About this file
This is a Project Manual and Specifications document prepared by Jennings Architects for The University of Texas at Tyler's Liberty Landing Apartments Residential Paint Project. The project encompasses interior painting and associated repairs within residential student housing units at Buildings 7, 8, 9, and 12 of Liberty Landing Apartments located at 3088 Old Omen Road, Tyler, Texas. The scope of work includes supervision, materials, equipment, and labor for interior painting, drywall patching and repair, stain encapsulation, trim replacement, tub/shower caulking, and move-in-ready cleaning services. The contract is structured as a single prime fixed-price agreement with unit prices for contingent work items. The owner intends to occupy designated buildings throughout the entire construction period and expects project completion by the contract completion date specified in the Agreement. The Architect's Project Number is 2025.31, and the University's Project Number is RFP 750-25/26-007, with an issue date of March 10, 2026.
The contract establishes a Cash Allowance of fifteen thousand dollars ($15,000.00) for patching and repair work and a Contingency Allowance of ten thousand dollars ($10,000.00) for use upon Owner's instruction. Unit pricing is required for wall patching and repair, ceiling patching and repair, wall and ceiling stains, mouldings (baseboard, door/window casing, and window sill), and tub/shower surround caulking. The contractor must submit a Schedule of Values using AIA G703 forms, with applications for progress payments using AIA G702 and G703 forms submitted electronically at intervals specified in the Agreement. Change orders are processed through the architect with documentation of costs, labor, equipment, taxes, insurance, bonds, overhead, and profit. Contractor must provide product data, shop drawings, and samples for review; maintain a Construction Progress Schedule; conduct bi-monthly progress meetings; and comply with security procedures, quality standards, and all applicable regulatory requirements including ADA Standards, International Building Code, and Texas Accessibility Standards. All closeout submittals, including project record documents, operation and maintenance manuals, warranties, and liens releases, must be completed prior to final payment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Exhibit D - Campus Map.pdf | ||
| 11-Exhibit A - Sample Agreement Between Owner and Contractor.doc | DOC document | |
| 10-RFP 750-25-26-007 Liberty Landing Paint.docx | DOCX document | |
| 7-Exhibit C - Sample Payment Bond.pdf | ||
| 5-Exhibit G - Respondents Pricing and Delivery Proposal.docx | DOCX document | |
| 9-Exhibit H - Owners Special Conditions.docx | DOCX document | |
| 1-Exhibit B - Sample Performance Bond.pdf | ||
| 12-2025.31 UTT Liberty Landing Painting - 100% CD.pdf | ||
| 6-Exhibit E - VetHUB Subcontracting Plan.docx | DOCX document | |
| 8-Exhibit I - Uniform General Conditions.docx | DOCX document | |
| 2-Exhibit F - HSP Quick Checklist.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JENNINGS
A R C H I T E C T S
JENNINGS ARCHITECTS
305 S Broadway Ave
Suite 900 Tyler, Texas 75702
903.253.0125 www.jenningsarchitects.com
PROJECT MANUAL FOR
LIBERTY LANDING APARTMENTS
RESIDENTIAL PAINT PROJECT
The University of Texas at Tyler
Tyler, Texas
Jason Jennings Principal Architect jason@jenningsarchitects.com
Architect’s Project No.: 2025.31
UT Tyler Project No.: RFP 750-25/26-007
Issue Date: March 10, 2026
Liberty Landing Apartments - Residential Paint Project TABLE OF CONTENTS 03-10-2026
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
000101 PROJECT TITLE PAGE
007200 GENERAL CONDITIONS
007300 SUPPLEMENTARY CONDITIONS
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY
012000 PRICE AND PAYMENT PROCEDURES
012100 ALLOWANCES
012200 UNIT PRICES
012500 SUBSTITUTION PROCEDURES
013000 ADMINISTRATIVE REQUIREMENTS
013553 SECURITY PROCEDURES
014000 QUALITY REQUIREMENTS
014100 REGULATORY REQUIREMENTS
015213 FIELD OFFICES AND SHEDS
016000 PRODUCT REQUIREMENTS
017000 EXECUTION AND CLOSEOUT REQUIREMENTS
017800 CLOSEOUT SUBMITTALS
Residential Paint Project 000101 - 1 Project Title Page
SECTION 000101
PROJECT TITLE PAGE
PROJECT MANUAL
FOR
LIBERTY LANDING APARTMENTS - RESIDENTIAL PAINT PROJECT
ARCHITECT'S PROJECT NUMBER: 2025.31.
OWNER'S PROJECT NUMBER: RFP 750-25/26-007.
OWNER: THE UNIVERSITY OF TEXAS AT TYLER
3900 UNIVERSITY BOULEVARD
TYLER, TEXAS 75799
PROJECT ADDRESS:
3088 OLD OMEN ROAD
TYLER, TEXAS 75799
DATE: MARCH 10, 2026
PREPARED BY:
JENNINGS ARCHITECTS, LLC
END OF SECTION
Residential Paint Project 007200 - 2 General Conditions
SECTION 007200
GENERAL CONDITIONS
FORM OF GENERAL CONDITIONS
1.01 THE GENERAL CONDITIONS DOCUMENT APPLICABLE TO THIS CONTRACT WAS
PROVIDED AS PART OF THE REQUEST FOR PROPOSALS PACKAGE.
RELATED REQUIREMENTS
2.01 SECTION 007300 - SUPPLEMENTARY CONDITIONS.
SUPPLEMENTARY CONDITIONS
3.01 REFER TO DOCUMENT 007300 - SUPPLEMENTARY CONDITIONS FOR AMENDMENTS TO
THESE GENERAL CONDITIONS.
Residential Paint Project 007300 - 3 Supplementary Conditions
SECTION 007300
SUPPLEMENTARY CONDITIONS
PART 1 GENERAL
1.01 SUMMARY
A. These Supplementary Conditions amend and supplement the General Conditions defined in Document 007200 - General Conditions and other provisions of Contract Documents as indicated below. Provisions that are not so amended or supplemented remain in full force and effect.
B. The terms used in these Supplementary Conditions that are defined in the General Conditions have the meanings assigned to them in the General Conditions.
1.02 MODIFICATIONS TO GENERAL CONDITIONS
A. The Owner's Special Conditions document applicable to this contract was provided as "Exhibit H" in the Request for Proposals package.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
Residential Paint Project 011000 - 4 Summary
SECTION 011000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Liberty Landing Apartments - Residential Paint Project
B. Owner's Name: The University of Texas at Tyler.
C. Architect's Name: Jennings Architects, LLC.
D. The Project consists of the renovation of painted surfaces in Buildings 7, 8, 9 and 12 on the Liberty Landing Apartments campus.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price as described in "Exhibit G - Respondent's Pricing and Delivery Proposal".
1.03 OWNER OCCUPANCY
A. Owner intends to occupy designated buildings on the existing campus during the entire construction period.
B. Owner intends to occupy the Project by the date stated in the Agreement as the contract completion date.
C. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.
D. Schedule the Work to accommodate Owner occupancy.
1.04 CONTRACTOR USE OF SITE AND PREMISES
A. Construction Operations: Limited to areas noted on Drawings.
1. Locate and conduct construction activities in ways that will limit disturbance to site.
B. Arrange use of site and premises to allow:
1. Owner occupancy.
C. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
D. Utility Outages and Shutdown:
1. Do not disrupt or shut down life safety systems, including but not limited to fire sprinklers and fire alarm system, without 7 days notice to Owner and authorities having jurisdiction.
2. Prevent accidental disruption of utility services to other facilities.
PART 2 PRODUCTS - NOT USED
Residential Paint Project 012000 - 5 Price and Payment Procedures
SECTION 012000
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedures for preparation and submittal of applications for progress payments.
1.02 SCHEDULE OF VALUES
A. Use Schedule of Values Form: AIA G703, edition stipulated in the Agreement.
B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to Architect for approval.
C. Forms filled out by hand will not be accepted.
D. Revise schedule to list approved Change Orders, with each Application For Payment.
1.03 APPLICATIONS FOR PROGRESS PAYMENTS
A. Payment Period: Submit at intervals stipulated in the Agreement.
B. Use Form AIA G702 and Form AIA G703, edition stipulated in the Agreement.
C. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to Architect for approval.
D. Forms filled out by hand will not be accepted.
E. Execute certification by signature of authorized officer.
F. Submit each Application for Payment electronically for approval.
G. When Architect requires substantiating information, submit data justifying dollar amounts in question.
1.04 MODIFICATION PROCEDURES
A. For minor changes not involving an adjustment to the Contract Sum or Contract Time, Architect will issue instructions directly to Contractor.
B. For other required changes, Architect will issue a document signed by Owner instructing Contractor to proceed with the change, for subsequent inclusion in a Change Order.
1. The document will describe the required changes and will designate method of determining any change in Contract Sum or Contract Time.
2. Promptly execute the change.
C. For changes for which advance pricing is desired, Architect will issue a document that includes a detailed description of a proposed change with supplementary or revised drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor shall prepare and submit a fixed price quotation.
D. Contractor may propose a change by submitting a request for change to Architect, describing the proposed change and its full effect on the work, with a statement describing the reason for the change, and the effect on the Contract Sum and Contract Time with full documentation.
E. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the Contract.
1. For change requested by Architect for work falling under a fixed price contract, the amount will be based on Contractor's price quotation.
2. For change requested by Contractor, the amount will be based on the Contractor's request for a Change Order as approved by Architect.
3. For pre-determined unit prices and quantities, the amount will be based on the fixed unit prices.
Residential Paint Project 012000 - 6 Price and Payment Procedures
4. For change ordered by Architect without a quotation from Contractor, the amount will be determined by Architect based on the Contractor's substantiation of costs as specified for Time and Material work.
F. Substantiation of Costs: Provide full information required for evaluation.
1. Provide the following data:
a. Quantities of products, labor, and equipment.
b. Taxes, insurance, and bonds.
c. Overhead and profit.
d. Justification for any change in Contract Time.
e. Credit for deletions from Contract, similarly documented.
2. For Time and Material work, submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract.
G. Execution of Change Orders: Architect will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.
H. After execution of Change Order, promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum.
I. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by the change, and resubmit.
J. Promptly enter changes in Project Record Documents.
1.05 APPLICATION FOR FINAL PAYMENT
A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due.
PART 2 PRODUCTS - NOT USED
Residential Paint Project 012100 - 7 Allowances
SECTION 012100
ALLOWANCES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Cash allowances.
B. Contingency allowance.
1.02 CASH ALLOWANCES
A. Costs Included in Cash Allowances: Cost of product to Contractor or subcontractor, less applicable trade discounts as well as cost of labor for work assigned to allowance.
B. Funds will be drawn from the Cash Allowances only by approved Cost Proposal.
C. At closeout of Contract, funds remaining in Cash Allowances will be credited to Owner by Change Order.
1.03 CONTINGENCY ALLOWANCE
A. Contractor's costs for products, delivery, installation, labor, insurance, payroll, taxes, bonding, equipment rental, overhead and profit will be included in Change Orders authorizing expenditure of funds from this Contingency Allowance.
B. Funds will be drawn from the Contingency Allowance only by approved Cost Proposal.
C. At closeout of Contract, funds remaining in Contingency Allowance will be credited to Owner by Change Order.
1.04 ALLOWANCES SCHEDULE
A. Cash Allowance No. 1 - Patching and Repair: Include the stipulated sum of fifteen thousand dollars ($15,000.00) for patching and repair of interior surfaces or fixtures. Necessary patching and repair work shall be identified during a walkthrough with Owner's personnel prior to the commencement of work. All work assigned to this allowance shall be completed using approved unit prices.
1. Items to be patched or repaired may include:
a. Drywall holes larger than 2" x 2".
b. Damaged trim, casings, sills.
c. Visible or cracked drywall joints.
d. Cracked toilets.
e. Tub/shower surround caulking.
B. Contingency Allowance: Include the stipulated sum ten thousand dollars ($10,000.00) for use upon Owner's instructions.
PART 2 PRODUCTS - NOT USED
Residential Paint Project 012200 - 8 Unit Prices
SECTION 012200
UNIT PRICES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. List of unit prices, for use in preparing Bids.
1.02 COSTS INCLUDED
A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit.
1.03 UNIT QUANTITIES SPECIFIED
A. Quantities indicated in the Bid Form are for bidding and contract purposes only. Quantities and measurements of actual Work will determine the payment amount.
1.04 MEASUREMENT OF QUANTITIES
A. Take all measurements and compute quantities. Measurements and quantities will be verified by Owner.
B. Assist by providing necessary equipment, workers, and survey personnel as required.
C. Measurement by Area: Measured by square dimension using mean length and width or radius.
D. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord.
1.05 PAYMENT
A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Architect, multiplied by the unit price.
1.06 SCHEDULE OF UNIT PRICES
A. Unit Price No. 1: Wall Patching and Repair (Per Sq. Ft.)
1. Description: Furnish and install gypsum board, drywall compound, and any necessary accessories for a complete repair at all holes or other damage larger than 2"x2". Areas of damage smaller than 4 sq. inches shall be covered under base bid.
B. Unit Price No. 2: Ceiling Patching and Repair (Per Sq. Ft.)
1. Description: Furnish and install gypsum board, drywall compound, and any necessary accessories for a complete repair at all holes or other damage larger than 2"x2". Areas of damage smaller than 4 sq. inches shall be covered under base bid.
C. Unit Price No. 3: Wall and Ceiling Stains (Per Sq. Ft)
1. Description: Furnish and install stain-inhibiting primer at water stains and other surface discoloration damage greater than 12"x12". Stains smaller than 12"x12" shall be covered under base bid. Ensure stain is fully encapuslated prior to finish coating.
D. Unit Price No. 4: Mouldings (Per Linear Ft.)
1. Description: Furnish and install replacement trim elements where repair is not feasible.
Provide a cost per linear foot for each of the following:
a. Baseboard.
b. Door/Window Casing.
c. Window Sill.
E. Unit Price No. 5: Tub/Shower Surround Caulking (Per Tub)
1. Description: Remove existing caulking and provide new 100% silicone tub/tile caulk at all vertical and horizontal surround seams.
Residential Paint Project 012200 - 9 Unit Prices
PART 2 PRODUCTS - NOT USED
Residential Paint Project 012500 - 10 Substitution Procedures
SECTION 012500
SUBSTITUTION PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 DEFINITIONS
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, assemblies, and equipment.
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond
Contractor's control.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project.
1.03 REFERENCE STANDARDS
A. CSI/CSC Form 1.5C - Substitution Request (During the Bidding/Negotiating Stage); Current Edition.
B. CSI/CSC Form 13.1A - Substitution Request (After the Bidding/Negotiating Phase); Current Edition.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
4. Waives claims for additional costs or time extension that may subsequently become apparent.
B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
1. Note explicitly any non-compliant characteristics.
C. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
1. Forms indicated in the Project Manual are adequate for this purpose, and must be used.
D. Limit each request to a single proposed substitution item.
1. Submit an electronic document, combining the request form with supporting data into single document.
3.02 SUBSTITUTION PROCEDURES DURING PROCUREMENT
A. Submittal Time Restrictions:
1. Owner will consider requests for substitutions only if submitted at least 5 days prior to the date for receipt of bids.
B. Submittal Form (before award of contract):
1. Submit substitution requests by completing CSI/CSC Form 1.5C - Substitution
Request. See this form for additional information and instructions. Use only this form;
other forms of submission are unacceptable.
Residential Paint Project 012500 - 11 Substitution Procedures
3.03 SUBSTITUTION PROCEDURES DURING CONSTRUCTION
A. Submittal Form (after award of contract):
1. Submit substitution requests by completing CSI/CSC Form 13.1A - Substitution Request
(After Bidding/Negotiating). See this form for additional information and instructions. Use only this form; other forms of submission are unacceptable.
B. Submit request for Substitution for Cause within 14 days of discovery of need for substitution, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
C. Submit request for Substitution for Convenience within 14 days of discovery of its potential advantage to the project, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
1. In addition to meeting general documentation requirements, document how the requested substitution benefits the Owner through cost savings, time savings, greater energy conservation, or in other specific ways.
2. Document means of coordinating of substitution item with other portions of the work, including work by affected subcontractors.
3. Bear the costs engendered by proposed substitution of:
a. Owner's compensation to the Architect for any required redesign, time spent processing and evaluating the request.
D. Substitutions will not be considered under one or more of the following circumstances:
1. When they are indicated or implied on shop drawing or product data submittals, without having received prior approval.
2. Without a separate written request.
3.04 RESOLUTION
A. Architect may request additional information and documentation prior to rendering a decision. Provide this data in an expeditious manner.
B. Architect will notify Contractor in writing of decision to accept or reject request.
3.05 ACCEPTANCE
A. Accepted substitutions change the work of the Project. They will be documented and incorporated into work of the project by Change Order, Construction Change Directive, Architectural Supplementary Instructions, or similar instruments provided for in the Conditions of the Contract.
3.06 CLOSEOUT ACTIVITIES
A. Include completed Substitution Request Forms as part of the Project record. Include both approved and rejected Requests.
Residential Paint Project 013000 - 12 Administrative Requirements
SECTION 013000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Site mobilization meeting.
C. Progress meetings.
D. Construction progress schedule.
E. Submittals for review, information, and project closeout.
F. Number of copies of submittals.
G. Requests for Interpretation (RFI) procedures.
H. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 016000 - Product Requirements: General product requirements.
1.03 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Comply with requirements of Section 017000 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
B. Make the following types of submittals to Architect:
1. Requests for Interpretation (RFI).
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Substantial Completion.
11. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 SITE MOBILIZATION MEETING
A. Owner will schedule meeting at the Project site prior to Contractor occupancy.
B. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's superintendent.
5. Major subcontractors.
C. Agenda:
1. Use of premises by Owner and Contractor.
2. Owner's requirements.
3. Construction facilities and controls provided by Owner.
4. Temporary utilities provided by Owner.
5. Security and housekeeping procedures.
6. Schedules.
Residential Paint Project 013000 - 13 Administrative Requirements
7. Application for payment procedures.
8. Procedures for testing.
9. Procedures for maintaining record documents.
10. Requirements for start-up of equipment.
11. Inspection and acceptance of equipment put into service during construction period.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.02 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.
B. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required:
1. Contractor.
2. Owner.
3. Architect.
4. Contractor's superintendent.
5. Major subcontractors.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of RFIs log and status of responses.
7. Maintenance of progress schedule.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10. Maintenance of quality and work standards.
11. Effect of proposed changes on progress schedule and coordination.
12. Other business relating to work.
E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.03 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of work, with a general outline for remainder of work.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 10 days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
3.04 REQUESTS FOR INFORMATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract
Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the
Residential Paint Project 013000 - 14 Administrative Requirements same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
2. A resolution to an issue which has arisen due to field conditions and affects design intent.
B. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare in a format and with content acceptable to Owner.
C. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
b. Approval of substitutions (see Section - 016000 - Product Requirements)
c. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).
d. Different methods of performing work than those indicated in the Contract Drawings and Specifications (comply with provisions of the Conditions of the Contract).
2. Improper RFIs: Requests not prepared in compliance with requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response, with an explanatory notation.
3. Frivolous RFIs: Requests regarding information that is clearly indicated on, or reasonably inferable from, Contract Documents, with no additional input required to clarify the question. They will be returned without a response, with an explanatory notation.
D. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
E. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
F. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.
G. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.
1. Upon receipt of a response, promptly review and distribute it to all affected parties, and update the RFI Log.
3.05 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Architect for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 017800 - Closeout Submittals.
Residential Paint Project 013000 - 15 Administrative Requirements
3.06 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections; one of which will be retained by Architect.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.07 SUBMITTAL PROCEDURES
A. General Requirements:
1. Use a separate transmittal for each item.
2. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.
3. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
4. Schedule submittals to expedite the Project, and coordinate submission of related items.
5. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.
6. Provide space for Contractor and Architect review stamps.
7. When revised for resubmission, identify all changes made since previous submission.
8. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with requirements.
9. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct portion(s) of the work, and have received prior approval for their use.
B. Product Data Procedures:
1. Submit only information required by individual specification sections.
2. Collect required information into a single submittal.
3. Do not submit (Material) Safety Data Sheets for materials or products.
C. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting
Contract Documents and coordinating related work.
2. Do not reproduce Contract Documents to create shop drawings.
3. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
D. Samples Procedures:
1. Transmit related items together as single package.
2. Identify each item to allow review for applicability in relation to shop drawings showing installation locations.
3. Where samples are requested for review, deliver physical samples directly
Residential Paint Project 013553 - 16 Security Procedures
SECTION 013553
SECURITY PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Security measures including formal security program, entry control, personnel identification, and miscellaneous restrictions.
1.02 SECURITY PROGRAM
A. Protect Work , existing premises and Owner's operations from theft, vandalism, and unauthorized entry.
B. Initiate program in coordination with Owner's existing security system at project mobilization.
C. Maintain program throughout construction period until Owner occupancy.
1.03 ENTRY CONTROL
A. Restrict entrance of persons and vehicles into Project site and existing facilities.
B. Allow entrance only to authorized persons with proper identification.
1.04 RESTRICTIONS
PART 2 PRODUCTS - NOT USED
Residential Paint Project 014000 - 17 Quality Requirements
SECTION 014000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. References and standards.
C. Control of installation.
D. Tolerances.
E. Defect Assessment.
1.02 SUBMITTALS
A. See Section 013000 - Administrative Requirements, for submittal procedures.
1.03 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.
C. Obtain copies of standards where required by product specification sections.
D. Maintain copy at project site during submittals, planning, and progress of the specific work, until Substantial Completion.
E. Should specified reference standards conflict with Contract Documents, request clarification from Architect before proceeding.
F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Architect shall be altered from Contract Documents by mention or inference otherwise in any reference document.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.
Residential Paint Project 014000 - 18 Quality Requirements
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
Residential Paint Project 014100 - 19 Regulatory Requirements
SECTION 014100
REGULATORY REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY OF REFERENCE STANDARDS
A. Regulatory requirements applicable to this project are the following:
B. 28 CFR 35 - Nondiscrimination on the Basis of Disability in State and Local Government Services; Final Rule; Department of Justice; current edition.
C. 28 CFR 36 - Nondiscrimination by Public Accommodations and in Commercial Facilities; Final Rule; Department of Justice; current edition.
D. 36 CFR 1191 - Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines; current edition.
E. ADA Standards - 2010 ADA Standards for Accessible Design; 2010.
F. FED-STD-795 - Uniform Federal Accessibility Standards (UFAS); 1988.
G. 29 CFR 1910 - Occupational Safety and Health Standards; Current Edition.
H. ICC A117.1 - Accessible and Usable Buildings and Facilities; 2017.
I. ICC (IFC) - International Fire Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
J. NFPA 101 - Life Safety Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
K. ICC (IBC) - International Building Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
L. ICC (IPC) - International Plumbing Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
M. ICC (IMC) - International Mechanical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
N. ICC (IFGC) - International Fuel Gas Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
O. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
P. ICC (IECC) - International Energy Conservation Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
Q. TAS - Texas Accessibility Standards; Most Recent Edition Adopted by Authority Having Jurisdiction, Including all Applicable Amendments and Supplements..
PART 2 PRODUCTS - NOT USED
Residential Paint Project 015213 - 20 Field Offices and Sheds
SECTION 015213
FIELD OFFICES AND SHEDS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary field offices for use of Contractor.
1.02 USE OF EXISTING FACILITIES
A. Owner shall designate existing spaces that may be used for field offices.
PART 2 PRODUCTS
2.01 CONTRACTOR OFFICE AND FACILITIES
A. Size: For Contractor's needs and to provide space for project meetings.
B. Furnishings in Meeting Area: Conference table and chairs to seat at least eight persons; racks and files for Contract Documents, submittals, and project record documents.
2.02 OWNER AND ARCHITECT/ENGINEER OFFICE
PART 3 EXECUTION
3.01 INSTALLATION
A. Install office spaces ready for occupancy 15 days after date fixed in Notice to Proceed.
Residential Paint Project 016000 - 21 Product Requirements
SECTION 016000
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General product requirements.
B. Transportation, handling, storage and protection.
C. Product option requirements.
D. Substitution limitations.
E. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.
PART 2 PRODUCTS
2.01 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by Contract Documents.
B. Use of products having any of the following characteristics is not permitted:
1. Containing lead, cadmium, or asbestos.
C. Where other criteria are met, Contractor shall give preference to products that:
1. If used on interior, have lower emissions.
2. If wet-applied, have lower VOC content.
2.02 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.
2.03 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.
B. Deliver to Project site; obtain receipt prior to final payment.
PART 3 EXECUTION
3.01 SUBSTITUTION LIMITATIONS
A. See Section 012500 - Substitution Procedures.
3.02 TRANSPORTATION AND HANDLING
A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.
Residential Paint Project 016000 - 22 Product Requirements
B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.
C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
D. Transport and handle products in accordance with manufacturer's instructions.
E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.
F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.
H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.03 STORAGE AND PROTECTION
A. Provide protection of stored materials and products against theft, casualty, or deterioration.
B. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.
1. Structural Loading Limitations: Handle and store products and materials so as not to exceed static and dynamic load-bearing capacities of project floor areas.
C. Store and protect products in accordance with manufacturers' instructions.
D. Store with seals and labels intact and legible.
E. Store sensitive products in weathertight, climate-controlled enclosures in an environment favorable to product.
F. For exterior storage of fabricated products, place on sloped supports above ground.
G. Provide off-site storage and protection when site does not permit on-site storage or protection.
H. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.
I. Comply with manufacturer's warranty conditions, if any.
J. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
K. Prevent contact with material that may cause corrosion, discoloration, or staining.
L. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
M. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
Residential Paint Project 017000 - 23 Execution and Closeout
Requirements
SECTION 017000
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Pre-installation meetings.
C. Cutting and patching.
D. Cleaning and protection.
E. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.
1.02 PROJECT CONDITIONS
A. Use of explosives is not permitted.
B. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.
C. Dust Control: Execute work by methods to minimize raising dust from construction operations. Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.
D. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations.
PART 2 PRODUCTS
2.01 PATCHING MATERIALS
A. New Materials: As specified in product sections; match existing products and work for patching and extending work.
B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.
C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 016000 - Product Requirements.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.
E. Verify that utility services are available, of the correct characteristics, and in the correct locations.
F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.
3.02 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
Residential Paint Project 017000 - 24 Execution and Closeout
Requirements
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.
3.03 PREINSTALLATION MEETINGS
A. When required in individual specification sections, convene a preinstallation meeting at the site prior to commencing work of the section.
B. Require attendance of parties directly affecting, or affected by, work of the specific section.
C. Notify Architect four days in advance of meeting date.
D. Prepare agenda and preside at meeting:
1. Review conditions of examination, preparation and installation procedures.
2. Review coordination with related work.
E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.04 GENERAL INSTALLATION REQUIREMENTS
A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.
B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.
D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
E. Make neat transitions between different surfaces, maintaining texture and appearance.
3.05 CUTTING AND PATCHING
A. Whenever possible, execute the work by methods that avoid cutting or patching.
B. Perform whatever cutting and patching is necessary to:
1. Complete the work.
2. Fit products together to integrate with other work.
3. Provide openings for penetration of mechanical, electrical, and other services.
4. Match work that has been cut to adjacent work.
5. Repair areas adjacent to cuts to required condition.
6. Repair new work damaged by subsequent work.
7. Remove samples of installed work for testing when requested.
8. Remove and replace defective and non-complying work.
C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.
D. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.
E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.
F. Restore work with new products in accordance with requirements of Contract Documents.
G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material, to full thickness of the penetrated element.
I. Patching:
1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.
Residential Paint Project 017000 - 25 Execution and Closeout
Requirements
2. Match color, texture, and appearance.
3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.
3.06 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.
C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.
D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.
3.07 PROTECTION OF INSTALLED WORK
A. Protect installed work from damage by construction operations.
B. Provide special protection where specified in individual specification sections.
C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
D. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.
E. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials.
F. Remove protective coverings when no longer needed; reuse or recycle coverings if possible.
3.08 ADJUSTING
A. Adjust operating products and equipment to ensure smooth and unhindered operation.
3.09 FINAL CLEANING
A. Use cleaning materials that are nonhazardous.
B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.
C. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or nameplates on mechanical and electrical equipment.
D. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.
E. Clean filters of operating equipment.
F. Clean debris from roofs, gutters, downspouts, scuppers, overflow drains, area drains, drainage systems, and ______.
G. Clean site; sweep paved areas, rake clean landscaped surfaces.
H. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site;
dispose of in legal manner; do not burn or bury.
3.10 CLOSEOUT PROCEDURES
A. Make submittals that are required by governing or other authorities.
B. Accompany Project Coordinator on preliminary inspection to determine items to be listed for completion or correction in the Contractor's Correction Punch List for Contractor's Notice of Substantial Completion.
C. Notify Architect when work is considered ready for Architect's Substantial Completion inspection.
Residential Paint Project 017000 - 26 Execution and Closeout
Requirements
D. Submit written certification containing Contractor's Correction Punch List, that Contract Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for Architect's Substantial Completion inspection.
E. Conduct Substantial Completion inspection and create Final Correction Punch List containing Architect's and Contractor's comprehensive list of items identified to be completed or corrected and submit to Architect.
F. Correct items of work listed in Final Correction Punch List and comply with requirements for access to Owner-occupied areas.
G. Notify Architect when work is considered finally complete and ready for Architect's Substantial Completion final…