About this file
This is a comprehensive Bid Drawing Package for the West Broad YMCA Pool Renovation project issued by Chatham County Parks & Recreation in Savannah, Georgia. The scope of work includes construction of a new approximately 3,000 square foot pool with an 87,007-gallon water capacity, new pool deck, pole lighting with mounted camera, proposed restroom building, and proposed pool equipment building. The project is located at 1110 May Street, Savannah, Georgia 31415, on a 3.98-acre site with 0.25 acres of disturbed area. Contractors must provide base bids for utility stubbing to the proposed restroom, add-alternate bids for full restroom building buildout, add-alternate pricing for pool heater installation with gas line design coordination, and add-alternate pricing for concrete finish options. The contract is identified as Project Number 1250471 and was issued for bid on December 5, 2025. Program management contact is Holly Holdsworth at Chatham County Parks & Recreation (912-652-6784), with project management by Kevin Thomas, PLA at Pond & Company (706-847-8874).
The drawing package encompasses extensive civil, architectural, pool, electrical, and landscape design details prepared by Pond & Company and WaterDesign. Key project components include demolition of existing pool infrastructure, installation of shotcrete pool shell with 4,000 PSI minimum compression strength, equipotential bonding systems compliant with NEC Article 680, two main drain outlets with VGB anti-entrapment covers, surface skimmers, underwater LED lighting, stainless steel ladders and handrails, ADA lift access, emergency shut-off switch, complete filtration system with sand filters and chemical controllers, pool equipment room and chemical storage facilities, and full electrical infrastructure including 200-amp panel in pump room. The project requires contractor coordination with multiple utilities including existing water, gas, and power lines; contractor responsibility for survey control establishment by Georgia licensed land surveyor; and compliance with Georgia Department of Health regulations for public swimming pools. All equipment must bear NSF seals, and the contractor must provide three days of operational supervision following facility start-up and final water chemistry adjustment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHATHAM COUNTY
WEST BROAD YMCA POOL RENOVATION
ISSUED FOR BID
POND PROJECT NUMBER: 1250471
1110 MAY ST SAVANNAH, GA 31415
SCOPE OF PROJECT:
THE PROJECT PROVIDES A PROPOSED ~3000 S.F. POOL.
THE SCOPE ALSO INCLUDE A NEW POOL DECK, POLE
LIGHTING, A PROPOSED RESTROOM AND A PROPOSED
POOL EQUIPMENT BUILDING.
SURVEY REFERENCE NOTES:
1. SEE THE INCLUDED PARTIAL TOPOGRAPHIC SURVEY
SHEETS FOR APPLICABLE SURVEY NOTES, SYMBOLS
LEGEND, AND ABBREVIATIONS.
2. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL
NETWORK OUTSIDE LIMITS OF DEMOLITION PRIOR TO
COMMENCEMENT OF WORK. THIS WORK MUST BE
PERFORMED BY A GEORGIA LICENSED LAND
SURVEYOR.
BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION
PROVIDED BY:
TR LONG ENGINEERING
302 SOUTH ZETTEROWER AVENUE
STATESBORO, GEORGIA 30458.
912-335-1046
PROJECT SITE
TOTAL ACREAGE: 3.98
TOTAL DISTURBED AREA: .25 AC
OWNER INFO.
CHATHAM COUNTY - PARKS & RECREATION
7226 VARNEDOE DR.
SAVANNAH, GA 31406
PHONE: 912-652-6780
PROGRAM MANAGEMENT
CHATHAM COUNTY - PARKS & RECREATION
7226 VARNEDOE
SAVANNAH, GA 31406
NAME: HOLLY HOLDSWORTH
EMAIL:HHOLDSWORTH@CHATHAMCOUNTY.ORG
PHONE NUMBER: 912-652-6784
PROJECT MANAGER
POND & COMPANY
55 IVAN ALLEN JR BLVD, SUITE 850
ATLANTA, GA 30308
PHONE:706-847-8874
NAME: KEVIN THOMAS, PLA
ADDRESS: KEVIN.THOMAS@PONDCO.COM
SCALE: N.T.S.
PROXIMITY MAP
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\G -0
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
COVER PAGE
G-001
PROJECT SITE
SP-1 POOL LAYOUT & DATA
SP-2
POOL EQUIPMENT LIST, GENERAL SPECIFICATIONS,
DIMENSIONS & MAP
SP-3 POOL DIMENSIONS
SP-4 POOL SECTIONS
SP-5 POOL FLOOR SLOPES AND DEPTH MARKERS
LAYOUT
SP-6 POOL SUCTION & RETURN PIPING, & CONDUITS
SP-7 POOL EQUIPMENT LAYOUT & ELECTRICAL DATA
SP-8 PIPING & EQUIPOTENTIAL BONDING SCHEMATIC
SP-9 POOL DETAILS
SP-10 POOL DETAILS
SP-11 POOL DETAILS
SP-12 POOL DETAILS
SP-13 GENERAL NOTES & HEALTH DEPT REQUIREMENTS
E001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS
E002 ELECTRICAL LEGEND
ES101 ELECTRICAL SITE PLAN
E101 ENLARGED ELECTRICAL PLAN
E-101G PHOTOMETRIC PLAN - GENERALBID NOTES FOR CONTRACTOR:
1. PROVIDE BASE BID FOR STUBBING UP UTILITIES
ONLY FOR PROPOSED RESTROOM
2. PROVIDE ADD-ALTERNATE BID FOR FULL BUILDOUT
OF PROPOSED RESTROOM BUILDING
3. PROVIDE ADD AL-ALTERNATE FOR POOL HEATER.
DESIGN AND SUPPLY OF GAS LINE SHOWN IS
DIAGRAMMATIC ONLY. CONTRACTOR TO
COORDINATE WITH PLUMBING SUBCONSULTANT
FOR DESIGN, SUPPLY, AND PERMIT OF GAS LINE
EXTENSION IF ADD-ALTERNATE IS ACCEPTED.
4. PROVIDE ADD-ALTERNATE FOR CONCRETE FINISH.
SEE DETAIL A/C501
E621 PANELBOARD SCHEDULES
DECEMBER 5TH, 2025
Sheet List Table Sheet Number Sheet Title
G-001 COVER PAGE
C-001 GENERAL NOTES LEGENDS AND ABREVIATIONS
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS102 JOINT PLAN
CG101 GRADING & DRAINAGE PLAN
CG201 STORM SEWER PROFILES 1
CG202 STORM SEWER PROFILES 2
CU101 UTILITIES PLAN
CU202 UTILITIES DETAIL
CU201 SANITARY SEWER PROFILES
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-503 CONSTRUCTION DETAILS
LP101 LANDSCAPE PLAN
AutoCAD SHX Text N
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C -0
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
GENERAL
NOTES
LEGENDS
AND
ABREVIATIONS
C-001
Ø
AC
ADS
A.K.A.
APPROX.
ASTM
ATFP
AWWA
BLDG.
BC
BFP
BMP
BOW
B.S.
BSTP
BVCE
BVCS
CL
CB
C&G C.O.
COR
CF
CFS
C.I.
CJ
CONC.
CMP
CPP
CY
DI
DIA.
D.I.
DIP
DOT
DWG
E
EISA
EJ
ELEV.
EOI
EP
EQUIP
ESMT
EVCE
AT
AND
DIAMETER
ACRES
ADVANCED DRAINAGE SYSTEMS
ALSO KNOWN AS
APPROXIMATE
AMERICAN SOCIETY FOR TESTING OF MATERIALS
ANTI-TERRORISM/FORCE PROTECTION
AMERICAN WATER WORKS ASSOCIATION
BUILDING
BACK OF CURB
BACKFLOW PREVENTER
BEST MANAGEMENT PRACTICE
BOTTOM OF WALL AT FINISHED GRADE
BOTTOM OF STAIR (LAST TREAD)
TELEPHONE PEDESTAL
BEGINNING VERTICAL CURVE ELEVATION
BEGINNING VERTICAL CURVE STATION
CENTERLINE
CATCH BASIN
CURB AND GUTTER
CLEAN OUT
CONTRACTING OFFICER'S REPRESENTATIVE
CUBIC FEET
CUBIC FEET PER SECOND
CAST IRON
CONTRACTION JOINT
CONCRETE
CORRUGATED METAL PIPE
CORRUGATED PLASTIC PIPE
CUBIC YARDS
DROP INLET
DIAMETER
DROP INLET
DUCTILE IRON PIPE
DEPARTMENT OF TRANSPORTATION
DRAWING
EASTING
ENERGY INDEPENDENCE SECURITY ACT
EXPANSION JOINT
ELEVATION
END OF INFORMATION
EDGE OF PAVEMENT
EQUIPMENT
EASEMENT
ENDING VERTICAL CURVE ELEVATION
PRVT
PROP
PSI
PSUS
PVC
PVI
PVMT
R
RCP
RD
RECP
R/W S
SD
SDWK
SF
SN
S.R.
SS
SSMH
STA.
STD
STRUC.
TBM
TEMP.
TOS
T.S.
TYP
TOW
UDP
VCP
W/
WM
WOS
WV
B&B
CAL
PRIVATE
PROPOSED
POUND PER SQUARE INCH
PALMETTO STATE UTILITY SERVICES
POLYVINYL CHLORIDE
POINT OF VERTICAL INTERSECTION
PAVEMENT
RADIUS
REINFORCED CONCRETE PIPE
UNDERGROUND ROOF DRAIN
ROLLED EROSION CONTROL PRODUCT
RIGHT-OF-WAY
SOUTH
STORM DRAIN
SIDEWALK
SQUARE FEET
SIGN
STATE ROUTE
SANITARY SEWER
SANITARY MANHOLE
STATION
STANDARD
STRUCTURE
TOPOGRAPHY BENCH MARK
TEMPORARY
TOP OF SLAB
TOP OF STAIR (LAST TREAD)
TYPICAL
TOP OF WALL
UNIFIED DEVELOPMENT PLAN
VITRIFIED CLAY PIPE
WITH
WATER METER
WATERS OF THE STATE
WATER VALVE
BALLED AND BURLAPPED
CALIPER
ENDING VERTICAL CURVE STATION
EACH WAY
EXISTING
FIRE DEPARTMENT CONNECTION
FEDERAL EMERGENCY MANAGEMENT AGENCY
FLARED END SECTION
FINISHED FLOOR ELEVATION
FIRE HYDRANT
FORMERLY KNOWN AS
FIBER OPTICS MARKER
FEET
GAS
GRADED AGGREGATE BASE
GALLON
GUARD POST
GATE VALVE
HIGH-DENSITY POLYETHYLENE
MIN.
MNS
MON
MUTCD
NCBC
N N/A N/F
NIC
NSA
O.C.
PCC
PIV
POB
POV
PP
MINIMUM
MAGNETIC NAIL SET
MONUMENT
MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
NORTH CAROLINA BUILDING CODE
NORTHING
NOT APPLICABLE
NOW OR FORMERLY
NOT IN CONTRACT
NATIONAL STONE ASSOCIATION
ON CENTER
PORTLAND CEMENT CONCRETE
POST INDICATOR VALVE
POINT OF BEGINNING
PRIVATELY OWNED VEHICLE
POWER POLE
ABBREVIATION DEFINITIONS
HP
HW
HYD
ICV
I.E.
IPF
INV.
IPS
IN.
JB
L
LEV
LF
LP
LVC
M
MAX.
M.E.
MECH
MH
HIGH POINT / DRAINAGE DIVIDE
HEADWALL
HYDRANT
IRRIGATION CONTROL VALVE
INVERT ELEVATION
IRON PIN FOUND
INVERT
IRON PIN SET
INCH
JUNCTION BOX
LENGTH
LOW EMISSION VEHICLE
LINEAR FEET
LOW POINT
LENGTH OF VERTICAL CURVE
METER
MAXIMUM
MATCH ELEVATION
MECHANICAL
MANHOLE
EVCS
EW
EX
FDC
FEMA
FES
FFE
FH
FKA
FOM
FT.
G G.A.B.
GAL
GP
GV
HDPE
GENERAL NOTES
1. LOCATIONS OF EXISTING FACILITIES AND UTILITIES ARE TAKEN FROM RECORD
DRAWINGS AND SURVEY PERFORMED BY TR LONG DATED 12/26/2024. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL LOCATIONS
AND ELEVATIONS INCLUDING UNDERGROUND UTILITY LINES, VAULTS, OR
BOXES PRIOR TO COMMENCING WORK.
2. EXISTING TOPOGRAPHY, STRUCTURES, AND SITE FEATURES ARE SHOWN
SCREENED AND/OR LIGHT-LINED. NEW FINISH GRADE, STRUCTURES, AND SITE
FEATURES ARE SHOWN HEAVY-LINED.
3. CONTRACTOR WILL VERIFY PROJECT LIMITS PRIOR TO COMMENCING WORK.
4. ANY DAMAGE INCURRED TO ANY EXISTING UTILITY ELEMENTS MUST BE
REPAIRED PROPERLY AND IMMEDIATELY AT NO ADDITIONAL COST TO THE
OWNER.
5. DAMAGE TO EXISTING PLANT MATERIAL OR HARDSCAPE ELEMENTS THAT ARE
TO REMAIN, I.E. CURBS, ROADS, WALLS, FENCES, TREES, SHRUBS, ETC., WILL
BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
3. CONTRACTOR MUST NOT WILLINGLY PROCEED WITH CONSTRUCTION WHEN IT
IS OBVIOUS THAT UNKNOWN OBSTRUCTIONS AND/OR DIFFERENCES EXIST
THAT MAY NOT HAVE BEEN KNOWN DURING DESIGN. SUCH CONDITIONS WILL
BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER. THE
CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR ALL NECESSARY
REVISIONS DUE TO FAILURE TO GIVE SUCH NOTIFICATION.
4. CONTRACTOR WILL BRING TO THE OWNER'S ATTENTION ANY OBSERVED
DISCREPANCIES IN DRAWINGS, SITE CONDITIONS OR EXISTING FEATURES
BEFORE ANY FURTHER WORK IN THE AREA IS TO BE PERFORMED.
5. REPETITIVE FEATURES ARE NOT DRAWN IN THEIR ENTIRETY AND WILL BE
COMPLETELY PROVIDED AS IF DRAWN IN FULL.
6. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SITE SECURITY AT ALL
TIMES DURING CONSTRUCTION.
7. ALL SITE CONSTRUCTION OPERATIONS WILL COMPLY WITH CURRENT OSHA
CONSTRUCTION STANDARDS.
8. THE PROJECT CONTAINS NO WETLANDS WITHIN THE SITE.
9. APPROVAL OF THESE DRAWINGS DOES NOT CONSTITUTE APPROVAL OF ANY
LAND DISTURBING ACTIVITIES WITHIN WATER OF THE UNITED STATES
(WETLAND AREAS).
DEMOLITION NOTES:
1. THE CONTRACTOR WILL SUBMIT A DETAILED DEMOLITION PROCEDURE TO THE
OWNER FOR APPROVAL AT LEAST 10 DAYS BEFORE DEMOLITION IS TO BEGIN.
THE DEMOLITION PROCEDURE WILL INCLUDE A DETAILED DESCRIPTION OF
THE METHODS AND EQUIPMENT TO BE USED FOR EACH OPERATION AND THE
SEQUENCE OF WORK. THE DEMOLITION PROCEDURES WILL PROVIDE FOR
SAFE CONDUCT OF WORK AND THE PROTECTION OF PROPERTY WHICH IS TO
REMAIN UNDISTURBED AND COORDINATION WITH OTHER WORK OR
OPERATIONS THAT MAY BE IN PROGRESS. METHODS AND SCHEDULING OF
DEMOLITION ACTIVITIES MUST BE APPROVED BY THE OWNER.
2. LOCATIONS OF EXISTING FACILITIES AND UTILITIES ARE TAKEN FROM THE
SURVEY. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL
EXISTING UTILITIES.
3. THE CONTRACTOR WILL DEMOLISH AND REMOVE ALL EXISTING BUILDINGS,
PAVEMENT, UTILITIES, EQUIPMENT, ETC. NOTED TO BE REMOVED WITHIN THE
LIMITS OF DISTURBANCE AS SHOWN ON THIS PLAN.
4. CONTRACTOR TO PROVIDE AND MAINTAIN NECESSARY FENCES, BARRICADES,
LIGHTS, SIGNS AND OTHER TRAFFIC CONTROL MEASURES AS REQUIRED FOR
THE PROTECTION AND SAFETY OF THE PUBLIC THROUGHOUT THE DEMOLITION
AND CONSTRUCTION ACTIVITIES ON THE SITE.
5. CONTRACTOR WILL MINIMIZE THE IMPACT OF CONSTRUCTION ACTIVITIES ON
THE TRAFFIC FLOW TO SURROUNDING FACILITIES TO REMAIN.
6. CONTRACTOR WILL LOCATE ALL EXISTING UTILITIES PRIOR TO THE START OF
DEMOLITION ACTIVITIES.
7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL EXISTING SERVICE
CONNECTIONS TO BE REMOVED FROM BUILDINGS OR THE SITE AND
PERMANENTLY PLUGGING THE PIPES WHERE REQUIRED IN ACCORDANCE WITH
THE REQUIREMENTS OF THE UTILITY COMPANIES CONCERNED.
8. CONTRACTOR WILL COORDINATE WITH THE UTILITY COMPANY FOR THE
RELOCATION OF ANY UTILITY TO REMAIN IN SERVICE. CONTRACTOR TO
EXERCISE EXTREME CAUTION WHEN CONSTRUCTION OCCURS NEAR EXISTING
UTILITIES.
9. CONTRACTOR WILL SAW CUT TO FULL PAVEMENT, SIDEWALK AND CURB AND
GUTTER DEPTH AT THE LIMIT OF DEMOLITION FOR REMOVAL OF PAVEMENT,
SIDEWALK AND CURB AND GUTTER.
10. ALL EXISTING PIPE TO BE ABANDONED WILL BE CUT, AND PLUGGED OR
CAPPED AT EACH END. WHERE EXISTING PIPING INTERFERES WITH NEW
PIPING OR CONSTRUCTION, IT WILL BE REMOVED BEYOND THE LIMITS
REQUIRED FOR THE PROPER COMPLETION OF THE WORK AND THE OPEN ENDS
PLUGGED OR CAPPED. UNLESS OTHERWISE SHOWN, LINES TO BE PLUGGED
OR CAPPED AT LEAST 12-INCHES BEHIND OR BELOW FINISH BUILDING
SURFACES AND AT LEAST 12 INCHES BELOW PROPOSED GRADE SURFACES.
11. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO OTHER
BUILDINGS OR STRUCTURES NOT INTENDED FOR DEMOLITION. THE
CONTRACTOR WILL RESTORE ANY DAMAGED FACILITY TO THEIR CONDITION
PRIOR TO THE ERRANT DEMOLITION OPERATIONS.
12. CONTRACTOR WILL STRIVE TO MAXIMIZE ALL RECYCLABLE MATERIALS AND
DESIGNATE A STOCKING AREA ON SITE FOR SUCH MATERIALS.
13. ALL SALVAGEABLE METAL MATERIALS WILL REMAIN PROPERTY OF THE OWNER
AND WILL BE CLEANED AND STORED ON THE OWNERS PROPERTY AS
DIRECTED BY THE OWNER.
14. NO DEBRIS FROM SITE DEMOLITION WILL BE BURIED ON SITE. ALL MATERIAL
GENERATED FROM DEMOLITION OPERATION WILL BE PROPERLY DISPOSED OF
OFFSITE.
15. THE CONTRACTOR WILL INSTALL ALL INITIAL EROSION AND SEDIMENTATION
CONTROL MEASURES PRIOR TO DEMOLITION OPERATIONS BEGINNING.
SITE CONSTRUCTION NOTES:
1. ALL MATERIALS AND CONSTRUCTION WILL CONFORM TO THE CURRENT
STANDARDS AND SPECIFICATIONS OF THE LOCAL AUTHORITY HAVING
JURISDICTION, THE GEORGIA DEPARTMENT OF TRANSPORTATION, THE
MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA, LATEST EDITION
AND ANY OTHER LOCAL AND STATE STANDARDS THAT MAY APPLY.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL FEDERAL, STATE, OSHA AND
LOCAL SAFETY REGULATIONS, LAWS, CODES OR ORDINANCES WHICH MAY
APPLY.
3. THE CONTRACTOR WILL REVIEW THE PLANS AND SPECIFICATIONS FOR
ERRORS, OMISSIONS, DISCREPANCIES OR CONFLICTS PRIOR TO
CONSTRUCTION. THE CONTRACTOR WILL NOTIFY THE ENGINEER OF ANY
ERRORS, OMISSIONS, DISCREPANCIES OR CONFLICTS IN THE PLANS OR
BETWEEN THE PLANS AND FIELD CONDITIONS IMMEDIATELY.
4. THE CONTRACTOR WILL MAINTAIN ACCESS TO AND FROM THE SITE AT ALL
TIMES. UTILITY SERVICES WILL BE MAINTAINED AT ALL TIMES. THE
CONTRACTOR WILL COORDINATE ANY TEMPORARY INTERRUPTION OF ACCESS
OR UTILITIES WITH THE OWNER PRIOR TO THE INTERRUPTION.
5. CONTRACTOR IS RESPONSIBLE FOR OBTAINING REQUIRED TEMPORARY
ELECTRICAL SERVICE UNTIL SUCH TIME THE OWNER ACCEPTS THE PROJECT
AS COMPLETE AND PROVIDING WATER AS REQUIRED FOR CONSTRUCTION,
AND FOR 12 MONTH LANDSCAPE MAINTENANCE PERIOD.
6. CONTRACTOR TO PROVIDE BARRIERS AS REQUIRED TO PREVENT PUBLIC
ENTRY TO CONSTRUCTION AREAS AND PROTECT EXISTING FACILITIES AND ADJACENT
PROPERTIES FROM CONSTRUCTION ACTIVITIES. THE REQUIRED BARRIERS
AND DEVICES WILL BE ERECTED PRIOR TO COMMENCEMENT OF THE WORK.
7. TESTING REQUIREMENTS WILL BE IN ACCORDANCE WITH ACCEPTABLE
STANDARDS INCLUDING ASTM OR OTHERS RECOGNIZED IN THE INDUSTRY.
8. ALL UTILITIES SHOWN ON THE PLANS ARE SHOWN ACCORDING TO
INFORMATION AVAILABLE. UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON
THE PLANS. CONTRACTOR WILL LOCATE AND VERIFY EXISTING CABLES,
DUCTS, CONDUIT, PIPELINE, ETC. IN ADVANCE OF ANY PROPOSED
CONSTRUCTION. CONTRACTOR WILL NOTIFY ALL AFFECTED UTILITIES,
ENGINEER AND OWNER AT LEAST 48 HOURS IN ADVANCE OF CONSTRUCTION
NEAR EXISTING UTILITIES.
9. CONTRACTOR WILL REPAIR ANY DAMAGE DONE BY CONSTRUCTION ACTIVITIES
TO EXISTING UTILITIES AT NO ADDITIONAL COST TO THE OWNER OR ENGINEER.
10. A GEOTECHNICAL REPORT HAS NOT BEEN CONDUCTED ON THIS SITE EXCEPT
FOR SEPTIC SOIL TESTING. THE OWNER WILL ENGAGE A QUALIFIED
GEOTECHNICAL ENGINEERING TESTING AGENCY TO PERFORM TESTS AND
INSPECTIONS DURING CONSTRUCTION.
11. CONTRACTOR WILL OBTAIN ALL NECESSARY PERMITS AND APPROVALS
ASSOCIATED WITH DEWATERING.
12. CONTRACTOR WILL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN
THE GENERAL NPDES PERMIT FOR STORM WATER DISCHARGE ASSOCIATED
WITH CONSTRUCTION ACTIVITIES. THE CONTRACTOR WILL PROVIDE STORM
WATER DISCHARGE MONITORING, DOCUMENTATION AND REPORTING RELATED
TO CONSTRUCTION ACTIVITIES FOR THE PROJECT.
13. CONTRACTOR WILL COORDINATE AND GIVE PROPER NOTIFICATIONS TO ALL
INSPECTION AGENCIES PRIOR TO START OF THE CONSTRUCTION.
14. ALL MATERIALS TO BE REMOVED ARE TO BE DISPOSED OF OFFSITE IN A LEGAL
MANNER.
STAKING NOTES:
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL SURVEYING
SERVICES REQUIRED TO LAYOUT AND BUILD THE PROJECT. THIS WILL
INCLUDE ALL HORIZONTAL AND VERTICAL STAKEOUT.
2. CENTERLINES OF ROADS AND DRIVES WILL BE STAKED AT 50-FOOT
INCREMENTS.
3. VERIFY AND STAKE PROPERTY LINE LOCATIONS IN FIELD PRIOR TO
COMMENCING CONSTRUCTION ACTIVITIES.
4. VERIFY AND STAKE ALL WETLAND BOUNDARIES AND STATE WATER BUFFER
LIMITS IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.
5. THE CONTRACTOR WILL BRING ANY DISCREPANCIES BETWEEN THE DESIGN
PLANS AND EXISTING CONDITIONS TO THE ATTENTION OF THE ARCHITECT.
6. UPON SUBSTANTIAL COMPLETION OF THE PROJECT, THE CONTRACTOR WILL
PROVIDE CONSTRUCTION AS-BUILT DRAWINGS AND/OR SURVEYS IN
ACCORDANCE WITH JURISDICTIONAL REQUIREMENTS. DOCK SUPPLIER
REQUIRES AS-BUILT LOCATIONS ON FOUR CORNERS AND FINAL ELEVATIONS
OF EACH FOUNDATION; CONTRACTOR TO PROVIDE THIS AS-BUILT
INFORMATION TO OWNER/DOCK SUPPLIER.
GRADING NOTES:
1. CONTRACTOR TO VERIFY PROJECT LIMITS PRIOR TO COMMENCING WORK.
THE CONTRACTOR AND SUBCONTRACTORS WILL VISIT THE SITE PRIOR TO
SUBMITTING BIDS.
2. CONTRACTOR TO VERIFY LOCATIONS OF ALL UNDERGROUND UTILITY LINES,
VAULTS, OR BOXES PRIOR TO COMMENCING WORK. ANY DAMAGE INCURRED
TO ANY EXISTING UTILITY ELEMENTS WILL BE REPAIRED PROPERLY AND
IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER.
3. THE CONTRACTOR WILL BE RESPONSIBLE FOR TEMPORARY AND PERMANENT
GROUNDWATER CONTROL DURING CONSTRUCTION. THE CONTRACTOR WILL
ALSO CONTROL SURFACE RUNOFF IN ORDER TO PREVENT PONDING IN OPEN
EXCAVATIONS AND PREVENT POTENTIAL UNDERMINING OF PERMANENT
CONSTRUCTION FEATURES.
4. CONTRACTOR WILL NOT WORK FILL MATERIALS DURING UNFAVORABLE
WEATHER CONDITIONS. CONTRACTOR WILL NOT PERMIT EQUIPMENT TO BE
USED IN SUCH A MANNER AS TO CAUSE EQUIPMENT TO EXCESSIVELY PUMP
OR RUT THE SUBGRADE OR OTHER PREPARED AREAS.
5. CONTRACTOR WILL STRIP ALL TOPSOIL AND ORGANIC MATTER FROM AREAS
TO BE DISTURBED.
6. CONTRACTOR WILL GRADE IN A MANNER TO ESTABLISH LONG SMOOTH
GRADIENTS IN ORDER TO REDUCE ABRUPT CHANGES, DIPS AND SHARP
TRANSITIONS IN THE FINISHED GRADE.
7. THE CONTRACTOR WILL BE RESPONSIBLE TO PROVIDE POSITIVE DRAINAGE ON
ALL GRADED SURFACE AREAS. THE CONTRACTOR WILL MAINTAIN A MINIMUM
SLOPE OF 1% ON HARDSCAPE AND MINIMUM SLOPE OF 2% ON GRADED AREAS,
UNLESS OTHERWISE INDICATED.
8. UNLESS OTHERWISE INDICATED ON DRAWINGS, THE MAXIMUM CUT OR FILL
SLOPES ARE 2 HORIZONTAL TO 1 VERTICAL.
9. UNLESS OTHERWISE INDICATED ON DRAWINGS, FILL MATERIALS SUPPORTING
ROADWAYS, PARKING AREAS, SIDEWALKS, STRUCTURES, BUILDINGS AND
WALLS WILL BE COMPACTED TO 95 PERCENT OF THE MAXIMUM DRY DENSITY.
THE TOP 12-INCHES OF FILL MATERIALS SUPPORTING ROADWAYS, PARKING
AREAS, SIDEWALKS, STRUCTURES, BUILDINGS AND WALLS WILL BE
COMPACTED TO 98 PERCENT OF THE MAXIMUM DRY DENSITY. FILL PLACED
FOR GENERAL SITE GRADING WILL BE COMPACTED TO 90 PERCENT OF THE
MAXIMUM DRY DENSITY.
10. FILL MATERIALS WILL BE FREE OF TOPSOIL, ORGANICS, DELETERIOUS
MATERIALS AND ROCK FRAGMENTS LARGER THAN 3 INCHES. ALL FILL
MATERIALS WILL BE SUBJECT TO THE APPROVAL OF THE DESIGN
PROFESSIONAL.
11. SOIL TESTING WILL BE PERFORMED BY AN INDEPENDENT TESTING
LABORATORY SELECTED AND PAID FOR BY THE OWNER. ALL AREAS WHERE
ROADS, SIDEWALKS, WALLS AND/OR OTHER STRUCTURES ARE TO BE
CONSTRUCTED, THEY WILL BE TESTED PRIOR THE PLACEMENT OF CONCRETE,
ASPHALT, GRADED AGGREGATE BASE OR FILL MATERIALS.
12. DETENTION FACILITIES AND EROSION CONTROL MEASURES ARE TO BE
INSTALLED PRIOR TO ANY OTHER CONSTRUCTION ON THE SITE AND
MAINTAINED UNTIL PERMANENT GROUND COVER IS ESTABLISHED.
13. CONTRACTOR WILL REMOVE ALL DEBRIS FROM THE SITE AND LEGALLY
DISPOSE OF IT. NO RUBBISH OR DEBRIS WILL BE BURNED ON THE SITE.
ACCESSIBILITY NOTES:
1. CROSS SLOPES OF ACCESSIBLE ROUTES WILL NOT EXCEED 1:50 (2%).
2. AT LEAST 80 INCHES OF CLEAR HEAD ROOM IS REQUIRED ALONG ALL
PATHWAYS.
3. WHEN ANY WALKWAY LEVEL CHANGES, THE VERTICAL DISTANCE BETWEEN
LEVELS WILL BE LESS THAN 1/4 INCH.
4. IF THERE IS A CHANGE IN LEVEL OF BETWEEN 1/4 AND 1/2 INCH ALONG THE
ACCESSIBLE ROUTE, THE EDGE WILL BE BEVELED WITH A SLOPE OF 1:2.
5. ALL CHANGES IN LEVEL GREATER THAN 1/2 INCH WILL BE RAMPED.
6. ALL ACCESSIBLE ROUTES AND RAMPS WILL BE STABLE, FIRM, AND HAVE
NON-SLIP FINISHES.
SURVEY REFERENCE NOTES:
1. SEE THE INCLUDED SURVEY (SHEET C-1) FOR APPLICABLE SURVEY NOTES,
SYMBOLS LEGEND, AND ABBREVIATIONS.
2. CONTRACTOR WILL ESTABLISH SURVEY CONTROL NETWORK OUTSIDE LIMITS
OF DEMOLITION PRIOR TO COMMENCEMENT OF WORK. THIS WORK MUST BE
PERFORMED BY A GEORGIA LICENSED LAND SURVEYOR.
C 1.1
PROFILE DESIGNATION
(NUMBER)
SHEET NO. ON WHICH
PROFILE APPEARS
SYMBOL FOR PROFILE
ENCLOSES ALIGNMENT
BEING PROFILED
C 1.1
DETAIL DESIGNATION
(NUMBER)
SHEET NO. ON WHICH
DETAIL APPEARS
SYMBOL FOR DETAIL
ARROWHEAD TO ITEM
BEING DETAILED
TRANSFORMER
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
COMMUNICATION MANHOLET
UE
WATER METER
POWER POLE
LIGHT POLE
GAS VALVEGV
RIP RAP
SS
G
F
STORM DRAIN PIPE
GAS LINE
LIMITS OF DISTURBANCE
1' CONTOUR
35 5' CONTOUR
SPOT ELEVATION
SURFACE FLOW DIRECTION
WATER VALVE
S
3 33
W
SILT FENCESF
TREE PROTECTION FENCE
TREE
DOUBLE WING CATCH BASIN
SANITARY SEWER MANHOLES
FLARED END SECTION
SIGN
N/A
N/A
N/A
N/A
SANITARY SEWER CLEANOUTCO
N/A
N/A
N/A
N/A DRAINAGE SWALE
POST INDICATOR VALVEN/A
N/A
N/A
CHAINLINK FENCEX XX X X X X X
N/A E
N/A
TPF
N/A
N/A
N/A
REDUCERN/A
UC N/A
UNDERGROUND FIBER OPTICFO N/A
W WATER MAIN - DOMESTICW
N/A
18"P
N/A
W MONITORING WELL
M
HEADWALL
JUNCTION BOXN/A
ELEV
DROP INLETN/A
GRATE INLETN/A GI
DI
JUNCTION BOXJBN/A
UNDER DRAINSUD
NUMBER OF PARKING SPACES
DEMOLISH AND REMOVE
EXISTING ASPHALT AND
CONCRETE PAVEMENT
DEMOLISH SITE UTILITY
X DEMOLISH SITE FEATURE
N/A
N/A
SS
S
N/A
MAIL BOX
N/A
ELEV
UNDERGROUND ROOF DRAIN PIPE
SANITARY SEWER LINE - GRAVITY
WATER MAIN - FIRE
PROTECTION
FIRE DEPARTMENT
CONNECTION
UNDERGROUND
COMMUNICATION
FIRE HYDRANT
N/A
N/A
SPOT ELEVATION
LOD LOD
PROPERTY LINE
NEW DESCRIPTIONEXISTING
N/A
AutoCAD SHX Text
AutoCAD SHX Text
MB
AutoCAD SHX Text 999.8
1004.1
TPF
TPF
TPF
EXISTING TREE
EXISTING TREE
EXISTING TREE
EXISTING TREE
EXISTING TREE
SF
SF
SF
SF
SF
SF
SF
SF
SF
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
TP
F
A1 DEMOLITION PLAN
SCALE: 1" = 20' 0 20' 40' 60'10'
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR ABBREVIATIONS, AND CIVIL NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND MUST BE READ WITH THE FULL SET TO BEST
ENSURE PROPER INTERPRETATION.
3. "DEMOLISH" MUST MEAN TO REMOVE AN OBJECT IN ITS
ENTIRETY. RESTORE GRADES AND SURFACE IMPROVEMENTS
TO MATCH EXISTING CONDITIONS OR PER REQUIREMENTS OF
NEW WORK, WHICHEVER IS APPLICABLE.
4. EROSION AND SEDIMENTATION CONTROL MEASURES AND
TEMPORARY CONSTRUCTION FENCING MUST BE IN PLACE
PRIOR TO COMMENCEMENT OF CONSTRUCTION.
5. EXISTING CONDITION INFORMATION SHOWN IS FROM
DRAWINGS PROVIDED BY TR LONG ENGINEERING, DATED
12/26/2024 AND SUPPLEMENT AS-BUILT INFORMATION.
CONTRACTOR MUST VERIFY ALL EXISTING CONDITIONS AND
NOTIFY COUNTY OF ANY DISCREPANCIES.
6. HAVE ALL UTILITIES FIELD LOCATED PRIOR TO START OF
CONSTRUCTION.
7. DEMOLITION LIMITS DELINEATED ON THIS PLAN ARE
APPROXIMATE IN NATURE, MORE OR LESS DEMOLITION MAY BE
REQUIRED. THE CONTRACTOR MUST NOTIFY CHATHAM COUNTY
IN WRITING AND PRIOR TO THE COMMENCEMENT OF LAND
DISTURBANCE IF MORE DEMOLITION IS REQUIRED THAN IS
DEPICTED ON THIS PLAN SET.
KEYNOTES
1. DEMOLISH CONCRETE POOL DECK
2. DEMOLISH POOL FENCE
3. DEMOLISH BUILDING
4. DEMOLISH LIGHT POLE
5. EXISTING BUILDING TO REMAIN
6. EXISTING PLANTER BOXES TO REMAIN, TYP
7. EXIST 2" WATER SERVICE TO BE PROTECTED
THROUGHOUT CONSTRUCTION
8. EXISTING POWER POLE TO REMAIN
9. INSTALL BLOCK AND GRAVEL INLET PROTECTION
10. PROTECT EMERGENCY PHONE IN THIS
APPROXIMATE LOCATION THROUGHOUT
CONSTRUCTION
11. PROPOSED TREE PROTECTION ROOT MATTING,
SEE DETAIL A1/C-503
12. TREE PROTECTION FENCING, SEE DETAIL A4/C-501
13. SILT FENCE TYPE A, SEE DETAIL C4/C-501
14. REMOVE EXISTING TREE
15. EXISTING TREE TO REMAIN
16. SEE SP SERIES DRAWING FOR SPECIFIC
INFORMATION REGARDING DEMOLITION OF
EXISTING POOL
17. DEMOLISH FENCE
LINEAR ITEM TO BE DEMOLISHED/ / / / / / / / / / /
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C D
PL
O
TT
ED
B Y:
L U
KE
R
, B
EN
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
DEMOLISH ITEM
DEMOLITION
PLAN
CD101
LOD LOD
LIMITS OF DISTURBANCE
PAVEMENT TO BE DEMOLISHED
LEGEND
TREE ROOT PROTECTION MATTING
SILT FENCESF
TREE PROTECTION FENCETPF TPF
AutoCAD SHX Text
MAY STREET (40' R/W)
AutoCAD SHX Text
WV
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text 25.00'
AutoCAD SHX Text 40.00'
AutoCAD SHX Text 40.00'
AutoCAD SHX Text 40.00'
AutoCAD SHX Text 10.51'
AutoCAD SHX Text 20.00'
WV
5 FT4 FT3 FT
VAC
6 FT
2 FT
3FTNO DIVING
FT
N O
D
IV
IN
G
FT
N O
D
IV
IN
G
5 FT NO DIVING
4 FT NO DIVING
IN
FT
N O
D
IV
IN
G
3 FT NO DIVING 6 FT NO DIVING
FTNO DIVINGFTNO DIVING4FTNO DIVING
VAC
4 FT
FT
N
O D
IV
IN
G
6 FT NO DIVING
FT
N O
D
IV
IN
G
X X
X X
X X
X X
X X
X X X
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C S1
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR GENERAL CIVIL NOTES, LEGEND,
AND ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL
SET TO BEST ENSURE PROPER INTERPRETATION.
A1 SITE PLAN
SCALE: 1" = 10' 0 5' 30'20'10'
SITE PLAN
CS101
KEYNOTES
1. NEW POOL - SEE "SP" SERIES DRAWINGS BY
WATERDESIGN
2. PROPOSED POOL DECK CONCRETE - SEE DETAIL
C1/C-501
3. PROPOSED PRE-FABRICATED RESTROOM BY ROMTEC
4. PROPOSED PRE-FABRICATED MECHANICAL ROOM BY
ROMTEC
5. PROPOSED POOL FENCE - 8' HEIGHT - SEE DETAIL
A2/C501
6. PROPOSED LIGHT POLE WITH MOUNTED CAMERA.
CONTRACTOR TO COORDINATE WITH OWNER ON MAKE
AND MODEL OF SECURITY SYSTEM
7. PROPOSED HOSE BIBB - SEE DETAIL C2/C503
8. PROPOSED WATER FOUNTAIN - SEE DETAIL C2/C501
9. PROPOSED TRASH CAN BY OWNER. N.I.C.
10. PROPOSED ADA-LIFT - SEE "SP" SERIES DRAWINGS BY
WATERDESIGN
11. PROPOSED POOL RULES SIGNAGE - SEE "SP" SERIES
DRAWINGS BY WATERDESIGN
12. PROPOSED LIFESAVING EQUIPMENT - SEE "SP" SERIES
DRAWINGS BY WATERDESIGN
13. EXISTING EMERGENCY PHONE TO REMAIN
14. EXISTING BUILDING TO REMAIN
15. EXISTING PLANTER BOXES TO REMAIN
16. PROPOSED SINGLE GATE - SEE DETAIL A1/C502
17. PROPOSED DOUBLE GATE - SEE DETAIL A3/C502
EXISTING BUILDING
FFE: 41.27'
EXISTING BUILDING
FFE: 41.27'
PROPOSED BATHROOM
BUILDING
PROPOSED
POOL
EQUIPMENT
BUILDING
8 16
5 5
S
6 FT
2 FT
3FTNO DIVING
FT
N O
D
IV
IN
G
FT
N O
D
IV
IN
G
5 FT
NO DIVING
4 FT NO DIVING
IN
FT
N O
D
IV
IN
G
3 FT NO DIVING 6 FT NO DIVING
FTNO DIVINGFTNO DIVING4FTNO DIVING
VAC
4 FT
FT
N
O D
IV
IN
G
6 FT NO DIVING
FT
N O
D
IV
IN
G
X X
X X
X X
X X
X X
X X
X X X X
PUMP
PIT
3' CLEAR ENTRY / EGRESS3' CLEAR ENTRY / EGRESS3' CLEAR ENTRY / EGRESS3' CLEAR ENTRY / EGRESS
MATCHLINE
41.00
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
D
2"
H D
PE
JB A-1
DI A-5
END OF PIPE A-2.3
DI A-2.1
DI A-2DI A-4
12" HDPE
SF SF SF SF SF
SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
DI A-2.2
DI A-3
15" HDPE
15" HDPE
41.27 41.27
41.27
40.97
41.27
41.12
40.6240.44
41.27
41.19
41.19
40.39
40.39
39.39
41.19
41.14
41.12
41.12
41.14
41.17
41.24
41.24
40.39
40.72 41.22
40.70 40.70 40.70
41.22
40.39
40.39
39.39
41.14 41.12
MATCHLINE
2"
H D
PE
EXISTING GRATE INLET A-0 1
2"
C M
P
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C G
PL
O
TT
ED
B Y:
L U
KE
R
, B
EN
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR GENERAL CIVIL NOTES, LEGEND,
AND ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL
SET TO BEST ENSURE PROPER INTERPRETATION.
A1 GRADING & DRAINAGE PLAN
SCALE: 1" = 10' 0 5' 30'20'10'
BATHROOM
560 S.F.
FFE: 41.27'
EQUIPMENT
BUILDING
560 S.F.
FFE: 41.27'
POOL DECK EDGE
ELEV. 41.24'
KEYNOTES
1. 2' BOTTOM TRAPEZOIDAL GRASS DITCH WITH 3:1 SIDE
SLOPES
2. 2' WIDE CONCRETE HEADER/LEVEL SPREADER
3. DOWNSPOUTS TO DISCHARGE AT SURFACE TO DITCH
TO BIO-RETENTION AREA
4. BIO-RETENTION AREA. SEE DETAIL A3/C-503
5. DURASLOT SLOTTED DRAIN PIPE. SEE DETAIL C4/C-503
1 23
SHEET LEGEND
BIO-RETENTION MEDIA
GRADING &
DRAINAGE
PLAN
CG101
TIE INTO EXISTING
STORM MANHOLE
BERM
2" OVERFLOW
TO CONNECT DIRECTLY
INTO STORM DRAIN
BREAK IN SLOTTED
DRAIN FRO UTILITY
CROSSING, SUBDRAIN
PIPE TO CONTINUE
CONTRACTOR TO TIE ROOF
DRAINS INTO PROPOSED STORM DRAINS
CONTRACTOR TO TIE ROOF
DRAINS INTO PROPOSED STORM DRAINS
BIORETENTION NOTES
CONTRACTOR SHALL VERIFY THAT EXISTING SUBGRADE SOILS
WITHIN THE BIORETENTION AREA ARE ACCEPTABLE FOR
INFILTRATION WITH INFILTRATION TESTING. IF SOILS ARE FOUND
TO BE UNSUITABLE FOR INFILTRATION (LESS THAN 0.5 IN/HR OR
HEAVY CLAYS, COMPACTED SOILS, OR EVIDENCE OF STANDING
WATER), THE CONTRACTOR SHALL OVER-EXCAVATE A MINIMUM
OF 2 FT BELOW THE DESIGN BOTTOM ELEVATION (37.04', BELOW
THE #57 STONE) AND REPLACE WITH SUITABLE, FREE-DRAINING
BIORETENTION SUBGRADE SOIL MEETING PROJECT
SPECIFICATIONS.
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
SSMH TOP:40.30 24" RCP INV IN:23.92 INV OUT: 23.85
AutoCAD SHX Text S
AutoCAD SHX Text
FFE:41.11
AutoCAD SHX Text
EX. BUILDING
AutoCAD SHX Text
UNDERGROUND GAS LINE
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text pH/ORP AUTOMATED CONTROLLER
AutoCAD SHX Text pH
AutoCAD SHX Text
ORP
AutoCAD SHX Text
FLOW CELL
AutoCAD SHX Text
WV
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
GRATE INLET TOP:39.04 12" PVC INV OUT:35.43
AutoCAD SHX Text
GRATE INLET TOP:38.27 12" PVC INV IN:35.20 INV OUT:34.45
AutoCAD SHX Text
SSMH TOP:40.36 4" PVC INV IN:37.27 6" PVC INV IN:34.39
AutoCAD SHX Text S
EX. CURB & GUTTER
ELEVATIO
STATION
STRUC. A2.3-A2 PROFILE
HORZ. SCALE 1"= 10'
VERT. SCALE 1"= 2'
0+50 1+00
D I D
I A -2
TO
P:
1.
IE
IN
7.
D
I A -2
.1
IE
IN
7.
D
I A -3
IE
O U
T
.5
4' (J
B A-
1)
D I E
N D
O F
PI
PE
A -2
.3
TO
P:
1.
IE
O U
T
.8
8' (D
I A -2
.2
D I A
-2 .2
TO
P:
1.
IE
IN
8.
EN
D O
F
PI
PE
A
-2 .3
IE
O U
T
.5
0' (D
I A -2
.1
D I A
-2 .1
TO
P:
1.
IE
IN
8.
D
I A -2
.2
IE
O
U T
.0 8'
(D I A
-2
PROPOSED GRADE
EXISTING GRADE
25-YR HGL
15" HDPE
40LF @ 1.06%
15" HDPE
54LF @ 1.00%
15" HDPE
40LF @ 0.94%
APPROX. LOCATION
OF POOL SUCTION &
RETURN PIPING CONDUITS
SLOTTED DRAIN
ELEVATIO
N
STATION
STRUC. A5-A0 PROFILE
HORZ. SCALE 1"= 10'
VERT. SCALE 1"= 2'
0+50 1+00
E
XI
ST
IN
G G
R
AT
E
IN
LE
T
A-
TO
P:
0.
IE
IN
6.
JB
A -1
IN
O U
T
.4
IE
O U
T
.4
3'
EXISTING GRADE
25-YR HGL
12" HDPE
129LF @ 1.00%
FI
LE
P
AT
H : X
:\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C G
PL
O
TT
ED
B Y:
L U
KE
R
, B
EN
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
STORM
SEWER
PROFILES 1
CG201
EL
EV
AT
IO
N
STATION
STRUC. A5-A0 PROFILE
HORZ. SCALE 1"= 10'
VERT. SCALE 1"= 2'
1+50 2+00 2+50
J B
A-
TO
P:
0.
IE
IN
7.
D
I A -2
IE
O U
T
.2
9' (E
XI
ST
IN
G
G R
AT
E
IN
LE
T A-
0)
D I D
I A -2
TO
P:
1.
IE
IN
7.
D
I A -2
.1
IE
IN
7.
D
I A -3
IE
O U
T
.5
4' (J
B A-
1)
D I A
-4
TO
P:
1.
IE
IN
8.
D I A
-5
IE
O
U T
.3 9'
(D I A
-3
D I A
-3
TO
P:
1.
IE
IN
7.
D I A
-4
IE
O
U T
.9 7'
(D I A
-2
PROPOSED GRADE EXISTING GRADE
25-YR HGL
APPROXIMATE LOCATION
OF EXISTING UNDERGROUND
POWER LINE.
CONTRACTOR TO FIELD VERIFY
APPROXIMATE LOCATION
OF EXISTING GAS LINE.
CONTRACTOR TO FIELD VERIFY
15" HDPE
54LF @ 1.00%
15" HDPE
42LF @ 1.00%
12" HDPE
25LF @ 1.00%
15" HDPE
43LF @ 1.00%
SLOTTED DRAIN
FI
LE
P
AT
H : X
:\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C G
PL
O
TT
ED
B Y:
L U
KE
R
, B
EN
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
STORM
SEWER
PROFILES 2
CG202
6 FT
2 FT
3FTNO DIVING
FT
N O
D
IV
IN
G
FT
N O
D
IV
IN
G
5 FT NO DIVING
4 FT NO DIVING
IN
FT
N O
D
IV
IN
G
3 FT NO DIVING 6 FT NO DIVING
FTNO DIVINGFTNO DIVING4FTNO DIVING
VAC
4 FT
FT
N
O D
IV
IN
G
6 FT
NO DIVING
FT
N O
D
IV
IN
G
X X
X X
X X
X X
X X
X X
X X X X
PUMP
PIT
3' CLEAR ENTRY / EGRESS3' CLEAR ENTRY / EGRESS3' CLEAR ENTRY / EGRESS3' CLEAR ENTRY / EGRESS
WV
W W
WWWWWWWWWWWWW
S
SS
SS
SS
CO
COCO SSSSSSSSSSSSSS
SS
W W
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
G
W V
WWWWW
W
WV
WWWW
D
CO A3
CO A1
CO A2
EXIST SSWR MH A0
4" BUILDING CONNETION
6" PVC
" P
VC
6" PVC
4" PVC
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C U
PL
O
TT
ED
B Y:
L U
KE
R
, B
EN
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
KEYNOTES
1. 4" X 2" TEE WITH VALVE
2. 1 1/2" WATER SERVICE LINE
3. CONTINUE 4" WATER MAIN TO RESTROOM
4. 1 1/2" WATER SERVICE LINE
5. 1" SERVICE TO PUMP ROOM
6. MAINTAIN 2" WATER SERVICE TO DAYCARE
THROUGHOUT CONSTRUCTION
7. SANITARY SEWER CLEANOUT (TYP)
8. EXISTING SANITARY SEWER MANHOLE
9. 6" POOL EFFLUENT
10. LIGHT POLE, SEE ES101 FOR DETAILS
11. HOSE BIB, SEE DETAIL C2/C-503 FOR DETAILS
SCALE: 1" = 10'
0 5' 30'20'10'SCALE:A1 UTILITIES PLAN
1" = 10'
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
CO
H
Y DW
SS SANITARY LINE
UP UNDERGROUND ELEC.
STORM LINE
FIRE HYDRANT
CLEANOUT
(STORM & SAN)
GATE VALVE
SHEET LEGEND
WATER LINE
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR GENERAL CIVIL NOTES, LEGEND,
AND ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL
SET TO BEST ENSURE PROPER INTERPRETATION.
3. DEVELOPER SHALL PROVIDE RECORD DRAWINGS "AS-BUILT
PLANS" AND" FINAL PLATS" (IF APPLICABLE) IN HARD COPY
AND ELECTRONIC FORMAT, AS WELL AS, RECORD ALL
EASEMENTS THAT WILL BE DEDICATED TO CHATHAM COUNTY
4. FIELD CHANGES DURING CONSTRUCTION MUST BE
SUBMITTED FOR REVIEW AND APPROVAL BY THE CITY OF
SAVANNAH WATER & SEWER ENGINEER BEFORE CHANGES
ARE IMPLEMENTED.
5. CONTRACTOR MUST JET CLEAN AND T.V. SANITARY SEWER
LINES AFTER CONNECTIONS ARE MADE TO THE EXISTING
SEWER TIE-IN POINTS. TRACER WIRE MUST BE INSTALLED
FOR PVC PIPES.
6. THRUST BLOCKS ARE REQUIRED WHEREVER PIPES CHANGE
DIRECTION AND WATER TEES
UTILITIES
PLAN
CU101
LANDFILL CERTIFICATION:
THE PROPOSED WATER AND SANITARY SEWER LINES ARE NOT CONSTRUCTED ON SOLID WASTE LANDFILLS AND THAT THEY DO NOT SERVE EXISTING OR PROPOSED STRUCTURES CONSTRUCTED ON SOLID WASTE LANDFILLS.
IRRIGATION STATEMENT:
AN IRRIGATION SYSTEM IS NOT INCLUDED AS PART OF THIS PROJECT.
FIRE PROTECTION STATEMENT:
A FIRE PROTECTION SYSTEM IS NOT INCLUDED AS PART OF THIS PROJECT.
INDUSTRIAL WASTEWATER STATEMENT:
THIS PROJECT WILL NOT DISCHARGE INDUSTRIAL WASTEWATER TO THE SANITARY SYSTEM
40' UTILITY EASEMENT
40' U
TILITY EASEM
EN
T
EXISTING 4" WATER LINE
WATER FOUNTAIN
1" 1/2"
1"
1"11
STEEL CASING
AutoCAD SHX Text
SSMH TOP:40.30 24" RCP INV IN:23.92 INV OUT: 23.85
AutoCAD SHX Text S
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text pH/ORP AUTOMATED CONTROLLER
AutoCAD SHX Text pH
AutoCAD SHX Text
ORP
AutoCAD SHX Text
FLOW CELL
R
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C U
PL
O
TT
ED
B Y:
L U
KE
R
, B
EN
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
UTILITIES
DETAIL
CU202
SCALE:B1 CITY OF SAVANNAH SANITARY SEWER GENERAL NOTES
N.T.S. SCALE:B2 CITY OF SAVANNAH WATER GENERAL NOTES
N.T.S.
EL
EV
AT
IO
N
STATION
SANITARY SEWER RESTROOM PROFILE
HORZ. SCALE 1"= 10'
VERT. SCALE 1"= 2'
0+50 1+00
6" PVC
24LF @ 2.00%
C O
A
TO
P:
0.
IE
IN
1.
A2
IE
O U
T
.6
2' (A
0)
C O
A
TO
P:
0.
IE
IN
1.
A3
IE
O U
T
.7
9' (A
1)
6" PVC
8LF @ 2.00%
C O
A
TO
P:
1.
IE
IN
2.
BU
IL
D
IN
G
C O
N N
ET
IO
N
IE
O
U T
.9 4'
(A 2)
6" PVC
58LF @ 2.00%
4" PVC
11LF @ 2.00%
EX
IS
T
SS
W R
M H
A
TO
P:
0.
IE
IN
1.
A1
IE
O U
T
.9
2'
PROPOSED GRADE
EXISTING GRADE
APPROX. LOCATION
OF PROPOSED 2" WATER LINE
CROSSING
APPROX. LOCATION OF
EXISTING 2" WATER LINE
CROSSING. CONTRACTOR
TO FIELD VERIFY
INSIDE DROP
BUILDING
CONNECTION
3' 3'APPROX. LOCATION OF
EXISTING 2" WATER LINE
CROSSING. CONTRACT
TO FIELD VERIFY.
3'
APPROX. LOCATION OF
EXISTING GAS LINE
CROSSING. CONTRACTOR
TO FIELD VERIFY.
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C U
PL
O
TT
ED
B Y:
L U
KE
R
, B
EN
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
SANITARY
SEWER
PROFILES
CU201
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C -5
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
CONSTRUCTION
DETAILS
C-501
POOL DECK CONCRETE
SCALE: N.T.S.
4" MINIMUM CONCRETE
SIDEWALK SLAB. 3000 PSI
@ 28 DAYS
NOTES:
1. CONCRETE TO BE PLAIN GREY WITH A BROOM FINISH.
2. CONTRACTOR TO PROVIDE ADD-ALT PRICING FOR A PLAIN GREY CONCRETE WITH
EXPOSED AGGRGATE FINISH.
AGGREGATE: #7 GRANITE SAND
SAND: 100% GRANITE SAND
FINISH: EXPOSED AGGREGATE FINISH UTILIZING TOP CAST #75
SEALER: ACRYLIC
3. SEAL ALL BROOM FINISHED CONCRETE WITH A SILOXANE OR SILANE BASED SEALER.
4. 3/8" EXPANSION JOINT AT ALL CURBS AND ALL VERTICAL WALLS.
4" COMPACTED GAB
12" COMPACTED SUBGRADE,
98% PROCTOR, (TYP).
4" MIN
FINISHED GRADE - SEE
PLANS
P-025-CHA-04
C1
CONCRETE JOINTS
6" = 1'-0"
3 DEPTH
OF CONC.
CURBWALL, VARIES, SEE PLANS
POLYURETHANE ELASTOMERIC SELF-LEVELING
SEALANT, TOOLDOWN 18", COLOR TO MATCH
PAVEMENT SURFACE
BACKER ROD WITH NO BOND
PRE-FORMED, COMPRESSIBLE FILLER
THROUGH FULL DEPTH OF SLAB
2"
ISOLATION JOINT
JOINT SEALANT COLOR TO MATCH PAVEMENT
4" RADIUS EACH SIDE
4" MAX.
8"
EXPANSION JOINT
2"
8" P.E. CLOSED CELL BACKER ROD
2" PRE FORMED JOINT FILLER EXTENDS FULL
WIDTH AND DEPTH OF SLAB
8"
CONTROL JOINT
NOTES:
1. FOR ALL JOINT WIDTHS SEE CONTRACTOR DELEGATED DESIGN SUBMITTALS.
2. POLYURETHANE ELATOMERIC SELF-LEVELING SEALANT, TOOL DOWN 18", COLOR TO
MATCH PAVEMENT SURFACE.
3. LOCATE EXPANSION JOINTS EVERY 30' MAX. AND AT ALL SIDEWALK JUNCTIONS WITH
CURBS, STRUCTURES, AND OTHER SIDEWALKS.
4. LOCATE CONTROL JOINTS AS SHOWN ON SITE PLAN. SUBSTITUTE CONSTRUCTION JOINT
AT CONTROL JOINT LOCATION WHERE REQUIRED.
8" SAW CUT CONTROL JOINT
SAW CUT JOINT DEPTH TO BE 13 DEPTH OF
CONCRETE (TYP.).
P-025-CHA-39
A1
WATER FOUNTAIN
NTS
C2
P-025-CHA-44
CLEAN GRAVEL
COMPACTED SUBGRAD
CONCRETE FOOTING
(3000 psi)
SEE NOTE 3
FINISHED GRADE
BOTTOM RAIL TO BE 2" ABOVE
FINISHED GRADE
TENSION WIRE
TURN BUCLE
TRUSS ROD
BRACE RAIL
END OR CORNER POSTS
LINE POSTS
WIRE TIES
CLEAN GRAVEL TOP RAIL
DO NOT EXTEND FABRIC
KNUCKLES PAST THE TOP RAIL.
FENCE FABRIC
STRETCHER BAR
BRACE BAND
POST CAP
8'
0"
4'
0"
10'-0" O.C. (MAX)
NOTES:
1. CONTRACTOR TO PROVIDE FOOTING DESIGN SIGNED AND SEALED BY GEORGIA LICENSED ENGINEER.
2. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO LA FOR APPROVAL
3. FENCE TO BE BLACK VINYL COATED.
4. HOLD DOWN TOP OF FOOTING BELOW PAVEMENT THICKNESS
8'-0" HEIGHT CHAIN LINK FENCE
SCALE: NTS
A2
P-025-CHA-12
SCALE:C4 SILT FENCE - TYPE A
N.T.S.
SCALE:A4 TREE PROTECTION FENCE
N.T.S.
Kevin.Thomas Snapshot
Kevin.Thomas Snapshot
CONSTRUCTION
DETAILS
C-502
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C -5
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
8'-0" HEIGHT SINGLE SWING GATE
NTS
2 12" 1" 2 12"
8' -0
4'
-0
FENCE FABRIC
ADJOINING FENCE, SEE FENCE
DETAIL FOR CONSTRUCTION
REQUIREMENTS
DO NOT EXTEND FABRIC
KNUCKLES PAST THE TOP RAIL
HINGE, 3 PER GATE
KEY LOCKABLE LATCH BY SAFETECH
HARDWARE, SLV-X1 OR EQUIVALENT
GATE POSTS
WELDED GATE FRAME
FINISHED GRADE
SEE NOTE 3
CONCRETE FOOTING (3000psi)
COMPACTED SUBGRADE
CLEAN GRAVEL
STRETCHER BAR
POST CAP
2" MAX. CLEARANCE OVER
FINISHED GRADE
NOTES:
1. CONTRACTOR TO PROVIDE FOOTING DESIGN SIGNED AND SEALED BY GEORGIA LICENSED ENGINEER.
2. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO LA FOR APPROVAL
3. FENCE TO BE BLACK VINYL COATED.
4. HOLD DOWN TOP OF FOOTING BELOW PAVEMENT THICKNESS
3.00'
A1
P-025-CHA-10
8' -0
4' -0
CONCRETE FOOTING
(3000psi)
COMPACTED SUBGRADE
CLEAN GRAVEL
CONCRETE FOOTING
W/ STEEL SLEEVE,
FINISH GRADE
SEE NOTE 4 OF
HINGE, 2 PER GATE
2" MAX. CLEARANCE OVER
FINISHED GRADE
WELDED GATE FRAME
MALLEABLE IRON FORK TYPE LATCH
WITH DROP BAR & WITH PROVISION
FOR KEY LOCKABLE DOUBLE GATE
LATCH ASSEMBLY. LATCH ASSEMBLY
TO BE SAFETECH SLV-XS OR
EQUIVALENT
GATE POSTS
FENCE FABRIC
STRETCHER BAR
POST CAP
DO NOT EXTEND FABRIC
KNUCKLES PAST THE TOP RAILADJOINING FENCE, SEE FENCE
DETAIL FOR CONSTRUCTION
REQUIREMENTS
2'
- 6
" M
IN
6"
1'- 6" MIN.
GATE OPENING, 4'
6" 1'
1'
2 12" 1" 3" 2 12"
8'-0" HEIGHT DOUBLE SWING GATE
SCALE: NTS
NOTES:
1. CONTRACTOR TO PROVIDE FOOTING DESIGN SIGNED AND SEALED BY GEORGIA LICENSED ENGINEER.
2. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO LA FOR APPROVAL
3. FENCE TO BE BLACK VINYL COATED.
4. HOLD DOWN TOP OF FOOTING BELOW PAVEMENT THICKNESS
A3
P-025-CHA-11
CONSTRUCTION
DETAILS
C-503
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\C -5
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
NOTES:
1. CONTRACTOR TO INSTALL PER
MANUFACTURERS
RECOMMENDATIONS
SCALE:A1 TREE PROTECTION ROOT MATTING
N.T.S.
NOTES:
1. CONTRACTOR TO INSTALL PER
MANUFACTURERS
RECOMMENDATIONS
2. TREE PROTECTION ROOT MATTING TO
BE BAM! GROUND PROTECTION MATS
BY ADS, OR APPROVED EQUAL.
CONTRACTOR TO SUBMIT PRODUCT
SPECIFICATION TO LA FOR APPROVAL
PRIOR TO INSTALLATION
BIORETENTION WITHOUT UNDERDRAIN
3"-4" FINE SHREDDED
HARDWOOD MULCH
NATIVE PLANTS
SCARIFY BOTTOM
6" - #57
WASHED STONE
6" MAXIMUM
PONDING DEPTH
(WATER ELEV. 39.39)
PROTECT FROM
SOIL COMPACTION
DURING CONSTRUCTION
3" #8 WASHED
CHOKER STONE
3:1 SIDE SLOPES
18"
PLANTING MEDIA
ELEV. 37.04
TOP OF BANK ELEV = 40.39
SCALE:A3 BIORETENTION PLANTING MEDIA
N.T.S.
LOOSE KEY HOSE BIBB AT GARDEN
1" = 1'-0"
3/4" MALE HOSE TO 1" FEMALE PIPE
LOOSE KEY HOSE BIBB
1"X3" GALVANIZED NIPPLE.
1"X1-1/4" GALVANIZED THREADED
REDUCING COUPLING
1-1/4" GALVANIZED SHORT NIPPLE
1-1/4" GALVANIZED TEE WITH PLUG.
1-1/4" GALVANIZED SHORT NIPPLE
1/1/4" PLASTIC BALL VALVE
FINISHED GRADE
1-1/4" GALVANIZED RISER
1-1/4" GALVANIZED ELL WITH SHORT NIPPLE
PVC MAIN LINE AS OCCURS
PVC SLIP-THREAD COUPLER
4X4 REDWOOD
STAKE, SLOPE TOP
STAINLESS
STEEL
CLAMPS
2' -6
" M
IN
IM
U
M 1'
-6
C2
P-025-CHA-03
SCALE:C3 DURASLOT SLOTTED DRAIN
N.T.S.
SYMBOL QTY BOTANICAL / COMMON NAME CONT CAL
TREES
3 LIVISTONA DECIPIENS / RIBBON PALM B&B 6' C.T.
PLANT SCHEDULE
WV
W W
W W
W W
W W
W W
W W
W
S
SS
SS
CO
CO
CO
SS
SS
SS
SS
SS
SS
SS
W W
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
SS
SS
G
W V
W W
W W
W
WV
W W
W
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
5 FT
4 FT
3 FT
VAC
6 FT
2 FT
3FTNO DIVING
FT
N O
D
IVIN
G
FT
N O
D
IV
IN
G
5 FT
NO DIVING
4 FT
NO DIVING
IN
FT
N O
D
IVIN
G
3 FT
NO DIVING
6 FT
NO DIVING
FTNO DIVING
FTNO DIVING
4FTNO DIVING
VAC
4 FT
FT
N
O D
IV
IN
G
6 FT
NO DIVING
FT
N O
D
IVIN
G
X X
X X
X X
X X
X X
X X
X
A1 LANDSCAPE PLAN
SCALE: 1" = 20' 0 20' 40' 60'10'
GENERAL SHEET NOTES
1. REFER TO SHEET C-001 FOR LEGENDS, ABBREVIATIONS,
AND CIVIL NOTES.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE
FULL SET TO BEST ENSURE PROPER INTERPRETATION.
FI
LE
P
AT
H
\S
TA
R
FI
G H
TE
R
\P R
O
JE
C
TS
\F Y2
5\
1\
.C
AD
-B
IM
\0 7.
C
AD
\C
IV
IL
\L P1
P
LO
TT
ED
B
Y:
L
U
KE
R , B
EN
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY: KT
CHECKED BY: ML
DRAWN BY: KT / GB / WJ
DESIGNED BY: KT
DATE:
SHEET TITLE
DRAWING ISSUE
DPR SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
ISSUED FOR BID
12/5/2025
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1250471
CHATHAM
COUNTY WEST
BROAD YMCA
POOL
RENOVATION
1110 MAY ST,
SAVANNAH, GA
31415
Copyright © 2025 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
IS
SU
ED
F O
R B
ID
/5 /2
LANDSCAPE
PLAN
LP101
OA =OVERALL PALM
HEIGHT (MEASURED
TO TOP OF BUD)
CT =CLEAR TRUNK
(MEASURED TO
BOTTOM OF
LEAF SHEATHS)
GW =GRAY WOOD
(MEASURED TO TOP
OF HARDENED
TRUNK)
NOTES:
A. FINAL TREE STAKING DETAILS AND PLACEMENT
TO BE APPROVED BY OWNER.
B. ALL TREE STAKING IS TO BE WITHIN MULCH BED
AREA OUTSIDE TREE PIT.
C. CONTRACTOR SHALL ASSURE PERCOLATION OF
ALL PLANTING PITS PRIOR TO INSTALLATION -
REFER TO POOR DRAINAGE CONDITION DETAIL.
O A
C T
/ G W
12"
6"
PLAN
SECTION
5 LAYERS OF BURLAP TO PROTECT
TRUNK.
FIVE 2" X 4" X 18" WOOD BATTENS.2
SECURE BATTENS WITH 2- 3/4" CARBON
STEEL BANDS TO HOLD BATTENS IN
PLACE. NO NAILS SHALL BE DRIVEN INTO
PALM. HEIGHT OF BATTENS SHALL BE
LOCATED IN RELATION TO THE HEIGHT OF
THE PALM FOR ADEQUATE BRACING.
(3) 2"X4"X8' SUPPORTS. NAIL (DRILL AN
NAIL IF NECESSARY) TO BATTENS AND 2"
4" STAKES. STAIN DARK BROWN.
3" SPECIFIED MULCH5
BERM SOIL TO HOLD WATER.6
FINISH GRADE7
2X4X24" (MIN) P.T. WOOD STAKES (TYP.)
NAIL TO SUPPORT POLES.
PREPARED PLANTING SOIL AS SPECIFIED.
(SEE LANDSCAPE NOTES).
PALM PLANTING
1/4" = 1'-0"
C1
P-025-CHA-02
(2) RIBBON PALM
(1) RIBBON PALM
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text S
24" PVC
ELECTRICAL GENERAL NOTES
1. THE WORK MUST CONFORM WITH ALL REQUIREMENTS OF:
A. NFPA 70 NATIONAL ELECTRICAL CODE, 2023 EDITION.
B. NFPA 101, 2018 ADDITION.
C. IBC, 2018 EDITION.
D. IECC, 2015 EDITION.
E. APPLICABLE LOCAL CODES AND FEDERAL AND STATE LAWS.
2. MINIMUM RACEWAY SIZE MUST BE 3/4". INCREASE RACEWAY SIZE AS REQUIRED TO LIMIT RACEWAY FILL RATIO TO LESS
THAN 40% FULL.
3. COORDINATE WORK WITH OTHER TRADES AND SECURE SPACE REQUIREMENTS FOR ELECTRICAL EQUIPMENT, CLEARANCE FOR RECESSED LUMINAIRES, AND CORRECT ROUGH-IN LOCATIONS OF ELECTRICAL CONNECTIONS.
4. VERIFY CATALOG NUMBERS ON THESE DRAWINGS TO MATCH WITH MATERIAL DESCRIPTIONS INDICATED.
5. VERIFY EXACT HEIGHT OF EACH COUNTERTOP AND BACKSPLASH ON ARCHITECTURAL DETAILS AND/OR CASE WORK SHOP DRAWINGS AND ADJUST SPECIFIED MOUNTING HEIGHT OF WALL OUTLETS TO LOCATE CENTER OF OUTLET BOX 4" ABOVE TOP OF BACKSPLASH. IF NO BACKSPLASH IS USED, LOCATE CENTER OF OUTLET BOX 6" ABOVE COUNTERTOP.
6. VERIFY DOOR SWINGS WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING IN WALL SWITCHES. SWITCHES IN THE SAME LOCATION MUST BE GANGED TOGETHER IN ONE COMMON BACKBOX AND MUST HAVE ONE COMMON FACE PLATE.
7. ALL FEEDERS AND BRANCH CIRCUITS MUST INCLUDE A GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR, SIZE PER NATIONAL ELECTRICAL CODE, OR AS SHOWN, CONNECTED TO EACH DEVICE AND OUTLET BOX ON THE CIRCUIT AND TO THE PANELBOARD GROUND BUS. PROVIDE NEUTRAL CONDUCTORS AS INDICATED HEREIN. MULTIPLE BRANCH CIRCUITS IN ONE
RACEWAY REQUIRE ONLY ONE EQUIPMENT GROUNDING CONDUCTOR.
8. VERIFY LUMINAIRE AND CEILING MOUNTED OCCUPANCY SENSOR LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS AND DIMENSIONS PRIOR TO INSTALLATION. VERIFY EXACT LOCATIONS OF MOTORS AND
EQUIPMENT BEFORE ROUGHING-IN.
9. EXISTING ELECTRICAL WORK (NOT SHOWN) MUST REMAIN, UNLESS INDICATED OTHERWISE. SHOULD ANY EXISTING ELECTRICAL POWER, LIGHTING OR AUXILIARY CIRCUIT, FEEDER OR EQUIPMENT BE SEVERED, DISCONNECTED OR DEMOLISHED IN THE PROCESS OF CONSTRUCTION OR REMODELING WHICH IS DONE AS A RESULT OF THE PROJECT PLANS AND SPECIFICATIONS, AND UNLESS SPECIFICALLY DESIGNATED BY THE DRAWINGS TO BE DEMOLISHED, THEN SAID CIRCUIT OR FEEDER MUST BE RESTORED TO WORKING CONDITION.