3-2025-30 RFP Scope and Appendices.pdf

PDF 1 MB Posted

Attached to
Catalyst Industrial Park Water Reclamation Facility Standby Power Equipment
Solicitation number
2025-30
Issued by
Seminole County, Florida

View the file

Other files

File Type Posted
2-2025-30 RFP Instructions.pdf PDF
4-2025-30 RFP Addendum 1.pdf PDF
5-2025-30 RFP Addendum 1.pdf PDF
1-0.0 Advertisement for RFP.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal

3976000 08/06/2025

Request for Proposals

Catalyst Industrial Park Water Reclamation Facility

Standby Power Equipment

Table of Contents Page

Section 1 - Introduction/Overview

1.01 Purpose/Objective/Background 2

1.02 Request For Proposal and Appendices 2

Section 2 - Proposal Instructions and Requirements

2.01 Submission of Proposals 3

2.02 Compliance with the RFP 3

2.03 Inquiries 3

2.04 Ambiguity, Conflict or Other Errors in the RFP 3

2.05 Proposal and Presentation Costs 4

2.06 Rejection of Proposals 4

2.07 Terms and Conditions of Construction Contract 4

2.08 Validity of Proposals 4

Section 3 - Proposal Evaluation and Contractor Selection

3.01 Method of Contractor Selection 5

3.02 Projected Timetable 5

3.03 Price 5

3.04 Proposal Evaluation Panel and Evaluation Factors 6

Section 4 - Proposal Format and Contents

4.01 General 6

4.02 Standards for Drawings 6

4.03 Tab I – Proposal Affidavit 7

4.04 Tab II – Cost to the Owner 7

4.05 Tab III – Scope of Supply, Exceptions and Alternates 7

4.06 Tab IV – Schedule 7

4.07 Tab V – Acceptance of Conditions 7

4.08 Tab VI – Standby Power Equipment Information 8

4.09 Tab VII – Warranty 8

4.10 Tab VIII – Proposal Appendices 8

Appendices Appendix A – Proposal Affidavit Appendix B - Proposal Cost Form Appendix C – Project Schedule Appendix D – Project Description Appendix E – Drawings and Specifications Appendix F – Negotiation Process Appendix G – Deliverables Appendix H – Evaluation Criteria Appendix I – Suwannee County Supplementary Forms Appendix J – Suwannee County Standard Addendum to Contract

3976000 08/06/2025

Catalyst Industrial Park Water Reclamation Facility – Standby Power Equipment

Section 1 Introduction/Overview

1.01 Purpose / Objective/ Background

On behalf of Suwannee County, Florida (Owner), we are inviting your Proposal for furnishing the Goods and Special Services described in this Request for Proposal (RFP). Barge Design Solutions, Inc. (Barge) is the design engineer (Engineer) for the Catalyst Industrial Park Water Reclamation Facility that is located in Live Oak, Florida. The Engineer will act as the Owner’s representative during the proposal process. The purpose of this RFP is to solicit Proposal from standby power equipment manufacturers (System Manufacturer).

This solicitation does not constitute an offer by the Engineer or the Owner to enter into a contract. The terms of the Proposal and resulting Procurement Agreement shall comply with all applicable federal, state, and local laws. Proposal and the information utilized in the selection process will remain confidential, to the fullest extent allowed by law, except as provided elsewhere in this RFP.

The information provided in the Proposal will be used for developing an equipment scope to be used by the Owner in the wastewater treatment plant construction contract. The Owner will execute the final agreement with the selected system manufacturer (“Seller”) and may transfer the executed agreement to the Contractor selected for the construction of the water treatment plant expansion.

1.02 Request For Proposal and Appendices

Each prospective Proposer will be furnished:

Request For Proposal (RFP)

• Appendix A – Proposal Affidavit

• Appendix B - Proposal Cost Form

• Appendix C - Project Schedule

• Appendix D – Project Description

• Appendix E – Drawings and Specifications (bound separately)

• Appendix F – Negotiation Process

• Appendix G – Deliverables

• Appendix H – Evaluation Criteria

• Appendix I – Suwannee County Supplementary Forms

• Appendix J – Suwannee County Standard Addendum to Contract

3976000 07/29/2025

Section 2 Proposal Instructions and Requirements

2.01 Submission of Proposals

All sealed paper responses must be submitted with two copies and one original (3 total) of the Proposal are to be delivered and labeled before 4:00 P.M., local time on September 8, 2025 as listed below:

Suwannee County Attention: Cashier Window 200 S Ohio Avenue Live Oak, Florida 32064

SEALED RFP 2025-30 CATALYST INDUSTRIAL PARK WATER

RECLAMATION FACILITY STANDBY POWER EQUIPMENT

Or electronically submitted through the County’s procurement portal:

suwanneecountyfl.bonfirehub.com

2.02 Compliance with the RFP

Proposals must be in strict compliance with this RFP. Failure to comply with all provisions of the RFP may result in disqualification.

2.03 Inquiries

Any questions related to this RFP shall be directed to the Engineer through the Bonfire system, before August 27, 2025, AT 5:00 p.m. EST. Provide reference to the Specifications and other attached documentation as appropriate.

Proposer is advised that responses to questions will only be official and binding where issued in a formal written addendum.

2.04 Ambiguity, Conflict or Other Errors in the RFP

If Proposer discovers any ambiguity, conflict, discrepancy, omission, or other error in the RFP or any document attached to, incorporated into or referenced by the RFP, they shall immediately notify the Engineer and Suwannee County Procurement of such error in writing and request modification or clarification of the document as outlined in Paragraph 2.03 above. Modifications will be made by issuance of a written addendum. All parties who have received this RFP from the Engineer will receive addenda.

Failure of Proposer to receive or acknowledge any addendum shall not relieve it of any obligation under this RFP. All addenda shall become part of this RFP.

2.05 Proposal and Presentation Costs

The Owner will not be liable in any way for any costs incurred by Proposer in the preparation of its Proposal in response to this RFP, nor for the presentation of its Proposal and/or participation in any discussions or negotiations.

3976000 08/06/2025

2.06 Rejection of Proposal

The Owner reserves the right to accept or reject the Proposal submitted.

Reasons for which Proposer may be disqualified and its Proposal not considered include, but are not limited to:

• The Owner determines that the Proposal is not responsive to the RFP.

• The Owner determines that the Proposal is not in the Owner’s best interest.

• The Proposer fails to complete the Proposal in its entirety in response to this

RFP.

• Failure of the Proposer to satisfy any requirements of the RFP.

2.07 Terms and Conditions of Procurement Contract

The Procurement Agreement resulting from this RFP shall be subject to the conditions set forth in the Engineers Joint Contract Documents Committee (EJCDC) procurement documents, as amended, including the “Procurement Agreement between Buyer and Seller for Procurement Contracts”, and the “Standard General Conditions for Procurement Contracts”.

Terms of payment shall be in accordance with the “Standard General Conditions for Procurement Contracts” and the “Procurement Agreement between Buyer and Seller for Procurement Contracts”.

The Proposer’s standard preprinted terms and conditions will not be accepted as a substitute to the above referenced EJCDC procurement documents. Should there be other terms and conditions in addition to the above referenced EJCDC procurement documents, those terms and conditions shall be identified on a separate sheet of the Proposer’s letterhead and included in the Proposal under the appropriate section (Tab VII – Acceptance of Conditions). Additionally, any conflicting provision in the EJCDC procurement documents and the additional terms and conditions must be identified.

2.08 Validity of Proposals

All proposals shall be valid for a period of 90 days from date due.

Section 3 Proposal Evaluation and Selection

3.01 Selection Process

The Proposal will be evaluated using the criteria stated in the RFP. The Owner reserves the right to request clarifications or corrections to Proposal.

The process by which a scope of supply, price, and terms and conditions will be negotiated is described in Appendix F, Negotiation Process.

3976000 08/06/2025

3.02 Projected Timetable of Deliverables

See Appendix G, Deliverables, for a detailed list of non-equipment deliverables required during this project.

The System Manufacturer shall complete the Proposed Project Schedule in Appendix C, subject to the following requirements:

• The proposed schedule is understood to contain the maximum time required for the System Manufacturer to complete the required task.

The actual time for delivery of goods will be adjusted as required for the schedule of the general construction contract for the Suwannee County Catalyst Industrial Park Water Reclamation Facility as required by the “Procurement Agreement between Buyer and Seller for Procurement Contracts”.

• The Engineer, Owner, and System Manufacturer shall agree upon the delivery schedule for each design submittal (see Appendix G for list of deliverables).

• The delivery schedule for all submittals shall satisfy the projected timetable for the design and construction of the project.

3.03 Price

The System Manufacturer shall complete the Itemized Price Proposal (Appendix B) as part of its Proposal.

Submittal of a Price Proposal indicates that the System Manufacturer has a full understanding of the scope of work based upon a review of all information furnished with this RFP, including the Specifications. The prices entered shall reflect the scope of work requested in this RFP, including any additional pricing, based on the requirements of this RFP.

Modifications and adjustments may be made to the original scope of supply, and price if applicable, as the overall design proceeds.

Provide the total, not-to-exceed (NTE) lump sum price of the Standby Power System based on the scope of supply and equipment specified in this RFP, including anticipated material, labor or other component price increases, escalation percentages, and royalty and/or license fees. Prices shall be based on freight-on-board jobsite delivery and shall not include sales tax.

The cost for the System Manufacturer’s field service scope of supply as required by this RFP shall be provided, along with detailed unit cost rates.

Standard labor and expense billing rates for additional field service not included in the base scope of supply shall also be provided in the Price Proposal.

Negotiation of the final price of the Standby Power Equipment will be based on the scope of supply agreed upon by the Owner and the System Manufacturer in the Final Proposal.

3976000 08/06/2025

3.04 Proposal Evaluation Panel and Evaluation Factors

A panel appointed by the Owner will evaluate the Proposal and negotiate a final price and scope of supply. Other agencies and representatives of the Owner may, at the sole discretion of the Owner, evaluate the Proposal and/or System Manufacturer. The factors to be considered by the panel in the evaluation of the Proposal and the negotiation of an agreement are listed in Appendix H, Evaluation Criteria.

Section 4 Proposal Format and Contents

4.01 General

The information listed below shall be submitted with each proposal and should be submitted in the order shown. Each section should be clearly labeled, with pages numbered and separated by tabs. Failure by a Proposer to include all listed items may result in the rejection of the proposal. All items in all tabs shall be included in each copy of the Proposal.

4.02 Standards for Drawings

To ensure consistency between drawings and other electronic documents produced by the Engineer and the Proposer, the Proposer shall comply with the following standards for the Proposal and any subsequent design documentation, after negotiations and selection:

• The Proposer shall provide scalable drawings in a sheet size of 11" x 17" or 22” x 34” format. A title block shall be included for each drawing that includes (as a minimum) project title, building name or unit process, date, scale, sheet number, and revision number.

• Dimensions on all drawings and equipment cut sheets shall be shown in English units.

• All equipment, piping, valves and controls not supplied by the Proposer shall be clearly identified as such on the Proposer’s drawings.

• The Proposer shall provide all applicable legends for Electrical Distribution System drawings.

4.03 Tab I - Proposal Affidavit

The Proposer shall complete the affidavit (See Appendix A – Proposal Affidavit) and enclose under Tab I.

4.04 Tab II - Cost to the Owner

The Proposer shall complete the Price Proposal (Appendix B) in its entirety and enclose under Tab II.

3976000 08/06/2025

4.05 Tab III – Scope of Supply, Exceptions, and Alternates

The System Manufacturer shall submit under Tab III a detailed description of the System Manufacturer’s scope of supply, including the name of the component manufacturer of all equipment supplied.

Any exceptions to or deviations from the requirements of this RFP shall clearly be described in the Proposal under this Tab.

The System Manufacturer shall consider the cost of items required in this RFP and whether some scope items would be more cost effective if provided by the Contractor or different component manufacturer than specified. Provide itemized price deductions for these items along with a description of alternate scope of supply.

In addition, the System Manufacturer may propose scopes and costs for optional items they feel may be desired by the Owner.

4.06 Tab IV – Delivery Schedule

The System Manufacturer shall provide the information required on the Proposed Project Schedule (Appendix C) provided with this RFP, as well as any other relevant schedule information, under Tab IV.

4.07 Tab V – Acceptance of Conditions

The System Manufacturer shall indicate under Tab V, on a separate sheet of the System Manufacturer’s letterhead, any requested exceptions to the requirements of this RFP, General Conditions, or Procurement Agreement between Buyer and Seller for Procurement Contracts. These requested exceptions or modifications shall specifically reference the document, article and paragraph of the attached Specifications (Appendix E).

4.08 Tab VI – Standby Power Equipment Information

The System Manufacturer shall provide shop drawings and product data under Tab VI. Proposed systems must conform to the requirements outlined in the Appendices.

4.09 Tab VII – Warranty

The System Manufacturer shall include under Tab VII a description of the manufacturer’s warranty, as well as details of optional extended warranties available. The cost of the base warranty shall be included in the Price Proposal.

4.10 Tab VIII – Proposal Appendices

The content of this tab is left to the Proposer’s discretion. However, the Proposer should limit materials included here to those that will be helpful to the Owner in understanding the Proposal.

3976000 04/25/25

APPENDIX A

Proposal Affidavit

TO: Suwannee County Board of County Commissioners

(Owner’s Name)

FROM:

(Proposer’s Name) FOR: Catalyst Industrial Park Water

Reclamation Facility

(Project Name) Submitted: , 2025

ARTICLE 1 – PROPOSAL RECIPIENT

1.01 The undersigned Proposer proposes and agrees, if this Proposal is accepted, to enter into a Procurement Agreement with the Buyer in the form included in the Request for Proposal (RFP) to furnish the Goods and Special Services as specified or indicated in the RFP for the prices and within the times indicated in this Proposal and in accordance with the other terms and conditions of the RFP.

1.02 The initial Buyer of the Goods and Special Services will be the Owner, who may assign the Procurement Agreement to the successful Proposer (Contractor) for construction of the wastewater treatment plant improvements.

ARTICLE 2 - PROPOSER’S ACKNOWLEDGMENTS

2.01 Proposer accepts all of the terms and conditions of the RFP. This Proposal will remain subject to acceptance for 90 days after receipt of the Proposal, or for such longer period of time that Proposer may agree to in writing upon request of Engineer or Buyer.

2.02 Proposer accepts the provisions of the Procurement Agreement between

Buyer and Proposer as to liquidated damages in the event of its failure to furnish the Goods and Special Services in accordance with the schedule set forth in the Procurement Agreement between Buyer and Seller.

2.03 Proposer acknowledges that the Owner and Engineer will in no way be liable for any costs incurred by Proposer in the preparation of its Proposal.

2.04 The Proposer hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Owner or Owner’s representatives in verification of the recitals comprising this Proposal. By the signature provided below, the signer affirms that the information g provided herein is true and correct to the best of his/her knowledge and belief.

ARTICLE 3 – PROPOSER’S REPRESENTATIONS

3.01 In submitting this Proposal, Proposer represents, as set forth in the Procurement Agreement, that:

A. Proposer has examined and carefully studied the RFP, other related data identified, and the following Addenda, receipt of all of which is hereby acknowledged.

Addendum No. Addendum Date

B. Proposer has become familiar with and is satisfied as to the local conditions that may affect cost, progress, delivery and the furnishing of Goods and Special Services.

C. Proposer is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress delivery and the furnishing of Goods and Special Services.

D. Proposer has carefully studied and correlated the information known to Proposer, and information and observations obtained from Proposer’s visits, if any, with the contents of the RFP.

E. Proposer has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Proposer has discovered in the RFP, and the written resolution thereof by Engineer is acceptable to Proposer.

F. The RFP is generally sufficient to indicate and convey understanding of all terms and conditions for furnishing the Goods and Special Services for which this Proposal is submitted.

G. Proposer further represents that this Proposal is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation.

ARTICLE 4 – BASIS OF PROPOSAL

4.01 The cost for the proposed work shall be as identified in Tab II of this Proposal.

4.02 Additional Proposed Costs:

A. US $___________/day: The Proposer’s fee for Buyer for not executing the Procurement Agreement between Buyer and Proposer within the time specified in 4.03 below.

4.03 Proposer and Buyer shall execute the Procurement Agreement between

Buyer and Seller within 180 days after receipt of a Proposal acceptable to the Owner. Should the Procurement Agreement between Buyer and Seller not be executed within said 180 days due to the fault of the Buyer, the Buyer shall be subject to the additional costs identified in Paragraph 4.02 above. Should the Procurement Agreement between Buyer and Seller not be executed within the said 180 days due to the fault of the Proposer, Proposer shall be subject to the liquidated damages provisions in the Procurement Agreement between Buyer and Seller. The issue of fault will be determined by the Engineer.

ARTICLE 5 – TIME OF COMPLETION

5.01 Proposer agrees that the furnishing of Goods and Special Services will conform to the schedules set forth in Appendix C of this RFP, which will be incorporated into Article 5 of the Procurement Agreement between Buyer and Seller.

ARTICLE 6 – PROPOSAL DOCUMENTS

6.01 The following documents are attached to and made a condition of this Proposal:

A. Proposer’s supporting data included in Tabs I through VIII of this Proposal.

6.02 The following documents are incorporated by reference as included in the

RFP and as amended by addenda, if any:

A. Drawings and Specifications: See Appendix E

ARTICLE 7 – DEFINED TERMS

7.01 The terms used in this Proposal have the meanings indicated in the General Conditions. The significance of terms with initial capital letters is described in the General Conditions.

ARTICLE 8 – PROPOSAL SUBMITTAL

8.01 This Proposal submitted by:

Corporation Name: (SEAL)

State of Incorporation:

Type (General Business, Professional, Service, Limited Liability) (circle one)

By:

(Signature -- attach evidence of authority to sign)

Name (typed or printed):

Title:

(CORPORATE SEAL)

Attest (Signature of Corporate Secretary)

Business address:

E-mail address:

Phone: Email:

Date of Qualification to do business is

8.02 This Proposal is submitted this ______ day of ________________, 2025.

Note: Attest for a corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a notary.

Note: If the Proposer is a corporation, the Proposal shall be signed by an officer of the corporation; if a partnership, it shall be signed by a partner. If signed by others, authority for signature shall be attached.

APPENDIX B

Price Proposal

Item Description Proposed Price Units

1. Base Scope:

1.a. Catalyst WWTP Standby Generator $ US $

1.b. Catalyst WWTP Automatic Transfer Switch (ATS) $ US $

1.c. Cost of Manufacturer’s Field Service $ US $

TOTAL Not-To-Exceed Price of Standby Power Equipment

(Items 1.a. through 1.c.) $

US $

APPENDIX C

Project Schedule

Item Description Proposed Date Comments

1.

Owner Issues RFP

August 6, 2025 n/a

2.

System Manufacturers Submit Proposal

September 8, 2025 n/a

3.

System Manufacturer Submits EEIP*

2 Weeks after issuance of Notice to Begin Preparation of EEIP

4.

System Manufacturer Submits Final Proposal

2 Weeks from receipt of comments on

EEIP

5.

System Manufacturer Submits Shop Drawing Submittal

4 Weeks from Buyer’s executed Contract

6.

Automatic Transfer Switch Delivered to Job Site

March 16, 2026

7. Standby Generator Delivered to Job Site June 8, 2026

*EEIP = Early Equipment Information Package

APPENDIX D

Project Description Project Overview

Suwannee County wishes to provide sanitary sewer service to the proposed Catalyst Industrial Park. As part of this work, the County wishes to construct a water reclamation facility suitable for treating 0.2 MGD (max. 3-month average day flow) to meet Florida Department of Environmental Protection (FDEP) requirements. Wastewater will be domestic and pre-treated industrial wastewaters.

This project will be funded by a direct legislative grant to the County. This grant requires the project to be complete and operational by August 30, 2026.

Effluent disposal/reuse will be via a combination of rapid infiltration basins and spray irrigation systems. To comply with FDEP requirements for land application to the site, the treatment facility must be constructed to meet Class I reliability requirements in accordance with the EPA publication “Design Criteria for Mechanical, Electric, and Fluid System and Component Reliability.” The facility must also meet requirements for high-level disinfection, as defined by FDEP, with a TSS concentration less than 5 mg/L. The site is located within a Spring Protection Zone, and total nitrogen in the effluent discharge must be less than 3 mg/L.

The scope of this proposal involves the procurement and manufacturer services of the Standby Power Equipment for the facility to meet these treatment and reliability criteria at a 3-month average daily flow of 0.2 MGD. Future phases will expand the capacity of the plant to 0.4 MGD, and ultimately to 1.2 MGD. In addition, control panels and programmable logic controllers shall be provided that allow future expansion to 0.4 MGD with no hardware changes.

System Manufacturer Equipment Scope of Supply

The Standby Power Equipment, for the purposes of this RFP, shall include:

• The Catalyst WWTP Standby Generator, as shown on the drawings and specifications in Appendix E.

• The Catalyst WWTP Automatic Transfer Switch, as shown on the drawings and specifications in Appendix E.

The System Manufacturer’s base scope of supply (included in Item 1 of the Price Proposal) shall also include the following items:

1. Preparation of Early Equipment Information Package (EEIP), Final Proposal, and approvable Shop Drawings.

2. System Manufacturer Field Services during construction as specified in Appendix E.

Acceptable Manufacturers

A list of acceptable manufacturers for Standby Power Equipment is listed in the Specifications - Appendix E.

APPENDIX E

Drawings and Specifications

Drawings:

Number Description 00-E001 Electrical Symbols and Abbreviations – A 00-E002 Electrical Symbols and Abbreviations – B 50-E601 Operations Building One Line Diagram

Specifications:

Section Title 01 33 00 Submittal Procedures 01 78 23 Operation and Maintenance Data 26 01 00 Basic Electrical Requirements 26 05 26 Grounding and Bonding for Electrical Systems 26 05 53 Identification for Electrical Systems 26 32 13 Packaged Engine Generators 26 36 00 Transfer Switches

615 3RD AVENUE SOUTH // SUITE 700 // NASHVILLE, TN 37210

PHONE: (615) 254-1500

SHEET

NO.

JOB NUMBER:

EOR:

P.E. NO.:

REVISIONS

DATE DESCRIPTION

Autodesk Docs://Catalyst Ind Park WWTP - 3976000/3976000_50_E_R24.rvt7/15/2025 4:06:45 PM

ELECTRICAL SYMBOLS AND ABBREVIATIONS - A

615 3rd AVENUE SOUTH, NASHVILLE, TN 37210 00-E001

MJE

94800

CATALYST INDUSTRIAL PARK WASTEWATER TREATMENT PLANT

POWER

DUPLEX RECEPTACLE, NEMA 5-20, 18"AFF, UON

XX: AC = ABOVE COUNTER

C = CONTROLLED RECEPTACLE

GFI = GROUND FAULT CIRCUIT INTERRUPTER

TV = TV RECEPTACLE, 60"AFF UON

WP = WEATHER-RESISTANT RECEPTACLE WITH

WEATHERPROOF IN-USE COVER

QUADRUPLEX RECEPTACLE, NEMA 5-20, 18"AFF, UON

SIMPLEX RECEPTACLE, NEMA 5-20, 18"AFF, UON

SPECIAL PURPOSE SINGLE RECEPTACLE, NEMA

CONFIGURATION AS INDICATED

FLOOR BOX WITH DUPLEX RECEPTACLE, NEMA 5-20 UON;

"S" (WHERE SHOWN) INDICATES SURFACE-MOUNT ON

LOW-PROFILE FLOOR RACEWAY. CIRCLE INDICATES

POKE-THROUGH TYPE.

FLOOR BOX WITH QUADRUPLEX RECEPTACLE, NEMA 5-20

UON; CIRCLE INDICATES POKE-THROUGH TYPE.

FLOOR BOX WITH NEMA 5-20 RECEPTACLE(S) AND DATA

OUTLET(S); OVAL INDICATES POKE-THROUGH TYPE.

FLOOR BOX WITH NEMA 5-20 RECEPTACLE(S), DATA

OUTLET(S), AND A/V JACK(S); OVAL INDICATES POKE-

THROUGH TYPE.

AV AV

FLOOR BOX FOR FURNITURE CONNECTION; CIRCLE

INDICATES POKE-THROUGH TYPE.

J J

CEILING MOUNTED TWIST LOCK SIMPLEX RECEPTACLE,

NEMA L5-20 UON

S

XX

CEILING MOUNTED DUPLEX RECEPTACLE, NEMA 5-20 UON

FLOOR-TO-CEILING WORKSTATION POWER POLE, WITH

DIVIDER FOR POWER AND LOW VOLTAGE WIRING UON.

PP

J JUNCTION BOX, 2-GANG WITH BLANK COVER UON

SURFACE MOUNTED PANELBOARD; HATCHED FILL

INDICATES 480/277V, SOLID FILL INDICATES 208/120V, UON.

HATCHED AREA IN FRONT OF PANELBOARD INDICATES

EXTENT OF WORKING CLEARANCE.

RECESSED MOUNTED PANELBOARD; LINE INDICATES WALL

FACE. HATCHED FILL INDICATES 480/277V, SOLID FILL

INDICATES 208/120V, UON. HATCHED AREA IN FRONT OF

PANELBOARD INDICATES EXTENT OF WORKING CLEARANCE.

DRY-TYPE TRANSFORMER

COMBINATION ENCAPSULATED TRANSFORMER AND

PANELBOARD WITH PRIMARY AND SECONDARY MAIN

BREAKERS

NON-FUSIBLE DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

ENCLOSED CIRCUIT BREAKER DISCONNECT SWITCH

MOTOR STARTER

COMBINATION MOTOR STARTER AND DISCONNECT SWITCH

VARIABLE FREQUENCY DRIVE; DOUBLE LINE INDICATES

FRONT.

VFD

SS SOFT STARTER; DOUBLE LINE INDICATES FRONT.

LOCKABLE MANUAL MOTOR STARTING SWITCH WITH

OVERLOADSM

PB PULL BOX (INTERIOR OR ABOVE GRADE)

CP CONTROL PANEL; DOUBLE LINE INDICATES FRONT.

MOTOR; "#" INDICATES MOTOR HORSEPOWER.

PB

X

PAD-MOUNTED TRANSFORMER; DOOR SWING (WHERE

SHOWN) INDICATES FRONT OF TRANSFORMER. LARGER

DOOR IS HIGH VOLTAGE SIDE, SMALLER DOOR IS LOW

VOLTAGE SIDE.

T

PULL BOX (UNDERGROUND)

X: P = POWER, F = FIBER OPTIC, L = LIGHTING CIRCUIT,

C = COMMUNICATION

208V/3 SPECIAL RECEPTACLE, NEMA

CONFIGURATION AS INDICATED

240V/1 SPECIAL RECEPTACLE, NEMA

CONFIGURATION AS INDICATED

480V/3 SPECIAL RECEPTACLE, NEMA

CONFIGURATION AS INDICATED

SWITCH RATED PIN-AND-SLEEVE RECEPTACLE, 600V,

3-POLE + GROUND, 48"AFF TO BOTTOM OF RECEPTACLE,

UON

COMBINATION FUSED DISCONNECT AND INTERLOCKED

PIN-AND-SLEEVE RECEPTACLE, 600V, 3-POLE + GROUND,

48"AFF TO BOTTOM OF RECEPTACLE, UON

DCP DOOR CONTROL PANEL; DOUBLE LINE INDICATES FRONT.

PUSHBUTTON CONTROL STATION

E-STOP PUSHBUTTON

CABLE TRAY

BUS DUCT, PLUG-IN TYPE

BUS DUCT, FEEDER TYPE

BUS DUCT END CABLE TAP BOX

BUS DUCT CENTER CABLE TAP BOX

MOTOR CONTROL CENTER, FOOTPRINT AND NUMBER OF

SECTIONS AS SHOWN ON PLANS; DOUBLE LINE INDICATES

FRONT.

SWITCHBOARD, FOOTPRINT AND NUMBER OF SECTIONS AS

SHOWN ON PLANS; DOUBLE LINE INDICATES FRONT.

SWITCHGEAR, FOOTPRINT AND NUMBER OF SECTIONS AS

SHOWN ON PLANS; DOUBLE LINE INDICATES FRONT.

MANHOLE

UTILITY POLE

UTILITY POLE WITH GUY WIRE

FIELD INSTRUMENT; "XX" "XXX" INDICATES TAG NUMBER.

*SEE P&ID SHEETS, CONTROL WIRING

DIAGRAMS, AND DIVISION 40 SPECIFICATIONS

MOTOR OPERATED VALVE; "XXX" INDICATES TAG NUMBER.

MOTOR OPERATED GATE; "XXX" INDICATES TAG NUMBER.

MH

XX*

XXX

MOV - XXX

MOG - XXX

POWER (CONTINUED)

E

ELECTRICAL NOTATIONS

HOMERUN

RP-A:21

RP-A:21

CIRCUIT NUMBER

SOURCE PANEL

LIGHTING

A a LP-A:21

CIRCUIT NUMBER

SOURCE PANEL

FIXTURE TYPE PER

LUMINAIRE SCHEDULE

CONTROL ZONE

RECEPTACLE MOUNTING

FLUSH MOUNTED

SURFACE MOUNTED

DISCONNECT RATINGS

600V/3P/30A(30A)/12

NEMA ENCLOSURE RATING

FUSE CURRENT RATING

SWITCH CURRENT RATING

NUMBER OF POLES

VOLTAGE RATING

WIRE AND CONDUIT

2[3"C(4-350 KCMIL, #1G)]

GROUND CONDUCTOR SIZE IN EACH CONDUIT

PHASE/NEUTRAL CONDUCTOR SIZE IN EACH CONDUIT

NUMBER OF PHASE/NEUTRAL CONDUCTORS IN EACH CONDUIT

CONDUIT SIZE

NUMBER OF PARALLEL CONDUITS

CABLE TRAY

TYPE

ELEV

SIZE

BOTTOM OF TRAY ELEVATION

TRAY WIDTH AND LOAD DEPTH

SYSTEM (e.g. DATA, 600V, 5kV, 15kV)

EQUIPMENT NAMING

XX-YY

UNIQUE EQUIPMENT DESIGNATION

EQUIPMENT TYPE:

DP = DISTRIBUTION PANEL

RP = RECEPTACLE PANEL

LP = LIGHTING PANEL

LC = LIGHTING CONTACTOR

FD = FUSED DISCONNECT

NF = NON-FUSIBLE DISCONNECT

CS = COMBINATION STARTER

CP = CONTROL PANEL

T-XX = TRANSFORMER; XX INDICATES

SECONDARY PANEL TYPE

CONTROL WIRING DIAGRAMS

CONTROL POWER TRANSFORMER

MOTOR STARTER COIL OR CONTROL RELAY COIL; "#"

INDICATES COIL ID NUMBER.

XX: CR = CONTROL RELAY

TD = TIME DELAY RELAY

M = MOTOR STARTER COIL

CONTACT, NORMALLY OPEN / NORMALLY CLOSED

HAND-OFF-AUTO SELECTOR SWITCH

PILOT LIGHT

X: A = AMBER, B = BLUE, G = GREEN, R = RED, W = WHITE

MOTOR HEATER

SOLENOID

RESISTANCE TEMPERATURE DETECTOR

H A

CONTACT, NORMALLY OPEN / NORMALLY CLOSED

EMERGENCY STOP PUSHBUTTON

PILOT LIGHT, PUSH-TO-TEST

LIMIT SWITCH

NORMALLY OPEN

NORMALLY OPEN, HELD CLOSED

NORMALLY CLOSED

NORMALLY CLOSED, HELD OPEN

FLOAT SWITCH

NORMALLY OPEN, CLOSES ON RISING LEVEL

NORMALLY CLOSED, OPENS ON RISING LEVEL

NORMALLY OPEN, CLOSES ON DROPPING LEVEL

NORMALLY CLOSED, OPENS ON DROPPING LEVEL

TIME DELAY RELAY SWITCH

NOTC - NORMALLY OPEN, TIMED CLOSING

WHEN ENERGIZED (ON DELAY)

NCTO - NORMALLY CLOSED, TIMED OPENING

WHEN ENERGIZED (ON DELAY)

NOTO - NORMALLY OPEN, TIMED OPENING WHEN

DE-ENERGIZED (OFF DELAY)

NCTC - NORMALLY CLOSED, TIMED CLOSING

WHEN DE-ENERGIZED (OFF DELAY)

PRESSURE SWITCH

NORMALLY OPEN, CLOSES ON INCREASED FLOW

NORMALLY CLOSED, OPENS ON INCREASED FLOW

FLOW SWITCH

NORMALLY OPEN, CLOSES ON INCREASED FLOW

NORMALLY CLOSED, OPENS ON INCREASED FLOW

TEMPERATURE SWITCH

NORMALLY OPEN, CLOSES ON RISING TEMPERATURE

NORMALLY CLOSED, OPENS ON RISING TEMPERATURE

RTD

NOTE: DASHED SYMBOLS INDICATE FIELD-LOCATED DEVICES UON.

H1

X1 X2

H2

XX#

E-STOP

X

X

SYSTEMS

AUTOMATIC DOOR OPERATOR

ELECTRIC DOOR STRIKE

DOOR CONTACT

MAGNETIC LOCK

MAGNETIC DOOR HOLDER

WIRELESS ACCESS POINT

AUDIO/VIDEO RACK

SPEAKER

FIRE ALARM ANNUNCIATOR

NOTIFICATION CIRCUIT POWER SUPPLY

SECURITY CONTROL PANEL

CARD READER, 40"AFF UON

FLOOR BOX WITH DATA OUTLET(S) AS INDICATED

FIRE ALARM CONTROL PANEL

ADDRESSABLE OUTPUT MODULE

ADDRESSABLE INPUT MODULE

CEILING MOUNTED SMOKE DETECTOR

CEILING MOUNTED HEAT DETECTOR

FIRE ALARM MANUAL PULL STATION, 48"AFF UON

SPRINKLER SYSTEM TAMPER SWITCH

SPRINKLER SYSTEM FLOW SWITCH

SCP

SECURITY KEYPAD, 40"AFF UON

AUTOMATIC DOOR ACTUATOR STATION, 40"AFF UON

REQUEST-TO-EXIT BUTTON, 40"AFF UON

CCTV CAMERA; "PTZ" (WHERE SHOWN) INDICATES

PAN-TILT-ZOOM TYPE

DUCT SMOKE DETECTOR WITH ADDRESSABLE

INPUT MODULE

PRE-ACTION SPRINKLER SYSTEM PRESSURE

DETECTOR / SWITCH

SPRINKLER SYSTEM POST INDICATOR VALVE

SUPERVISORY SWITCH

WALL / CEILING MOUNTED FIRE ALARM COMBINATION

AUDIBLE / STROBE NOTIFICATION DEVICE; SUPERSCRIPT

INDICATES CANDELA RATING. NO SUPERSCRIPT = 30cd.

WALL / CEILING MOUNTED FIRE ALARM STROBE

NOTIFICATION DEVICE; SUPERSCRIPT INDICATES CANDELA

RATING. NO SUPERSCRIPT = 30cd.

WALL / CEILING MOUNTED FIRE ALARM AUDIBLE

NOTIFICATION DEVICE

DATA OUTLET, 18"AFF UON; "xD" SUPERSCRIPT INDICATES

NUMBER OF CABLES/PORTS. NO SUPERSCRIPT = 2 CABLES/

PORTS.

CR

KP

DR

DA

ES

DC

ML

DH

EB

PTZ

xD xD xD

WAP

AV

S

FACP

FAA

NAC

AOM

AIM

F

PS

TS

FS

PIV

110 110

110 110

LIGHTING

CEILING MOUNTED LUMINAIRE (RECESSED, SURFACE

MOUNTED, OR SUSPENDED AS INDICATED ON LUMINAIRE

SCHEDULE); HALF SHADING INDICATES LUMINAIRE USED

FOR EMERGENCY LIGHTING.

WALL OR BRACKET MOUNTED LUMINAIRE; HALF SHADING

INDICATES LUMINAIRE USED FOR EMERGENCY LIGHTING.

STANCHION MOUNTED LUMINAIRE; HALF SHADING INDICATES

LUMINAIRE USED FOR EMERGENCY LIGHTING.

POLE MOUNTED LUMINAIRE(S); SQUARES INDICATE FIXTURE

QUANTITY AND ORIENTATION.

POST-TOP LUMINAIRE

GROUND MOUNTED LUMINAIRE

BOLLARD LUMINAIRE

EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED, WALL

OR BRACKET MOUNTED; SHADING REPRESENTS FACE OF

SIGNAGE.

EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED,

CEILING MOUNTED; SHADING REPRESENTS FACE OF

SIGNAGE.

EXIT SIGN WITH BATTERY OPERATED EMERGENCY LIGHT

FIXTURE, WALL MOUNTED

BATTERY OPERATED EMERGENCY LIGHT FIXTURE

REMOTE HEAD(S) FOR BATTERY OPERATED

EMERGENCY UNIT

X a SWITCH, 20 AMP, 125 VOLT, 48"AFF, TOGGLE TYPE, UON;

LOWERCASE LETTER INDICATES CONTROL ZONE.

X: 3 = 3-WAY SWITCH

4 = 4-WAY SWITCH

D = DIMMING CONTROL SWITCH

OS = OCCUPANCY/VACANCY SENSOR WITH

PUSHBUTTON ON/OFF CONTROL, WALL MOUNTED

WS

WALL MOUNTED TOUCH-SCREEN LIGHTING

CONTROL STATION, 48"AFF, UON

OCCUPANCY/VACANCY SENSOR, CEILING MOUNTED;

LOWERCASE LETTER INDICATES CONTROL ZONE.

DAYLIGHT SENSOR, CEILING MOUNTED;

LOWERCASE LETTER INDICATES CONTROL ZONE.

PHOTOCELL, WALL MOUNTED, FACING NORTH

OS

DS

PC

a a

LC

LIGHTING CONTACTOR

LIGHTING CONTROL PANELLCP

WORK CONDITION GRAPHICS

EXISTING

DEMOLITION

NEW

FUTURE

LIGHTNING PROTECTION

AIR TERMINAL, COPPER UON

COMPRESSION / MECHANICAL BONDING CONNECTION

LIGHTNING PROTECTION CABLE, COPPER UON

DOWN CONDUCTOR, COPPER UON

DOWN CONDUCTOR, COPPER UON

LP

DC

TR

AREA CLASSIFICATIONS

CLASS I - DIVISION 1

CLASS I - DIVISION 2

CLASS II - DIVISION 1

CLASS II - DIVISION 2

GROUNDING

EXOTHERMIC WELD BONDING CONNECTION

COMPRESSION / MECHANICAL BONDING CONNECTION

GROUND ROD, 3/4" x 10', COPPER

GROUND BAR

GROUND ROD IN TEST WELL

COPPER GROUND CABLE

COPPER GROUND CABLE, STUBBED UP 10' ABOVE FINISHED

FLOOR OR GRADE FOR EQUIPMENT CONNECTION, UON

G

07/11/2025 30% REVIEW

I/O MODULES

24" MONITOR

I/O MODULES

XX" OIT

I/O MODULES

NETWORK SYMBOLS

CELLULAR ROUTER

CHASSIS-BASED REMOTE I/O (RIO) RACK

COMPUTER MONITOR

MODULAR REMOTE I/O (RIO)

NETWORK ATTACHED STORAGE (NAS) APPLIANCE

OMNIDIRECTIONAL ANTENNA

OPERATOR INTERFACE TERMINAL

OR PANEL MOUNTED WORKSTATION

PANEL MOUNT CELLULAR ANTENNA

PANEL MOUNT FIBER OPTIC PATCH PANEL

PANEL MOUNT INDUSTRIAL

ETHERNET NETWORK SWITCH

PROGRAMMABLE LOGIC CONTROLLER (PLC)

OR PROCESS AUTOMATION CONTROLLER

RACK MOUNTED FIBER OPTIC PATCH PANEL

RACK MOUNTED SERVER OR VM SERVER APPLIANCE

RACK OR SHELF MOUNTED

ETHERNET NETWORK SWITCH

RACK OR SHELF MOUNTED NETWORK FIREWALL

RF LIGHTNING ARRESTOR

STAND-ALONE SERVER OR

WORKSTATION COMPUTER

TELEMETRY RADIO

YAGI ANTENNA

615 3RD AVENUE SOUTH // SUITE 700 // NASHVILLE, TN 37210

PHONE: (615) 254-1500

SHEET

NO.

JOB NUMBER:

EOR:

P.E. NO.:

REVISIONS

DATE DESCRIPTION

Autodesk Docs://Catalyst Ind Park WWTP - 3976000/3976000_50_E_R24.rvt7/15/2025 4:06:58 PM

ELECTRICAL SYMBOLS AND ABBREVIATIONS - B

615 3rd AVENUE SOUTH, NASHVILLE, TN 37210 00-E002

MJE

94800

CATALYST INDUSTRIAL PARK WASTEWATER TREATMENT PLANT

ONE-LINE DIAGRAMS

FUSE

BUS STAB OR SEPARABLE CONNECTOR

SWITCH

TRANSFER SWITCH, AUTOMATIC UON

CONTACTOR

POTENTIAL TRANSFORMER

CURRENT TRANSFORMER (SHOWN AROUND FEEDER)

SHORTING TERMINAL BLOCK

LIGHTNING ARRESTOR

BATTERY

DRAWOUT CIRCUIT BREAKER, 5 KV AND ABOVE

DRAWOUT LOW VOLTAGE CIRCUIT BREAKER

FIXED MOUNTED LOW VOLTAGE CIRCUIT BREAKER,

THERMAL MAGNETIC UON

DRAWOUT CIRCUIT BREAKER OR FUSE CLIP POSITION

(SPACE WITH PROVISIONS)

POWER TRANSFORMER, WINDING CONFIGURATION AS

INDICATED (DELTA PRIMARY / SOLIDLY GROUNDED WYE

SECONDARY SHOWN)

GROUND CONNECTION

RESISTANCE OR IMPEDANCE GROUND CONNECTION

NEUTRAL-GROUND BOND (MAIN BONDING JUMPER)

TERMINAL BLOCK

MOTOR; "#" INDICATES MOTOR HORSEPOWER.

GENERATOR

LIGHTING LOAD

CAPACITOR

RESISTOR OR RESISTIVE HEAT LOAD

OVERLOAD RELAY

PROTECTIVE RELAY; "#" INDICATES ANSI DEVICE NUMBER.

AMMETER

METER

SURGE PROTECTIVE DEVICE

DIGITAL POWER METER; "A" (WHERE SHOWN) INDICATES

AMMETER ON CT'S FOR FEEDER BREAKER

TRIP UNIT, LSIG FUNCTIONS AS INDICATED

METERING TRIP UNIT, LSIG FUNCTIONS AS INDICATED

SHUNT TRIP

KIRK KEY INTERLOCK

VOLTAGE TEST BLOCK

VARIABLE FREQUENCY DRIVE

REDUCED VOLTAGE SOFT STARTER

N

G

STB

TB

G

DPM

A

A

M

SPD

TU

MTU

ST

K

VTB

VFD

SS

NOTE: PLAN VIEW SYMBOLS MAY ALSO BE USED ON ONE-LINE DIAGRAMS.

ABBREVIATIONS

(D) (E) (R/E) (R/N)

A, AMP

AC

ACS

AF

AFF

AFG

AI

AL

AO

AT

ATS

A/V

AUX

AWG

BKR

#/C C

CB

CCTV

CKT

COMM

CPT

CT

CU

DC

DI

DISC

DO

DP

DWG

EF

EL, ELEV

EMT

ENCL

EWC

FACP

FAA

FBO

FDR

FS

FU

FVR

FVNR

FWU

GFI, GFCI

GFP

GND

H/A

HOA

HP

HT

HVAC

HZ

IND

INSTR

KAIC

KCMIL

KVA

KVAR

KW

KWH

LCP

LED

LI

LIM

LP

L-R

LS

LSI

LSIG

LTG

LVL

LV

EXISTING TO BE DEMOLISHED

EXISTING TO REMAIN

EXISTING TO BE RELOCATED (EXISTING LOCATION)

EXISTING RELOCATED (NEW LOCATION)

AMPERE

ABOVE COUNTER / ALTERNATING CURRENT

ACCESS CONTROL SYSTEM

AMPS FRAME

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE OR PAVEMENT

ANALOG INPUT

ALUMINUM

ANALOG OUTPUT

AMPS TRIP

AUTOMATIC TRANSFER SWITCH

AUDIO/VISUAL

AUXILIARY

AMERICAN WIRE GAUGE

BREAKER

NUMBER OF CONDUCTOR(S)

CONDUIT

CIRCUIT BREAKER

CLOSED CAPTION TELEVISION

CIRCUIT

COMMUNICATIONS

CONTROL POWER TRANSFORMER

CURRENT TRANSFORMER

COPPER

DIRECT CURRENT

DISCRETE INPUT

DISCONNECT

DISCRETE OUTPUT

DISTRIBUTION PANEL

DRAWING

EXHAUST FAN

ELEVATION

ELECTRICAL METALLIC TUBING

ENCLOSURE

ELECTRIC WATER COOLER

FIRE ALARM CONTROL PANEL

FIRE ALARM ANNUNCIATOR

FURNISHED BY OTHERS

FEEDER

FLOW SWITCH

FUSE

FULL VOLTAGE REVERSING STARTER

FULL VOLTAGE NON-REVERSING STARTER

FURNISHED WITH UNIT

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT PROTECTION

GROUND

HAND / AUTOMATIC

HAND / OFF / AUTOMATIC

HORSEPOWER

HEIGHT

HEATING, VENTILATION, AND AIR CONDITIONING

HERTZ

INDICATING

INSTRUMENT

KILOAMP INTERRUPTING CAPACITY

THOUSAND CIRCULAR MILS

KILOVOLT-AMP

KILOVOLT-AMP REACTIVE

KILOWATT

KILOWATT HOUR

LIGHTING CONTROL PANEL

LIGHT EMITTING DIODE

LONG-TIME & INSTANTANEOUS TRIP

LIMIT

LIGHTING PANEL

LOCAL-REMOTE

LONG-TIME & SHORT-TIME TRIP

LONG-TIME, SHORT-TIME, & INSTANTANEOUS TRIP

LONG-TIME, SHORT-TIME, INSTANTANEOUS, & GROUND TRIP

LIGHTING

LEVEL

LOW VOLTAGE

MCB

MCC

MCP

MFR

MH

MLO

MOV

MTD

MTS

NAC

NC

NCTC

NCTO

NEC

NFPA

NIC

NO

NOTC

NOTO

NTS

OL

PH

PIR

PIV

POS

PRI

PS

PT

PVC

RCPT

RGS

RP

RVSS

SCCR

SEC

SHLD

SPD

SS

STR

SV

SW

SWBD

SWGR

TB

TEMP

TERM

TS

TSP

TV

TYP

UG

UON

V

VA

VAR

VFD

W

WP

XFMR

XP

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MOTOR CIRCUIT PROTECTOR

MANUFACTURER

MOUNTING HEIGHT

MAIN LUGS ONLY

MOTOR OPERATED VALVE OR GATE

MOUNTED

MANUAL TRANSFER SWITCH

NOTIFICATION APPLIANCE CIRCUIT

NORMALLY CLOSED

NORMALLY CLOSED, TIME CLOSE

NORMALLY CLOSED, TIME OPEN

NATIONAL ELECTRICAL CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NORMALLY OPEN

NORMALLY OPEN, TIME CLOSE

NORMALLY OPEN, TIME OPEN

NOT TO SCALE

OVERLOAD RELAY

PHASE

PASSIVE INFRARED

POST INDICATOR VALVE

POSITION

PRIMARY

PRESSURE SWITCH

POTENTIAL TRANSFORMER

POLYVINYL CHLORIDE

RECEPTACLE

RIGID GALVANIZED STEEL

RECEPTACLE PANEL

REDUCED VOLTAGE SOFT STARTER

SHORT CIRCUIT CURRENT RATING

SECONDARY

SHIELDED

SURGE PROTECTIVE DEVICE

STAINLESS STEEL

STARTER

SOLENOID VALVE

SWITCH

SWITCHBOARD

SWITCHGEAR

TERMINAL BOX

TEMPERATURE

TERMINAL

TEMPERATURE SWITCH / TAMPER SWITCH

TWISTED SHIELDED PAIR

TELEVISION / MONITOR

TYPICAL

UNDERGROUND

UNLESS OTHERWISE NOTED

VOLT

VOLT-AMP

VOLT-AMP REACTIVE

VARIABLE FREQUENCY DRIVE

WATT

WEATHER PROOF

TRANSFORMER

EXPLOSION PROOF

GENERAL NOTES

1. ALL SYMBOLS SHOWN ON THIS SHEET MAY NOT BE USED ON THIS

PROJECT.

2. INSTALLATION SHALL CONFORM TO THE APPLICABLE

REQUIREMENTS OF THE LOCALLY ADOPTED NFPA 70 (NEC) CODE

ALONG WITH APPLICABLE STATE AND LOCAL CODES.

3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES

DURING CONSTRUCTION.

4. THE DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO

INCLUDE EVERY DETAIL OF REQUIRED CONSTRUCTION EQUIPMENT

AND MATERIALS. PROVIDE ALL LABOR, MATERIALS AND

EQUIPMENT NOT SPECIFICALLY SHOWN ON THE DRAWINGS BUT

WHICH ARE NECESSARY TO COMPLETE THE WORK. INSTALLATION

SHALL BE COORDINATED WITH PIPING, DUCTWORK, STRUCTURAL

STEEL ALONG WITH ROOM FINISHES.

5. CONDUIT ROUTING IS DIAGRAMMATIC. ROUTE PARALLEL AND

PERPENDICULAR TO LINES OF BUILDING STRUCTURE. FIELD

VERIFY EXACT ROUTING PER ACTUAL CONDITIONS. MINIMUM

ACCEPTABLE CONDUIT SIZE IS ¾” ABOVE GRADE AND 1”

UNDERGROUND.

6. CIRCUIT AMPACITY RATINGS ARE BASED ON RACEWAYS NOT

EXCEEDING (3) CURRENT-CARRYING CONDUCTORS PLUS NEUTRAL

CONDUCTORS AND EQUIPMENT GROUND CONDUCTOR PER NEC

CODE. A SEPARATE NEUTRAL CONDUCTOR SHALL BE PROVIDED

FOR EACH CURRENT CARRYING CONDUCTOR.

7. BOND ALL INTERIOR METALLIC PIPING SYSTEMS, INCLUDING NATURAL GAS,

IN ACCORDANCE WITH NFPA 70-250 REQUIREMENTS.

8. PROVIDE A GREEN-INSULATED GROUNDING CONDUCTOR, SIZED PER NEC

ARTICLE 250, IN ALL FEEDER AND BRANCH CIRCUIT RACEWAYS.

9. PROVIDE A PULL WIRE IN EACH EMPTY CONDUIT.

10. FIRE SEAL ALL CONDUIT PENETRATIONS OF FIRE RATED WALLS.

11. DO NOT USE ANY LIGHT FIXTURE AS A RACEWAY FOR CONDUCTORS NOT

SERVING FIXTURE, UNLESS FIXTURE IS DESIGNATED AND UL-LISTED FOR

USE AS A RACEWAY.

12. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN (RCP) FOR EXACT

LOCATION OF OVERHEAD LIGHT FIXTURES.

13. COORDINATE EXACT LOCATION AND MOUNTING HEIGHT OF ELECTRICAL

OUTLETS WITH CASEWORK, FURNITURE AND MILLWORK. REFER TO

ARCHITECTURAL PLANS AND ELEVATIONS FOR DETAILS.

14. COORDINATE MOUNTING HEIGHT AND ORIENTATION OF “ABOVE COUNTER”

DEVICES WITH ARCHITECT OR OWNER’S REPRESENTATIVE PRIOR TO

ROUGH-IN. IF NOT DIRECTED OTHERWISE, INSTALL “ABOVE COUNTER”

OUTLETS VERTICALLY 4” ABOVE BACKSPLASH OR TOP SURFACE OF

COUNTER WHEN A BACKSPLASH IS NOT INCLUDED.

15. DO NOT ATTACH STARTERS AND DISCONNECTS FURNISHED FOR HVAC

EQUIPMENT DIRECTLY TO EQUIPMENT. PROVIDE WALL-MOUNT SUPPORT

OR INDEPENDENTLY SUPPORT ON STEEL ANGLE OR UNISTRUT RACK

CONSTRUCTED FOR THAT PURPOSE. LOCAL DISCONNECTS FOR HVAC

EQUIPMENT SHALL BE FURNISHED SEPARATELY FROM THE HVAC

EQUIPMENT.

16. VERIFY EXACT MECHANICAL EQUIPMENT TO BE INSTALLED. ADJUST

CONDUIT, WIRING, DISCONNECT SIZE AND FUSING PER MANUFACTURER

FINAL REQUIREMENTS FOR ACTUAL EQUIPMENT INSTALLED.

17. BASIS OF DESIGN MANUFACTURERS AND MODELS ARE SHOWN ON THE

PLANS. THESE PROVIDE ONLY A MINIMUM LEVEL OF QUALITY AND ARE NOT

INTENDED AS PROPRIETARY SPECIFICATIONS. REFER TO SPECIFICATIONS

FOR SUBSTITUTION REQUIREMENTS AND PROCEDURES.

18. CONTRACTOR SHALL VISIT THE PROJECT SITE AND CAREFULLY EXAMINE

THOSE PORTIONS OF THE SITE AFFECTED BY THIS WORK TO BECOME

FAMILIAR WITH EXISTING CONDITIONS THAT MAY AFFECT EXECUTION OF

THE WORK.

19. “PROVIDE” IS AN ALL-INCLUSIVE TERM REQUIRING THE CONTRACTOR TO

FURNISH, INSTALL, WIRE AND CONNECT ALL SPECIFIED EQUIPMENT AS

WELL AS COMPONENTS, ACCESSORIES, AND MOUNTING HARDWARE TO

MEET SYSTEM REQUIREMENTS.

20. “INSTALL” SPECIFIES THAT THE CONTRACTOR SHALL INSTALL EQUIPMENT

PROVIDED BY OTHERS. THE CONTRACTOR SHALL PROVIDE ALL

ANCILLARY EQUIPMENT FOR A COMPLETE INSTALLATION.

WIRING

CONDUIT TURNING UP

CONDUIT STUB OUT; TERMINATE WITH BUSHING IF

INTERIOR. CAP IF EXTERIOR OR UNDERGROUND.

XXX: UGP = UNDERGROUND PRIMARY

UGS = UNDERGROUND SECONDARY

UGE = UNDERGROUND ELECTRICAL

UGE/C = UNDERGROUND ELECTRICAL / COMM.

P = POWER

S = SIGNAL

E = ETHERNET

D = DIGITAL I/O

A = ANALOG I/O

COMM = COMMUNCATIONS

OH = OVERHEAD

CONDUIT EXPOSED OR ABOVE CEILING

CONDUIT CONCEALED IN FLOOR OR UNDERGROUND

FLEXIBLE CONDUIT CONNECTION

CONDUIT TURNING DOWN

XXX

12kV/480VAC

(BY SVEC)

TFR-UTIL

HIGH VOLTAGE

SERVICE FROM SVEC

G

CB-GEN

800AT

800 AF

GEN

STANDBY GENERATOR

500kW, 4-WIRE, 3-PHASE

CB-MAIN

1000AT

1200 AF

N G

LSI

LSIG

M

UTILITY METER

(BY SVEC)

TO SWBD SEE

DRAWING 50-E602

ATS

480VAC, 1000A

4-POLE, 4-WIRE, 3-PHASE

SERVICE ENTRANCE RATED

WITH BONDED NEUTRAL AND

BYPASS/ISOLATION SWITCH

PAD MOUNTED

TRANSFORMER

N G

ATS

BYPASS

P0001A-C P0003A-C

P0005A-C

615 3RD AVENUE SOUTH // SUITE 700 // NASHVILLE, TN 37210

PHONE: (615) 254-1500

SHEET

NO.

JOB NUMBER:

EOR:

P.E. NO.:

REVISIONS

DATE DESCRIPTION

Autodesk Docs://Catalyst Ind Park WWTP - 3976000/3976000_50_E_R24.rvt7/15/2025 4:12:14 PM

OP BLDG ONE LINE DGRM - UTIL GEN & ATS SCHED

615 3rd AVENUE SOUTH, NASHVILLE, TN 37210 50-E601

MJE

94800

CATALYST INDUSTRIAL PARK WASTEWATER TREATMENT PLANT

NTS

50-E601

1 OPERATIONS BUILDING ONE LINE DIAGRAM

1.

NOTES:

B. COMMUNICATIONS NETWORK N/A

GENERATOR ENGINE SHUTDOWN 20 MINUTES

RETRANSFER TO NORMAL 10 MINUTES

TRANSFER TO EMERGENCY 2 SECONDS

NORMAL SOURCE MOMENTARY OUTAGE OVERRIDE 2 SECONDS

A. TIME DELAYS

ACCESSORIES:

MANUFACTURER/MODEL NO.: -

A. CABLE ENTRY/EXIT BOTTOM

ENCLOSURE TYPE: NEMA 3R

F. LOAD TYPE -

E. CLOSE AND WITHSTAND (CB PROTECTED/3 CYCLE) 65,000 @ 480VAC

D. POLES 4

C. FREQUENCY 60

B. VOLTS (RATED/APPLICATION) 480Y/277

A. AMPERES (CONTINUOUS) 1000

SYSTEM REQUIREMENTS:

E. OPERATING MODES OPEN TRANSITION-PROGRAMMED DELAY

D. DRAWOUT POSITION (MANUALLY OPERATED) MANUALLY SELECTED

C. BYPASS (MECHANICALLY OPERATED AND HELD) MANUAL BYPASS/ISOLATION SWITCH

B. OPERATION OF AUTOMATIC MODE ELEC OPERATED, MECH HELD

A. CONFIGURATION DUAL CONTACTOR, DUAL OPERATOR

APPLICATION:

GENSET IDENTIFICATION ATS NOTES

AUTOMATIC TRANSFER SWITCH SCHEDULE

1.

NOTES:

C. TANK DESCRIPTION UL 142

B. SIZE TANK 72 HOURS

A. FUEL SYSTEM NO.2 STATIONARY DIESEL

FUEL SUPPLY:

I. OUTPUT CIRCUIT BREAKERS 600AF/600AT LSI

-STEPCHANGE 0 TO 100% ISO 8528-5 AND NFPA 110

H. VOLTAGE REGULATION

G. ENCLOSURE WEATHER RESISTANT, OUTDOOR

F. TEMPERATURE RISE 125° C

E. INSULATION CLASS CLASS H

D. RPM @ RATED LOAD 1,800

C. FREQUENCY 60 HZ

B. PHASE/WIRE 3 Φ/ 4 WIRE

A. VOLTAGE 480Y/277

GENERATOR:

D. DUTY EMERGENCY

C. ALTITUDE <1000 FT AMSL

B. POWER FACTOR 0.8

A. KILOWATTS 500

SYSTEM REQUIREMENTS

APPLICATION: LEGALLY REQUIRED

GENSET IDENTIFICATION GEN NOTES

ENGINE - GENERATOR SCHEDULE

Section 01 33 00 Submittal Procedures

06/06/2025 39760-00

Part 1 General

1.1 Scope

A. The work under this Section includes submittal to the Engineer of shop drawings, product data and samples required by the various Sections of these Specifications.

B. Submittal Contents: The submittal contents required are specified in each Section.

C. Definitions: Submittals are categorized as follows:

1. Shop Drawings

a. Shop drawings shall include technical data, drawings, diagrams, procedure and methodology, performance curves, schedules, templates, patterns, test reports, calculations, instructions, measurements and similar information as applicable to the specific item for which the shop drawing is prepared.

b. Provide newly-prepared information with graphic information at accurate scale (except as otherwise indicated) with name or preparer (firm name) indicated. The Contract Drawings shall not be reproduced by any method for use as or in lieu of detail shop drawings. Show dimensions and note dimensions that are based on field measurement. Identify materials and products in the work shown. Indicate compliance with standards and special coordination requirements. Do not allow shop drawings to be used in connection with the Work without appropriate final �Action� markings by the Engineer.

c. Drawings shall be presented in a clear and thorough manner. Details shall be identified by reference to sheet and detail, Specification Section, schedule or room numbers shown on the Contract Drawings.

d. Minimum assembly drawings sheet size shall be 11 x 17-inches.

e. Minimum detail sheet size shall be 8-1/2 x 11-inches.

f. Minimum Scale:

i. Assembly Drawings Sheet, Scale: 1-inch = 30 feet.

ii. Detail Sheet, Scale: 1/4-inch = 1 foot.

2. Product Data

a. Product data includes standard published information on materials, products and systems, not specially prepared for this Project, other than the designation of selections from among available choices printed therein.

01 33 00 - 2

06/06/2025 39760-00

b. Collect required data into one submittal for each unit of work or system, and mark each copy to show which choices and options are applicable to the Project. Include manufacturer's standard published recommendations for application and use, compliance with standards, application of labels and seals, notation of field measurements which have been checked and special coordination requirements.

4. Miscellaneous submittals related directly to the work (non-administrative) include warranties, maintenance agreements, workmanship bonds, project photographs, survey data and reports, physical work records, statements of applicability, quality testing and certifying reports, copies of industry standards, record drawings, field measurement data, operating and maintenance materials, overrun stock, security/protection/safety keys and similar information, devices and materials applicable to the work but not processed as shop drawings, product data or samples.

1.2 Specific Category Requirements

A. General: Except as otherwise indicated in the individual work sections, comply with general requirements specified herein for each indicated category of submittal.

Submittals shall contain:

1. The date of submittal and the dates of any previous submittals.

2. The Project title.

3. Unless indicated otherwise by the Engineer�s submittal management software, provide numerical submittal numbers, starting with 1.0, 2.0, etc. Revisions to be numbered 1.1, 1.2, etc.

4. The Names of:

a. Supplier

b. Manufacturer

5. Identification of the product, with the Specification Section number, permanent equipment tag numbers and applicable Drawing No.

6. Field dimensions, clearly identified as such.

7. Relation to adjacent or critical features of the work or materials.

8. Applicable standards, such as ASTM .

9. Notification to the Engineer in writing, at time of submissions, of any deviations on the submittals from requirements of the Contract Documents.

10. Identification of revisions on resubmittals.

01 33 00 - 3

06/06/2025 39760-00

12. Contractor's stamp, initialed or signed or affirmatively indicated on submittal, certifying to review of submittal, verification of products, field measurements and field construction criteria and coordination of the information within the submittal with requirements of the work and of Contract Documents.

13. Submittals showing more than the particular item under consideration shall have all but the pertinent description of the item for which review is requested crossed out.

1.3 Routing of Submittals

A. Submittals and routine correspondence shall be routed as follows:

1. Supplier to Engineer

2. Engineer to Supplier and Owner

Part 2 Products

2.1 Shop Drawings

A. Unless otherwise specifically directed by the Engineer, make all shop drawings accurately to a scale sufficiently large to show all pertinent features of the item and its method of connection to the work.

B. Submit all shop assembly drawings, as a digital image, pdf format, scanned at the original scale.

C. Submit all shop drawings as a…