3-2025-30 RFP Scope and Appendices.pdf
PDF 1 MB Posted
- Solicitation number
- 2025-30
- Issued by
- Seminole County, Florida
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2025-30 RFP Instructions.pdf | ||
| 4-2025-30 RFP Addendum 1.pdf | ||
| 5-2025-30 RFP Addendum 1.pdf | ||
| 1-0.0 Advertisement for RFP.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
3976000 08/06/2025
Request for Proposals
Catalyst Industrial Park Water Reclamation Facility
Standby Power Equipment
Table of Contents Page
Section 1 - Introduction/Overview
1.01 Purpose/Objective/Background 2
1.02 Request For Proposal and Appendices 2
Section 2 - Proposal Instructions and Requirements
2.01 Submission of Proposals 3
2.02 Compliance with the RFP 3
2.03 Inquiries 3
2.04 Ambiguity, Conflict or Other Errors in the RFP 3
2.05 Proposal and Presentation Costs 4
2.06 Rejection of Proposals 4
2.07 Terms and Conditions of Construction Contract 4
2.08 Validity of Proposals 4
Section 3 - Proposal Evaluation and Contractor Selection
3.01 Method of Contractor Selection 5
3.02 Projected Timetable 5
3.03 Price 5
3.04 Proposal Evaluation Panel and Evaluation Factors 6
Section 4 - Proposal Format and Contents
4.01 General 6
4.02 Standards for Drawings 6
4.03 Tab I – Proposal Affidavit 7
4.04 Tab II – Cost to the Owner 7
4.05 Tab III – Scope of Supply, Exceptions and Alternates 7
4.06 Tab IV – Schedule 7
4.07 Tab V – Acceptance of Conditions 7
4.08 Tab VI – Standby Power Equipment Information 8
4.09 Tab VII – Warranty 8
4.10 Tab VIII – Proposal Appendices 8
Appendices Appendix A – Proposal Affidavit Appendix B - Proposal Cost Form Appendix C – Project Schedule Appendix D – Project Description Appendix E – Drawings and Specifications Appendix F – Negotiation Process Appendix G – Deliverables Appendix H – Evaluation Criteria Appendix I – Suwannee County Supplementary Forms Appendix J – Suwannee County Standard Addendum to Contract
3976000 08/06/2025
Catalyst Industrial Park Water Reclamation Facility – Standby Power Equipment
Section 1 Introduction/Overview
1.01 Purpose / Objective/ Background
On behalf of Suwannee County, Florida (Owner), we are inviting your Proposal for furnishing the Goods and Special Services described in this Request for Proposal (RFP). Barge Design Solutions, Inc. (Barge) is the design engineer (Engineer) for the Catalyst Industrial Park Water Reclamation Facility that is located in Live Oak, Florida. The Engineer will act as the Owner’s representative during the proposal process. The purpose of this RFP is to solicit Proposal from standby power equipment manufacturers (System Manufacturer).
This solicitation does not constitute an offer by the Engineer or the Owner to enter into a contract. The terms of the Proposal and resulting Procurement Agreement shall comply with all applicable federal, state, and local laws. Proposal and the information utilized in the selection process will remain confidential, to the fullest extent allowed by law, except as provided elsewhere in this RFP.
The information provided in the Proposal will be used for developing an equipment scope to be used by the Owner in the wastewater treatment plant construction contract. The Owner will execute the final agreement with the selected system manufacturer (“Seller”) and may transfer the executed agreement to the Contractor selected for the construction of the water treatment plant expansion.
1.02 Request For Proposal and Appendices
Each prospective Proposer will be furnished:
Request For Proposal (RFP)
• Appendix A – Proposal Affidavit
• Appendix B - Proposal Cost Form
• Appendix C - Project Schedule
• Appendix D – Project Description
• Appendix E – Drawings and Specifications (bound separately)
• Appendix F – Negotiation Process
• Appendix G – Deliverables
• Appendix H – Evaluation Criteria
• Appendix I – Suwannee County Supplementary Forms
• Appendix J – Suwannee County Standard Addendum to Contract
3976000 07/29/2025
Section 2 Proposal Instructions and Requirements
2.01 Submission of Proposals
All sealed paper responses must be submitted with two copies and one original (3 total) of the Proposal are to be delivered and labeled before 4:00 P.M., local time on September 8, 2025 as listed below:
Suwannee County Attention: Cashier Window 200 S Ohio Avenue Live Oak, Florida 32064
SEALED RFP 2025-30 CATALYST INDUSTRIAL PARK WATER
RECLAMATION FACILITY STANDBY POWER EQUIPMENT
Or electronically submitted through the County’s procurement portal:
suwanneecountyfl.bonfirehub.com
2.02 Compliance with the RFP
Proposals must be in strict compliance with this RFP. Failure to comply with all provisions of the RFP may result in disqualification.
2.03 Inquiries
Any questions related to this RFP shall be directed to the Engineer through the Bonfire system, before August 27, 2025, AT 5:00 p.m. EST. Provide reference to the Specifications and other attached documentation as appropriate.
Proposer is advised that responses to questions will only be official and binding where issued in a formal written addendum.
2.04 Ambiguity, Conflict or Other Errors in the RFP
If Proposer discovers any ambiguity, conflict, discrepancy, omission, or other error in the RFP or any document attached to, incorporated into or referenced by the RFP, they shall immediately notify the Engineer and Suwannee County Procurement of such error in writing and request modification or clarification of the document as outlined in Paragraph 2.03 above. Modifications will be made by issuance of a written addendum. All parties who have received this RFP from the Engineer will receive addenda.
Failure of Proposer to receive or acknowledge any addendum shall not relieve it of any obligation under this RFP. All addenda shall become part of this RFP.
2.05 Proposal and Presentation Costs
The Owner will not be liable in any way for any costs incurred by Proposer in the preparation of its Proposal in response to this RFP, nor for the presentation of its Proposal and/or participation in any discussions or negotiations.
3976000 08/06/2025
2.06 Rejection of Proposal
The Owner reserves the right to accept or reject the Proposal submitted.
Reasons for which Proposer may be disqualified and its Proposal not considered include, but are not limited to:
• The Owner determines that the Proposal is not responsive to the RFP.
• The Owner determines that the Proposal is not in the Owner’s best interest.
• The Proposer fails to complete the Proposal in its entirety in response to this
RFP.
• Failure of the Proposer to satisfy any requirements of the RFP.
2.07 Terms and Conditions of Procurement Contract
The Procurement Agreement resulting from this RFP shall be subject to the conditions set forth in the Engineers Joint Contract Documents Committee (EJCDC) procurement documents, as amended, including the “Procurement Agreement between Buyer and Seller for Procurement Contracts”, and the “Standard General Conditions for Procurement Contracts”.
Terms of payment shall be in accordance with the “Standard General Conditions for Procurement Contracts” and the “Procurement Agreement between Buyer and Seller for Procurement Contracts”.
The Proposer’s standard preprinted terms and conditions will not be accepted as a substitute to the above referenced EJCDC procurement documents. Should there be other terms and conditions in addition to the above referenced EJCDC procurement documents, those terms and conditions shall be identified on a separate sheet of the Proposer’s letterhead and included in the Proposal under the appropriate section (Tab VII – Acceptance of Conditions). Additionally, any conflicting provision in the EJCDC procurement documents and the additional terms and conditions must be identified.
2.08 Validity of Proposals
All proposals shall be valid for a period of 90 days from date due.
Section 3 Proposal Evaluation and Selection
3.01 Selection Process
The Proposal will be evaluated using the criteria stated in the RFP. The Owner reserves the right to request clarifications or corrections to Proposal.
The process by which a scope of supply, price, and terms and conditions will be negotiated is described in Appendix F, Negotiation Process.
3976000 08/06/2025
3.02 Projected Timetable of Deliverables
See Appendix G, Deliverables, for a detailed list of non-equipment deliverables required during this project.
The System Manufacturer shall complete the Proposed Project Schedule in Appendix C, subject to the following requirements:
• The proposed schedule is understood to contain the maximum time required for the System Manufacturer to complete the required task.
The actual time for delivery of goods will be adjusted as required for the schedule of the general construction contract for the Suwannee County Catalyst Industrial Park Water Reclamation Facility as required by the “Procurement Agreement between Buyer and Seller for Procurement Contracts”.
• The Engineer, Owner, and System Manufacturer shall agree upon the delivery schedule for each design submittal (see Appendix G for list of deliverables).
• The delivery schedule for all submittals shall satisfy the projected timetable for the design and construction of the project.
3.03 Price
The System Manufacturer shall complete the Itemized Price Proposal (Appendix B) as part of its Proposal.
Submittal of a Price Proposal indicates that the System Manufacturer has a full understanding of the scope of work based upon a review of all information furnished with this RFP, including the Specifications. The prices entered shall reflect the scope of work requested in this RFP, including any additional pricing, based on the requirements of this RFP.
Modifications and adjustments may be made to the original scope of supply, and price if applicable, as the overall design proceeds.
Provide the total, not-to-exceed (NTE) lump sum price of the Standby Power System based on the scope of supply and equipment specified in this RFP, including anticipated material, labor or other component price increases, escalation percentages, and royalty and/or license fees. Prices shall be based on freight-on-board jobsite delivery and shall not include sales tax.
The cost for the System Manufacturer’s field service scope of supply as required by this RFP shall be provided, along with detailed unit cost rates.
Standard labor and expense billing rates for additional field service not included in the base scope of supply shall also be provided in the Price Proposal.
Negotiation of the final price of the Standby Power Equipment will be based on the scope of supply agreed upon by the Owner and the System Manufacturer in the Final Proposal.
3976000 08/06/2025
3.04 Proposal Evaluation Panel and Evaluation Factors
A panel appointed by the Owner will evaluate the Proposal and negotiate a final price and scope of supply. Other agencies and representatives of the Owner may, at the sole discretion of the Owner, evaluate the Proposal and/or System Manufacturer. The factors to be considered by the panel in the evaluation of the Proposal and the negotiation of an agreement are listed in Appendix H, Evaluation Criteria.
Section 4 Proposal Format and Contents
4.01 General
The information listed below shall be submitted with each proposal and should be submitted in the order shown. Each section should be clearly labeled, with pages numbered and separated by tabs. Failure by a Proposer to include all listed items may result in the rejection of the proposal. All items in all tabs shall be included in each copy of the Proposal.
4.02 Standards for Drawings
To ensure consistency between drawings and other electronic documents produced by the Engineer and the Proposer, the Proposer shall comply with the following standards for the Proposal and any subsequent design documentation, after negotiations and selection:
• The Proposer shall provide scalable drawings in a sheet size of 11" x 17" or 22” x 34” format. A title block shall be included for each drawing that includes (as a minimum) project title, building name or unit process, date, scale, sheet number, and revision number.
• Dimensions on all drawings and equipment cut sheets shall be shown in English units.
• All equipment, piping, valves and controls not supplied by the Proposer shall be clearly identified as such on the Proposer’s drawings.
• The Proposer shall provide all applicable legends for Electrical Distribution System drawings.
4.03 Tab I - Proposal Affidavit
The Proposer shall complete the affidavit (See Appendix A – Proposal Affidavit) and enclose under Tab I.
4.04 Tab II - Cost to the Owner
The Proposer shall complete the Price Proposal (Appendix B) in its entirety and enclose under Tab II.
3976000 08/06/2025
4.05 Tab III – Scope of Supply, Exceptions, and Alternates
The System Manufacturer shall submit under Tab III a detailed description of the System Manufacturer’s scope of supply, including the name of the component manufacturer of all equipment supplied.
Any exceptions to or deviations from the requirements of this RFP shall clearly be described in the Proposal under this Tab.
The System Manufacturer shall consider the cost of items required in this RFP and whether some scope items would be more cost effective if provided by the Contractor or different component manufacturer than specified. Provide itemized price deductions for these items along with a description of alternate scope of supply.
In addition, the System Manufacturer may propose scopes and costs for optional items they feel may be desired by the Owner.
4.06 Tab IV – Delivery Schedule
The System Manufacturer shall provide the information required on the Proposed Project Schedule (Appendix C) provided with this RFP, as well as any other relevant schedule information, under Tab IV.
4.07 Tab V – Acceptance of Conditions
The System Manufacturer shall indicate under Tab V, on a separate sheet of the System Manufacturer’s letterhead, any requested exceptions to the requirements of this RFP, General Conditions, or Procurement Agreement between Buyer and Seller for Procurement Contracts. These requested exceptions or modifications shall specifically reference the document, article and paragraph of the attached Specifications (Appendix E).
4.08 Tab VI – Standby Power Equipment Information
The System Manufacturer shall provide shop drawings and product data under Tab VI. Proposed systems must conform to the requirements outlined in the Appendices.
4.09 Tab VII – Warranty
The System Manufacturer shall include under Tab VII a description of the manufacturer’s warranty, as well as details of optional extended warranties available. The cost of the base warranty shall be included in the Price Proposal.
4.10 Tab VIII – Proposal Appendices
The content of this tab is left to the Proposer’s discretion. However, the Proposer should limit materials included here to those that will be helpful to the Owner in understanding the Proposal.
3976000 04/25/25
APPENDIX A
Proposal Affidavit
TO: Suwannee County Board of County Commissioners
(Owner’s Name)
FROM:
(Proposer’s Name) FOR: Catalyst Industrial Park Water
Reclamation Facility
(Project Name) Submitted: , 2025
ARTICLE 1 – PROPOSAL RECIPIENT
1.01 The undersigned Proposer proposes and agrees, if this Proposal is accepted, to enter into a Procurement Agreement with the Buyer in the form included in the Request for Proposal (RFP) to furnish the Goods and Special Services as specified or indicated in the RFP for the prices and within the times indicated in this Proposal and in accordance with the other terms and conditions of the RFP.
1.02 The initial Buyer of the Goods and Special Services will be the Owner, who may assign the Procurement Agreement to the successful Proposer (Contractor) for construction of the wastewater treatment plant improvements.
ARTICLE 2 - PROPOSER’S ACKNOWLEDGMENTS
2.01 Proposer accepts all of the terms and conditions of the RFP. This Proposal will remain subject to acceptance for 90 days after receipt of the Proposal, or for such longer period of time that Proposer may agree to in writing upon request of Engineer or Buyer.
2.02 Proposer accepts the provisions of the Procurement Agreement between
Buyer and Proposer as to liquidated damages in the event of its failure to furnish the Goods and Special Services in accordance with the schedule set forth in the Procurement Agreement between Buyer and Seller.
2.03 Proposer acknowledges that the Owner and Engineer will in no way be liable for any costs incurred by Proposer in the preparation of its Proposal.
2.04 The Proposer hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Owner or Owner’s representatives in verification of the recitals comprising this Proposal. By the signature provided below, the signer affirms that the information g provided herein is true and correct to the best of his/her knowledge and belief.
ARTICLE 3 – PROPOSER’S REPRESENTATIONS
3.01 In submitting this Proposal, Proposer represents, as set forth in the Procurement Agreement, that:
A. Proposer has examined and carefully studied the RFP, other related data identified, and the following Addenda, receipt of all of which is hereby acknowledged.
Addendum No. Addendum Date
B. Proposer has become familiar with and is satisfied as to the local conditions that may affect cost, progress, delivery and the furnishing of Goods and Special Services.
C. Proposer is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress delivery and the furnishing of Goods and Special Services.
D. Proposer has carefully studied and correlated the information known to Proposer, and information and observations obtained from Proposer’s visits, if any, with the contents of the RFP.
E. Proposer has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Proposer has discovered in the RFP, and the written resolution thereof by Engineer is acceptable to Proposer.
F. The RFP is generally sufficient to indicate and convey understanding of all terms and conditions for furnishing the Goods and Special Services for which this Proposal is submitted.
G. Proposer further represents that this Proposal is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation.
ARTICLE 4 – BASIS OF PROPOSAL
4.01 The cost for the proposed work shall be as identified in Tab II of this Proposal.
4.02 Additional Proposed Costs:
A. US $___________/day: The Proposer’s fee for Buyer for not executing the Procurement Agreement between Buyer and Proposer within the time specified in 4.03 below.
4.03 Proposer and Buyer shall execute the Procurement Agreement between
Buyer and Seller within 180 days after receipt of a Proposal acceptable to the Owner. Should the Procurement Agreement between Buyer and Seller not be executed within said 180 days due to the fault of the Buyer, the Buyer shall be subject to the additional costs identified in Paragraph 4.02 above. Should the Procurement Agreement between Buyer and Seller not be executed within the said 180 days due to the fault of the Proposer, Proposer shall be subject to the liquidated damages provisions in the Procurement Agreement between Buyer and Seller. The issue of fault will be determined by the Engineer.
ARTICLE 5 – TIME OF COMPLETION
5.01 Proposer agrees that the furnishing of Goods and Special Services will conform to the schedules set forth in Appendix C of this RFP, which will be incorporated into Article 5 of the Procurement Agreement between Buyer and Seller.
ARTICLE 6 – PROPOSAL DOCUMENTS
6.01 The following documents are attached to and made a condition of this Proposal:
A. Proposer’s supporting data included in Tabs I through VIII of this Proposal.
6.02 The following documents are incorporated by reference as included in the
RFP and as amended by addenda, if any:
A. Drawings and Specifications: See Appendix E
ARTICLE 7 – DEFINED TERMS
7.01 The terms used in this Proposal have the meanings indicated in the General Conditions. The significance of terms with initial capital letters is described in the General Conditions.
ARTICLE 8 – PROPOSAL SUBMITTAL
8.01 This Proposal submitted by:
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability) (circle one)
By:
(Signature -- attach evidence of authority to sign)
Name (typed or printed):
Title:
(CORPORATE SEAL)
Attest (Signature of Corporate Secretary)
Business address:
E-mail address:
Phone: Email:
Date of Qualification to do business is
8.02 This Proposal is submitted this ______ day of ________________, 2025.
Note: Attest for a corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a notary.
Note: If the Proposer is a corporation, the Proposal shall be signed by an officer of the corporation; if a partnership, it shall be signed by a partner. If signed by others, authority for signature shall be attached.
APPENDIX B
Price Proposal
Item Description Proposed Price Units
1. Base Scope:
1.a. Catalyst WWTP Standby Generator $ US $
1.b. Catalyst WWTP Automatic Transfer Switch (ATS) $ US $
1.c. Cost of Manufacturer’s Field Service $ US $
TOTAL Not-To-Exceed Price of Standby Power Equipment
(Items 1.a. through 1.c.) $
US $
APPENDIX C
Project Schedule
Item Description Proposed Date Comments
1.
Owner Issues RFP
August 6, 2025 n/a
2.
System Manufacturers Submit Proposal
September 8, 2025 n/a
3.
System Manufacturer Submits EEIP*
2 Weeks after issuance of Notice to Begin Preparation of EEIP
4.
System Manufacturer Submits Final Proposal
2 Weeks from receipt of comments on
EEIP
5.
System Manufacturer Submits Shop Drawing Submittal
4 Weeks from Buyer’s executed Contract
6.
Automatic Transfer Switch Delivered to Job Site
March 16, 2026
7. Standby Generator Delivered to Job Site June 8, 2026
*EEIP = Early Equipment Information Package
APPENDIX D
Project Description Project Overview
Suwannee County wishes to provide sanitary sewer service to the proposed Catalyst Industrial Park. As part of this work, the County wishes to construct a water reclamation facility suitable for treating 0.2 MGD (max. 3-month average day flow) to meet Florida Department of Environmental Protection (FDEP) requirements. Wastewater will be domestic and pre-treated industrial wastewaters.
This project will be funded by a direct legislative grant to the County. This grant requires the project to be complete and operational by August 30, 2026.
Effluent disposal/reuse will be via a combination of rapid infiltration basins and spray irrigation systems. To comply with FDEP requirements for land application to the site, the treatment facility must be constructed to meet Class I reliability requirements in accordance with the EPA publication “Design Criteria for Mechanical, Electric, and Fluid System and Component Reliability.” The facility must also meet requirements for high-level disinfection, as defined by FDEP, with a TSS concentration less than 5 mg/L. The site is located within a Spring Protection Zone, and total nitrogen in the effluent discharge must be less than 3 mg/L.
The scope of this proposal involves the procurement and manufacturer services of the Standby Power Equipment for the facility to meet these treatment and reliability criteria at a 3-month average daily flow of 0.2 MGD. Future phases will expand the capacity of the plant to 0.4 MGD, and ultimately to 1.2 MGD. In addition, control panels and programmable logic controllers shall be provided that allow future expansion to 0.4 MGD with no hardware changes.
System Manufacturer Equipment Scope of Supply
The Standby Power Equipment, for the purposes of this RFP, shall include:
• The Catalyst WWTP Standby Generator, as shown on the drawings and specifications in Appendix E.
• The Catalyst WWTP Automatic Transfer Switch, as shown on the drawings and specifications in Appendix E.
The System Manufacturer’s base scope of supply (included in Item 1 of the Price Proposal) shall also include the following items:
1. Preparation of Early Equipment Information Package (EEIP), Final Proposal, and approvable Shop Drawings.
2. System Manufacturer Field Services during construction as specified in Appendix E.
Acceptable Manufacturers
A list of acceptable manufacturers for Standby Power Equipment is listed in the Specifications - Appendix E.
APPENDIX E
Drawings and Specifications
Drawings:
Number Description 00-E001 Electrical Symbols and Abbreviations – A 00-E002 Electrical Symbols and Abbreviations – B 50-E601 Operations Building One Line Diagram
Specifications:
Section Title 01 33 00 Submittal Procedures 01 78 23 Operation and Maintenance Data 26 01 00 Basic Electrical Requirements 26 05 26 Grounding and Bonding for Electrical Systems 26 05 53 Identification for Electrical Systems 26 32 13 Packaged Engine Generators 26 36 00 Transfer Switches
615 3RD AVENUE SOUTH // SUITE 700 // NASHVILLE, TN 37210
PHONE: (615) 254-1500
SHEET
NO.
JOB NUMBER:
EOR:
P.E. NO.:
REVISIONS
DATE DESCRIPTION
Autodesk Docs://Catalyst Ind Park WWTP - 3976000/3976000_50_E_R24.rvt7/15/2025 4:06:45 PM
ELECTRICAL SYMBOLS AND ABBREVIATIONS - A
615 3rd AVENUE SOUTH, NASHVILLE, TN 37210 00-E001
MJE
94800
CATALYST INDUSTRIAL PARK WASTEWATER TREATMENT PLANT
POWER
DUPLEX RECEPTACLE, NEMA 5-20, 18"AFF, UON
XX: AC = ABOVE COUNTER
C = CONTROLLED RECEPTACLE
GFI = GROUND FAULT CIRCUIT INTERRUPTER
TV = TV RECEPTACLE, 60"AFF UON
WP = WEATHER-RESISTANT RECEPTACLE WITH
WEATHERPROOF IN-USE COVER
QUADRUPLEX RECEPTACLE, NEMA 5-20, 18"AFF, UON
SIMPLEX RECEPTACLE, NEMA 5-20, 18"AFF, UON
SPECIAL PURPOSE SINGLE RECEPTACLE, NEMA
CONFIGURATION AS INDICATED
FLOOR BOX WITH DUPLEX RECEPTACLE, NEMA 5-20 UON;
"S" (WHERE SHOWN) INDICATES SURFACE-MOUNT ON
LOW-PROFILE FLOOR RACEWAY. CIRCLE INDICATES
POKE-THROUGH TYPE.
FLOOR BOX WITH QUADRUPLEX RECEPTACLE, NEMA 5-20
UON; CIRCLE INDICATES POKE-THROUGH TYPE.
FLOOR BOX WITH NEMA 5-20 RECEPTACLE(S) AND DATA
OUTLET(S); OVAL INDICATES POKE-THROUGH TYPE.
FLOOR BOX WITH NEMA 5-20 RECEPTACLE(S), DATA
OUTLET(S), AND A/V JACK(S); OVAL INDICATES POKE-
THROUGH TYPE.
AV AV
FLOOR BOX FOR FURNITURE CONNECTION; CIRCLE
INDICATES POKE-THROUGH TYPE.
J J
CEILING MOUNTED TWIST LOCK SIMPLEX RECEPTACLE,
NEMA L5-20 UON
S
XX
CEILING MOUNTED DUPLEX RECEPTACLE, NEMA 5-20 UON
FLOOR-TO-CEILING WORKSTATION POWER POLE, WITH
DIVIDER FOR POWER AND LOW VOLTAGE WIRING UON.
PP
J JUNCTION BOX, 2-GANG WITH BLANK COVER UON
SURFACE MOUNTED PANELBOARD; HATCHED FILL
INDICATES 480/277V, SOLID FILL INDICATES 208/120V, UON.
HATCHED AREA IN FRONT OF PANELBOARD INDICATES
EXTENT OF WORKING CLEARANCE.
RECESSED MOUNTED PANELBOARD; LINE INDICATES WALL
FACE. HATCHED FILL INDICATES 480/277V, SOLID FILL
INDICATES 208/120V, UON. HATCHED AREA IN FRONT OF
PANELBOARD INDICATES EXTENT OF WORKING CLEARANCE.
DRY-TYPE TRANSFORMER
COMBINATION ENCAPSULATED TRANSFORMER AND
PANELBOARD WITH PRIMARY AND SECONDARY MAIN
BREAKERS
NON-FUSIBLE DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
ENCLOSED CIRCUIT BREAKER DISCONNECT SWITCH
MOTOR STARTER
COMBINATION MOTOR STARTER AND DISCONNECT SWITCH
VARIABLE FREQUENCY DRIVE; DOUBLE LINE INDICATES
FRONT.
VFD
SS SOFT STARTER; DOUBLE LINE INDICATES FRONT.
LOCKABLE MANUAL MOTOR STARTING SWITCH WITH
OVERLOADSM
PB PULL BOX (INTERIOR OR ABOVE GRADE)
CP CONTROL PANEL; DOUBLE LINE INDICATES FRONT.
MOTOR; "#" INDICATES MOTOR HORSEPOWER.
PB
X
PAD-MOUNTED TRANSFORMER; DOOR SWING (WHERE
SHOWN) INDICATES FRONT OF TRANSFORMER. LARGER
DOOR IS HIGH VOLTAGE SIDE, SMALLER DOOR IS LOW
VOLTAGE SIDE.
T
PULL BOX (UNDERGROUND)
X: P = POWER, F = FIBER OPTIC, L = LIGHTING CIRCUIT,
C = COMMUNICATION
208V/3 SPECIAL RECEPTACLE, NEMA
CONFIGURATION AS INDICATED
240V/1 SPECIAL RECEPTACLE, NEMA
CONFIGURATION AS INDICATED
480V/3 SPECIAL RECEPTACLE, NEMA
CONFIGURATION AS INDICATED
SWITCH RATED PIN-AND-SLEEVE RECEPTACLE, 600V,
3-POLE + GROUND, 48"AFF TO BOTTOM OF RECEPTACLE,
UON
COMBINATION FUSED DISCONNECT AND INTERLOCKED
PIN-AND-SLEEVE RECEPTACLE, 600V, 3-POLE + GROUND,
48"AFF TO BOTTOM OF RECEPTACLE, UON
DCP DOOR CONTROL PANEL; DOUBLE LINE INDICATES FRONT.
PUSHBUTTON CONTROL STATION
E-STOP PUSHBUTTON
CABLE TRAY
BUS DUCT, PLUG-IN TYPE
BUS DUCT, FEEDER TYPE
BUS DUCT END CABLE TAP BOX
BUS DUCT CENTER CABLE TAP BOX
MOTOR CONTROL CENTER, FOOTPRINT AND NUMBER OF
SECTIONS AS SHOWN ON PLANS; DOUBLE LINE INDICATES
FRONT.
SWITCHBOARD, FOOTPRINT AND NUMBER OF SECTIONS AS
SHOWN ON PLANS; DOUBLE LINE INDICATES FRONT.
SWITCHGEAR, FOOTPRINT AND NUMBER OF SECTIONS AS
SHOWN ON PLANS; DOUBLE LINE INDICATES FRONT.
MANHOLE
UTILITY POLE
UTILITY POLE WITH GUY WIRE
FIELD INSTRUMENT; "XX" "XXX" INDICATES TAG NUMBER.
*SEE P&ID SHEETS, CONTROL WIRING
DIAGRAMS, AND DIVISION 40 SPECIFICATIONS
MOTOR OPERATED VALVE; "XXX" INDICATES TAG NUMBER.
MOTOR OPERATED GATE; "XXX" INDICATES TAG NUMBER.
MH
XX*
XXX
MOV - XXX
MOG - XXX
POWER (CONTINUED)
E
ELECTRICAL NOTATIONS
HOMERUN
RP-A:21
RP-A:21
CIRCUIT NUMBER
SOURCE PANEL
LIGHTING
A a LP-A:21
CIRCUIT NUMBER
SOURCE PANEL
FIXTURE TYPE PER
LUMINAIRE SCHEDULE
CONTROL ZONE
RECEPTACLE MOUNTING
FLUSH MOUNTED
SURFACE MOUNTED
DISCONNECT RATINGS
600V/3P/30A(30A)/12
NEMA ENCLOSURE RATING
FUSE CURRENT RATING
SWITCH CURRENT RATING
NUMBER OF POLES
VOLTAGE RATING
WIRE AND CONDUIT
2[3"C(4-350 KCMIL, #1G)]
GROUND CONDUCTOR SIZE IN EACH CONDUIT
PHASE/NEUTRAL CONDUCTOR SIZE IN EACH CONDUIT
NUMBER OF PHASE/NEUTRAL CONDUCTORS IN EACH CONDUIT
CONDUIT SIZE
NUMBER OF PARALLEL CONDUITS
CABLE TRAY
TYPE
ELEV
SIZE
BOTTOM OF TRAY ELEVATION
TRAY WIDTH AND LOAD DEPTH
SYSTEM (e.g. DATA, 600V, 5kV, 15kV)
EQUIPMENT NAMING
XX-YY
UNIQUE EQUIPMENT DESIGNATION
EQUIPMENT TYPE:
DP = DISTRIBUTION PANEL
RP = RECEPTACLE PANEL
LP = LIGHTING PANEL
LC = LIGHTING CONTACTOR
FD = FUSED DISCONNECT
NF = NON-FUSIBLE DISCONNECT
CS = COMBINATION STARTER
CP = CONTROL PANEL
T-XX = TRANSFORMER; XX INDICATES
SECONDARY PANEL TYPE
CONTROL WIRING DIAGRAMS
CONTROL POWER TRANSFORMER
MOTOR STARTER COIL OR CONTROL RELAY COIL; "#"
INDICATES COIL ID NUMBER.
XX: CR = CONTROL RELAY
TD = TIME DELAY RELAY
M = MOTOR STARTER COIL
CONTACT, NORMALLY OPEN / NORMALLY CLOSED
HAND-OFF-AUTO SELECTOR SWITCH
PILOT LIGHT
X: A = AMBER, B = BLUE, G = GREEN, R = RED, W = WHITE
MOTOR HEATER
SOLENOID
RESISTANCE TEMPERATURE DETECTOR
H A
CONTACT, NORMALLY OPEN / NORMALLY CLOSED
EMERGENCY STOP PUSHBUTTON
PILOT LIGHT, PUSH-TO-TEST
LIMIT SWITCH
NORMALLY OPEN
NORMALLY OPEN, HELD CLOSED
NORMALLY CLOSED
NORMALLY CLOSED, HELD OPEN
FLOAT SWITCH
NORMALLY OPEN, CLOSES ON RISING LEVEL
NORMALLY CLOSED, OPENS ON RISING LEVEL
NORMALLY OPEN, CLOSES ON DROPPING LEVEL
NORMALLY CLOSED, OPENS ON DROPPING LEVEL
TIME DELAY RELAY SWITCH
NOTC - NORMALLY OPEN, TIMED CLOSING
WHEN ENERGIZED (ON DELAY)
NCTO - NORMALLY CLOSED, TIMED OPENING
WHEN ENERGIZED (ON DELAY)
NOTO - NORMALLY OPEN, TIMED OPENING WHEN
DE-ENERGIZED (OFF DELAY)
NCTC - NORMALLY CLOSED, TIMED CLOSING
WHEN DE-ENERGIZED (OFF DELAY)
PRESSURE SWITCH
NORMALLY OPEN, CLOSES ON INCREASED FLOW
NORMALLY CLOSED, OPENS ON INCREASED FLOW
FLOW SWITCH
NORMALLY OPEN, CLOSES ON INCREASED FLOW
NORMALLY CLOSED, OPENS ON INCREASED FLOW
TEMPERATURE SWITCH
NORMALLY OPEN, CLOSES ON RISING TEMPERATURE
NORMALLY CLOSED, OPENS ON RISING TEMPERATURE
RTD
NOTE: DASHED SYMBOLS INDICATE FIELD-LOCATED DEVICES UON.
H1
X1 X2
H2
XX#
E-STOP
X
X
SYSTEMS
AUTOMATIC DOOR OPERATOR
ELECTRIC DOOR STRIKE
DOOR CONTACT
MAGNETIC LOCK
MAGNETIC DOOR HOLDER
WIRELESS ACCESS POINT
AUDIO/VIDEO RACK
SPEAKER
FIRE ALARM ANNUNCIATOR
NOTIFICATION CIRCUIT POWER SUPPLY
SECURITY CONTROL PANEL
CARD READER, 40"AFF UON
FLOOR BOX WITH DATA OUTLET(S) AS INDICATED
FIRE ALARM CONTROL PANEL
ADDRESSABLE OUTPUT MODULE
ADDRESSABLE INPUT MODULE
CEILING MOUNTED SMOKE DETECTOR
CEILING MOUNTED HEAT DETECTOR
FIRE ALARM MANUAL PULL STATION, 48"AFF UON
SPRINKLER SYSTEM TAMPER SWITCH
SPRINKLER SYSTEM FLOW SWITCH
SCP
SECURITY KEYPAD, 40"AFF UON
AUTOMATIC DOOR ACTUATOR STATION, 40"AFF UON
REQUEST-TO-EXIT BUTTON, 40"AFF UON
CCTV CAMERA; "PTZ" (WHERE SHOWN) INDICATES
PAN-TILT-ZOOM TYPE
DUCT SMOKE DETECTOR WITH ADDRESSABLE
INPUT MODULE
PRE-ACTION SPRINKLER SYSTEM PRESSURE
DETECTOR / SWITCH
SPRINKLER SYSTEM POST INDICATOR VALVE
SUPERVISORY SWITCH
WALL / CEILING MOUNTED FIRE ALARM COMBINATION
AUDIBLE / STROBE NOTIFICATION DEVICE; SUPERSCRIPT
INDICATES CANDELA RATING. NO SUPERSCRIPT = 30cd.
WALL / CEILING MOUNTED FIRE ALARM STROBE
NOTIFICATION DEVICE; SUPERSCRIPT INDICATES CANDELA
RATING. NO SUPERSCRIPT = 30cd.
WALL / CEILING MOUNTED FIRE ALARM AUDIBLE
NOTIFICATION DEVICE
DATA OUTLET, 18"AFF UON; "xD" SUPERSCRIPT INDICATES
NUMBER OF CABLES/PORTS. NO SUPERSCRIPT = 2 CABLES/
PORTS.
CR
KP
DR
DA
ES
DC
ML
DH
EB
PTZ
xD xD xD
WAP
AV
S
FACP
FAA
NAC
AOM
AIM
F
PS
TS
FS
PIV
110 110
110 110
LIGHTING
CEILING MOUNTED LUMINAIRE (RECESSED, SURFACE
MOUNTED, OR SUSPENDED AS INDICATED ON LUMINAIRE
SCHEDULE); HALF SHADING INDICATES LUMINAIRE USED
FOR EMERGENCY LIGHTING.
WALL OR BRACKET MOUNTED LUMINAIRE; HALF SHADING
INDICATES LUMINAIRE USED FOR EMERGENCY LIGHTING.
STANCHION MOUNTED LUMINAIRE; HALF SHADING INDICATES
LUMINAIRE USED FOR EMERGENCY LIGHTING.
POLE MOUNTED LUMINAIRE(S); SQUARES INDICATE FIXTURE
QUANTITY AND ORIENTATION.
POST-TOP LUMINAIRE
GROUND MOUNTED LUMINAIRE
BOLLARD LUMINAIRE
EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED, WALL
OR BRACKET MOUNTED; SHADING REPRESENTS FACE OF
SIGNAGE.
EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED,
CEILING MOUNTED; SHADING REPRESENTS FACE OF
SIGNAGE.
EXIT SIGN WITH BATTERY OPERATED EMERGENCY LIGHT
FIXTURE, WALL MOUNTED
BATTERY OPERATED EMERGENCY LIGHT FIXTURE
REMOTE HEAD(S) FOR BATTERY OPERATED
EMERGENCY UNIT
X a SWITCH, 20 AMP, 125 VOLT, 48"AFF, TOGGLE TYPE, UON;
LOWERCASE LETTER INDICATES CONTROL ZONE.
X: 3 = 3-WAY SWITCH
4 = 4-WAY SWITCH
D = DIMMING CONTROL SWITCH
OS = OCCUPANCY/VACANCY SENSOR WITH
PUSHBUTTON ON/OFF CONTROL, WALL MOUNTED
WS
WALL MOUNTED TOUCH-SCREEN LIGHTING
CONTROL STATION, 48"AFF, UON
OCCUPANCY/VACANCY SENSOR, CEILING MOUNTED;
LOWERCASE LETTER INDICATES CONTROL ZONE.
DAYLIGHT SENSOR, CEILING MOUNTED;
LOWERCASE LETTER INDICATES CONTROL ZONE.
PHOTOCELL, WALL MOUNTED, FACING NORTH
OS
DS
PC
a a
LC
LIGHTING CONTACTOR
LIGHTING CONTROL PANELLCP
WORK CONDITION GRAPHICS
EXISTING
DEMOLITION
NEW
FUTURE
LIGHTNING PROTECTION
AIR TERMINAL, COPPER UON
COMPRESSION / MECHANICAL BONDING CONNECTION
LIGHTNING PROTECTION CABLE, COPPER UON
DOWN CONDUCTOR, COPPER UON
DOWN CONDUCTOR, COPPER UON
LP
DC
TR
AREA CLASSIFICATIONS
CLASS I - DIVISION 1
CLASS I - DIVISION 2
CLASS II - DIVISION 1
CLASS II - DIVISION 2
GROUNDING
EXOTHERMIC WELD BONDING CONNECTION
COMPRESSION / MECHANICAL BONDING CONNECTION
GROUND ROD, 3/4" x 10', COPPER
GROUND BAR
GROUND ROD IN TEST WELL
COPPER GROUND CABLE
COPPER GROUND CABLE, STUBBED UP 10' ABOVE FINISHED
FLOOR OR GRADE FOR EQUIPMENT CONNECTION, UON
G
07/11/2025 30% REVIEW
I/O MODULES
24" MONITOR
I/O MODULES
XX" OIT
I/O MODULES
NETWORK SYMBOLS
CELLULAR ROUTER
CHASSIS-BASED REMOTE I/O (RIO) RACK
COMPUTER MONITOR
MODULAR REMOTE I/O (RIO)
NETWORK ATTACHED STORAGE (NAS) APPLIANCE
OMNIDIRECTIONAL ANTENNA
OPERATOR INTERFACE TERMINAL
OR PANEL MOUNTED WORKSTATION
PANEL MOUNT CELLULAR ANTENNA
PANEL MOUNT FIBER OPTIC PATCH PANEL
PANEL MOUNT INDUSTRIAL
ETHERNET NETWORK SWITCH
PROGRAMMABLE LOGIC CONTROLLER (PLC)
OR PROCESS AUTOMATION CONTROLLER
RACK MOUNTED FIBER OPTIC PATCH PANEL
RACK MOUNTED SERVER OR VM SERVER APPLIANCE
RACK OR SHELF MOUNTED
ETHERNET NETWORK SWITCH
RACK OR SHELF MOUNTED NETWORK FIREWALL
RF LIGHTNING ARRESTOR
STAND-ALONE SERVER OR
WORKSTATION COMPUTER
TELEMETRY RADIO
YAGI ANTENNA
615 3RD AVENUE SOUTH // SUITE 700 // NASHVILLE, TN 37210
PHONE: (615) 254-1500
SHEET
NO.
JOB NUMBER:
EOR:
P.E. NO.:
REVISIONS
DATE DESCRIPTION
Autodesk Docs://Catalyst Ind Park WWTP - 3976000/3976000_50_E_R24.rvt7/15/2025 4:06:58 PM
ELECTRICAL SYMBOLS AND ABBREVIATIONS - B
615 3rd AVENUE SOUTH, NASHVILLE, TN 37210 00-E002
MJE
94800
CATALYST INDUSTRIAL PARK WASTEWATER TREATMENT PLANT
ONE-LINE DIAGRAMS
FUSE
BUS STAB OR SEPARABLE CONNECTOR
SWITCH
TRANSFER SWITCH, AUTOMATIC UON
CONTACTOR
POTENTIAL TRANSFORMER
CURRENT TRANSFORMER (SHOWN AROUND FEEDER)
SHORTING TERMINAL BLOCK
LIGHTNING ARRESTOR
BATTERY
DRAWOUT CIRCUIT BREAKER, 5 KV AND ABOVE
DRAWOUT LOW VOLTAGE CIRCUIT BREAKER
FIXED MOUNTED LOW VOLTAGE CIRCUIT BREAKER,
THERMAL MAGNETIC UON
DRAWOUT CIRCUIT BREAKER OR FUSE CLIP POSITION
(SPACE WITH PROVISIONS)
POWER TRANSFORMER, WINDING CONFIGURATION AS
INDICATED (DELTA PRIMARY / SOLIDLY GROUNDED WYE
SECONDARY SHOWN)
GROUND CONNECTION
RESISTANCE OR IMPEDANCE GROUND CONNECTION
NEUTRAL-GROUND BOND (MAIN BONDING JUMPER)
TERMINAL BLOCK
MOTOR; "#" INDICATES MOTOR HORSEPOWER.
GENERATOR
LIGHTING LOAD
CAPACITOR
RESISTOR OR RESISTIVE HEAT LOAD
OVERLOAD RELAY
PROTECTIVE RELAY; "#" INDICATES ANSI DEVICE NUMBER.
AMMETER
METER
SURGE PROTECTIVE DEVICE
DIGITAL POWER METER; "A" (WHERE SHOWN) INDICATES
AMMETER ON CT'S FOR FEEDER BREAKER
TRIP UNIT, LSIG FUNCTIONS AS INDICATED
METERING TRIP UNIT, LSIG FUNCTIONS AS INDICATED
SHUNT TRIP
KIRK KEY INTERLOCK
VOLTAGE TEST BLOCK
VARIABLE FREQUENCY DRIVE
REDUCED VOLTAGE SOFT STARTER
N
G
STB
TB
G
DPM
A
A
M
SPD
TU
MTU
ST
K
VTB
VFD
SS
NOTE: PLAN VIEW SYMBOLS MAY ALSO BE USED ON ONE-LINE DIAGRAMS.
ABBREVIATIONS
(D) (E) (R/E) (R/N)
A, AMP
AC
ACS
AF
AFF
AFG
AI
AL
AO
AT
ATS
A/V
AUX
AWG
BKR
#/C C
CB
CCTV
CKT
COMM
CPT
CT
CU
DC
DI
DISC
DO
DP
DWG
EF
EL, ELEV
EMT
ENCL
EWC
FACP
FAA
FBO
FDR
FS
FU
FVR
FVNR
FWU
GFI, GFCI
GFP
GND
H/A
HOA
HP
HT
HVAC
HZ
IND
INSTR
KAIC
KCMIL
KVA
KVAR
KW
KWH
LCP
LED
LI
LIM
LP
L-R
LS
LSI
LSIG
LTG
LVL
LV
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
EXISTING TO BE RELOCATED (EXISTING LOCATION)
EXISTING RELOCATED (NEW LOCATION)
AMPERE
ABOVE COUNTER / ALTERNATING CURRENT
ACCESS CONTROL SYSTEM
AMPS FRAME
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE OR PAVEMENT
ANALOG INPUT
ALUMINUM
ANALOG OUTPUT
AMPS TRIP
AUTOMATIC TRANSFER SWITCH
AUDIO/VISUAL
AUXILIARY
AMERICAN WIRE GAUGE
BREAKER
NUMBER OF CONDUCTOR(S)
CONDUIT
CIRCUIT BREAKER
CLOSED CAPTION TELEVISION
CIRCUIT
COMMUNICATIONS
CONTROL POWER TRANSFORMER
CURRENT TRANSFORMER
COPPER
DIRECT CURRENT
DISCRETE INPUT
DISCONNECT
DISCRETE OUTPUT
DISTRIBUTION PANEL
DRAWING
EXHAUST FAN
ELEVATION
ELECTRICAL METALLIC TUBING
ENCLOSURE
ELECTRIC WATER COOLER
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR
FURNISHED BY OTHERS
FEEDER
FLOW SWITCH
FUSE
FULL VOLTAGE REVERSING STARTER
FULL VOLTAGE NON-REVERSING STARTER
FURNISHED WITH UNIT
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT PROTECTION
GROUND
HAND / AUTOMATIC
HAND / OFF / AUTOMATIC
HORSEPOWER
HEIGHT
HEATING, VENTILATION, AND AIR CONDITIONING
HERTZ
INDICATING
INSTRUMENT
KILOAMP INTERRUPTING CAPACITY
THOUSAND CIRCULAR MILS
KILOVOLT-AMP
KILOVOLT-AMP REACTIVE
KILOWATT
KILOWATT HOUR
LIGHTING CONTROL PANEL
LIGHT EMITTING DIODE
LONG-TIME & INSTANTANEOUS TRIP
LIMIT
LIGHTING PANEL
LOCAL-REMOTE
LONG-TIME & SHORT-TIME TRIP
LONG-TIME, SHORT-TIME, & INSTANTANEOUS TRIP
LONG-TIME, SHORT-TIME, INSTANTANEOUS, & GROUND TRIP
LIGHTING
LEVEL
LOW VOLTAGE
MCB
MCC
MCP
MFR
MH
MLO
MOV
MTD
MTS
NAC
NC
NCTC
NCTO
NEC
NFPA
NIC
NO
NOTC
NOTO
NTS
OL
PH
PIR
PIV
POS
PRI
PS
PT
PVC
RCPT
RGS
RP
RVSS
SCCR
SEC
SHLD
SPD
SS
STR
SV
SW
SWBD
SWGR
TB
TEMP
TERM
TS
TSP
TV
TYP
UG
UON
V
VA
VAR
VFD
W
WP
XFMR
XP
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
MANUFACTURER
MOUNTING HEIGHT
MAIN LUGS ONLY
MOTOR OPERATED VALVE OR GATE
MOUNTED
MANUAL TRANSFER SWITCH
NOTIFICATION APPLIANCE CIRCUIT
NORMALLY CLOSED
NORMALLY CLOSED, TIME CLOSE
NORMALLY CLOSED, TIME OPEN
NATIONAL ELECTRICAL CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NORMALLY OPEN
NORMALLY OPEN, TIME CLOSE
NORMALLY OPEN, TIME OPEN
NOT TO SCALE
OVERLOAD RELAY
PHASE
PASSIVE INFRARED
POST INDICATOR VALVE
POSITION
PRIMARY
PRESSURE SWITCH
POTENTIAL TRANSFORMER
POLYVINYL CHLORIDE
RECEPTACLE
RIGID GALVANIZED STEEL
RECEPTACLE PANEL
REDUCED VOLTAGE SOFT STARTER
SHORT CIRCUIT CURRENT RATING
SECONDARY
SHIELDED
SURGE PROTECTIVE DEVICE
STAINLESS STEEL
STARTER
SOLENOID VALVE
SWITCH
SWITCHBOARD
SWITCHGEAR
TERMINAL BOX
TEMPERATURE
TERMINAL
TEMPERATURE SWITCH / TAMPER SWITCH
TWISTED SHIELDED PAIR
TELEVISION / MONITOR
TYPICAL
UNDERGROUND
UNLESS OTHERWISE NOTED
VOLT
VOLT-AMP
VOLT-AMP REACTIVE
VARIABLE FREQUENCY DRIVE
WATT
WEATHER PROOF
TRANSFORMER
EXPLOSION PROOF
GENERAL NOTES
1. ALL SYMBOLS SHOWN ON THIS SHEET MAY NOT BE USED ON THIS
PROJECT.
2. INSTALLATION SHALL CONFORM TO THE APPLICABLE
REQUIREMENTS OF THE LOCALLY ADOPTED NFPA 70 (NEC) CODE
ALONG WITH APPLICABLE STATE AND LOCAL CODES.
3. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES
DURING CONSTRUCTION.
4. THE DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO
INCLUDE EVERY DETAIL OF REQUIRED CONSTRUCTION EQUIPMENT
AND MATERIALS. PROVIDE ALL LABOR, MATERIALS AND
EQUIPMENT NOT SPECIFICALLY SHOWN ON THE DRAWINGS BUT
WHICH ARE NECESSARY TO COMPLETE THE WORK. INSTALLATION
SHALL BE COORDINATED WITH PIPING, DUCTWORK, STRUCTURAL
STEEL ALONG WITH ROOM FINISHES.
5. CONDUIT ROUTING IS DIAGRAMMATIC. ROUTE PARALLEL AND
PERPENDICULAR TO LINES OF BUILDING STRUCTURE. FIELD
VERIFY EXACT ROUTING PER ACTUAL CONDITIONS. MINIMUM
ACCEPTABLE CONDUIT SIZE IS ¾” ABOVE GRADE AND 1”
UNDERGROUND.
6. CIRCUIT AMPACITY RATINGS ARE BASED ON RACEWAYS NOT
EXCEEDING (3) CURRENT-CARRYING CONDUCTORS PLUS NEUTRAL
CONDUCTORS AND EQUIPMENT GROUND CONDUCTOR PER NEC
CODE. A SEPARATE NEUTRAL CONDUCTOR SHALL BE PROVIDED
FOR EACH CURRENT CARRYING CONDUCTOR.
7. BOND ALL INTERIOR METALLIC PIPING SYSTEMS, INCLUDING NATURAL GAS,
IN ACCORDANCE WITH NFPA 70-250 REQUIREMENTS.
8. PROVIDE A GREEN-INSULATED GROUNDING CONDUCTOR, SIZED PER NEC
ARTICLE 250, IN ALL FEEDER AND BRANCH CIRCUIT RACEWAYS.
9. PROVIDE A PULL WIRE IN EACH EMPTY CONDUIT.
10. FIRE SEAL ALL CONDUIT PENETRATIONS OF FIRE RATED WALLS.
11. DO NOT USE ANY LIGHT FIXTURE AS A RACEWAY FOR CONDUCTORS NOT
SERVING FIXTURE, UNLESS FIXTURE IS DESIGNATED AND UL-LISTED FOR
USE AS A RACEWAY.
12. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN (RCP) FOR EXACT
LOCATION OF OVERHEAD LIGHT FIXTURES.
13. COORDINATE EXACT LOCATION AND MOUNTING HEIGHT OF ELECTRICAL
OUTLETS WITH CASEWORK, FURNITURE AND MILLWORK. REFER TO
ARCHITECTURAL PLANS AND ELEVATIONS FOR DETAILS.
14. COORDINATE MOUNTING HEIGHT AND ORIENTATION OF “ABOVE COUNTER”
DEVICES WITH ARCHITECT OR OWNER’S REPRESENTATIVE PRIOR TO
ROUGH-IN. IF NOT DIRECTED OTHERWISE, INSTALL “ABOVE COUNTER”
OUTLETS VERTICALLY 4” ABOVE BACKSPLASH OR TOP SURFACE OF
COUNTER WHEN A BACKSPLASH IS NOT INCLUDED.
15. DO NOT ATTACH STARTERS AND DISCONNECTS FURNISHED FOR HVAC
EQUIPMENT DIRECTLY TO EQUIPMENT. PROVIDE WALL-MOUNT SUPPORT
OR INDEPENDENTLY SUPPORT ON STEEL ANGLE OR UNISTRUT RACK
CONSTRUCTED FOR THAT PURPOSE. LOCAL DISCONNECTS FOR HVAC
EQUIPMENT SHALL BE FURNISHED SEPARATELY FROM THE HVAC
EQUIPMENT.
16. VERIFY EXACT MECHANICAL EQUIPMENT TO BE INSTALLED. ADJUST
CONDUIT, WIRING, DISCONNECT SIZE AND FUSING PER MANUFACTURER
FINAL REQUIREMENTS FOR ACTUAL EQUIPMENT INSTALLED.
17. BASIS OF DESIGN MANUFACTURERS AND MODELS ARE SHOWN ON THE
PLANS. THESE PROVIDE ONLY A MINIMUM LEVEL OF QUALITY AND ARE NOT
INTENDED AS PROPRIETARY SPECIFICATIONS. REFER TO SPECIFICATIONS
FOR SUBSTITUTION REQUIREMENTS AND PROCEDURES.
18. CONTRACTOR SHALL VISIT THE PROJECT SITE AND CAREFULLY EXAMINE
THOSE PORTIONS OF THE SITE AFFECTED BY THIS WORK TO BECOME
FAMILIAR WITH EXISTING CONDITIONS THAT MAY AFFECT EXECUTION OF
THE WORK.
19. “PROVIDE” IS AN ALL-INCLUSIVE TERM REQUIRING THE CONTRACTOR TO
FURNISH, INSTALL, WIRE AND CONNECT ALL SPECIFIED EQUIPMENT AS
WELL AS COMPONENTS, ACCESSORIES, AND MOUNTING HARDWARE TO
MEET SYSTEM REQUIREMENTS.
20. “INSTALL” SPECIFIES THAT THE CONTRACTOR SHALL INSTALL EQUIPMENT
PROVIDED BY OTHERS. THE CONTRACTOR SHALL PROVIDE ALL
ANCILLARY EQUIPMENT FOR A COMPLETE INSTALLATION.
WIRING
CONDUIT TURNING UP
CONDUIT STUB OUT; TERMINATE WITH BUSHING IF
INTERIOR. CAP IF EXTERIOR OR UNDERGROUND.
XXX: UGP = UNDERGROUND PRIMARY
UGS = UNDERGROUND SECONDARY
UGE = UNDERGROUND ELECTRICAL
UGE/C = UNDERGROUND ELECTRICAL / COMM.
P = POWER
S = SIGNAL
E = ETHERNET
D = DIGITAL I/O
A = ANALOG I/O
COMM = COMMUNCATIONS
OH = OVERHEAD
CONDUIT EXPOSED OR ABOVE CEILING
CONDUIT CONCEALED IN FLOOR OR UNDERGROUND
FLEXIBLE CONDUIT CONNECTION
CONDUIT TURNING DOWN
XXX
12kV/480VAC
(BY SVEC)
TFR-UTIL
HIGH VOLTAGE
SERVICE FROM SVEC
G
CB-GEN
800AT
800 AF
GEN
STANDBY GENERATOR
500kW, 4-WIRE, 3-PHASE
CB-MAIN
1000AT
1200 AF
N G
LSI
LSIG
M
UTILITY METER
(BY SVEC)
TO SWBD SEE
DRAWING 50-E602
ATS
480VAC, 1000A
4-POLE, 4-WIRE, 3-PHASE
SERVICE ENTRANCE RATED
WITH BONDED NEUTRAL AND
BYPASS/ISOLATION SWITCH
PAD MOUNTED
TRANSFORMER
N G
ATS
BYPASS
P0001A-C P0003A-C
P0005A-C
615 3RD AVENUE SOUTH // SUITE 700 // NASHVILLE, TN 37210
PHONE: (615) 254-1500
SHEET
NO.
JOB NUMBER:
EOR:
P.E. NO.:
REVISIONS
DATE DESCRIPTION
Autodesk Docs://Catalyst Ind Park WWTP - 3976000/3976000_50_E_R24.rvt7/15/2025 4:12:14 PM
OP BLDG ONE LINE DGRM - UTIL GEN & ATS SCHED
615 3rd AVENUE SOUTH, NASHVILLE, TN 37210 50-E601
MJE
94800
CATALYST INDUSTRIAL PARK WASTEWATER TREATMENT PLANT
NTS
50-E601
1 OPERATIONS BUILDING ONE LINE DIAGRAM
1.
NOTES:
B. COMMUNICATIONS NETWORK N/A
GENERATOR ENGINE SHUTDOWN 20 MINUTES
RETRANSFER TO NORMAL 10 MINUTES
TRANSFER TO EMERGENCY 2 SECONDS
NORMAL SOURCE MOMENTARY OUTAGE OVERRIDE 2 SECONDS
A. TIME DELAYS
ACCESSORIES:
MANUFACTURER/MODEL NO.: -
A. CABLE ENTRY/EXIT BOTTOM
ENCLOSURE TYPE: NEMA 3R
F. LOAD TYPE -
E. CLOSE AND WITHSTAND (CB PROTECTED/3 CYCLE) 65,000 @ 480VAC
D. POLES 4
C. FREQUENCY 60
B. VOLTS (RATED/APPLICATION) 480Y/277
A. AMPERES (CONTINUOUS) 1000
SYSTEM REQUIREMENTS:
E. OPERATING MODES OPEN TRANSITION-PROGRAMMED DELAY
D. DRAWOUT POSITION (MANUALLY OPERATED) MANUALLY SELECTED
C. BYPASS (MECHANICALLY OPERATED AND HELD) MANUAL BYPASS/ISOLATION SWITCH
B. OPERATION OF AUTOMATIC MODE ELEC OPERATED, MECH HELD
A. CONFIGURATION DUAL CONTACTOR, DUAL OPERATOR
APPLICATION:
GENSET IDENTIFICATION ATS NOTES
AUTOMATIC TRANSFER SWITCH SCHEDULE
1.
NOTES:
C. TANK DESCRIPTION UL 142
B. SIZE TANK 72 HOURS
A. FUEL SYSTEM NO.2 STATIONARY DIESEL
FUEL SUPPLY:
I. OUTPUT CIRCUIT BREAKERS 600AF/600AT LSI
-STEPCHANGE 0 TO 100% ISO 8528-5 AND NFPA 110
H. VOLTAGE REGULATION
G. ENCLOSURE WEATHER RESISTANT, OUTDOOR
F. TEMPERATURE RISE 125° C
E. INSULATION CLASS CLASS H
D. RPM @ RATED LOAD 1,800
C. FREQUENCY 60 HZ
B. PHASE/WIRE 3 Φ/ 4 WIRE
A. VOLTAGE 480Y/277
GENERATOR:
D. DUTY EMERGENCY
C. ALTITUDE <1000 FT AMSL
B. POWER FACTOR 0.8
A. KILOWATTS 500
SYSTEM REQUIREMENTS
APPLICATION: LEGALLY REQUIRED
GENSET IDENTIFICATION GEN NOTES
ENGINE - GENERATOR SCHEDULE
Section 01 33 00 Submittal Procedures
06/06/2025 39760-00
Part 1 General
1.1 Scope
A. The work under this Section includes submittal to the Engineer of shop drawings, product data and samples required by the various Sections of these Specifications.
B. Submittal Contents: The submittal contents required are specified in each Section.
C. Definitions: Submittals are categorized as follows:
1. Shop Drawings
a. Shop drawings shall include technical data, drawings, diagrams, procedure and methodology, performance curves, schedules, templates, patterns, test reports, calculations, instructions, measurements and similar information as applicable to the specific item for which the shop drawing is prepared.
b. Provide newly-prepared information with graphic information at accurate scale (except as otherwise indicated) with name or preparer (firm name) indicated. The Contract Drawings shall not be reproduced by any method for use as or in lieu of detail shop drawings. Show dimensions and note dimensions that are based on field measurement. Identify materials and products in the work shown. Indicate compliance with standards and special coordination requirements. Do not allow shop drawings to be used in connection with the Work without appropriate final �Action� markings by the Engineer.
c. Drawings shall be presented in a clear and thorough manner. Details shall be identified by reference to sheet and detail, Specification Section, schedule or room numbers shown on the Contract Drawings.
d. Minimum assembly drawings sheet size shall be 11 x 17-inches.
e. Minimum detail sheet size shall be 8-1/2 x 11-inches.
f. Minimum Scale:
i. Assembly Drawings Sheet, Scale: 1-inch = 30 feet.
ii. Detail Sheet, Scale: 1/4-inch = 1 foot.
2. Product Data
a. Product data includes standard published information on materials, products and systems, not specially prepared for this Project, other than the designation of selections from among available choices printed therein.
01 33 00 - 2
06/06/2025 39760-00
b. Collect required data into one submittal for each unit of work or system, and mark each copy to show which choices and options are applicable to the Project. Include manufacturer's standard published recommendations for application and use, compliance with standards, application of labels and seals, notation of field measurements which have been checked and special coordination requirements.
4. Miscellaneous submittals related directly to the work (non-administrative) include warranties, maintenance agreements, workmanship bonds, project photographs, survey data and reports, physical work records, statements of applicability, quality testing and certifying reports, copies of industry standards, record drawings, field measurement data, operating and maintenance materials, overrun stock, security/protection/safety keys and similar information, devices and materials applicable to the work but not processed as shop drawings, product data or samples.
1.2 Specific Category Requirements
A. General: Except as otherwise indicated in the individual work sections, comply with general requirements specified herein for each indicated category of submittal.
Submittals shall contain:
1. The date of submittal and the dates of any previous submittals.
2. The Project title.
3. Unless indicated otherwise by the Engineer�s submittal management software, provide numerical submittal numbers, starting with 1.0, 2.0, etc. Revisions to be numbered 1.1, 1.2, etc.
4. The Names of:
a. Supplier
b. Manufacturer
5. Identification of the product, with the Specification Section number, permanent equipment tag numbers and applicable Drawing No.
6. Field dimensions, clearly identified as such.
7. Relation to adjacent or critical features of the work or materials.
8. Applicable standards, such as ASTM .
9. Notification to the Engineer in writing, at time of submissions, of any deviations on the submittals from requirements of the Contract Documents.
10. Identification of revisions on resubmittals.
01 33 00 - 3
06/06/2025 39760-00
12. Contractor's stamp, initialed or signed or affirmatively indicated on submittal, certifying to review of submittal, verification of products, field measurements and field construction criteria and coordination of the information within the submittal with requirements of the work and of Contract Documents.
13. Submittals showing more than the particular item under consideration shall have all but the pertinent description of the item for which review is requested crossed out.
1.3 Routing of Submittals
A. Submittals and routine correspondence shall be routed as follows:
1. Supplier to Engineer
2. Engineer to Supplier and Owner
Part 2 Products
2.1 Shop Drawings
A. Unless otherwise specifically directed by the Engineer, make all shop drawings accurately to a scale sufficiently large to show all pertinent features of the item and its method of connection to the work.
B. Submit all shop assembly drawings, as a digital image, pdf format, scanned at the original scale.
C. Submit all shop drawings as a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .