Contract Summary: Demolition Services – 907 Harper Road, Crescent Township
This is a Request for Bids and Contract Documents package issued by Char-West Council of Governments (Char-West COG) for the complete demolition of a residential structure located at 907 Harper Road in Crescent Township, Pennsylvania, under Contract No. 25-D01. The project scope includes demolition and off-site disposal of the existing dwelling, asbestos abatement, utility termination and capping (gas, water, sewer, electric, cable, and telephone), excavation and removal of the foundation to a depth of four feet below finished grade, backfilling and compaction with approved materials, site restoration including topsoiling and seeding, and restoration of disturbed yard and roadway areas. Sealed bids are due at 11:00 a.m. prevailing time on Thursday, January 8, 2026, with bids to be opened immediately. The work must be completed within thirty (30) calendar days from the date of written Notice to Proceed. All work is to be performed in accordance with Pennsylvania Department of Transportation Publication 408 standards and federal traffic control requirements.
Bidders must submit a bid bond or certified check in the amount of not less than ten percent (10%) of the bid amount, along with a Labor and Materials Payment Bond, Performance Bond, and Maintenance Bond each equal to one hundred percent (100%) of the contract price. Required insurance includes Workmen's Compensation (minimum $1,000,000), Comprehensive Automobile Liability ($1,000,000 combined single limit), Comprehensive General Liability ($1,000,000 combined single limit with contractual liability coverage), All-Risk Builder's Risk Insurance (100% of contract price), and Comprehensive Catastrophe Excess Liability Insurance ($1,000,000 minimum). The project is subject to prevailing wage requirements established by Pennsylvania wage determination Serial No. 25-10248 dated November 25, 2025, compliance with the Pennsylvania Public Works Employment Verification Act, Davis-Bacon Act requirements, and various federal and state civil rights and nondiscrimination provisions. The contract is funded through a Pennsylvania Department of Community and Economic Development Blight Remediation Program Grant. Liquidated damages are assessed at five hundred dollars ($500.00) per calendar day for failure to complete work by the stipulated completion date. Bidders must provide an AIA Document A305-2020 Contractor's Qualification Statement, and the apparent low bidder must submit within seven days an experience statement, proposed subcontractor list, financial statement, and auditor's report.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N:\PROJ\250\250-49 907 Harper Demo\Docs\250049C01 CHARWEST Biddocs.Docx
December 15, 2025
S. O. No. 250-049
VIA EMAIL
(admin@cwcog.com)
Ms. Tracy McKee, Executive Director Community Development Coordinator Char-West Council of Government One Veterans Way – Suite 202 Carnegie, Pennsylvania 15106
Subject: Crescent Township Structure Demolition – 907 Harper Road Contract No. 25-D01
Dear Ms. McKee:
As requested, attached is an electronic copy of the Contract Documents and Technical Specifications; and bid worksheet for the subject project for your use in utilizing PennBID.
Should you have any questions, please contact Joshua R. Callender, E.I.T. directly (Ext. 284).
Sincerely, Kevin A. Brett, P.E. Josuha R. Callender, E.I.T.
KAB/JRC:dcs
Attachments cc/att: Kristin Farrell, Manager – Crescent Township (manager@crescenttownship.com)
Proposal From: _____________________________
S. O. No. 250-049
CONTRACT DOCUMENTS AND
TECHNICAL SPECIFICATIONS
FOR
CONTRACT NO. 25-D01
907 HARPER ROAD DEMOLITION (C80560A)
CRESCENT TOWNSHIP
Prepared For
CHAR-WEST COUNCIL OF GOVERNMENTS
One Veterans Way, Suite 202
Carnegie, Pennsylvania 15106
DECEMBER 2025
Final Design Serial No. 20253383192 (12/04/2025)
CRESCENT TOWNSHIP – CONTRACT NO. 25-D01
907 HARPER ROAD DEMOLITION i TABLE OF CONTENTS (1/16)
TABLE OF CONTENTS
PAGE NO.
REQUEST FOR BIDS A-1 - A-2
INSTRUCTIONS TO BIDDERS B-1 - B-15
PROPOSAL C-1 - C-12f
AGREEMENT AG-1 - AG-9
PERFORMANCE AND MAINTENANCE BOND PER-1 - PER-3
PAYMENT BOND PAY-1 - PAY-4
GENERAL CONDITIONS GC-1 - GC-35
SUPPLEMENTAL GENERAL CONDITIONS SGC-1-SGC-12
Prevailing Wage Rates Non-Discrimination/Sexual Harassment Clause
SECTION ONE – GENERAL REQUIREMENTS 1-1 - 1-7
SECTION TWO – TECHNICAL SPECIFICATIONS 2-1 - 2-6
APPENDICES:
APPENDIX A – LOCATION MAP
APPENDIX B – PHOTOGRAPHS
APPENDIX C – ASBESTOS DEMOLITION SURVEY REPORT
APPENDIX D – CFA GRANT AGREEMENT
907 HARPER ROAD DEMOLITION A-1 REQUEST FOR BIDS
REQUEST FOR BIDS
CHAR-WEST COG
Notice is hereby given that specifications and proposal forms are available at no cost via the PennBid Program (https://pennbid.bonfirehub.com).
PROJECTS:
Work includes complete demolition of below listed structures; off-site disposal; backfilling; asbestos removal, if applicable; all utilities to be terminated and capped, as needed, pest control; site restoration and other ancillary items.
A. Crescent Twp – 907 Harper Rd B. Ingram Borough – 16 Charlton C. McKees Rocks Borough – 819 Boquet D. McKees Rocks Borough - 1601 Poplar E. Neville Twp – 7119 Front River Rd F. North Fayette Twp – 8212 Steubenville Pike G. Stowe Twp – 1437 Fleming H. Stowe Twp - 1457 Fleming
Sealed bids will be until 11:00 am prevailing time on Thursday, January 8, 2026. Bids will be opened immediately. Bidder shall submit all questions about the meaning or intent of the Bidding Documents via the “Ask a question” feature in PennBid.
A Labor and Materials Payment Bond, Performance Bond and Maintenance Bond in the amount of 100% of the bid amount will be required. Certificates of Insurance in the amounts specified, as well as Certificate of Worker’s Compensation; Explosion, Underground Damage and Collapse Insurance Certificate must be filed with the executed Agreement. The Char-West COG reserves the right to reject any and all bids in whole or in part, and to waive any informalities.
Bids must be accompanied by a Bid Bond or a certified check made payable, without condition, to the Char-West COG in an amount no less than 10% of the bid or a certified check in the same amount.
All recipients of funds should have a Data Universal Numbering System (DUNS) number and a
CAGE CODE.
Compliance is required with the Davis Bacon Act and other Federal Labor Standard Provisions; Title VI and other applicable provisions of the Civil Rights Act of 1964; The Department of Labor Equal Opportunity Clause (41 CFR 60 – 1.4); Section 109 of the Housing and Community Development Act of 1974; Executive Order 11625 (Utilization of Minority Business Enterprise); Executive Order 12138 (Utilization of Female Business Enterprise); in compliance with Section 504 of the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990; and the Allegheny County MBE/WBE Program enacted July, 1981, which sets forth goals of 13 percent Minority and 2 percent Female Business Enterprise; and the Allegheny County Ordinance #6867-12, setting forth goals of 5 percent Veteran-Owned Small Business. Further, notice is hereby given that this is a Section 3 Project under the Housing and Urban Development Act of 1968, (as amended) and must to the greatest extent feasible, utilize lower income residents for employment and training opportunities and Section 3 Business concerns and all contacts and subcontracts for this project shall contain the “Section 3 Clause” as set forth in 24 CFR, Part 135.38. Moreover, compliance is required by the prime contactor and all subcontractors with the Federal General Conditions included in the contract documents between ACED and the operating agency. These Federal General Conditions are https://pennbid.bonfirehub.com/
907 HARPER ROAD DEMOLITION A-2 REQUEST FOR BIDS
to be incorporated by reference into all construction contracts between operating agency and contractor, contractor and subcontractor(s), and subcontractor(s) and lower tiered subcontractor(s).
By order of the Board of Directors of the Char-West Council of Governments.
Tracy McKee, Executive Director
907 HARPER ROAD DEMOLITION B-1 INSTRUCTIONS TO BIDDERS (1/2024)
INSTRUCTIONS TO BIDDERS
B.1 SCOPE OF WORK
B.1.1 Contract No. 25-D01 – 907 Harper Road Demolition includes the complete demolition and off-site disposal of the existing structure located at 907 Harper Road in the Township of Crescent including asbestos removal and restoration.
B.2 EXAMINATION OF CONTRACT DOCUMENTS AND SITE CONDITIONS
B.2.1 The Bidder is required to visit and carefully examine the site of the project and in particular all physical conditions including evidence of subsurface utilities, soils, pavements, facilities, operations and features which may affect the Contractor's work, as well as the Contract Documents and all other matters pertinent to the proposed work.
B.2.2 All prospective Bidders are notified that neither the Engineer nor the Owner has performed an exhaustive review of the Owners’ records or the records of the local government agency (i.e., township, borough, etc.) to establish whether there is secondary information in the files that might suggest conditions to be encountered in excavation. This includes, but is not limited to, meeting minutes, developer submissions, engineering reports prepared pursuant to other projects of the Owner or others, maintenance logs/notes, etc. To the extent that said records are known by appropriate staff to exist and are in the possession of or available to the Owner, they will be made available to the Bidder for review; however, the Bidder must make written request to the Owner or local government agency retaining such documents and make arrangements to review same. Time is of the essence and it is the Bidder’s responsibility to make all such requests far enough in advance of the bid submission deadline to permit reasonable research. Failure of the Owner or local government agency to respond shall not obligate the Owner in any manner and shall not relieve the Bidder of his/her/their responsibility.
B.2.3 It shall be assumed that the Bidder has satisfied himself/herself as to the conditions to be encountered overhead, on the surface and underground, the character, quality and quantities of work to be done and materials to be furnished, and the requirements of the Contract and Specifications. It shall also be assumed that the Bidder has adequately determined the means, methods, techniques and sequences of construction including health and safety programs required to successfully undertake and complete the work required to construct the project complete. No allowance or concession will be made for lack of such understanding on the part of the Bidder.
B.2.4 The Bidder/Contractor affirmatively represents that he/she/they is aware and accepts that:
907 HARPER ROAD DEMOLITION B-2 INSTRUCTIONS TO BIDDERS (1/2024)
a. no responsibility is assumed by the Owner for subsurface conditions;
b. any information concerning subsurface conditions provided by the Owner or Engineer was obtained for its own use in designing the project, and neither Engineer nor Owner guarantee the accuracy or relevance of such data;
c. the Bidder/Contractor is not entitled to rely on any data provided by the
Owner or Engineer regarding subsurface conditions, and that all of such information is excluded from the Contract;
d. the Contractor shall make its own independent investigations of the site and existing subsurface conditions;
e. all excavation on the project is to be completed on an unclassified basis;
and
f. the Contractor will be held responsible for carrying out and completing all excavation work regardless of the conditions encountered.
B.2.5 Engineer's Investigations: From such investigations and/or surveys as may have been made at the site(s), it is assumed that physical conditions, including existing underground and overhead structure locations, are approximate as indicated on the Drawings, but the nature and extent of the structures and/or conditions below the surface are not guaranteed. For this Contract, all existing subsurface utility information presented on the Contract Drawings is characterized as either Subsurface Utility Engineering (SUE) quality level C or quality level D as defined in ASCE Standard CI/ASCE 38-02 and referred to in the One Call Act. See Article XI(d) of the Agreement which is part of these Contract Documents. Upon investigation of the site of the work, should the Bidder determine that utility Quality Level A or B is required to complete the work Bidder shall arrange to obtain such information as it determines in its sole judgment is required. Individual structure underground electric, gas or water service lines and sanitary service laterals are not shown on the construction plans.
If the information presented in good faith on the drawings is used by a Bidder in preparing its Proposal, Bidder must independently verify the physical conditions, including existing underground and overhead structure locations and assumes all risks resulting from conditions differing from the approximations indicated.
Bidder is also solely responsible for confirmation and verification of subsurface conditions to the extent required to prepare, substantiate and submit bid prices.
B.2.6 Bidders Subsurface Investigations: Bidders are hereby advised that before drilling any holes or excavating any test pits for the purpose of identifying underground conditions, they must secure permission in writing to do such drilling or test pit excavation from authorized officials of the Owner, governmental bodies and agencies having jurisdiction, and in addition, from private property owners, as required.
907 HARPER ROAD DEMOLITION B-3 INSTRUCTIONS TO BIDDERS (1/2024)
B.3 BID PROPOSAL
B.3.1 Bids are to be submitted using the online PennBid website. The completed BID WORKSHEET, proposal form, certifications, and the Bid Bond form (when a bid bond is used as proposal security) must be properly executed in ink without alterations and digitally submitted along with the completed AIA Document A305-2020 Contractor’s Qualification Statement described in Paragraph B.8.1. When a bid bond is used as proposal security the certificate as to corporate principal must also be completed and submitted with each proposal.
All Proposals submitted shall conform to the following sub-paragraphs of this B.3.
B.3.2 Bid Prices: Using the prescribed BID WORKSHEET, all bid prices shall be entered on the PennBid online submission for each item, with the amount extended if a unit price bid, and all amounts totaled. For unit price items, the "unit price" shall govern in the event of occurrence of a multiplication error in arriving at a total price for the item bid.
B.3.3 Partial Bid Prices: It is mandatory that Bidders submit prices for all items included in the BID WORKSHEET. Incomplete bids shall be rejected.
B.3.4 Lump Sum Prices: The lump sum price shall be based on the quantities described in the Specifications, BID WORKSHEET, Proposal Form and/or as shown on the Contract Drawings. Where adjustment is authorized by Owner as a result of field conditions, payment to the Contractor shall be adjusted on the basis of the actual quantities installed in accordance with the Contract provisions and/or Supplemental Unit Prices. Adjustment to the lump sum contract price will be in the form of change orders as specified in Article 38 of the General Conditions of the Contract. The Owner reserves the right to delete any lump sum bid item and any such deletion shall not be considered as sufficient ground for granting an increase in lump sum prices for remaining bid items.
B.3.5 Unit Prices: In unit price bids, the written extensions and the total are for informational purposes only. As stipulated in B.3.2., for unit price items, the "unit price" shall govern in the event of occurrence of a multiplication error in arriving at a total price for the item bid. The PennBid system will calculate the bid price using the estimated quantities and the unit price or lump sum price inserted by the bidder. and shall re-compute the total price for each item and the Total Contract Price Bid. The determination of the lowest bid will be based solely on the total results of computations of the estimated quantities for items of work specified and the respective unit/lump sum prices bid including any combination of alternates authorized by the Proposal.
B.3.6 Approximate Estimate of Quantities: The Bidder's attention is directed to the fact that in contracts based on unit prices, the estimate of quantities of work to be done and materials to be furnished under these Specifications, as shown on the BID WORKSHEET and in the Contract, is approximate and is given only for
907 HARPER ROAD DEMOLITION B-4 INSTRUCTIONS TO BIDDERS (1/2024)
the benefit of the Owner to be used as a basis of calculation upon which to determine the lowest Bidder. Neither the Owner nor Engineer assumes any responsibility that the quantities indicated will be obtained in the construction of the Project, nor shall the Contractor plead misunderstanding or deception because of such estimate of quantities, or the character of the work or location, or other conditions pertaining thereto.
B.3.7 Owner's Changes: The Owner reserves the right to increase or diminish any or all of the Quantities of Work or to omit any of them as it may deem necessary; and any such increase or decrease of the quantities given for any of the items shall not be considered as sufficient ground for granting an increase in the unit price bid.
B.3.8 Requirements Affecting Bid: Bidders shall ascertain all governmental and utility requirements with respect to wage scales, trench and structure excavations, tunnel construction, blasting, equipment, materials, labor, health, safety and sanitation and traffic control; and shall base their bid prices on full compliance therewith. In the case where subsurface public or privately owned utility pipe lines, cables or structures exist within the construction area, Bidders shall ascertain from each utility owner its rules, regulations and requirements relative to support and protection of such. Bidders will be assumed to have included in their bids pertinent costs and expenses for the above including risks, loss and damage due to such rules, regulations and requirements.
B.3.9 Signatures: The Bidder shall sign his/her/their name, and give his/her/their business address in the spaces provided therefor. If the Proposal is made by a partnership, it shall be signed by all general partners and, in lieu thereof, by a general partner and accompanied by an appropriate authorization executed by all general partners of the partnership; if made by a corporation it shall be signed in the name of the corporation by the President or a Vice President, or by a duly authorized agent due proof of whose authority shall be attached, and shall have affixed the seal of the corporation attested by the Secretary or an Assistant Secretary.
B.3.10 Submitting Proposal: The completed BID WORKSHEET, executed Proposal, and executed Addenda (if any) and all other documents identified on the PennBid website as required for submission shall be submitted/uploaded using the PennBid website and instructions prior to the bid deadline for submission.
B.3.11 Bidder's Representations: Attention is called to the representations made by the Contractor in Article XI of the Agreement which is part of these Contract Documents.
B.3.12 Bid Shall Not Qualify Specification: No Proposal shall be considered which is not based upon these drawings and specifications, or which contains any letter or written memorandum qualifying same, or which is not properly made out and signed in writing by the Bidder or an authorized agent of the Bidder.
907 HARPER ROAD DEMOLITION B-5 INSTRUCTIONS TO BIDDERS (1/2024)
B.4 BID SECURITY
B.4.1 Each Proposal shall be accompanied by a certified check or approved surety company's Bid Bond in the amount of not less than ten percent (10%) of the bid, which shall be payable to the Owner, as designated in the Advertisement, as payee or obligee, and the full amount of said check or bond shall be forfeited and payable as damages to the Owner if the Bidder fails to execute the Contract form(s) incorporated in these documents and furnish the specified bond or bonds to the Owner within ten (10) days after notification of award of the Contract to the Bidder. All Bidders desiring to secure their respective bids with bid bonds shall use the form appended to the Proposal, inserted herein immediately following the Proposal. Approved securities shall be “those companies holding certificates of authorization” as listed in the latest issue of the U.S. Department of Treasury, Circular 570.
B.4.2 In the event that the successful Bidder fails to execute the Contract awarded and furnish bond or bonds as specified, he/she/they shall further be responsible for the total loss sustained by the Owner.
B.4.3 If the bid security is in the form of a certified check, those securities of all except the three (3) lowest Bidders will be returned within three (3) days after the opening of bids. The same securities of the three (3) lowest Bidders will be returned within forty-eight (48) hours after the Contract has been executed and finally approved by the Owner.
B.5 INTERPRETATION OF CONTRACT DOCUMENTS PRIOR TO BIDDING
B.5.1 The Contract Documents, including but not limited to the Drawings and the Technical Specifications, depict and describe the general design intent of the character and scope of the work to be constructed, and the material and/or equipment to be installed therein. For sewer line and/or waterline projects except where specific coordinates or reference dimensions are shown, it shall be understood that the drawings show the general alignment of the mainline and the house services. The final constructed alignment and/or location of structures may be adjusted to suit field conditions encountered with prior approval of the Engineer. Individual services shown, including mainline wyes and site tees, are intended to indicate that service is to be provided and are not intended to show actual constructed location.
B.5.2 During the period allowed for preparation of bids, Bidders may be furnished addenda or bulletins for additions to or alterations of the Drawings or Specifications which shall be included in the work covered by the Proposal and become a part of the Contract Documents.
B.5.3 Written Requests: If a prospective Bidder is in doubt as to the true meaning of any part of the Drawings, Contract Documents or Technical Specifications, he/she/they may submit to the Engineer a written request for an
907 HARPER ROAD DEMOLITION B-6 INSTRUCTIONS TO BIDDERS (1/2024)
interpretation thereof. The Bidder submitting the request will be responsible for its prompt delivery. Any interpretation of the Contract Documents will be made only by written addendum duly issued and a copy of such addendum will be mailed or delivered to each prospective Bidder of record. Neither the Engineer nor the Owner will be responsible for any other explanation or interpretations of the proposed Contract.
Failure of any Bidder to receive any such Addenda or interpretation shall not relieve such Bidder from any obligation under his/her/their bid as submitted.
B.5.4 Addenda Acknowledgment: Each Bidder is required to acknowledge receipt of all addenda in the spaces provided in the Proposal form, including not only that which is bound in and attached to the Project Manual at the time the manual is received by the Bidder, but also all addenda which may be later delivered to his/her/their address by mail service, telegram, electronically or messenger, prior to bid opening. Failure to acknowledge receipt of all addenda may cause his/her/their bid to be rejected.
B.6 CONTRACTOR CERTIFICATION OF CONSTRUCTABILITY
B.6.1 Each Proposal shall include an executed Certification of the Contractor as follows:
a. Contractor acknowledges that: (1) the Engineer's obligations are to the
Owner and that, in performing such obligations, the Engineer may increase the burdens and expense of the Contractor, its Subcontractors or the surety of any of them; (2) the Contractor has an independent duty and responsibility to review the Contract Documents prepared by the Engineer as to Constructability (meaning the difficulty, cost and time to build the Project as designed); and, therefore (3) the Contractor represents, certifies and warrants to the Owner, the Engineer and the Engineer's Consultants that:
1. The Contractor has its own in-house engineers and/or staff expertise who have reviewed the Contract Documents for Constructability and has fully satisfied itself and its subcontractors that the Project can be built as designed and within the cost, budget and schedule submitted to the Owner by the Contractor, or
2. The Contractor has engaged independent Engineers and/or experts who have reviewed the Contract Documents for Constructability and has fully satisfied itself and its subcontractors that the Project can be built as designed and within the cost, budget and schedule submitted to the Owner by the Contractor, or
3. The Contractor has decided to forego any such review by any
Engineer or expert and has accepted the risk that the difficulty, cost
907 HARPER ROAD DEMOLITION B-7 INSTRUCTIONS TO BIDDERS (1/2024)
and time required to complete the Project as designed may be greater than its bid or any submitted cost estimate, budget or schedule for the Project, and therefore;
b. Contractor acknowledges that the Drawings and Specifications are intended only to depict and describe the intent of the completed Project.
Contractor represents that it is qualified to construct the Project as depicted in the Contract Documents and to determine its own means, methods, techniques, sequences and procedures. To the extent that means, methods, techniques, sequences and procedures are identified in the Contract Documents, Contractor is required to independently evaluate those means, methods, techniques, sequences and procedures for the purpose of determining whether the means, methods, techniques, sequences and procedures depicted or described in the Contract Documents are adequate to construct the Project. Contractor further represents that it has based its bid upon its own determination of the means, methods, techniques, sequences and procedures required to construct the Project.
c. Submission of a bid and/or Execution of the Contract by the Contractor is a representation that the Contractor has carefully reviewed and thoroughly examined and evaluated the Contract Documents to determine whether the Contractor needs clarification of the Contract Documents or additional interpretation of the intent of the Contract Documents to determine its bid and that it has requested any needed clarification prior to submitting its bid. Contractor represents that it has the knowledge, skill and expertise to perform the Work; that it understands that it must make reasonable inferences to determine portions of the Work not shown in the Contract Documents that would be required for a proper and complete project, and it has included all costs for such inferences in its bid; and, that Contractor is not relying on representations from the Contract Documents for the purpose of determining the means, methods, sequences or procedures of performing the Work.
d. The Contractor, on behalf of itself and all of its subcontractors and sub-subcontractors) will waive the right to make any claim against the Owner, the Engineer or any of the Engineer's Consultants for this Project (whether such claim is based on breach of contract, breach of warranty, misrepresentation, negligence or other tort or any other legal doctrine) for any alleged increased difficulty, cost or delay in completion of the Project due to any alleged misrepresentation, error or omission in the Contract Documents that was or should have been discovered in the constructability review, and
e. The Contractor agrees to indemnify and hold harmless the Owner, Engineer and all of the Engineer's Consultants from any and all claims brought by any subcontractor or anyone else working on the Project under
907 HARPER ROAD DEMOLITION B-8 INSTRUCTIONS TO BIDDERS (1/2024)
the Contractors Agreement with the Owner for any and all attorneys fees and costs incurred by the Owner, the Engineer or any of the Engineer's Consultants in defending any Contractor or subcontractor claim for increased costs based on any alleged misrepresentation, error or omission in the Contract Documents, and that this indemnity includes any damages any of them are required to pay to such Contractor or subcontractor for alleged increased costs of construction or delay in completion of the Project), and
f. The Contractor acknowledges the right of any such Engineer or Engineer's
Consultant to bring suit directly against the Contractor to recover or enforce this indemnity obligation, and
g. The Contractor also certifies that it shall secure similar certifications from each of its Subcontractors for the Project waiving their rights to recover against the Owner or the Engineer or any of the Engineer's Consultants for increased costs of construction or delay in construction due to any alleged misrepresentation, error or omission in the Contract Documents. Should the Contractor fail to secure any such waiver, then that failure shall be deemed a material breach of this Contractor Certification and the measure of damages recoverable by the Owner, the Engineer or any of the Engineer's Consultants for this breach shall be all attorneys fees and costs expended in defending any such claim as well as any damages awarded against any of them because of such a claim.
B.7 TIME OF COMPLETION AND LIQUIDATED DAMAGES
B.7.1 If the Bidder is awarded a Contract, he/she/they shall commence work on a date to be specified in a written Notice to Proceed, and shall fully complete same within the stipulated time of completion. He shall also pay the Owner as liquidated damages, the sum of Five Hundred Dollars ($500.00) for each consecutive calendar day thereafter during which all Contract work is not completed, as hereinafter provided in the General Conditions.
B.8 BIDDER'S QUALIFICATIONS
B.8.1 As part of his/her/their bid submission, the Bidder shall furnish a fully completed and executed AIA Document A305-2020 Contractor’s Qualification Statement.
B.8.2 In addition to the foregoing, within seven (7) days after the opening of bids, the Bidder selected as the apparent low Bidder shall furnish to the Engineer in duplicate, in accordance with Paragraph B.3.11, the following sworn statements:
a. Experience Statement: A sworn statement listing the Bidder's experience in performing work of the character for which his/her/their bid is
907 HARPER ROAD DEMOLITION B-9 INSTRUCTIONS TO BIDDERS (1/2024)
submitted. The experience statement shall be submitted on the “Consolidated Experience Statement” attached hereto which includes Owner, description of the work, dates of work, contract time of completion, actual time of completion, bid amounts, change order amounts and disputes. Bidder shall supply references by including name of owner and owner's engineer or authorized representatives and telephone number for each project listed.
b. List of Proposed Subcontractors: The Bidder shall submit a listing of all subcontractors (excluding equipment manufacturers) he/she/they proposes to award more than ten percent (10%) of the work. This listing shall identify the work to be subcontracted and the percentage of the total work to be awarded to the subcontractor. The Bidder shall also provide the sworn, experience and as noted in a. and b. of this Paragraph B.8.2.
B.8.3 In addition to the foregoing, within seven (7) days after the opening of bids, the Bidder selected as the apparent low Bidder shall furnish to the Owner’s Legal Counsel in duplicate, in accordance with Paragraph B.3.9, the following:
a. Financial Statement: A sworn financial statement showing his/her/their assets and liabilities as of a date not more than ninety (90) days prior to the date of submission, and
b. A copy of the Bidder’s most recent auditor's report.
B.8.4 The Owner may make such investigations as he/she/they deems necessary to determine the ability of the Bidder to perform the work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified and capable to carry out the obligations of the Contract and to complete the work contemplated therein within the Time of Completion.
B.9 EXECUTION OF DOCUMENTS
B.9.1 The successful Bidders will be required to execute the Contract and bonds in no less than five (5) counterparts in accordance with requirements of Paragraph B.3.19.
B.10 COLLUSIVE AGREEMENTS
B.10.1 Each Bidder submitting a Proposal to the Owner for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto, an affidavit substantially in the form herein provided (Proposal Form), to the effect that he/she/they has not colluded with any other person, firm, or corporation in regard to any Proposal submitted.
907 HARPER ROAD DEMOLITION B-10 INSTRUCTIONS TO BIDDERS (1/2024)
B.10.2 Before executing any subcontract the successful Bidder shall submit the name of any proposed subcontractor for prior approval and an affidavit substantially in the form provided herein.
B.11 TIME FOR RECEIVING PROPOSALS
B.11.1 Proposals received prior to the advertised hour of opening will be securely kept, sealed. The officer whose duty it is to open them will decide when the specified time has arrived, and no Proposal received thereafter will be considered, except that when a Proposal arrives by mail after the time fixed for opening, but before the reading of all other Proposals is completed, and it is shown to the satisfaction of the Owner that the non-arrival on time was due solely to delay in the mails for which the Bidder was not responsible, such Proposal will be received and considered.
B.11.2 Bidders are cautioned that, while telegraphic modifications of Proposals may be received as provided above, such modifications, if not explicit and if in any sense are subject to misinterpretation, shall make the Proposal so modified or amended, subject to rejection.
B.12 OPENING OF PROPOSALS
B.12.1 At the time and place fixed for the opening of Bids, the Owner will cause to be opened and publicly read aloud every Proposal received within the time set for receiving Proposals, irrespective of any irregularities therein. Bidders and other persons properly interested may be present, in person or by representative.
B.13 WITHDRAWAL OF PROPOSALS
B.13.1 All Bidders specifically waive any right to withdraw a Proposal after it has been submitted to the Owner, except as provided in the following:
a. Prior to Date and Time for Opening Proposals: A Bidder may withdraw a
Proposal, prior to the date and time for opening of Proposals, if a written request to withdraw the Proposal is delivered to the Owner by an accredited representative of the Bidder or by U.S. mail, and actually received by the Owner prior to the time set for the opening of Proposals.
b. On and After Date and Time for Opening Proposals: No Proposal may be withdrawn at the date and time for the opening of Proposals nor for a minimum period of ninety (90) days (one hundred twenty (120) days when stipulated in the Advertisement) thereafter. The bid of the lowest responsible Bidder may not be withdrawn during the period within which the Owner may award the Contract to such lowest Bidder as provided herein.
907 HARPER ROAD DEMOLITION B-11 INSTRUCTIONS TO BIDDERS (1/2024)
B.14 PROPOSAL REJECTION
B.14.1 The unqualified right is reserved by the Owner, at its option, to waive any informalities, irregularities, defects, errors or omissions in any or all Proposals and to reject any or all Proposals as may be deemed to be in the best interest of the Owner. Proposals which contain omissions, erasures, alterations, additions not called for, conditional bids or irregularities of any kind, or Proposals otherwise regular which are not accompanied by Proposal Security, may be rejected as informal. Proposals in which the bid prices are obviously unbalanced may be rejected.
B.15 LAWS AND REGULATIONS
B.15.1 The Bidder's attention is directed to the fact that all applicable Federal and State laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.
B.16 AWARD OF CONTRACT
B.16.1 Award of the contract, if made, will be to the low, responsive, responsible Bidder who complies with the requirements and conditions herein.
B.16.2 For Projects bid with Add or Deductive Alternates the Owner reserves the sole and exclusive right to determine low bidder based on any combination of the Base Bid plus or minus any, all, or none of the Add/Deductive Alternates.
B.16.3 Award of the contract does not constitute Notice to Proceed. Notice to Proceed when issued by the Owner requires, receipt by the Owner from the Contractor of proper Agreement, Bonds, Insurance and other documents required to comprise a complete contract package, and is subject to finalizing any required financial closings including but not limited to Loan Closing and/or Bond issuance.
The Contract time begins upon, and the time for completion is measured from, the issuance of the Notice to Proceed.
B.17 EXECUTION OF AGREEMENT -- PERFORMANCE AND PAYMENT BOND
B.17.1 Subsequent to the award and within ten (10) days after the prescribed forms are presented for signature, the successful Bidder shall execute and deliver to the Owner an Agreement in the form included in the Contract Documents in such number of copies as the Owner may require.
B.17.2 Having satisfied all conditions of award as set forth elsewhere in these documents, the successful Bidder shall, within the period specified in paragraph B.17.1 above, furnish a surety bond in a penal sum not less than the amount of the Contract, and for the payment of all persons, firms or corporations to whom the
907 HARPER ROAD DEMOLITION B-12 INSTRUCTIONS TO BIDDERS (1/2024)
Contractor may become legally indebted for labor, materials, tools, equipment, or services of any nature including utility and transportation services, employed or used by him in performing the work. Such bond shall be in the form as that included in the Contract Documents and shall bear the same date as, or a date subsequent to that of the Agreement. The current power of attorney for the person who signs for any surety company shall be attached to such bond. This bond shall be signed by a guaranty or surety company listed in the latest issue of the U.S. Department of Treasury, Circular 570 and the penal sum shall be within the maximum specified for such company in said Circular 570.
B.17.3 The failure of the successful Bidder to execute such Agreement and to supply the required bond or bonds within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the Owner may grant, based upon reasons determined sufficient by the Owner, the Owner may either award the Contract to the next lowest responsible Bidder or readvertise for bids, and may charge against the defaulting Bidder the difference between the amount of the bid and the amount for which a Contract for the work is subsequently executed, irrespective of whether the amount thus determined exceeds the amount of the Bid Bond. If a more favorable bid is received by readvertising, the defaulting Bidder shall have no claim against the Owner for a refund.
B.18 WAGES AND SALARIES
B.18.1 Attention of Bidders is particularly directed to the requirement concerning the payment of not less than the prevailing wage and salary rates specified in the Contract Documents and the conditions of employment with respect to certain categories and classifications of employees.
B.19 PENNSYLVANIA PUBLIC WORKS EMPLOYMENT VERIFICATION ACT
REQUIREMENTS
B.19.1 Attention of the Bidders is particularly directed to the requirement to comply with the Pennsylvania Public Works Employment Verification Act (July 2012). Award of this contract requires proper execution and submission of a completed Commonwealth of Pennsylvania proscribed Public Works Employment Verification Form by the Contractor. The form is available online at www.dgs.state.pa.us (sample appended). The Form may not be modified.
B.19.2 The requirement to comply with the Act as well as to complete the Form extends to all subcontractors.
B.19.3 Bidders are also notified that the Payment Request forms to be used on this contract contain a check box for the contractor to certify that they are in compliance with the Act. No payments will be processed if the box certifying compliance is not checked.
907 HARPER ROAD DEMOLITION B-13 INSTRUCTIONS TO BIDDERS (1/2024)
B.20 UNCLASSIFIED EXCAVATION
B.20.1 All excavation work of the Contract shall be performed on an "unclassified" basis.
B.20.2 Unclassified excavation shall mean the removal and disposal of material of any kind, including removal of any rock regardless of type or hardness, boulders, stumps, trees, tree roots, muck, shale, masonry, concrete, curbing, paving or any other natural or manmade materials. No extra payment shall be made for any excavated materials regardless of type.
B.21 RESPONSIBLE EMPLOYEE/COMPETENT PERSON
B.21.1 Under this Contract, the Contractor shall provide a full time, on-site responsible employee/competent person to remedy emergency situations stemming from the construction activity. This employee shall also be designated the "competent person" regarding trench excavation safety as defined by the Occupational, Safety and Health Administration (OSHA). Failure to provide for or to place said competent person on the project shall not operate to absolve the Contractor of his/her/their responsibilities.
B.22 PERMITS AND PERMIT SPECIAL CONDITIONS
B.22.1 Contractor shall obtain and pay all necessary demolition permits required by the Municipality and Allegheny County Health Department; and coordinate necessary notifications and inspections.
B.23 PROHIBITION OF DISCRIMINATION
B.25.1 In the hiring of employees for the performance of work under the Contract or any subcontract, no contractor, subcontractor or any other person acting on behalf of the contractor or subcontractor shall by reason of gender, race, creed, or color discriminate against any citizen of this Commonwealth who is qualified and available to perform the work to which the employment relates.
B.25.2 No contractor or subcontractor or any person on their behalf shall in any manner discriminate against or intimidate any employee hired for the performance of work under the Contractor on account of gender, race, creed, or color.
B.25.3 The Contract may be canceled or terminated by Owner, and all money due or to become due under the Contract may be forfeited for a violation of the terms or conditions of this portion of the Contract.
907 HARPER ROAD DEMOLITION B-14 INSTRUCTIONS TO BIDDERS (1/2024)
B.24 PENNSYLVANIA NONDISCRIMINATION / SEXUAL HARASSMENT
CLAUSE
B.24.1 The project is being funded by the Pennsylvania Department of Community and Economic Development – Blight Remediation Program Grant
B.24.2 During the term of this Contract, the Contractor agrees as follows:
a. In the hiring of any employee(s) for the manufacture of supplies, performance of work, or any other activity required under the Contract or any subcontract, the Engineer, subcontractor, or any person acting on behalf of the Contractor or subcontractor shall not discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the Pennsylvania Human Relations Act (PHRA) and applicable federal laws, against any citizen of this Commonwealth who is qualified and available to perform the work to which the employment relates.
b. The Grantee, any subgrantee, contractor or any subcontractor or any person on their behalf shall not in any manner discriminate by reason of race, gender, creed, color, sexual orientation, gender identity or expression, or in violation of the PHRA and applicable federal laws, against or intimate any of the employees.
c. The Grantee, any subgrantee, contractor or any subcontractor shall establish and maintain a written nondiscrimination and sexual harassment policy and shall inform their employees in writing of the policy. The policy must contain a provision that sexual harassment will not be tolerate and employees who practice it will be disciplined. Posting this Nondiscrimination/Sexual Harassment Clause conspicuously in easily-accessible and well-lighted places customarily frequented by employees and at or near where the grant services are performed shall satisfy this requirement for employees with an established work site.
d. The Grantee, any subgrantee, contractor or any subcontractor shall not discriminate by reason of race, gender, creed, color, sexual orientation, gender identify or expression, or in violation of the PHRA and applicable federal laws, against any subgrantee, contractor, subcontractor or supplier who is qualified to perform the work to which the grant relates.
e. The Grantee and each subgrantee, contractor and subcontractor represents that it is presently in compliance with and will maintain compliance with all applicable federal, state, and local laws and regulations relating to nondiscrimination and sexual harassment. The Grantee and each subgrantee, contractor and subcontractor further represents that it has filed a Standard Form 100 Employer Information Report (EEO-1) with the U.
S. Equal Employment Opportunity Commission (EEOC) and shall file an
907 HARPER ROAD DEMOLITION B-15 INSTRUCTIONS TO BIDDERS (1/2024)
annual EEO-1 report with the EEOC as required for employers subject to Title VII of the Civil Rights Act of 1964, as amended, that have 100 or more employees and employers that have federal government contracts or first-tier subcontracts and have 50 or more employees. The Grantee, any subgrantee, any contractor or any subcontractor shall, upon request and within the time periods requested by the Commonwealth, furnish all necessary employment documents and records, including EEO-1 reports, and permit access to their books, records, and accounts by the granting agency and the Bureau of Diversity, Inclusion and Small Business Opportunities for the purpose of ascertaining compliance with the provisions of the Nondiscrimination/Sexual Harassment Clause.
f. The Grantee, any subgrantee, contractor or any subcontractor shall include the provisions of this Nondiscrimination/Sexual Harassment Clause in every subgrantee agreement, contract or subcontract so that those provisions applicable to subgrantees, contractors or subcontractors will be binding upon each subgrantee, contractor or subcontractor.
g. The Grantee’s and each subgrantee’s, contactor’s and subcontractor’s obligations pursuant to these provisions are ongoing from and after the effective date of the grant agreement through the termination date thereof.
Accordingly, the Grantee and each subgrantee, contractor and subcontractor shall have an obligation to inform the Commonwealth if, at any time during the term of the grant agreement, it becomes aware of any actions or occurrence that would result in violation of these provisions.
h. The Commonwealth may cancel or terminate the grant agreement and all money due or to become due under the grant agreement may be forfeited for a violation of the terms and conditions of this Nondiscrimination/Sexual Harassment Clause. In addition, the granting agency may proceed with debarment or suspension and may place the Grantee, subgrantee, contractor, or subcontractor in the Contractor Responsibility File.
END OF SECTION
Document A305™ – 2020 Contractor's Qualification Statement
AIA Document A305™ – 2020. Copyright © 1964, 1969, 1979, 1986, and 2020 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 10:46:44 ET on 01/11/2021 under Order No.5890157977 which expires on 11/12/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (1282952529)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
THE PARTIES SHOULD EXECUTE A SEPARATE CONFIDENTIALITY AGREEMENT IF THEY
INTEND FOR ANY OF THE INFORMATION IN THIS A305-2020 TO BE HELD CONFIDENTIAL.
SUBMITTED BY: SUBMITTED TO:
(Organization name and address.) (Organization name and address.)
TYPE OF WORK TYPICALLY PERFORMED
(Indicate the type of work your organization typically performs, such as general contracting, construction manager as constructor services, HVAC contracting, electrical contracting, plumbing contracting, or other.)
THIS CONTRACTOR’S QUALIFICATION STATEMENT INCLUDES THE FOLLOWING:
(Check all that apply.)
[ ] Exhibit A – General Information [ ] Exhibit B – Financial and Performance Information [ ] Exhibit C – Project-Specific Information [ ] Exhibit D – Past Project Experience [ ] Exhibit E – Past Project Experience (Continued)
CONTRACTOR CERTIFICATION
The undersigned certifies under oath that the information provided in this Contractor’s Qualification Statement is true and sufficiently complete so as not to be misleading.
Organization’s Authorized Representative Signature
Date
Printed Name and Title
NOTARY
State of:
County of:
Signed and sworn to before me this day of
Notary Signature
My commission expires:
Document A305™ – 2020 Exhibit A General Information
AIA Document A305™ – 2020 Exhibit A. Copyright © 2020 by The American Institute of Architects. All rights reserved. The “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was produced by AIA software at 10:43:58 ET on 01/11/2021 under Order No.5890157977 which expires on 11/12/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org.
User Notes: (2050316085)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
This Exhibit is part of the Contractor’s Qualification Statement, submitted by and dated the day of in the year (In words, indicate day, month and year.)
§ A.1 ORGANIZATION
§ A.1.1 Name and Location § A.1.1.1 Identify the full legal name of your organization.
§ A.1.1.2 List all other names under which your organization currently does business and, for each name, identify jurisdictions in which it is registered to do business under that trade name.
§ A.1.1.3 List all prior names under which your organization has operated and, for each name, indicate the date range and jurisdiction in which it was used.
§ A.1.1.4 Identify the address of your…