3-2024-0771 2025-10-03 ANTRIM-EXIT 3 ES SET.pdf

PDF 4 MB Posted

Attached to
Exit 3 South Water Line Extension - Phase I
Solicitation number
US.257181
Issued by
Pennsylvania

About this file

This is a project set for Exit 3 South Water Line Extension - Phase I, a Pennsylvania infrastructure project managed by Antrim Township. The project consists of the installation of approximately 660 linear feet of 12-inch water main and approximately 200 linear feet of boring under Interstate 81, along with associated appurtenances as specified in the project plans and specifications. The scope of work encompasses all materials, labor, and equipment necessary to complete the water line extension in accordance with the detailed design and technical requirements provided in the contract documents.

The project documents establish the technical specifications, drawings, and contractual requirements for bidders to prepare comprehensive proposals. Contractors should review all supporting exhibits, scopes of work, and project descriptions contained within the contract opportunity package to understand the full extent of work required, site conditions, and any special provisions or requirements specific to this phase of the water line extension project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3939 BIRNEY AVENUE

MOOSIC, PA 18507

AS NOTED PF

PF

JAK

2024-07-03

2024-0771

CALL BEFORE YOU DIG!

844-542-4757

DRAFT PLAN

DISCLAIMER:

MD NY OH PA VA WV

www.jhacompanies.com

EXIT 3 SOUTH WATER LINE EXTENSION

FOR

ATMA

LOCATED IN

ANTRIM TWP, FRANKLIN COUNTY,

PENNSYLVANIA

C-0.00E

EXIT 3 SOUTH WATER LINE EXTENSION PHASE I

I-81 TO EXECUTIVE BLVD.

ANTRIM TOWNSHIP MUNICIPAL AUTHORITY

10655 ANTRIM CHURCH RD. PO BOX 130

GREENCASTLE, PA 17225

PREPARED BY

466 S. MAIN STREET

MONTROSE, PA 18801

SHEET INDEX

SHEET C-0.00E - COVER SHEET

SHEET C-7.01E - E&S GENERAL NOTES

SHEET C-7.02E - E&S DETAILS

SHEET C-1.01E - SITE PLAN

EROSION AND SEDIMENTATION CONTROL PLANS

M i l n o r

R d

P e n s i n g e r

R d

SITE

EXIT 3

AutoCAD SHX Text THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF JHA COMPANIES

AutoCAD SHX Text

NO.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BY

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT ID:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DESIGN:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text SHEET No.

AutoCAD SHX Text PENNSYLVANIA LAW REQUIRES: 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN STATE - STOP CALL Pennsylvania One Call System, Inc

AutoCAD SHX Text

SERIAL NO.

AutoCAD SHX Text THESE DRAWINGS HAVE BEEN PROVIDED AS A TOOL TO ASSIST THE CONTRACTOR IN CONSTRUCTING THE PROPOSED PROJECT. JHA COMPANIES AND THE OWNER HAVE MADE REASONABLE EFFORTS TO PROVIDE THIS INFORMATION AND VERIFY ITS ACCURACY: HOWEVER, THE CONTRACTOR SHALL NOT RELY SOLELY ON THE INFORMATION PROVIDED. RECORDS MAPS, TAX PARCEL MAPS AND AVAILABLE UTILITY RECORD PLANS HAVE BEEN USED TO CREATE THESE PLANS. EXISTING UTILITY AND TOPOGRAPHIC INFORMATION SHOULD BE FIELD VERIFIED PRIOR TO ANY CONSTRUCTION ON THIS PROJECT. JHA COMPANIES AND THE OWNER RECOMMENDS THAT THE CONTRACTOR PERFORM THEIR OWN DUE DILIGENCE TO DETERMINE THE LOCATION OF ALL UNDERGROUND FACILITIES, INCLUDING THE APPROPRIATE ONE-CALL AS WELL AS COMMUNICATE WITH LANDOWNERS TO LOCATE ALL UNDERGROUND FACILITIES PRIOR TO THE START OF THE PROJECT CONSTRUCTION. JHA COMPANIES AND THE OWNER MAKE NO WARRANTY REGARDING THE COMPLETENESS OR ACCURACY OF THE INFORMATION INCLUDED IN THESE PROJECT PLANS.

AutoCAD SHX Text

PRELIMINARY SUBMITTAL FOR CLIENT REVIEW.

3939 BIRNEY AVENUE

MOOSIC, PA 18507

AS NOTED PF

PF

JAK

2024-07-03

2024-0771

CALL BEFORE YOU DIG!

844-542-4757

DRAFT PLAN

DISCLAIMER:

MD NY OH PA VA WV

www.jhacompanies.com

EXIT 3 SOUTH WATER LINE EXTENSION

FOR

ATMA

LOCATED IN

ANTRIM TWP, FRANKLIN COUNTY,

PENNSYLVANIA

C-7.01E

HcB

HAGERSTOWN-CARBO SILTY CLAY LOAMS

3-8% SLOPES, VERY ROCKY

HaB

HAGERSTOWN SILT LOAM

0-3% SLOPE

0.18

0.41

30.5%

69.5%

AutoCAD SHX Text THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF JHA COMPANIES

AutoCAD SHX Text

NO.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BY

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PROJECT ID:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DESIGN:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text SHEET No.

AutoCAD SHX Text PENNSYLVANIA LAW REQUIRES: 3 WORKING DAYS NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING DAYS IN DESIGN STATE - STOP CALL Pennsylvania One Call System, Inc

AutoCAD SHX Text

SERIAL NO.

AutoCAD SHX Text THESE DRAWINGS HAVE BEEN PROVIDED AS A TOOL TO ASSIST THE CONTRACTOR IN CONSTRUCTING THE PROPOSED PROJECT. JHA COMPANIES AND THE OWNER HAVE MADE REASONABLE EFFORTS TO PROVIDE THIS INFORMATION AND VERIFY ITS ACCURACY: HOWEVER, THE CONTRACTOR SHALL NOT RELY SOLELY ON THE INFORMATION PROVIDED. RECORDS MAPS, TAX PARCEL MAPS AND AVAILABLE UTILITY RECORD PLANS HAVE BEEN USED TO CREATE THESE PLANS. EXISTING UTILITY AND TOPOGRAPHIC INFORMATION SHOULD BE FIELD VERIFIED PRIOR TO ANY CONSTRUCTION ON THIS PROJECT. JHA COMPANIES AND THE OWNER RECOMMENDS THAT THE CONTRACTOR PERFORM THEIR OWN DUE DILIGENCE TO DETERMINE THE LOCATION OF ALL UNDERGROUND FACILITIES, INCLUDING THE APPROPRIATE ONE-CALL AS WELL AS COMMUNICATE WITH LANDOWNERS TO LOCATE ALL UNDERGROUND FACILITIES PRIOR TO THE START OF THE PROJECT CONSTRUCTION. JHA COMPANIES AND THE OWNER MAKE NO WARRANTY REGARDING THE COMPLETENESS OR ACCURACY OF THE INFORMATION INCLUDED IN THESE PROJECT PLANS.

AutoCAD SHX Text

PRELIMINARY SUBMITTAL FOR CLIENT REVIEW.

AutoCAD SHX Text GENERAL NOTES PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING TO BEGINNING CONSTRUCTION, THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING TO BEGINNING CONSTRUCTION, THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING BEGINNING CONSTRUCTION, THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING BEGINNING CONSTRUCTION, THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING CONSTRUCTION, THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING CONSTRUCTION, THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING THE CONTRACTOR IS TO BE AWARE OF THE FOLLOWING CONTRACTOR IS TO BE AWARE OF THE FOLLOWING CONTRACTOR IS TO BE AWARE OF THE FOLLOWING IS TO BE AWARE OF THE FOLLOWING IS TO BE AWARE OF THE FOLLOWING TO BE AWARE OF THE FOLLOWING TO BE AWARE OF THE FOLLOWING BE AWARE OF THE FOLLOWING BE AWARE OF THE FOLLOWING AWARE OF THE FOLLOWING AWARE OF THE FOLLOWING OF THE FOLLOWING OF THE FOLLOWING THE FOLLOWING THE FOLLOWING FOLLOWING FOLLOWING DIRECTIVES: 1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND CLEARING AND GRUBBING AS WELL AS CUTS AND CLEARING AND GRUBBING AS WELL AS CUTS AND AND GRUBBING AS WELL AS CUTS AND AND GRUBBING AS WELL AS CUTS AND GRUBBING AS WELL AS CUTS AND GRUBBING AS WELL AS CUTS AND AS WELL AS CUTS AND AS WELL AS CUTS AND WELL AS CUTS AND WELL AS CUTS AND AS CUTS AND AS CUTS AND CUTS AND CUTS AND AND AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE WITH THE APPROVED E&S PLAN. A COPY OF THE WITH THE APPROVED E&S PLAN. A COPY OF THE THE APPROVED E&S PLAN. A COPY OF THE THE APPROVED E&S PLAN. A COPY OF THE APPROVED E&S PLAN. A COPY OF THE APPROVED E&S PLAN. A COPY OF THE E&S PLAN. A COPY OF THE E&S PLAN. A COPY OF THE PLAN. A COPY OF THE PLAN. A COPY OF THE A COPY OF THE A COPY OF THE A COPY OF THE COPY OF THE COPY OF THE OF THE OF THE THE THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AND DATED BY THE REVIEWING AGENCY) MUST BE AND DATED BY THE REVIEWING AGENCY) MUST BE DATED BY THE REVIEWING AGENCY) MUST BE DATED BY THE REVIEWING AGENCY) MUST BE BY THE REVIEWING AGENCY) MUST BE BY THE REVIEWING AGENCY) MUST BE THE REVIEWING AGENCY) MUST BE THE REVIEWING AGENCY) MUST BE REVIEWING AGENCY) MUST BE REVIEWING AGENCY) MUST BE AGENCY) MUST BE AGENCY) MUST BE MUST BE MUST BE BE BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED THE REVIEWING AGENCY SHALL BE NOTIFIED THE REVIEWING AGENCY SHALL BE NOTIFIED REVIEWING AGENCY SHALL BE NOTIFIED REVIEWING AGENCY SHALL BE NOTIFIED AGENCY SHALL BE NOTIFIED AGENCY SHALL BE NOTIFIED SHALL BE NOTIFIED SHALL BE NOTIFIED BE NOTIFIED BE NOTIFIED NOTIFIED NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. PRIOR TO IMPLEMENTATION OF THOSE CHANGES. PRIOR TO IMPLEMENTATION OF THOSE CHANGES. TO IMPLEMENTATION OF THOSE CHANGES. TO IMPLEMENTATION OF THOSE CHANGES. IMPLEMENTATION OF THOSE CHANGES. IMPLEMENTATION OF THOSE CHANGES. OF THOSE CHANGES. OF THOSE CHANGES. THOSE CHANGES. THOSE CHANGES. CHANGES. CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR A WRITTEN SUBMITTAL OF THOSE CHANGES FOR A WRITTEN SUBMITTAL OF THOSE CHANGES FOR WRITTEN SUBMITTAL OF THOSE CHANGES FOR WRITTEN SUBMITTAL OF THOSE CHANGES FOR SUBMITTAL OF THOSE CHANGES FOR SUBMITTAL OF THOSE CHANGES FOR OF THOSE CHANGES FOR OF THOSE CHANGES FOR THOSE CHANGES FOR THOSE CHANGES FOR CHANGES FOR CHANGES FOR FOR FOR REVIEW AND APPROVAL AT ITS DISCRETION. 2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING EARTH DISTURBANCE ACTIVITIES, INCLUDING EARTH DISTURBANCE ACTIVITIES, INCLUDING DISTURBANCE ACTIVITIES, INCLUDING DISTURBANCE ACTIVITIES, INCLUDING ACTIVITIES, INCLUDING ACTIVITIES, INCLUDING INCLUDING INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, OPERATOR SHALL INVITE ALL CONTRACTORS, OPERATOR SHALL INVITE ALL CONTRACTORS, SHALL INVITE ALL CONTRACTORS, SHALL INVITE ALL CONTRACTORS, INVITE ALL CONTRACTORS, INVITE ALL CONTRACTORS, ALL CONTRACTORS, ALL CONTRACTORS, CONTRACTORS, CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM OFFICIALS, THE E&S PLAN PREPARER, THE PCSM OFFICIALS, THE E&S PLAN PREPARER, THE PCSM THE E&S PLAN PREPARER, THE PCSM THE E&S PLAN PREPARER, THE PCSM E&S PLAN PREPARER, THE PCSM E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE PCSM PLAN PREPARER, THE PCSM PREPARER, THE PCSM PREPARER, THE PCSM THE PCSM THE PCSM PCSM PCSM PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL FOR OVERSIGHT OF CRITICAL FOR OVERSIGHT OF CRITICAL OVERSIGHT OF CRITICAL OVERSIGHT OF CRITICAL OF CRITICAL OF CRITICAL CRITICAL CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL PLAN, AND A REPRESENTATIVE FROM THE LOCAL PLAN, AND A REPRESENTATIVE FROM THE LOCAL AND A REPRESENTATIVE FROM THE LOCAL AND A REPRESENTATIVE FROM THE LOCAL A REPRESENTATIVE FROM THE LOCAL A REPRESENTATIVE FROM THE LOCAL REPRESENTATIVE FROM THE LOCAL REPRESENTATIVE FROM THE LOCAL FROM THE LOCAL FROM THE LOCAL THE LOCAL THE LOCAL LOCAL LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING. 3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING EARTH DISTURBANCE ACTIVITIES, OR EXPANDING EARTH DISTURBANCE ACTIVITIES, OR EXPANDING DISTURBANCE ACTIVITIES, OR EXPANDING DISTURBANCE ACTIVITIES, OR EXPANDING ACTIVITIES, OR EXPANDING ACTIVITIES, OR EXPANDING OR EXPANDING OR EXPANDING EXPANDING EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL PENNSYLVANIA ONE CALL SYSTEM INC. SHALL PENNSYLVANIA ONE CALL SYSTEM INC. SHALL ONE CALL SYSTEM INC. SHALL ONE CALL SYSTEM INC. SHALL CALL SYSTEM INC. SHALL CALL SYSTEM INC. SHALL SYSTEM INC. SHALL SYSTEM INC. SHALL INC. SHALL INC. SHALL SHALL SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES. 4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROCEED IN ACCORDANCE WITH THE SEQUENCE PROCEED IN ACCORDANCE WITH THE SEQUENCE IN ACCORDANCE WITH THE SEQUENCE IN ACCORDANCE WITH THE SEQUENCE ACCORDANCE WITH THE SEQUENCE ACCORDANCE WITH THE SEQUENCE WITH THE SEQUENCE WITH THE SEQUENCE THE SEQUENCE THE SEQUENCE SEQUENCE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED DEVIATION FROM THAT SEQUENCE MUST BE APPROVED DEVIATION FROM THAT SEQUENCE MUST BE APPROVED FROM THAT SEQUENCE MUST BE APPROVED FROM THAT SEQUENCE MUST BE APPROVED THAT SEQUENCE MUST BE APPROVED THAT SEQUENCE MUST BE APPROVED SEQUENCE MUST BE APPROVED SEQUENCE MUST BE APPROVED MUST BE APPROVED MUST BE APPROVED BE APPROVED BE APPROVED APPROVED APPROVED IN WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO DISTRICT OR BY THE DEPARTMENT PRIOR TO DISTRICT OR BY THE DEPARTMENT PRIOR TO OR BY THE DEPARTMENT PRIOR TO OR BY THE DEPARTMENT PRIOR TO BY THE DEPARTMENT PRIOR TO BY THE DEPARTMENT PRIOR TO THE DEPARTMENT PRIOR TO THE DEPARTMENT PRIOR TO DEPARTMENT PRIOR TO DEPARTMENT PRIOR TO PRIOR TO PRIOR TO TO TO IMPLEMENTATION. 5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO GRUBBED, AND STRIPPED OF TOPSOIL TO GRUBBED, AND STRIPPED OF TOPSOIL TO AND STRIPPED OF TOPSOIL TO AND STRIPPED OF TOPSOIL TO STRIPPED OF TOPSOIL TO STRIPPED OF TOPSOIL TO OF TOPSOIL TO OF TOPSOIL TO TOPSOIL TO TOPSOIL TO TO TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. 6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS STRIPPING SHALL BE LIMITED TO THOSE AREAS STRIPPING SHALL BE LIMITED TO THOSE AREAS SHALL BE LIMITED TO THOSE AREAS SHALL BE LIMITED TO THOSE AREAS BE LIMITED TO THOSE AREAS BE LIMITED TO THOSE AREAS LIMITED TO THOSE AREAS LIMITED TO THOSE AREAS TO THOSE AREAS TO THOSE AREAS THOSE AREAS THOSE AREAS AREAS AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, SEQUENCE. GENERAL SITE CLEARING, SEQUENCE. GENERAL SITE CLEARING, GENERAL SITE CLEARING, GENERAL SITE CLEARING, SITE CLEARING, SITE CLEARING, CLEARING, CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE NOT COMMENCE IN ANY STAGE OR PHASE OF THE NOT COMMENCE IN ANY STAGE OR PHASE OF THE COMMENCE IN ANY STAGE OR PHASE OF THE COMMENCE IN ANY STAGE OR PHASE OF THE IN ANY STAGE OR PHASE OF THE IN ANY STAGE OR PHASE OF THE ANY STAGE OR PHASE OF THE ANY STAGE OR PHASE OF THE STAGE OR PHASE OF THE STAGE OR PHASE OF THE OR PHASE OF THE OR PHASE OF THE PHASE OF THE PHASE OF THE OF THE OF THE THE THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR BY THE BMP SEQUENCE FOR THAT STAGE OR BY THE BMP SEQUENCE FOR THAT STAGE OR THE BMP SEQUENCE FOR THAT STAGE OR THE BMP SEQUENCE FOR THAT STAGE OR BMP SEQUENCE FOR THAT STAGE OR BMP SEQUENCE FOR THAT STAGE OR SEQUENCE FOR THAT STAGE OR SEQUENCE FOR THAT STAGE OR FOR THAT STAGE OR FOR THAT STAGE OR THAT STAGE OR THAT STAGE OR STAGE OR STAGE OR OR OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN. 7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE BE ALLOWED TO ENTER AREAS OUTSIDE THE BE ALLOWED TO ENTER AREAS OUTSIDE THE ALLOWED TO ENTER AREAS OUTSIDE THE ALLOWED TO ENTER AREAS OUTSIDE THE TO ENTER AREAS OUTSIDE THE TO ENTER AREAS OUTSIDE THE ENTER AREAS OUTSIDE THE ENTER AREAS OUTSIDE THE AREAS OUTSIDE THE AREAS OUTSIDE THE OUTSIDE THE OUTSIDE THE THE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE BOUNDARIES SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE BOUNDARIES SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE SHOWN ON THE PLAN MAPS. THOSE AREAS MUST BE ON THE PLAN MAPS. THOSE AREAS MUST BE ON THE PLAN MAPS. THOSE AREAS MUST BE THE PLAN MAPS. THOSE AREAS MUST BE THE PLAN MAPS. THOSE AREAS MUST BE PLAN MAPS. THOSE AREAS MUST BE PLAN MAPS. THOSE AREAS MUST BE MAPS. THOSE AREAS MUST BE MAPS. THOSE AREAS MUST BE THOSE AREAS MUST BE THOSE AREAS MUST BE AREAS MUST BE AREAS MUST BE MUST BE MUST BE BE BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN. 8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE OF VEGETATION SHALL BE STOCKPILED AT THE OF VEGETATION SHALL BE STOCKPILED AT THE VEGETATION SHALL BE STOCKPILED AT THE VEGETATION SHALL BE STOCKPILED AT THE SHALL BE STOCKPILED AT THE SHALL BE STOCKPILED AT THE BE STOCKPILED AT THE BE STOCKPILED AT THE STOCKPILED AT THE STOCKPILED AT THE AT THE AT THE THE THE LOCATION(S) SHOWN ON THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE SHOWN ON THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE SHOWN ON THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE ON THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE ON THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE IN THE AMOUNT NECESSARY TO COMPLETE THE IN THE AMOUNT NECESSARY TO COMPLETE THE THE AMOUNT NECESSARY TO COMPLETE THE THE AMOUNT NECESSARY TO COMPLETE THE AMOUNT NECESSARY TO COMPLETE THE AMOUNT NECESSARY TO COMPLETE THE NECESSARY TO COMPLETE THE NECESSARY TO COMPLETE THE TO COMPLETE THE TO COMPLETE THE COMPLETE THE COMPLETE THE THE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. AREAS THAT ARE TO BE STABILIZED BY VEGETATION. AREAS THAT ARE TO BE STABILIZED BY VEGETATION. THAT ARE TO BE STABILIZED BY VEGETATION. THAT ARE TO BE STABILIZED BY VEGETATION. ARE TO BE STABILIZED BY VEGETATION. ARE TO BE STABILIZED BY VEGETATION. TO BE STABILIZED BY VEGETATION. TO BE STABILIZED BY VEGETATION. BE STABILIZED BY VEGETATION. BE STABILIZED BY VEGETATION. STABILIZED BY VEGETATION. STABILIZED BY VEGETATION. BY VEGETATION. BY VEGETATION. VEGETATION. VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. IN THE MANNER SHOWN ON THE PLAN DRAWINGS. IN THE MANNER SHOWN ON THE PLAN DRAWINGS. THE MANNER SHOWN ON THE PLAN DRAWINGS. THE MANNER SHOWN ON THE PLAN DRAWINGS. MANNER SHOWN ON THE PLAN DRAWINGS. MANNER SHOWN ON THE PLAN DRAWINGS. SHOWN ON THE PLAN DRAWINGS. SHOWN ON THE PLAN DRAWINGS. ON THE PLAN DRAWINGS. ON THE PLAN DRAWINGS. THE PLAN DRAWINGS. THE PLAN DRAWINGS. PLAN DRAWINGS. PLAN DRAWINGS. DRAWINGS. DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR STOCKPILE SLOPES SHALL BE 2H:1V OR STOCKPILE SLOPES SHALL BE 2H:1V OR SLOPES SHALL BE 2H:1V OR SLOPES SHALL BE 2H:1V OR SHALL BE 2H:1V OR SHALL BE 2H:1V OR BE 2H:1V OR BE 2H:1V OR 2H:1V OR 2H:1V OR OR OR FLATTER. 9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR CIRCUMSTANCES POSING THE POTENTIAL FOR CIRCUMSTANCES POSING THE POTENTIAL FOR POSING THE POTENTIAL FOR POSING THE POTENTIAL FOR THE POTENTIAL FOR THE POTENTIAL FOR POTENTIAL FOR POTENTIAL FOR FOR FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT THE OPERATOR SHALL IMPLEMENT THE OPERATOR SHALL IMPLEMENT OPERATOR SHALL IMPLEMENT OPERATOR SHALL IMPLEMENT SHALL IMPLEMENT SHALL IMPLEMENT IMPLEMENT IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND TO MINIMIZE THE POTENTIAL FOR EROSION AND TO MINIMIZE THE POTENTIAL FOR EROSION AND MINIMIZE THE POTENTIAL FOR EROSION AND MINIMIZE THE POTENTIAL FOR EROSION AND THE POTENTIAL FOR EROSION AND THE POTENTIAL FOR EROSION AND POTENTIAL FOR EROSION AND POTENTIAL FOR EROSION AND FOR EROSION AND FOR EROSION AND EROSION AND EROSION AND AND AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE THE LOCAL CONSERVATION DISTRICT AND/OR THE THE LOCAL CONSERVATION DISTRICT AND/OR THE LOCAL CONSERVATION DISTRICT AND/OR THE LOCAL CONSERVATION DISTRICT AND/OR THE CONSERVATION DISTRICT AND/OR THE CONSERVATION DISTRICT AND/OR THE DISTRICT AND/OR THE DISTRICT AND/OR THE AND/OR THE AND/OR THE THE THE REGIONAL OFFICE OF THE DEPARTMENT. 10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED SHALL BE REMOVED FROM THE SITE AND RECYCLED SHALL BE REMOVED FROM THE SITE AND RECYCLED BE REMOVED FROM THE SITE AND RECYCLED BE REMOVED FROM THE SITE AND RECYCLED REMOVED FROM THE SITE AND RECYCLED REMOVED FROM THE SITE AND RECYCLED FROM THE SITE AND RECYCLED FROM THE SITE AND RECYCLED THE SITE AND RECYCLED THE SITE AND RECYCLED SITE AND RECYCLED SITE AND RECYCLED AND RECYCLED AND RECYCLED RECYCLED RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT THE DEPARTMENT'S SOLID WASTE MANAGEMENT THE DEPARTMENT'S SOLID WASTE MANAGEMENT DEPARTMENT'S SOLID WASTE MANAGEMENT DEPARTMENT'S SOLID WASTE MANAGEMENT SOLID WASTE MANAGEMENT SOLID WASTE MANAGEMENT WASTE MANAGEMENT WASTE MANAGEMENT MANAGEMENT MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING AT 25 PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING AT 25 PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING 25 PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING 25 PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING 271.1 AND 287.1 ET. SEQ. NO BUILDING 271.1 AND 287.1 ET. SEQ. NO BUILDING AND 287.1 ET. SEQ. NO BUILDING AND 287.1 ET. SEQ. NO BUILDING 287.1 ET. SEQ. NO BUILDING 287.1 ET. SEQ. NO BUILDING ET. SEQ. NO BUILDING ET. SEQ. NO BUILDING SEQ. NO BUILDING SEQ. NO BUILDING NO BUILDING NO BUILDING BUILDING BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, BUILDING MATERIALS SHALL BE BURNED, BURIED, BUILDING MATERIALS SHALL BE BURNED, BURIED, MATERIALS SHALL BE BURNED, BURIED, MATERIALS SHALL BE BURNED, BURIED, SHALL BE BURNED, BURIED, SHALL BE BURNED, BURIED, BE BURNED, BURIED, BE BURNED, BURIED, BURNED, BURIED, BURNED, BURIED, BURIED, BURIED, DUMPED, OR DISCHARGED AT THE SITE. 11. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW IS RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW IS RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW RESPONSIBLE FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW FOR ENSURING THAT ANY OFF-SITE WASTE OR BORROW ENSURING THAT ANY OFF-SITE WASTE OR BORROW ENSURING THAT ANY OFF-SITE WASTE OR BORROW THAT ANY OFF-SITE WASTE OR BORROW THAT ANY OFF-SITE WASTE OR BORROW ANY OFF-SITE WASTE OR BORROW ANY OFF-SITE WASTE OR BORROW OFF-SITE WASTE OR BORROW OFF-SITE WASTE OR BORROW WASTE OR BORROW WASTE OR BORROW OR BORROW OR BORROW BORROW BORROW AREAS HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE BY THE LOCAL CONSERVATION DISTRICT OR THE BY THE LOCAL CONSERVATION DISTRICT OR THE THE LOCAL CONSERVATION DISTRICT OR THE THE LOCAL CONSERVATION DISTRICT OR THE LOCAL CONSERVATION DISTRICT OR THE LOCAL CONSERVATION DISTRICT OR THE CONSERVATION DISTRICT OR THE CONSERVATION DISTRICT OR THE DISTRICT OR THE DISTRICT OR THE OR THE OR THE THE THE DEPARTMENT AND IS FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED. 12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS THAT ANY MATERIAL BROUGHT ON SITE IS THAT ANY MATERIAL BROUGHT ON SITE IS ANY MATERIAL BROUGHT ON SITE IS ANY MATERIAL BROUGHT ON SITE IS MATERIAL BROUGHT ON SITE IS MATERIAL BROUGHT ON SITE IS BROUGHT ON SITE IS BROUGHT ON SITE IS ON SITE IS ON SITE IS SITE IS SITE IS IS IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL RETAINED BY THE PROPERTY OWNER FOR ANY FILL RETAINED BY THE PROPERTY OWNER FOR ANY FILL BY THE PROPERTY OWNER FOR ANY FILL BY THE PROPERTY OWNER FOR ANY FILL THE PROPERTY OWNER FOR ANY FILL THE PROPERTY OWNER FOR ANY FILL PROPERTY OWNER FOR ANY FILL PROPERTY OWNER FOR ANY FILL OWNER FOR ANY FILL OWNER FOR ANY FILL FOR ANY FILL FOR ANY FILL ANY FILL ANY FILL FILL FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING OF A REGULATED SUBSTANCE BUT QUALIFYING OF A REGULATED SUBSTANCE BUT QUALIFYING A REGULATED SUBSTANCE BUT QUALIFYING A REGULATED SUBSTANCE BUT QUALIFYING REGULATED SUBSTANCE BUT QUALIFYING REGULATED SUBSTANCE BUT QUALIFYING SUBSTANCE BUT QUALIFYING SUBSTANCE BUT QUALIFYING BUT QUALIFYING BUT QUALIFYING QUALIFYING QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING. 13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE ANY WORK AREA SHALL BE DONE ACCORDING TO THE ANY WORK AREA SHALL BE DONE ACCORDING TO THE WORK AREA SHALL BE DONE ACCORDING TO THE WORK AREA SHALL BE DONE ACCORDING TO THE AREA SHALL BE DONE ACCORDING TO THE AREA SHALL BE DONE ACCORDING TO THE SHALL BE DONE ACCORDING TO THE SHALL BE DONE ACCORDING TO THE BE DONE ACCORDING TO THE BE DONE ACCORDING TO THE DONE ACCORDING TO THE DONE ACCORDING TO THE ACCORDING TO THE ACCORDING TO THE TO THE TO THE THE THE PROCEDURE DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS. 14. VEHICLES AND EQUIPMENT MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY VEHICLES AND EQUIPMENT MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY AND EQUIPMENT MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY AND EQUIPMENT MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY EQUIPMENT MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY EQUIPMENT MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY MAY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY NEITHER ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY ENTER NOR EXIT DIRECTLY FROM LOTS (SPECIFY NOR EXIT DIRECTLY FROM LOTS (SPECIFY NOR EXIT DIRECTLY FROM LOTS (SPECIFY EXIT DIRECTLY FROM LOTS (SPECIFY EXIT DIRECTLY FROM LOTS (SPECIFY DIRECTLY FROM LOTS (SPECIFY DIRECTLY FROM LOTS (SPECIFY FROM LOTS (SPECIFY FROM LOTS (SPECIFY LOTS (SPECIFY LOTS (SPECIFY (SPECIFY (SPECIFY LOT NUMBERS) ONTO (SPECIFY ROAD NAMES). 15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED AND SEDIMENT BMPS SHALL BE MAINTAINED AND SEDIMENT BMPS SHALL BE MAINTAINED SEDIMENT BMPS SHALL BE MAINTAINED SEDIMENT BMPS SHALL BE MAINTAINED BMPS SHALL BE MAINTAINED BMPS SHALL BE MAINTAINED SHALL BE MAINTAINED SHALL BE MAINTAINED BE MAINTAINED BE MAINTAINED MAINTAINED MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT INSPECTIONS OF ALL EROSION AND SEDIMENT INSPECTIONS OF ALL EROSION AND SEDIMENT OF ALL EROSION AND SEDIMENT OF ALL EROSION AND SEDIMENT ALL EROSION AND SEDIMENT ALL EROSION AND SEDIMENT EROSION AND SEDIMENT EROSION AND SEDIMENT AND SEDIMENT AND SEDIMENT SEDIMENT SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS.

This is the start of the file's text. The full file is on GovTribe.