This is a construction document specification for a residential painting project at Liberty Landing Apartments, a student housing facility operated by The University of Texas at Tyler located at 3900 University Boulevard, Tyler, Texas 75799. The project encompasses interior painting and associated final cleaning services across four residential buildings (Buildings 7, 8, 9, and 12) containing multiple apartment units of varying sizes. The scope of work includes surface preparation, application of primers and finish coats to interior walls, ceilings, moldings, casings, wood doors, stair rails, and mechanical/electrical components; removal and cleaning of HVAC grilles and registers prior to refinishing; and comprehensive final cleaning of all renovated interior spaces to achieve move-in-ready condition. The specified color selections are "Alpaca" (SW7022) in eggshell finish for walls, "Pure White" (SW7005) in flat finish for ceilings, and "Pure White" (SW7005) in semi-gloss finish for moldings and millwork. All paint products must be Sherwin-Williams brand with zero VOC content complying with EPA standards, and the contractor must provide daily site cleanup, dedicated dumpster service, and portable restroom facilities during construction.

The contractor shall supply all labor, materials, equipment, and accessories necessary to complete the work in accordance with manufacturer specifications and the 2021 International Building Codes adopted by the University. Paint application requirements include specific primer and topcoat systems based on substrate type: gypsum board and plaster surfaces receive latex primers with either flat, eggshell, semi-gloss, or epoxy gloss topcoats depending on location; wood surfaces receive latex primer with urethane enamel topcoats; and ferrous metals receive water-based universal primer with alkyd urethane enamel topcoats. Critical quality assurance measures include moisture content testing (maximum 12 percent for gypsum and plaster, 15 percent for interior wood), minimum application temperatures (45 degrees Fahrenheit for interior latex, 50 degrees Fahrenheit for exterior latex, 65 degrees Fahrenheit for varnish), and submission of two 6-by-6-inch painted samples for each color and system. The contractor is responsible for protecting all life safety equipment from paint adhesion and damage, with no protective coverings allowed to remain in place for more than eight hours or unattended for more than one hour, and must coordinate unit access and HVAC management directly with the Owner's representative.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RM NAME

RM ###

RM NAME

RM ###

A

A

N

A

XX

XX

XX

XX

XX XX

XX XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

XX

14'-8"

BASE CABINET

UPPER CABINET

FLOOR DRAIN W/

SLOPED FLOOR

ELEMENT THAT OCCURS

ABOVE THE PLAN CUT

TYPICAL DIMENSIONS ARE

TO FACE OF STUD

FD

NEW WALLPARTITION TYPE

NEW WINDOW

NEW DOOR

WALL SECTION ROOM IDENTIFIER

BUILDING SECTION

NORTH ARROWDETAIL MARK/ENLARGED PLAN

EXTERIOR ELEVATION

INTERIOR ELEVATION

A

A/E ARCHITECT/ENGINEER

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

AOR AREA OF REFUGE

APPROX APPROXIMATE(LY)

ARCH ARCHITECT(URAL)

AVL AUDIO/VISUAL/LIGHTING

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOTT BOTTOM

BUR BUILT UP ROOF

C

CAB CABINET

CB CHALK BOARD

CJ CONTROL/CONSTRUCTION JOINT

CL CENTERLINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CT CERAMIC TILE

D

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DIST DISTANCE

DWG DRAWING

E

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EJ EXPANSION JOINT

ELEV ELEVATION

ELEC ELECTRIC

EPS EXPANDED POLYSTERENE

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COLOR

EX EXAMPLE

EXIST EXISTING

EXP EXPAN(D) (SION)

EXT EXTERIOR

F

FA FIRE ALARM

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FD FLOOR DRAIN

FF FINISH FLOOR

FFE FINISH FLOOR ELEVATION

FIN FINISH

FLR FLOOR(ING)

FT FEET

FTG FOOTING

G

GA GAUGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENERAL

GFI GROUND FAULT INTERRUPTER

GLU-LAM GLUE LAMINATED BEAM

GB GYPSUM BOARD

H

HB HOSE BIB

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HS HANDICAP SIGN

HT HEIGHT

HVAC HEATING, VENTILATING, AND

AIR CONDITIONING

I

ID INSIDE DIAMETER

INSUL INSULATION

IMP INSULATED METAL PANEL

INT INTERIOR

J

JT JOINT

K

KS KNEE SPACE

L

LAM LAMINAT(E) (ED)

LAV LAVATORY

LBS POUNDS

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONC LIMITS OF NEW CONSTRUCTION

LTG LIGHTING

M

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL(LY)

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTL METAL

MS METAL STUD

N

N NORTH

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER/DIMENSION

OFD OVERFLOW DRAIN

OH OVERHEAD

OPP OPPOSITE

OS OVERFLOW SCUPPER

P

PB PARKING BUMPER

PERM PERMANENT(LY)

PL PLATE

PLAM PLASTIC LAMINATE

PW PLYWOOD

PP POWER POLE

PR PAIR

PROJ PROJECT(ION) (OR)

PROP PROPERTY

PS PROJECTOR SCREEN

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PTD PAINTED

Q

QTY QUANTITY

R

R RADIUS, RADII

RA RETURN AIR

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REF REFER(ENCE)

REG REGISTER

REINF REINFORC(E) (ED) (ING) (EMENT)

REQD REQUIRED

REV REVISE(D)

RM ROOM

RO ROUGH OPENING

S

SCH SCHEDULE

SF SQUARE FOOT

SIM SIMILAR

SOG SLAB ON GRADE

SPEC(S) SPECIFICATION(S)

SQ SQUARE

SS STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STO STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T

T THERMOSTAT

T&G TONGUE AND GROOVE

TAS TEXAS ACCESSIBILITY STANDARDS

TB TACK BOARD

TEL TELEPHONE

TEMP TEMPORARY

THK THICK

TOP TOP OF PLATE

TV TELEVISION

TYP TYPICAL

U

UC UNDERCABINET

UCL UNDERCABINET LIGHTING

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

V

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VWC VINYL WALL COVERING

W

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WH WATER HEATER

WP WATER PROOF

WT WEIGHT

WWF WELDED WIRE FABRIC

GENERAL

COVER

G-001

Architect Project #2025.31

Print Date: March 10, 2026

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

COMMON SYMBOLS AND ABBREVIATIONS

LIBERTY LANDING APARTMENTS

RESIDENTIAL PAINT PROJECT

3900 UNIVERSITY BOULEVARD, TYLER TEXAS 75799

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

University of Texas at Tyler

3900 University Boulevard Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

SHEET INDEX

ID

G-001

G-002

A-001

AS100

A-101

A-102

A-103

A-201

A-202

A-203

A-301

A-302

A-303

A-401

A-402

A-403

Subset Name

GENERAL

GENERAL

INFORMATION

SITE

BUILDING 7

BUILDING 7

BUILDING 7

BUILDING 8

BUILDING 8

BUILDING 8

BUILDING 9

BUILDING 9

BUILDING 9

BUILDING 12

BUILDING 12

BUILDING 12

NAME

COVER

TAS DETAILS

SPECIFICATIONS

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

PLAN

UT Tyler Current Code Reference 2021 International Residential Code, Jaunary 2024 2021 International Building Code, Jaunary 2024 2021 International Energy Conservation Code, Jaunary 2024 2021 International Mechanical Code, Jaunary 2024 2021 International Plumbing Code, Jaunary 2024 2021 International Fuel Gas Code, Jaunary 2024 2023 National Electric Code, Jaunary 2024 2021 Existing Building Code, Jaunary 2024 2021 International Fire Code, Jaunary 2024

University of Texas at Tyler

3900 University Boulevard Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

GENERAL

TAS DETAILS

G-002

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

NOT TO SCALEA5 SIGNAGE LOCATIONS

NOT TO SCALEF1 VEHICLE PARKING SPACES

NOT TO SCALEE1 STAIR AND HANDRAIL REQUIREMENTS

NOT TO SCALEB1 SIDE REACH

NOT TO SCALEC1 FORWARD REACH

NOT TO SCALEB6 URINAL REQUIREMENTS

NOT TO SCALEB5 DRINKING FOUNTAINS

NOT TO SCALED1 ELEVATOR REQUIREMENTS

NOT TO SCALED5 TOILET AND STALL REQUIREMENTS

NOT TO SCALEF3 VEHICLE PARKING SPACES

NOT TO SCALEA1 PROTRUDING OBJECTS

NOT TO SCALEA3 DOOR AND APPROACH CLEARANCES

NOT TO SCALEC5 TYPICAL SHOWERS

NON-CIRCULAR HANDRAILS

MIN. CLEAR DOOR WIDTH REQUIRED DIMENSIONS FOR DOORS IN SERIES

TEXAS DEPARTMENT OF LICENSING AND REGULATION

ARCHITECTURAL BARRIERS PROJECT INFORMATION

REGISTERED ACCESSIBILITY SPECIALIST CONTACT INFORMATION

RONALD L. DAVIS

RAS #00000083

RON DAVIS CONSULTING

3001 MOTLEY DRIVE, SUITE J

MESQUITE, TEXAS 75150

T 972-270-3100 F 972-270-3104 ron@rondavisconsulting.com

FRONT APPROACH

HINGE APPROACH

LATCH APPROACH MINIMUM CLEAR WIDTH OF ROUTE

ROLL-IN SHOWER

TRANSFER SHOWER

INFORMATION

SPECIFICATIONS

A-001

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

University of Texas at Tyler

3900 University Boulevard Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

PAINTING AND COATING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Surface preparation.

B. Field application of paints, stains, and varnishes.

C. Scope: Finish all interior and exterior surfaces exposed to view, unless fully factory-finished and unless otherwise indicated, including the following:

D. Do Not Paint or Finish the Following Items:

1. Items fully factory-finished unless specifically so indicated; materials and products having factory-applied primers are not considered factory finished.

2. Items indicated to receive other finishes.

3. Items indicated to remain unfinished.

4. Fire rating labels, equipment serial number and capacity labels, and operating parts of equipment.

5. Floors, unless specifically so indicated.

6. Glass.

7. Concealed pipes, ducts, and conduits.

1.02 REFERENCE STANDARDS

A. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for Architectural Coatings; U.S.

Environmental Protection Agency; current edition.

B. ASTM D16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications; 2012.

C. ASTM D4442 - Standard Test Methods for Direct Moisture Content Measurement of Wood and Wood-Base

Materials; 2007.

1.03 DEFINITIONS

A. Conform to ASTM D 16 for interpretation of terms used in this section.

1.04 SUBMITTALS

A. Product Data: Provide data on all finishing products, including VOC content.

B. Samples: Submit two painted samples, illustrating selected colors for each color and system selected with specified coats cascaded. 6 x 6 inch in size.

C. Manufacturer's Instructions: Indicate special surface preparation procedures.

D. Maintenance Data: Submit data on cleaning, touch-up, and repair of painted and coated surfaces.

1.05 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the products specified, with minimum three years documented experience.

B. Applicator Qualifications: Company specializing in performing the type of work specified with minimum three years experience.

1.06 REGULATORY REQUIREMENTS

A. Conform to applicable code for flame and smoke rating requirements for products and finishes.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.

B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

C. Paint Materials: Store at minimum ambient temperature of 45 degrees F and a maximum of 90 degrees F, in ventilated area, and as required by manufacturer's instructions.

1.08 FIELD CONDITIONS

A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the paint product manufacturer.

B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.

C. Do not apply exterior coatings during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer.

D. Minimum Application Temperatures for Latex Paints: 45 degrees F for interiors; 50 degrees F for exterior; unless required otherwise by manufacturer's instructions.

E. Minimum Application Temperature for Varnish Finishes: 65 degrees F for interior or exterior, unless required otherwise by manufacturer's instructions.

F. Provide lighting level of 80 ft candles measured mid-height at substrate surface.

1.09 EXTRA MATERIALS

A. Supply 5 gallons of each color; store where directed.

B. Label each container with color in addition to the manufacturer's label.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Provide all paint and coating products used in any individual system from the same manufacturer; no exceptions.

Sherwin-Williams is the basis of design.

B. Primer Sealers: Same manufacturer as top coats.

C. Block Fillers: Same manufacturer as top coats.

2.02 PAINTS AND COATINGS - GENERAL

A. Paints and Coatings: Ready mixed, unless intended to be a field-catalyzed coating.

1. Provide paints and coatings of a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous coating, with good flow and brushing properties, and capable of drying or curing free of streaks or sags.

2. Supply each coating material in quantity required to complete entire project's work from a single production run.

3. Do not reduce, thin, or dilute coatings or add materials to coatings unless such procedure is specifically described in manufacturer's product instructions.

B. Primers: Where the manufacturer offers options on primers for a particular substrate, use primer categorized as

"best" by the manufacturer.

C. Volatile Organic Compound (VOC) Content:

1. Provide coatings that comply with the most stringent requirements specified in the following:

a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission Standards for Architectural

Coatings.

2. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59, Subpart D (EPA Method

24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction.

2.03 PAINT SYSTEMS - INTERIOR

A. Gypsum Board/Plaster Ceilings, Latex Flat Finish, 3 Coat:

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Flat: Two coats of B30-2600 Series, ProMar 200 Zero VOC Interior Latex Flat.

B. Gypsum Board/Plaster Walls, Latex Egg-Shell Finish, 3 Coat:

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Eggshell: Two coats of B20-2600 Series, ProMar 200 Zero VOC Interior Latex Eg-Shel.

C. Gypsum Board/Plaster Walls, Latex-Acrylic Semi-Gloss Finish, 3 Coat:

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Semi-gloss: Two coats of B31-2600 Series, ProMar 200 Zero VOC Interior Latex Semi-Gloss.

D. Gypsum Board/Plaster Walls, Latex-Acrylic Gloss Finish, 3 Coat: (typically wet areas)

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Gloss: Two coats of SW B73-300 Series, Waterborne Catalyzed Epoxy Gloss.

E. Wood, Opaque, Latex, 3 Coat:

1. One coat of SW B28W8111, Premium Wall & Wood Interior Latex Primer.

2. Semi-Gloss: Two coats of K37W03753, Emerald Urethane Trim Enamel.

F. Ferrous Metals (doors, frames, & handrails), Unprimed, Latex, 3 Coat:

1. One coat of SW B66-1300 Series, Pro-Cryl Universal Water Based Primer.

2. Semi-gloss: Two coats of SW B53-2150 Series, WB Alkyd Urethane Enamel Semi-Gloss.

2.04 ACCESSORY MATERIALS

A. Accessory Materials: Provide all primers, sealers, cleaning agents, cleaning cloths, sanding materials, and clean-up materials required to achieve the finishes specified whether specifically indicated or not; commercial quality.

B. Patching Material for Minor Repairs: Latex filler.

C. Patching Material for Larger Repairs and Millwork: Catalyzed filler.

D. Fastener Head Cover Material: Latex filler.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that surfaces are ready to receive work as instructed by the product manufacturer.

B. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application.

C. Test shop-applied primer for compatibility with subsequent cover materials.

D. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums:

1. Gypsum Wallboard: 12 percent.

2. Plaster and Stucco: 12 percent.

3. Interior Wood: 15 percent, measured in accordance with ASTM D4442.

3.02 PREPARATION

A. Clean surfaces thoroughly and correct defects prior to coating application.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

C. Remove surface appurtenances, including electrical plates, hardware, light fixture trim, escutcheons, and fittings, prior to preparing surfaces or finishing. DO NOT REMOVE fire alarm or fire sprinkler devices or escutcheons.

D. Surfaces: Correct defects and clean surfaces which affect work of this section. Remove or repair existing coatings that exhibit surface defects.

E. Seal surfaces that might cause bleed through or staining of topcoat.

F. Remove mildew from impervious surfaces by scrubbing with solution of tetra-sodium phosphate and bleach. Rinse with clean water and allow surface to dry.

G. Gypsum Board Surfaces to be Painted: Fill minor defects with filler compound. Spot prime defects after repair.

H. Plaster Surfaces to be Painted: Fill hairline cracks, small holes, and imperfections with latex patching plaster. Make smooth and flush with adjacent surfaces. Wash and neutralize high alkali surfaces.

I. Uncorroded Uncoated Steel and Iron Surfaces to be Painted: Remove grease, mill scale, weld splatter, dirt, and rust. Where heavy coatings of scale are evident, remove by hand wire brushing or sandblasting; clean by washing with solvent. Apply a treatment of phosphoric acid solution, ensuring weld joints, bolts, and nuts are similarly cleaned. Prime paint entire surface; spot prime after repairs.

J. Shop-Primed Steel Surfaces to be Finish Painted: Sand and scrape to remove loose primer and rust. Feather edges to make touch-up patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. Re-prime entire shop-primed item.

K. Interior Wood Surfaces to Receive Opaque Finish: Wipe off dust and grit prior to priming. Seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after primer has dried; sand between coats. Back prime concealed surfaces before installation.

L. Metal Doors to be Painted: Prime metal door top and bottom edge surfaces.

M. Contaminated Surfaces: Clean all surfaces that may be contaminated with oils or grease. Ensure that cleaned surface is adequately free of contaminants that may interfere with adhesion of new paint finishes.

3.03 APPLICATION

A. Apply products in accordance with manufacturer's instructions.

B. Where adjacent sealant is to be painted, do not apply finish coats until sealant is applied.

C. Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat is applied.

D. Apply each coat to uniform appearance.

E. Sand wood and metal surfaces lightly between coats to achieve required finish.

F. Vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying next coat.

G. Wood to Receive Transparent Finishes: Tint fillers to match wood. Work fillers into the grain before set. Wipe excess from surface.

H. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to finishing.

3.04 FINISHING MECHANICAL AND ELECTRICAL EQUIPMENT

A. Paint shop-primed equipment, where indicated.

B. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components and paint separately.

C. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to finishing.

3.05 CLEANING

A. Collect waste material that could constitute a fire hazard, place in closed metal containers, and remove daily from site.

3.06 SPECIAL CONDITIONS

A. Do Not Paint or Finish the Following Items:

1. Items fully factory-finished unless specifically noted.

2. Fire rating labels, equipment serial number and capacity labels.

3. Stainless steel items.

B. Mechanical and Electrical: Use paint systems defined for the substrates to be finished.

1. Paint all insulated and exposed pipes occurring in finished areas to match background surfaces, unless otherwise indicated.

2. Paint shop-primed items occurring in finished areas.

3. Paint interior surfaces of air ducts and convector and baseboard heating cabinets that are visible through grilles and louvers with one coat of flat black paint to visible surfaces.

4. Paint dampers exposed behind louvers, grilles, and convector and baseboard cabinets to match face panels.

END OF SECTION

PAINTING AND COATING

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Surface preparation.

B. Field application of paints, stains, and varnishes.

C. Scope: Finish all interior and exterior surfaces exposed to view, unless fully factory-finished and unless otherwise indicated, including the following:

D. Do Not Paint or Finish the Following Items:

1. Items fully factory-finished unless specifically so indicated; materials and products having factory-applied primers are not considered factory finished.

2. Items indicated to receive other finishes.

3. Items indicated to remain unfinished.

4. Fire rating labels, equipment serial number and capacity labels, and operating parts of equipment.

5. Floors, unless specifically so indicated.

6. Glass.

7. Concealed pipes, ducts, and conduits.

1.02 REFERENCE STANDARDS

A. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for Architectural Coatings; U.S.

Environmental Protection Agency; current edition.

B. ASTM D16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications; 2012.

C. ASTM D4442 - Standard Test Methods for Direct Moisture Content Measurement of Wood and Wood-Base

Materials; 2007.

1.03 DEFINITIONS

A. Conform to ASTM D 16 for interpretation of terms used in this section.

1.04 SUBMITTALS

A. Product Data: Provide data on all finishing products, including VOC content.

B. Samples: Submit two painted samples, illustrating selected colors for each color and system selected with specified coats cascaded. 6 x 6 inch in size.

C. Manufacturer's Instructions: Indicate special surface preparation procedures.

D. Maintenance Data: Submit data on cleaning, touch-up, and repair of painted and coated surfaces.

1.05 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the products specified, with minimum three years documented experience.

B. Applicator Qualifications: Company specializing in performing the type of work specified with minimum three years experience.

1.06 REGULATORY REQUIREMENTS

A. Conform to applicable code for flame and smoke rating requirements for products and finishes.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.

B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

C. Paint Materials: Store at minimum ambient temperature of 45 degrees F and a maximum of 90 degrees F, in ventilated area, and as required by manufacturer's instructions.

1.08 FIELD CONDITIONS

A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the paint product manufacturer.

B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.

C. Do not apply exterior coatings during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer.

D. Minimum Application Temperatures for Latex Paints: 45 degrees F for interiors; 50 degrees F for exterior; unless required otherwise by manufacturer's instructions.

E. Minimum Application Temperature for Varnish Finishes: 65 degrees F for interior or exterior, unless required otherwise by manufacturer's instructions.

F. Provide lighting level of 80 ft candles measured mid-height at substrate surface.

1.09 EXTRA MATERIALS

A. Supply 5 gallons of each color; store where directed.

B. Label each container with color in addition to the manufacturer's label.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Provide all paint and coating products used in any individual system from the same manufacturer; no exceptions.

Sherwin-Williams is the basis of design.

B. Primer Sealers: Same manufacturer as top coats.

C. Block Fillers: Same manufacturer as top coats.

2.02 PAINTS AND COATINGS - GENERAL

A. Paints and Coatings: Ready mixed, unless intended to be a field-catalyzed coating.

1. Provide paints and coatings of a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous coating, with good flow and brushing properties, and capable of drying or curing free of streaks or sags.

2. Supply each coating material in quantity required to complete entire project's work from a single production run.

3. Do not reduce, thin, or dilute coatings or add materials to coatings unless such procedure is specifically described in manufacturer's product instructions.

B. Primers: Where the manufacturer offers options on primers for a particular substrate, use primer categorized as

"best" by the manufacturer.

C. Volatile Organic Compound (VOC) Content:

1. Provide coatings that comply with the most stringent requirements specified in the following:

a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission Standards for Architectural

Coatings.

2. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59, Subpart D (EPA Method

24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction.

2.03 PAINT SYSTEMS - INTERIOR

A. Gypsum Board/Plaster Ceilings, Latex Flat Finish, 3 Coat:

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Flat: Two coats of B30-2600 Series, ProMar 200 Zero VOC Interior Latex Flat.

B. Gypsum Board/Plaster Walls, Latex Egg-Shell Finish, 3 Coat:

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Eggshell: Two coats of B20-2600 Series, ProMar 200 Zero VOC Interior Latex Eg-Shel.

C. Gypsum Board/Plaster Walls, Latex-Acrylic Semi-Gloss Finish, 3 Coat:

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Semi-gloss: Two coats of B31-2600 Series, ProMar 200 Zero VOC Interior Latex Semi-Gloss.

D. Gypsum Board/Plaster Walls, Latex-Acrylic Gloss Finish, 3 Coat: (typically wet areas)

1. One coat of B28W12600, ProMar 200 Zero VOC Interior Latex Primer.

2. Gloss: Two coats of SW B73-300 Series, Waterborne Catalyzed Epoxy Gloss.

E. Wood, Opaque, Latex, 3 Coat:

1. One coat of SW B28W8111, Premium Wall & Wood Interior Latex Primer.

2. Semi-Gloss: Two coats of K37W03753, Emerald Urethane Trim Enamel.

F. Ferrous Metals (doors, frames, & handrails), Unprimed, Latex, 3 Coat:

1. One coat of SW B66-1300 Series, Pro-Cryl Universal Water Based Primer.

2. Semi-gloss: Two coats of SW B53-2150 Series, WB Alkyd Urethane Enamel Semi-Gloss.

2.04 ACCESSORY MATERIALS

A. Accessory Materials: Provide all primers, sealers, cleaning agents, cleaning cloths, sanding materials, and clean-up materials required to achieve the finishes specified whether specifically indicated or not; commercial quality.

B. Patching Material for Minor Repairs: Latex filler.

C. Patching Material for Larger Repairs and Millwork: Catalyzed filler.

D. Fastener Head Cover Material: Latex filler.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that surfaces are ready to receive work as instructed by the product manufacturer.

B. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application.

C. Test shop-applied primer for compatibility with subsequent cover materials.

D. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums:

1. Gypsum Wallboard: 12 percent.

2. Plaster and Stucco: 12 percent.

3. Interior Wood: 15 percent, measured in accordance with ASTM D4442.

3.02 PREPARATION

A. Clean surfaces thoroughly and correct defects prior to coating application.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

C. Remove surface appurtenances, including electrical plates, hardware, light fixture trim, escutcheons, and fittings, prior to preparing surfaces or finishing. DO NOT REMOVE fire alarm or fire sprinkler devices or escutcheons.

D. Surfaces: Correct defects and clean surfaces which affect work of this section. Remove or repair existing coatings that exhibit surface defects.

E. Seal surfaces that might cause bleed through or staining of topcoat.

F. Remove mildew from impervious surfaces by scrubbing with solution of tetra-sodium phosphate and bleach. Rinse with clean water and allow surface to dry.

G. Gypsum Board Surfaces to be Painted: Fill minor defects with filler compound. Spot prime defects after repair.

H. Plaster Surfaces to be Painted: Fill hairline cracks, small holes, and imperfections with latex patching plaster. Make smooth and flush with adjacent surfaces. Wash and neutralize high alkali surfaces.

I. Uncorroded Uncoated Steel and Iron Surfaces to be Painted: Remove grease, mill scale, weld splatter, dirt, and rust. Where heavy coatings of scale are evident, remove by hand wire brushing or sandblasting; clean by washing with solvent. Apply a treatment of phosphoric acid solution, ensuring weld joints, bolts, and nuts are similarly cleaned. Prime paint entire surface; spot prime after repairs.

J. Shop-Primed Steel Surfaces to be Finish Painted: Sand and scrape to remove loose primer and rust. Feather edges to make touch-up patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. Re-prime entire shop-primed item.

K. Interior Wood Surfaces to Receive Opaque Finish: Wipe off dust and grit prior to priming. Seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after primer has dried; sand between coats. Back prime concealed surfaces before installation.

L. Metal Doors to be Painted: Prime metal door top and bottom edge surfaces.

M. Contaminated Surfaces: Clean all surfaces that may be contaminated with oils or grease. Ensure that cleaned surface is adequately free of contaminants that may interfere with adhesion of new paint finishes.

3.03 APPLICATION

A. Apply products in accordance with manufacturer's instructions.

B. Where adjacent sealant is to be painted, do not apply finish coats until sealant is applied.

C. Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat is applied.

D. Apply each coat to uniform appearance.

E. Sand wood and metal surfaces lightly between coats to achieve required finish.

F. Vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying next coat.

G. Wood to Receive Transparent Finishes: Tint fillers to match wood. Work fillers into the grain before set. Wipe excess from surface.

H. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to finishing.

3.04 FINISHING MECHANICAL AND ELECTRICAL EQUIPMENT

A. Paint shop-primed equipment, where indicated.

B. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components and paint separately.

C. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to finishing.

3.05 CLEANING

A. Collect waste material that could constitute a fire hazard, place in closed metal containers, and remove daily from site.

3.06 SPECIAL CONDITIONS

A. Do Not Paint or Finish the Following Items:

1. Items fully factory-finished unless specifically noted.

2. Fire rating labels, equipment serial number and capacity labels.

3. Stainless steel items.

B. Mechanical and Electrical: Use paint systems defined for the substrates to be finished.

1. Paint all insulated and exposed pipes occurring in finished areas to match background surfaces, unless otherwise indicated.

2. Paint shop-primed items occurring in finished areas.

3. Paint interior surfaces of air ducts and convector and baseboard heating cabinets that are visible through grilles and louvers with one coat of flat black paint to visible surfaces.

4. Paint dampers exposed behind louvers, grilles, and convector and baseboard cabinets to match face panels.

END OF SECTION

FINAL CLEANING

PART 1 GENERAL

1.1 SUMMARY

1. This Section includes final cleaning of all renovated interior spaces of the apartment complex prior to Owner occupancy.

2. Cleaning includes removal of construction debris, dust, adhesives, temporary protections, and surface contaminants;

detailed cleaning of finishes, fixtures, and equipment; and preparation of units and common areas for turnover.

1.2 QUALITY ASSURANCE

1. Perform cleaning using personnel experienced in post-construction cleaning for multi-unit residential projects.

2. Comply with manufacturer recommendations for cleaning of all installed materials.

3. Use only cleaning agents compatible with the surfaces being cleaned.

4. Protect adjacent finishes from damage during cleaning operations.

1.3 PROJECT CONDITIONS

1. Final cleaning shall occur after completion of all construction activities, correction of punch-list items, and removal of tools, equipment, and temporary protections.

2. Provide adequate ventilation during cleaning operations.

PART 2 PRODUCTS

2.1 CLEANING MATERIALS

1. Commercial-grade cleaning agents suitable for residential interior finishes.

2. Non-abrasive cleaners for glass, mirrors, polished metals, and high-gloss surfaces.

3. pH-neutral cleaners for resilient flooring, LVT, and sealed concrete.

4. Wood-safe cleaners for cabinetry and millwork.

5. Stainless-steel cleaners for appliances and fixtures.

6. HEPA-filtered vacuums for dust removal.

7. Non-marking ladders and equipment.

2.2 EQUIPMENT

1. Soft cloths, microfiber towels, non-abrasive pads.

2. Mops, buckets, wringers, and floor-cleaning tools.

3. Scrapers with plastic blades for adhesive removal.

4. Window-cleaning tools including squeegees and extension poles.

PART 3 EXECUTION

3.1 EXAMINATION

1. Verify that all construction work is complete and surfaces are ready for cleaning.

2. Report any damage or deficiencies prior to beginning final cleaning.

3.2 GENERAL CLEANING REQUIREMENTS

1. Remove all construction debris, trash, packaging, and unused materials from units and common areas.

2. Clean all switch plates and outlet covers reinstalled after painting.

3. Vacuum all horizontal surfaces, including tops of cabinets, door frames, and mechanical grilles.

4. Clean all light fixtures, including globes and lenses.

5. Clean all vertical surfaces to remove dust, smudges, fingerprints, and marks.

6. All surfaces should be visibly clean and free of dust, debris, grime or soap scum.

7. Units shall be move-in ready at the conclusion of cleaning services.

3.3 INTERIOR UNIT CLEANING

A. Kitchens

1. Clean cabinets inside and out; remove dust, fingerprints, and construction residue.

2. Clean countertops, backsplashes, and sinks.

3. Clean appliances (interior and exterior), including range, refrigerator, dishwasher, and microwave.

4. Polish stainless-steel surfaces.

B. Bathrooms

1. Clean and disinfect tubs, showers, enclosures, toilets, lavatories, and accessories.

2. Clean and disinfect all tile surfaces, including grout.

3. Clean and polish all chrome fixtures, including plumbing fixtures, towel bars, toilet paper holders, etc.

4. Polish mirrors and metal finishes.

C. Living Areas, Bedrooms, and Closets

1. Clean all doors, frames, hardware, and shelving.

2. Clean interior glazing, mirrors, and sliding doors.

3. Vacuum and mop floors; remove paint splatters and adhesive residue.

4. Clean ceiling fans, including top side of all blades.

C. Furnishings

1. Vacuum and spot clean all sofas, mattresses, and other furnishes within units to provide move-in level of cleanliness.

3.4 COMMON AREA CLEANING

1. Clean corridors, common storage areas, and laundry rooms.

2. Clean light fixtures, exit signs, and mechanical grilles.

3. Vacuum and mop floors; clean baseboards and wall protection.

3.5 FINAL FLOOR CLEANING

1. Resilient Flooring / LVT: Vacuum, damp mop, and remove scuffs; do not apply finish unless specified.

2. Carpet: HEPA vacuum; spot clean stains.

3. Tile: Clean and polish surfaces.

3.6 FINAL GLASS AND MIRROR CLEANING

1. Clean interior glass, windows, and mirrors to a streak-free finish.

2. Remove labels, stickers, and smudges.

3.7 FINAL TOUCH-UP

1. Re-clean any surfaces dirtied by subsequent work.

2. Ensure all units and common areas are free of odors, dust, and visible residue.

3. Verify furnishings are free of dust and ready for use.

3.8 COMPLETION

1. Present areas ready for Owner inspection and occupancy.

END OF SECTION

GENERAL PROJECT NOTES:

1. DAILY CLEAN-UP IS REQUIRED.

2. NO PRODUCTS OR PROCESS BY-PRODUCTS ARE ALLOWED TO BE DISPOSED OF ON CAMPUS.

3. CONTRACTOR IS REQUIRED TO PROVIDE THEIR OWN RESTROOM FACILITIES. THERE WILL BE NO

ACCESS TO UT TYLER FACILITIES AT ANY TIME DURING CONSTRUCTION.

4. CONTRACTOR MUST PROVIDE THEIR OWN DUMPSTER & WILL BE RESPONSIBLE FOR KEEPING ALL AFFECTED AREAS CLEAN. REMOVE ALL TRASH, DEMO'D MATERIALS, ETC AS REQUIRED TO MAINTAIN

CLEAN WORK AREAS ON A DAILY BASIS.

5. VERIFY MATERIAL QUANTITIES & AVAILABILITY WITH SUPPLIERS AS REQUIRED PRIOR TO

BIDDING & CONSULT OWNER IF AVAILABILITY IS QUESTIONABLE.

6. COORDINATE UNIT ACCESS & ENERGY MANAGEMENT WITH OWNER'S REPRESENTATIVE. OWNER

WILL PROVIDE KEY CARDS & WILL REQUIRE THAT EXTERIOR OPENINGS BE CLOSED WHEN FEASIBLE.

CONTRACTOR SHALL FOLLOW OWNER INSTRUCTIONS & GUIDELINES FOR MANAGING &

ECONOMIZING HVAC. IT IS EXPECTED THAT HVAC EQUIPMENT WILL REMAIN OFF DURING OPERATIONS

THAT CREATE DUST, PARTICLES, OR ODORS.

7. CONTRACTOR'S MANAGEMENT RESPONSIBILITY SHALL INCLUDE INITIAL SUBCONTRACTOR ORIENTATION AND CONTINUING OVERSIGHT & ACCOUNTABILITY REGARDING DAILY USE OF LIGHTING, CEILING FANS, AIR HANDLERS, AC CONDENSERS, THERMOSTATS, DOORS, WINDOWS, ETC., AND WILL BE BACK CHARGED

FOR ENERGY USE IN EXCESS OF TYPICAL LEVELS.

8. ACTUAL FLOOR PLAN LAYOUTS MAY VARY IN MINOR ASPECTS FROM THOSE SHOWN ON PLAN.

NOTIFY OWNER OF ANY SIGNIFICANT FOUND CONDITIONS OR VARIATIONS AFFECTING SCOPE OR

QUALITY.

9. PAINTING SCOPE SHALL INCLUDE ALL INTERIOR WALLS, WOOD BASE TO REMAIN (IN PAINT-ONLY SCOPE AREAS) MOLDINGS, CASINGS, CEILINGS (INCLUDING CLOSETS), WOOD DOORS, STAIR RAILS IF CURRENTLY PAINTED, AND OTHER CURRENTLY OR TYPICALLY PAINTED SURFACES, ETC. REMOVE AND CLEAN SUPPLY AND RETURN GRILLES AND REGISTERS FREE OF LINT, RUST, DIRT AND DUST, ETC., PRIOR TO REFINISHING WITH ENAMEL, AND REINSTALL TO PROPER WORKING ORDER.

10. ALL LIFE SAFETY EQUIPMENT (SPRINKLER, STROBE, HORN, SMOKE DETECTORS, ETC.) SHALL BE PROTECTED TO PREVENT FROM PAINT ADHESION, DAMAGE AND ACCIDENTAL ALARM. NO LIFE

SAFETY COMPONENTS SHALL BE COVERED FOR MORE THAT 8 HOURS AT A TIME OR UNATTENDED

FOR MORE THAN 1 HOUR.

COLOR SELECTIONS:

WALLS: "ALPACA" (SW7022) - EGGSHELL

CEILINGS: "PURE WHITE" (SW7005) - FLAT

MOULDING & MILLWORK: "PURE WHITE" (SW7005) - SEMI-GLOSS

Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

SITE

PLAN

AS100

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

BUILDING #13BUILDING #10

BUILDING #11

BUILDING #6

BUILDING #1

BUILDING #2

VOLLEYBALL

BUILDING #3

PAVILION

PAVILION

BASKETBALLSWIMMING

POOL

CLUBHOUSE

BUILDING #5

BUILDING #4

OLD OMEN RD

BUILDING #7

BUILDING #9

BUILDING #8

BUILDING #12

A1

AS100

BUILDING #13

BUILDING #10

BUILDING #11

BUILDING #7

BUILDING #9

BUILDING #8

BUILDING #12

SCALE: 1" = 50'D1 SITE PLAN

0 20' 50' 100'

SCALE: 1" = 30'A1 ENLARGED SITE PLAN

0 30' 60'

Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

BUILDING 7

A-101

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

UP UP

UP UP

D W

RE F

D W

RE F

F

DW

R E

F

DW

R E

D W

REF

D W

REF

F

DW

R E

F

DW

R E

D3 A-103

7102-B A: 817 sq ft

7101-B A: 817 sq ft

7103-C A: 1,233 sq ft

7104-C A: 1,233 sq ft

7108-B A: 817 sq ft

7107-B A: 817 sq ft

7105-C A: 1,233 sq ft

7106-C A: 1,233 sq ft

D1 A-103

DN DN

DN DNUP

UP

UP

UP

D W

RE

F

F

DW

R E

D W

RE

F

F

DW

R E

D W

RE

F

F

DW

R E

D W

RE

F

F

DW

R E

D3 A-103

U P

U P

U P

U P

U P

U P

U P

U P

7202-E A: 831 sq ft

7203-C A: 1,233 sq ft

7204-C A: 1,233 sq ft

7205-C A: 1,233 sq ft

7206-C A: 1,233 sq ft

7201-E A: 831 sq ft

7208-E A: 831 sq ft

7207-E A: 831 sq ft

B1 A-103

SCALE: 1/8" = 1'-0"D1 BUILDING 7 - 1ST FLOOR PLAN

0 4' 8' 16'

SCALE: 1/8" = 1'-0"A1 BUILDING 7 - 2ND FLOOR PLAN

0 4' 8' 16'

GENERAL PROJECT NOTES:

1. DAILY CLEAN-UP IS REQUIRED.

2. NO PRODUCTS OR PROCESS BY-PRODUCTS ARE ALLOWED TO BE DISPOSED OF ON CAMPUS.

3. CONTRACTOR IS REQUIRED TO PROVIDE THEIR OWN RESTROOM FACILITIES. THERE WILL BE NO

ACCESS TO UT TYLER FACILITIES AT ANY TIME DURING CONSTRUCTION.

4. CONTRACTOR MUST PROVIDE THEIR OWN DUMPSTER & WILL BE RESPONSIBLE FOR KEEPING ALL AFFECTED AREAS CLEAN. REMOVE ALL TRASH, DEMO'D MATERIALS, ETC AS REQUIRED TO MAINTAIN

CLEAN WORK AREAS ON A DAILY BASIS.

5. VERIFY MATERIAL QUANTITIES & AVAILABILITY WITH SUPPLIERS AS REQUIRED PRIOR TO

BIDDING & CONSULT OWNER IF AVAILABILITY IS QUESTIONABLE.

6. COORDINATE UNIT ACCESS & ENERGY MANAGEMENT WITH OWNER'S REPRESENTATIVE. OWNER

WILL PROVIDE KEY CARDS & WILL REQUIRE THAT EXTERIOR OPENINGS BE CLOSED WHEN FEASIBLE.

CONTRACTOR SHALL FOLLOW OWNER INSTRUCTIONS & GUIDELINES FOR MANAGING &

ECONOMIZING HVAC. IT IS EXPECTED THAT HVAC EQUIPMENT WILL REMAIN OFF DURING OPERATIONS

THAT CREATE DUST, PARTICLES, OR ODORS.

7. CONTRACTOR'S MANAGEMENT RESPONSIBILITY SHALL INCLUDE INITIAL SUBCONTRACTOR ORIENTATION AND CONTINUING OVERSIGHT & ACCOUNTABILITY REGARDING DAILY USE OF LIGHTING, CEILING FANS, AIR HANDLERS, AC CONDENSERS, THERMOSTATS, DOORS, WINDOWS, ETC., AND WILL BE BACK CHARGED

FOR ENERGY USE IN EXCESS OF TYPICAL LEVELS.

8. ACTUAL FLOOR PLAN LAYOUTS MAY VARY IN MINOR ASPECTS FROM THOSE SHOWN ON PLAN.

NOTIFY OWNER OF ANY SIGNIFICANT FOUND CONDITIONS OR VARIATIONS AFFECTING SCOPE OR

QUALITY.

9. PAINTING SCOPE SHALL INCLUDE ALL INTERIOR WALLS, WOOD BASE TO REMAIN (IN PAINT-ONLY SCOPE AREAS) MOLDINGS, CASINGS, CEILINGS (INCLUDING CLOSETS), WOOD DOORS, STAIR RAILS IF CURRENTLY PAINTED, AND OTHER CURRENTLY OR TYPICALLY PAINTED SURFACES, ETC. REMOVE AND CLEAN SUPPLY AND RETURN GRILLES AND REGISTERS FREE OF LINT, RUST, DIRT AND DUST, ETC., PRIOR TO REFINISHING WITH ENAMEL, AND REINSTALL TO PROPER WORKING ORDER.

10. ALL LIFE SAFETY EQUIPMENT (SPRINKLER, STROBE, HORN, SMOKE DETECTORS, ETC.) SHALL BE PROTECTED TO PREVENT FROM PAINT ADHESION, DAMAGE AND ACCIDENTAL ALARM. NO LIFE

SAFETY COMPONENTS SHALL BE COVERED FOR MORE THAT 8 HOURS AT A TIME OR UNATTENDED

FOR MORE THAN 1 HOUR.

Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

BUILDING 7

A-102

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

DN

DN

DN

DN

F

DW

R E

F

DW

R E

F

DW

R E

F

DW

R E

D3 A-103

U P

U P

U P

U P

U P

U P

U P

U P

OPEN

TO

BELOW

OPEN

TO

BELOW

OPEN

TO

BELOW

OPEN

TO

BELOW

7302-E A: 663 sq ft

7303-C A: 1,233 sq ft

7304-C A: 1,233 sq ft

7305-C A: 1,233 sq ft

7306-C A: 1,233 sq ft

7302-E A: 663 sq ft

7308-E A: 663 sq ft

7307-E A: 663 sq ft

B3 A-103

SCALE: 1/8" = 1'-0"D1 BUILDING 7 - 3RD FLOOR PLAN

0 4' 8' 16'

GENERAL PROJECT NOTES:

1. DAILY CLEAN-UP IS REQUIRED.

2. NO PRODUCTS OR PROCESS BY-PRODUCTS ARE ALLOWED TO BE DISPOSED OF ON CAMPUS.

3. CONTRACTOR IS REQUIRED TO PROVIDE THEIR OWN RESTROOM FACILITIES. THERE WILL BE NO

ACCESS TO UT TYLER FACILITIES AT ANY TIME DURING CONSTRUCTION.

4. CONTRACTOR MUST PROVIDE THEIR OWN DUMPSTER & WILL BE RESPONSIBLE FOR KEEPING ALL AFFECTED AREAS CLEAN. REMOVE ALL TRASH, DEMO'D MATERIALS, ETC AS REQUIRED TO MAINTAIN

CLEAN WORK AREAS ON A DAILY BASIS.

5. VERIFY MATERIAL QUANTITIES & AVAILABILITY WITH SUPPLIERS AS REQUIRED PRIOR TO

BIDDING & CONSULT OWNER IF AVAILABILITY IS QUESTIONABLE.

6. COORDINATE UNIT ACCESS & ENERGY MANAGEMENT WITH OWNER'S REPRESENTATIVE. OWNER

WILL PROVIDE KEY CARDS & WILL REQUIRE THAT EXTERIOR OPENINGS BE CLOSED WHEN FEASIBLE.

CONTRACTOR SHALL FOLLOW OWNER INSTRUCTIONS & GUIDELINES FOR MANAGING &

ECONOMIZING HVAC. IT IS EXPECTED THAT HVAC EQUIPMENT WILL REMAIN OFF DURING OPERATIONS

THAT CREATE DUST, PARTICLES, OR ODORS.

7. CONTRACTOR'S MANAGEMENT RESPONSIBILITY SHALL INCLUDE INITIAL SUBCONTRACTOR ORIENTATION AND CONTINUING OVERSIGHT & ACCOUNTABILITY REGARDING DAILY USE OF LIGHTING, CEILING FANS, AIR HANDLERS, AC CONDENSERS, THERMOSTATS, DOORS, WINDOWS, ETC., AND WILL BE BACK CHARGED

FOR ENERGY USE IN EXCESS OF TYPICAL LEVELS.

8. ACTUAL FLOOR PLAN LAYOUTS MAY VARY IN MINOR ASPECTS FROM THOSE SHOWN ON PLAN.

NOTIFY OWNER OF ANY SIGNIFICANT FOUND CONDITIONS OR VARIATIONS AFFECTING SCOPE OR

QUALITY.

9. PAINTING SCOPE SHALL INCLUDE ALL INTERIOR WALLS, WOOD BASE TO REMAIN (IN PAINT-ONLY SCOPE AREAS) MOLDINGS, CASINGS, CEILINGS (INCLUDING CLOSETS), WOOD DOORS, STAIR RAILS IF CURRENTLY PAINTED, AND OTHER CURRENTLY OR TYPICALLY PAINTED SURFACES, ETC. REMOVE AND CLEAN SUPPLY AND RETURN GRILLES AND REGISTERS FREE OF LINT, RUST, DIRT AND DUST, ETC., PRIOR TO REFINISHING WITH ENAMEL, AND REINSTALL TO PROPER WORKING ORDER.

10. ALL LIFE SAFETY EQUIPMENT (SPRINKLER, STROBE, HORN, SMOKE DETECTORS, ETC.) SHALL BE PROTECTED TO PREVENT FROM PAINT ADHESION, DAMAGE AND ACCIDENTAL ALARM. NO LIFE

Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

BUILDING 7

A-103

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

D W

RE F

HALL

A: 53 sq ft

LIVING

A: 253 sq ft

KITCHEN

A: 96 sq ft

BEDROOM 1

A: 127 sq ft

BEDROOM 2

A: 127 sq ftBATHROOM 1

A: 39 sq ft

BATHROOM 2

A: 39 sq ft

CLOSET

A: 11 sq ft

CLOSET

A: 11 sq ft

CLOSET

A: 21 sq ft

CLOSET

A: 6 sq ft

F

DW

R E

HALL

A: 119 sq ft

CLOSET

A: 11 sq ft

STORAGE

A: 34 sq ft

STORAGE

A: 34 sq ft

DINING

A: 105 sq ft

KITCHEN

A: 92 sq ft

PANTRY

A: 5 sq ft

LIVING

A: 154 sq ft

BEDROOM 1

A: 137 sq ft

CLOSET

A: 12 sq ft

BATHROOM 1

A: 43 sq ft

BEDROOM 2

A: 138 sq ft

CLOSET

A: 12 sq ft

BATHROOM 2

A: 43 sq ft

CLOSET

A: 17 sq ft

BATHROOM 3

A: 46 sq ft

BEDROOM 3

A: 125 sq ft

CLOSET

A: 11 sq ft

D W

RE

F

U P

U P

HALL

A: 55 sq ft

CLOSET

A: 11 sq ft

BEDROOM

A: 113 sq ft

BATHROOM

A: 44 sq ft

BATHROOM

A: 42 sq ft

BEDROOM

A: 113 sq ft

CLOSET

A: 11 sq ft

CLOSET

A: 15 sq ft

STAIRS

A: 61 sq ft

KITCHEN

A: 75 sq ft

LIVING

A: 216 sq ft U P

U P

OPEN

TO

BELOW

STAIRS

A: 61 sq ft

BEDROOM

A: 113 sq ft

CLOSET

A: 11 sq ft

BATHROOM

A: 44 sq ft

BATHROOM

A: 42 sq ft

BEDROOM

A: 113 sq ft

CLOSET

A: 11 sq ft

CLOSET

A: 11 sq ft

HALL

A: 107 sq ft

LANDING

A: 96 sq ft

SCALE: 1/4" = 1'-0"D1 APARTMENT TYPE 'B'

0 2' 4' 8'

SCALE: 1/4" = 1'-0"D3 APARTMENT TYPE 'C'

0 2' 4' 8'

SCALE: 1/4" = 1'-0"B1 APARTMENT TYPE 'E' - 1st FLOOR 0 2' 4' 8'

SCALE: 1/4" = 1'-0"B3 APARTMENT TYPE 'E' - 2nd FLOOR 0 2' 4' 8'

Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

BUILDING 8

A-201

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

UP UP

UP UP

D W

RE F

D W

FRE

D W

REF

D W

F RE

D W

RE F

D W

FRE

D W

REF

D W

F RE

D3 A-203

8102-B A: 817 sq ft

8104-D A: 1,441 sq ft

8101-B A: 817 sq ft

8103-D A: 1,441 sq ft

8108-B A: 817 sq ft

8106-D A: 1,441 sq ft

8107-B A: 817 sq ft

8105-D A: 1,441 sq ft

D1 A-203

DN DN

DN DN

UP UP

UP UP

D W

FRE

D W

RE

F

D W

F RE

D W

RE

F

D W

FRE

D W

RE

F

D W

F RE

D W

RE

F

D3 A-203

U P

U P

U P

U P

U P

U P

U P

U P

8202-E A: 830 sq ft

8204-D A: 1,441 sq ft

8201-E A: 830 sq ft

8203-D A: 1,441 sq ft

8208-E A: 830 sq ft

8206-D A: 1,441 sq ft

8207-E A: 830 sq ft

8205-D A: 1,441 sq ft

B1 A-203

SCALE: 1/8" = 1'-0"D1 BUILDING 8 - 1ST FLOOR PLAN

0 4' 8' 16'

SCALE: 1/8" = 1'-0"A1 BUILDING 8 - 2ND FLOOR PLAN

0 4' 8' 16'

GENERAL PROJECT NOTES:

1. DAILY CLEAN-UP IS REQUIRED.

2. NO PRODUCTS OR PROCESS BY-PRODUCTS ARE ALLOWED TO BE DISPOSED OF ON CAMPUS.

3. CONTRACTOR IS REQUIRED TO PROVIDE THEIR OWN RESTROOM FACILITIES. THERE WILL BE NO

ACCESS TO UT TYLER FACILITIES AT ANY TIME DURING CONSTRUCTION.

4. CONTRACTOR MUST PROVIDE THEIR OWN DUMPSTER & WILL BE RESPONSIBLE FOR KEEPING ALL AFFECTED AREAS CLEAN. REMOVE ALL TRASH, DEMO'D MATERIALS, ETC AS REQUIRED TO MAINTAIN

CLEAN WORK AREAS ON A DAILY BASIS.

5. VERIFY MATERIAL QUANTITIES & AVAILABILITY WITH SUPPLIERS AS REQUIRED PRIOR TO

BIDDING & CONSULT OWNER IF AVAILABILITY IS QUESTIONABLE.

6. COORDINATE UNIT ACCESS & ENERGY MANAGEMENT WITH OWNER'S REPRESENTATIVE. OWNER

WILL PROVIDE KEY CARDS & WILL REQUIRE THAT EXTERIOR OPENINGS BE CLOSED WHEN FEASIBLE.

CONTRACTOR SHALL FOLLOW OWNER INSTRUCTIONS & GUIDELINES FOR MANAGING &

ECONOMIZING HVAC. IT IS EXPECTED THAT HVAC EQUIPMENT WILL REMAIN OFF DURING OPERATIONS

THAT CREATE DUST, PARTICLES, OR ODORS.

7. CONTRACTOR'S MANAGEMENT RESPONSIBILITY SHALL INCLUDE INITIAL SUBCONTRACTOR ORIENTATION AND CONTINUING OVERSIGHT & ACCOUNTABILITY REGARDING DAILY USE OF LIGHTING, CEILING FANS, AIR HANDLERS, AC CONDENSERS, THERMOSTATS, DOORS, WINDOWS, ETC., AND WILL BE BACK CHARGED

FOR ENERGY USE IN EXCESS OF TYPICAL LEVELS.

8. ACTUAL FLOOR PLAN LAYOUTS MAY VARY IN MINOR ASPECTS FROM THOSE SHOWN ON PLAN.

NOTIFY OWNER OF ANY SIGNIFICANT FOUND CONDITIONS OR VARIATIONS AFFECTING SCOPE OR

QUALITY.

9. PAINTING SCOPE SHALL INCLUDE ALL INTERIOR WALLS, WOOD BASE TO REMAIN (IN PAINT-ONLY SCOPE AREAS) MOLDINGS, CASINGS, CEILINGS (INCLUDING CLOSETS), WOOD DOORS, STAIR RAILS IF CURRENTLY PAINTED, AND OTHER CURRENTLY OR TYPICALLY PAINTED SURFACES, ETC. REMOVE AND CLEAN SUPPLY AND RETURN GRILLES AND REGISTERS FREE OF LINT, RUST, DIRT AND DUST, ETC., PRIOR TO REFINISHING WITH ENAMEL, AND REINSTALL TO PROPER WORKING ORDER.

10. ALL LIFE SAFETY EQUIPMENT (SPRINKLER, STROBE, HORN, SMOKE DETECTORS, ETC.) SHALL BE PROTECTED TO PREVENT FROM PAINT ADHESION, DAMAGE AND ACCIDENTAL ALARM. NO LIFE

Tyler, Texas

75799

Demi Beckham 903.565.6407 dbeckham@uttyler.edu

BUILDING 8

A-202

Kristopher Jason Jennings TX Registration #18812

LI

B

ER

TY

L A

N D

IN

G

A

PA

R

TM

EN

TS

R

ES

ID

EN

TI

A

L

PA

IN

T

PR

O

JE

C

T

TH

E U

N

IV

ER

SI

TY

O

F

TE

XA

S

AT

T

YL

ER

U N

IV

ER

SI

TY

B O

U

LE

VA

R

D , T

YL

ER

T

EX

AS

JENNINGS

A R C H I T E C T S

305 South Broadway Avenue Suite 900

Tyler, Texas 75702

Jason Jennings, Principal 903.253.0125 jason@jenningsarchitects.com

DN DN

DN DN

D W

FRE

D W

F RE

D W

FRE

D W

F RE

D3 A-203

U P

U P

U P

U P

U P

U P

U P

U P

OPEN

TO

BELOW

OPEN

TO

BELOW

OPEN

TO

BELOW

OPEN

TO

BELOW

8302-E A: 653 sq ft

8304-D A: 1,441 sq ft

8303-D A: 1,441 sq ft

8306-D A: 1,441 sq ft

8305-D A: 1,441 sq ft

8301-E A: 653 sq ft

8308-E A: 653 sq ft

8307-E A: 653 sq ft

B3 A-203

SCALE: 1/8" = 1'-0"D1 BUILDING 8 - 3RD FLOOR PLAN

0 4' 8' 16'

GENERAL PROJECT NOTES:

1. DAILY CLEAN-UP IS REQUIRED.

2. NO PRODUCTS OR PROCESS BY-PRODUCTS ARE ALLOWED TO BE DISPOSED OF ON CAMPUS.

3. CONTRACTOR IS REQUIRED TO PROVIDE THEIR OWN RESTROOM FACILITIES. THERE WILL BE NO

ACCESS TO UT TYLER FACILITIES AT ANY TIME DURING CONSTRUCTION.

4. CONTRACTOR MUST PROVIDE THEIR OWN DUMPSTER & WILL BE RESPONSIBLE FOR KEEPING ALL AFFECTED AREAS CLEAN. REMOVE ALL TRASH, DEMO'D MATERIALS, ETC AS REQUIRED TO MAINTAIN

CLEAN WORK AREAS ON A DAILY BASIS.

5. VERIFY MATERIAL QUANTITIES & AVAILABILITY WITH SUPPLIERS AS REQUIRED PRIOR TO

BIDDING & CONSULT OWNER IF AVAILABILITY IS QUESTIONABLE.

6. COORDINATE UNIT ACCESS & ENERGY MANAGEMENT WITH OWNER'S REPRESENTATIVE. OWNER

WILL PROVIDE KEY CARDS & WILL REQUIRE THAT EXTERIOR OPENINGS BE CLOSED WHEN FEASIBLE.

CONTRACTOR SHALL FOLLOW OWNER INSTRUCTIONS & GUIDELINES FOR MANAGING &

ECONOMIZING HVAC. IT IS EXPECTED THAT HVAC EQUIPMENT WILL REMAIN OFF DURING…