
IP
IP IP
IP
IP IP IP
IP
IP
IP
IP
ICHAEL A SCHECHTMAN
ZYUP 00022
#1102
#1110
SAMANTHA ADAMIK
ZRG2 00004
#1101
JACK D HINZ
ZRG2 00003
#1107
JENNIFER S HATCH
GERALD K MOLLE
ZRG2 00002
#1109
ANGELA HAHN
ZW 00025
#1117
CHRISTOPHER KEEFE
ZW 00023
#1121
#1116
#1118 #1120
OCTAVIO VALEDEZ
CLARIBEL HERNANDEZ
ZYUP 00017
#1124
#1134
ZYUP 00014
#1140
WAYNE DAVID PARKER
TERRI RAE PARKER
ZW 00012
#1137
JUAN VALDEZ VALDEZ
ZW 00011
#1139
ANDREW VALENTINE
ASHLEY VALENTINE
ZW 00010
#1141
JAMES L GIESE
ZW 00009
#1143
SANDRA L. STEARNS
ZYUP 00013
#905
PANKONIN HOLDINGS L
ZYUP 00013A
104+00 105+00 106+00 107+00 108+00 109+00
110+00
PC
: 1
+7
5.
2" WE ENERGIES (GAS)2" WE ENERGIES (GAS)
2" W
E
EN
ER
G
IE
S
(G
AS
2" WE ENERGIES (GAS) 2" WE ENERGIES (GAS)
SS
G G
G G G G G
G G
G G
GGGGG
G G G
G G
G
G
G G G G
G
GGG
G G
G G
G G
G
G G
G
GSS
SAN SAN SAN
M
AT
CH
L
IN
E
4+
M
AT
CH
L
IN
E
9+
WISDOT/CADDS SHEET 44
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\022001-EC.DWGFILE NAME : 2/10/2026 1:22 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:40 FT
LAYOUT NAME - 022001-ec
26-003 CTH H WALWORTH EROSION CONTROL 14
CTH H (WILLIAMS ST)
CTH H (WILLIAMS ST)
C
TH
H (G
EO
R
G E
ST
G
AR
D N
ER
S
T
W
AL
KE
R
S T
R O
G
ER
S C
T
G R
AN
T
ST
50'
EX
R
/W
EX
R
/W
EX R/W
EX R/W
50'
EX
R
/W
EX
R
/W
EX R/W
EX R/W
50'
EX
R
/W
EX
R
/W
EX R/W
EX R/W
50'
EX
R
/W
EX
R
/W
66'
EX
R
/W
EX
R
/W
EX R/W
EX R/W
LEGEND
INLET PROTECTION (TYPE C)
UNLESS NOTED
TEMPORARY DITCH CHECK
SURFACE WATER FLOW
ROCK BAGS
BEGIN RESURFACING
STA 99+28.29
G
G
G
SS
SS
SS
WV
WVS
SAN
WVS
WVS
WVS
W
VS
SS
WV
WV
10" WE ENERGIES (GAS)
CHIS
POST
PO
ST
POST
POST
GUY
POST
G U
Y
GUY
POST
2- 7"
" 15
"13
2-
2- 7"
12"
10"
12"
W/MEMORIAL
PLAQUE
CO
NC
CO
NC
CO
NC
CONC
16"
6-2" 36"
8"
3' STONE
CONC
CO
NC
CONC
13"
W/MULCH
CONC
CONC
4-4"
CONC
CONC
8" 24"22"
DEAD
TREE LINE
GRVL
TIMBER EDGING
4' CHAIN LINKFENCE
26"
18"
4" 2-5"
10" 12"
24"
2"
15"
16"
10"
15"
14"18" 10"
7"24"
15"
ASPH
CO
NC
CONC
ASPH
ASPH
IP
IP
IP
IP
#9
PA
NK
ONI
N
HO
LD
IN
GS
LL
C
ZY
UP
3A
#1
PE
AS
E
FA
MILY
T
RUST
ZY
UP
#1
PHILLIP & CHERLY
FISHBECK TRUST
ZW 00003 #1205
#766
TOBY J HORON
JODI LP HORON
ZW 00002D
#742
MICHAEL FRANZENE
LOIS FRANZENEZW 00002C
#740SCOTT REIFF
#W2716
STEPHEN N COMPTON
GWEN BLACKBURN
J G 2500004A
9+
110+00
111+00
112+00 113+00
114+00
115+00
PT
: 1
+5
0.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
2" WE ENERGIES (GAS)
2" WE ENERGIES (GAS)
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
SS
SS
SA
N
SAN
M
ATCH LINE 109+50
M
AT
CH
LI
NE 1
+5
POST
G G G G G G
SAN
SS
SS SS SS
MH
SS
SS
TEL
W
VW
V
SAN
GV
WVS
WV
SA
N
WVS
SAN
GV
W V
SAN
WVSWVS
SAN
10" WE ENERGIES (GAS)
MP
GUYGUY
GUYGTST
MP
MP
M P
MPPOST
PO
ST
PO
ST
PO
ST
GUY
CONC
24"
22" GRVL
TIMBER EDGING
4' CHAIN LINK
FENCE
26"
2-5" 10" 12"
24" 2"
15"
16"
10" 15" 14"
18"
10"
7"
24" 15"
4"
ASPH
2'x2' STONE PILLAR
5' TALL
IFIBER TIME WARNER
MARKER
CO
N
C
CONC
24" 26"
CONC
CONC
ONLY
SPLICER CABINET
8"
15"
5" 6"
5" 10"
TREE LINE
AT&T FIBER
MARKER
GAS TEST STATION
BM#57
CONC
CONC
ASPH
10"
15" 14"
SANITARY SEWER MARKER
CONC
AT&T FIBER
MARKER
ASPH
ASPH
IP
IP
IP
IP
IP
IP
IP
IP
IP IP
#742
MICHAEL FRANZENE
LOIS FRANZENE
ZW 00002C
#740
SCOTT REIFF
ZW 00002B
#1240
MAZWRTIN S GUERRERO
YOLANDA VEGA SAVALETA
ZW 00002
#W2716
STEPHEN N COMPTON
GWEN BLACKBURN
J G 2500004A
FAIRWYN DEVELOPMENT
J G 2500004P
MICHAEL S. PODY
ZGC 00012
#1237
#616 BASSO BUILDER
BASSO BUILDERS INC
ZGC 00011A
114+00 115+00 116+00 117+00 118+00 119+00 120+00
PT
: 1
+5
0.
PC
: 1
+3
8.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X
XX
X
X X
X X
X X
X X
X X
X X
X X
X
X X X X X XX XX XX X XX XX X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X
XX
XX
X
XX
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
2" WE ENERGIES (GAS)
2" WE ENERGIES (GAS)
8" WE ENERGIES (GAS)
SAN
G G G G G G G
G G
G G
G
G
GG
G
G G
G G G G G
G G G G G G
M
AT
CH
L
IN
E
4+
M
AT
CH
L
IN
E
9+
WISDOT/CADDS SHEET 44
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\022001-EC.DWGFILE NAME : 2/10/2026 1:22 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:40 FT
LAYOUT NAME - 022002-ec
26-003 CTH H WALWORTH EROSION CONTROL 15
CTH H (SHERIDAN SPRINGS RD)
W
ILL
IA
MS
ST
SHERIDAN
SPRINGS RD
MILWAUKEE ST
CTH H (SHERIDAN SPRINGS RD)
C
EN
TE
R
S T
C
EN
TE
R
S T
64.5'
EX
R/
W
EX
R/
W
EX R/W
EX
R
/W
EX R/W
EX R/W
EX R/W
EX R/W
EX R/W
60'
EX
R
/W
EX
R
/W
60'
EX
R
/W
EX
R
/W
EX R/W
EX R/W
LEGEND
INLET PROTECTION (TYPE C)
UNLESS NOTED
TEMPORARY DITCH CHECK
SURFACE WATER FLOW
ROCK BAGS
POST
GUY
GUY
GUY
GUY
GUY
W
EL EL
EL
EL
EL
EL
MH
WVGV
MH
SSSAN
SS
SAN
SS
SA
NWV
WV
WV
SS
MP
MP
GUY
GUY
GUY
GUY
MP
GTSTMP
MP
GUY
ONLY
TREE LINE
ASPH
10"
15" 14"
SANITARY SEWER MARKER
OUTSIDE EDGE OFBILLBOARDS
CONC
CONC
CONC
HEAVY LANDSCAPING
W/SIGN
"BRUNK INDUSTRIES"
IFIBER MARKER
WATER PIPE LINE
MARKER
TREE LINE
GAS TEST STATION
SANITARY SEWER
MARKER TREE LINE
STEEL GRATE FOR
STORM SEWER CONC
CONC
ASPH
CONC
4" F
LE
X
IE = 872.55
IP
IP
IP
IP
IP
IP IP
IP
IP
JULIANNE FROELICH, ET AL.ZYUP 00140
#616
BASSO BUILDERS INCZA500200003BASSO BUILDERS INCZGC 00011A
119+00
120+00 121+00 122+00
123+00
124+00
125+00
PC
: 1
+3
8.
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X X
NC
8" WE ENERGIES (GAS)
G
G
G
G G
G G
G
G
G G
G G
G G
G
G G
G G G
G
G G G G G
G G
SAN
TEL
M
AT
CH
L
IN
E
9+
M
AT
CH
L
IN
E
3+
ONLY
GUY
GUY
GUY
GUY
GUYEL
EL
EL
EL
EL
EL
ELEL
ELEL
SAN
MH
SS
GTST
MP
GUYGUYGUYGUY
TREE LINE
CONC EDGING
CONC
CONC
ASPH
CONC
CONC
GAS TEST STATION
BM#52
ASPH
ASPH
4" F
LE
XIE = 872.55
IP
500 INTERCHANGE LLC
ZYUP 00135
#500
#495 #497 #499 #501
HASKINS LLC
ZYUP 00137N
#451
#401
BITTNER PROPERTIES LLC
ZYUP 00137M
#411
124+00
125+00 126+00 127+00 128+00 129+00
PT
: 1
+8
5.
N C1
NC1
2" WE ENERGIES (GAS)
G
G G
G G
G
G
G G
G G G G G G G G
G
G
TEL SS SS
M
AT
CH
L
IN
E
3+
M
AT
CH
L
IN
E
9+
WISDOT/CADDS SHEET 44
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\022001-EC.DWGFILE NAME : 2/10/2026 1:23 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:40 FT
LAYOUT NAME - 022003-ec
26-003 CTH H WALWORTH EROSION CONTROL 16
CTH H (SHERIDAN SPRINGS RD)
SA
G
E
ST
CTH H (INTERCHANGE N)
CTH H(SHERIDAN SPRINGS RD)
SH
ER
ID
AN
SP
R
IN
G
S R
D
EX R/W
EX R/W
EX R/W
66'
EX
R
/W
EX
R
/W
0'
EX R/W
EX R/W
EX
R
/W
LEGEND
INLET PROTECTION (TYPE C)
UNLESS NOTED
TEMPORARY DITCH CHECK
SURFACE WATER FLOW
ROCK BAGS
INLET PROTECTION TYPE B
INLET PROTECTION TYPE B
0'
EX R/W
INLET PROTECTION TYPE B INLET PROTECTION TYPE B
GUY GUY
MH MH
SAN
W V
GUY
CONC CONC
ASPH
BM#51
7" 2-10"
IP
IP
BITTNER PROPERTIES LLC
ZYUP 00137M
#411
IRVING DEVELOPMENT GROUP
ZYUP 00136
#334
WILLIAM D BURKE TRUST
J G 2500003
#W2570
#W2556
ROBERT E GIRARD JR
J G 2500004F
#300
WPC GENEVA LLC
ZYUP 00137A
129+00 130+00 131+00 132+00 133+00 134+00 135+00
PI
: 1
+7
7.
2" WE ENERGIES (GAS)G
G
G G G G G
G
G
G G
G G G G G G
M
AT
CH
L
IN
E
9+
#W2542
PETROS REAL ESTATE HOLDINGS
J G 2500004E
#290
MDC COAST 21 LLC
ZA441300001
KC NORTHGATE LLC
ZA441300002
135+00 136+00 137+00 138+00 139+00 140+00 141+00
PI
: 1
+4
2.
2" WE ENERGIES (GAS)
G G G G G
G
G G G
G
WISDOT/CADDS SHEET 44
EHWY: COUNTY:
P:\WALCO\2326453-CTHH LAKE GENEVA\CAD\01_CIVIL 3D-2024\01_SHTS_PLANS\022001-EC.DWGFILE NAME : 2/10/2026 1:23 PMPLOT DATE : PLOT BY : NATHAN HARVEY
PROJECT NO:
PLOT NAME :
SHEET
PLOT SCALE : 1 IN:40 FT
LAYOUT NAME - 022004-ec
26-003 CTH H WALWORTH EROSION CONTROL 17
CTH H (INTERCHANGE N)
M
IN
AH
AN
R D
100'
EX R/W
EX R/W
66'
EX
R
/W
EX
R
/W
INLET PROTECTION TYPE B INLET PROTECTION TYPE B
100'
EX R/W
EX R/W
M
AT
CH
L
IN
E
ST
A
5+
M
AT
CH
L
IN
E
ST
A
5+
100'
EX R/W
EX R/W
CTH H (INTERCHANGE N)
LEGEND
INLET PROTECTION (TYPE C)
UNLESS NOTED
TEMPORARY DITCH CHECK
SURFACE WATER FLOW
ROCK BAGS
INLET PROTECTION TYPE B
END PROJECT
STA 138+85.27
U
Y
G U
Y
PO
ST
CONC
CONC
5" STEEL POST
3' TALL
CO
N
C
CO
N
C
CO
N
C
CONC
CONC
CONC
CO
N
C
27' 15"
LANDSCAPING
W/WOOD SIGN
"KAISER CHIROPRACTIC"
17"
+9
+4
+9
IP
IP
BELARDI FAMILY
INVESTMENTS LLC
ZK 00014
#924
MICHAEL J SEICK
ZG 00010
#919 #923
DSC HOLDINGS LLC
ZG 00008
#790
BONNIE B. MILLER TRUST
ZK 00001
#1004
LAKE GENEVA LUXURY RENTAL
ZG 00007
#1003
#1016
JULIETA CHRISTINA AZICRI
LAKE GENEVA
\LUXURY RENTAL
ZG 00006
#1015
WILLIAMS STREET
HOLDINGS LLC
ZA 85500002
WILLIAM V KROHN
ZF 00008
#913
WILLIAM V KROHN
ZF 00009
#905
#912
X X
X X
X X
X X
X X
X X
X X
X X
XX
X
X X XX XX X XX X X X X XX X XX X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
XX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXX
X
X X X
X
X X
X
X X X
X X X X X X X X X X X X X X X X X X XX XX X X XX X X XX X X XX X XX
X
+1
+3
+6
+2
+4
+8
+8
+8
96+00 97+00 98+00 99+00 100+00 101+00 102+00
M
AT
CH
L
IN
E
2+
PO
ST
POST
FLAG
G U
Y
50' 35"
LANDSCAPE BLOCK
RAISED PLANTER
CONC
CONC
CONC
CONC
50' 20"
CONC
ASPH
CO
N C
CO
N
C
CO
N
C
CO
N
C
CONC
CONC
CONC STOOP W/ STEPS
WOOD ROOF OVERHANG
CONC
GRVL
1"
CONC
CONC
CONC
CONC
IP
IP
IP
IP IP
IP
IP IP IP
IP
JULIETA CHRISTINA AZICRI
ZYUP 00024
#1022
LAKE GENEVA
\LUXURY RENTAL
ZG 00006
#1015
WILLIAMS ROBERS
ZRG 00004
#1025
RICHARD DAMMER
ZRG 00003
#1033
#1028 #1032
MICHAEL A SCHECHTMAN
ZYUP 00022
#1036
ZWTC 00001
#1102
#1110
SAMANTHA ADAMIK
ZRG2 00004
#1101
JACK D HINZ
ZRG2 00003
#1107
JENNIFER S HATCH
GERALD K…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .