This document is a supplemental specifications manual issued by the City of Orem, Utah in April 2024, establishing construction standards and specifications for work performed within the city's public rights-of-way and utility easements. The specifications supplement the 2017 APWA Manual of Standard Specifications and Plans, UDOT Standard Specifications, and current MUTCD requirements. The manual covers comprehensive construction requirements across multiple divisions including general requirements, concrete, electrical, earthwork, exterior improvements, and utilities. Key procedural requirements include obtaining permits from the City Department of Development Services, posting a $1,000 cash bond held for a minimum of one year after project completion, maintaining current Utah State Contractor's licenses, and providing proof of adequate insurance with minimum coverage of $2,000,000 combined single limit for Commercial General Liability. All contractors performing work in the city's right-of-way must submit preconstruction plans for approval, schedule preconstruction meetings with the city's Private Development Engineer, and comply with traffic control requirements outlined in Section 01 55 26, which includes specific advance notice periods ranging from 48 hours to five workdays depending on street classification and closure type.

The specifications establish detailed technical requirements for materials, installation methods, inspection procedures, and quality assurance across all construction disciplines. Contractors must provide as-built drawings in electronic CAD-compatible format or 24" x 36" original drawings, professionally certified by a licensed engineer, land surveyor, or architect, with initial submittals required prior to permitting surface improvements and final submittals required at least one year prior to bond release. The city requires notification and coordination for work affecting traffic signals, fire stations, police stations, hospitals, schools, and utility systems, with specific provisions for tree protection including establishment of Tree Protection Zones (TPZ) calculated at 1.5 feet radius per inch of trunk diameter measured 4.5 feet above ground. Work site inspections are required prior to backfilling, concrete placement, asphalt installation, underground piping installation, and utility connections, with at least two hours' notice needed for inspections during regular working hours. Specific technical specifications address water system disinfection per ANSI/AWWA C651, sewer installation requirements, erosion and sedimentation control with required Storm Water Pollution Prevention Plans (SWPPP) for disturbances exceeding 500 square feet, and irrigation system installation using specified manufacturers including Rain Bird controllers and NetaFim components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Orem Supplemental Document to the

2017 APWA

Standard Construction

Specifications and Drawings

April 2024

This document is a supplement to the 2017 APWA Manual of Standard Specifications, the 2017

APWA Manual of Standard Plans and the most current approved UDOT Standard Specifications and Standard Drawings. The 2017 APWA Manual of Standard Specifications and Plans are fully enforced except for the specifications and plans outlined in this document.

Table of Contents

INTRODUCTION

GENERAL CONDITIONS

DIVISION 01 GENERAL REQUIREMENTS

SECTION 01 55 26 TRAFFIC CONTROL

SECTION 01 66 00 PRODUCT STORAGE AND PROTECTION

DIVISION 03 CONCRETE

SECTION 03 30 04 CONCRETE

SECTION 03 30 10 CONCRETE PLACEMENT

SECTION 03 35 00 CONCRETE FINISHING

DIVISION 26 ELECTRICAL

SECTION 26 56 19 ROADWAY LIGHTING

DIVISION 31 EARTHWORK

SECTION 31 11 00 SITE CLEARING

SECTION 31 23 16 EXCAVATION

SECTION 31 23 17 ROCK REMOVAL

SECTION 31 23 23 BACKFILLING FOR STRUCTURES

SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL

DIVISION 32 EXTERIOR IMPROVEMENTS

SECTION 32 01 13.61 SLURRY SEAL

SECTION 32 01 13.64 CHIP SEAL

SECTION 32 01 13.69 MICRO-SURFACE SEAL

SECTION 32 01 16.74 IN-PLACE HOT REUSED BITUMINOUS PAVING

SECTION 32 01 90 MAINTENANCE OF PLANTING

SECTION 32 01 91 TREE ROOT CUTTING

SECTION 32 01 93 PRUNING TREES

SECTION 32 12 13.13 TACK COAT

SECTION 32 12 16.13 PLANT MIX BITUMINOUS PAVING

SECTION 32 12 16.19 COLD MIX BITUMINOUS PAVING

SECTION 32 13 13 CONCRETE PAVING

SECTION 32 16 13 DRIVEWAY, SIDEWALK, CURB, GUTTER

SECTION 32 31 13 CHAIN LINK FENCES AND GATES

SECTION 32 84 23 UNDERGROUND IRRIGATION SYSTEMS

SECTION 32 91 19 LANDSCAPE GRADING

SECTION 32 92 00 TURF AND GRASSES

SECTION 32 93 43 TREE

DIVISION 33 UTILITIES

SECTION 33 05 05 DUCTILE IRON PIPE

SECTION 33 05 07 POLYVINYL CHLORIDE PIPE

SECTION 33 05 20 BACKFILLING TRENCHES

SECTION 33 05 25 PAVEMENT RESTORATION

SECTION 33 08 00 COMMISSIONING OF WATER UTILITIES

SECTION 33 11 00 WATER DISTRIBUTION AND TRANSMISSION

SECTION 33 11 11 RELOCATE WATER METERS AND FIRE HYDRANTS

SECTION 33 12 16 WATER VALVES

SECTION 33 12 19 HYDRANT

SECTION 33 12 33 WATER METER

SECTION 33 13 00 DISINFECTION

SECTION 33 31 00 SANITARY SEWERAGE SYSTEMS

SECTION 33 41 00 DRAINAGE SYSTEMS

SECTION 33 47 00 PONDS

DIVISION 34 TRANSPORTATION

SECTION 34 41 13 TRAFFIC SIGNALS

FIBER OPTICS SYSTEMS

FIBER OPTIC SYSTEMS

SECTION 13553 ITS CONDUIT

INTRODUCTION

The purpose of these Construction Standards and Specifications is to govern any Work done or improvements installed within the City of Orem’s Public Rights-of-Way and public utility easements (hereinafter collectively referred to as the ROW). Construction Work in the ROW shall conform to the Orem City Code, Orem Public Works & Development Services

Construction Drawings, these Construction Standards and Specifications, 2017 APWA Manual of Standard Specifications, 2017 APWA Manual of Standard Plans, most current approved

UDOT Standard Specifications and Standard Drawings, the current MUTCD and any State or

Federal Regulations. The Contractor is responsible to know and conform to the appropriate

Codes, Regulations, Drawings, Standards and Specifications. Contractors should thoroughly read and understand these associated documents before performing any Work in the City’s

ROW.

GENERAL CONDITIONS

0.1 DEFINITIONS The terms listed below can be referred to in their abbreviated form:

"City" The term City refers to the City of Orem. The authorized representative of the

City of Orem shall be the City Engineer and other City employees as designated by the City Engineer.

“Work” Any Excavation, Construction, Maintenance, Repairs, or Improvements within the ROW including any restriction of or closure of the use or access to the City’s ROW. The term Work also includes work on any street, curb, gutter, sidewalk, sewer line, water line or other public utility.

“CS&S” The abbreviation CS&S means the City of Orem Construction Standards and

Specifications and associated detail drawings. In addition, the provisions of the Orem City Code, as amended, are hereby incorporated into these CS&S as if fully set forth herein. The CS&S are meant to function as a single unit. No individual chapter, section or drawing can stand alone.

“Contractor” The term Contractor means any individual or entity that performs Work within the ROW including but not limited to: Contractors, sub-Contractors, developers, owners, owners’ agents, utility companies and City Crews.

“Engineer” The term Engineer refers to the City Engineer or his designated representative.

“MUTCD” Manual of Uniform Traffic Control Devices.

“ROW” The City of Orem’s Public Rights-of-Way and public utility easements. This includes but is not limited to public streets, curbs, gutters, sidewalks, easements, public utilities, and other areas owned or maintained by the City of

Orem. Records of ownership are kept at the County Recorder’s office.

“SWPPP” Storm Water Pollution Prevention Plan.

“TCP” Traffic Control Plans shall be required for most Work in the City’s ROW.

Refer to Section 01 55 26 for detailed explanations.

“Drawings” The term Drawings means collectively the drawings which are attached hereto at the end of these CS&S.

The Contractor shall contact Development Services Engineering at 56 North State for all matters dealing with construction Work within a ROW or with any Work connecting onto a

City utility. SPECIAL PERMITS AND BONDING ARE REQUIRED FOR ALL SUCH

Work.

0.2 PERMIT, FEES, AND BONDING REQUIRED

0.2.1 PERMITS No Contractor may do any Work in any ROW without a permit from the City Department of Development Services. A permit to do Work in the ROW may be obtained by filing a completed application with the Department of

Development Services. The Contractor’s signature must be on the application to be accepted. A fully executed contract between a Contractor and the City shall be considered a permit to do Work in the ROW. No Contractor shall start Work until a permit is secured. Refer to Section 01 55 26 for special conditions concerning traffic control issues. The City of Orem and all utility companies are also bound by these CS&S documents.

0.2.2 FEES Before a City permit is issued, a permit fee and an inspection fee shall be paid to the City. The amount of such fees will be set by resolution of the City

Council. Generally, all fees are paid at Development Services at the time of the issuance of a building permit or prior to recording a subdivision plat.

0.2.3 BONDS

0.2.3.1 As a prerequisite to the issuance of a permit, each Contractor who performs

Work in the City shall post and maintain a $1,000.00 cash bond with the

City that will be held by the City for a minimum of 1 year after the completion of Work performed by the Contractor. The bond shall be held by the City to ensure that:

A. Construction Work is completed, and as-builts are submitted and approved.

B. Final inspection is conducted and the Work is found to comply with the

CS&S.

C. Repairs and/or replacement of public improvements are finished and accepted.

D. Contractor complies with all other requirements of these Construction

Standards and Specifications.

0.2.3.2 Failure of the Contractor to maintain safe conditions, to restore the area to better than or equal to condition during the first year, or to comply with any other provision of these Construction Standards and Specifications shall entitle the City to execute on the bond and to use the proceeds to take whatever action may be necessary to bring the Work into compliance with the CS&S. The City retains the right to charge the Contractor for any additional amounts in excess of the bond which the City expends to bring the Work into compliance with the CS&S. Any such additional expenses not covered by the bond must be paid to the City before the Contractor is allowed to restore its bond and do any further Work in the City.

0.3 CONTRACTOR AND CONSTRUCTION PLAN APPROVAL Before a Contractor performs any Work within the City, the Contractor shall be approved by the City. The

Contractor shall allow a reasonable time for processing applications prior to the start of any

Work. Contractor Approval is granted for a period of 1 year upon verification of the following:

0.3.1 A current UTAH STATE CONTRACTOR'S LICENSE. Work will be restricted to that authorized by the license.

0.3.2 INSURANCE: The Contractor shall attach a Certificate of Insurance from the

Contractor’s insurance company. The minimum insurance requirements are as follows:

Commercial General Liability: $2,000,000.00 combined single limit per occurrence for bodily injury, personal injury and property damage. If the policy contains a general aggregate limit, either the general aggregate limit shall apply separately to the Work being performed by Contractor or the general aggregate limit shall be

$3,000,000.00. Coverage shall be at least as broad as the Insurance Services Office

Commercial General Liability coverage (occurrence form). Business Auto:

$2,000,000.00 combined single limit per accident for bodily injury and property damage. Commercial General Liability. Coverage shall be at least as broad as the

Insurance Services Office Business Auto Coverage form.

Workers' Compensation and Employers Liability: Workers' compensation limits required by Utah State Law and Employer's Liability Limits of $1,000,000.00 per accident or as required by Section 21 of the General Conditions of the appropriate

City Contract.

The City, its officers, officials, employees, agents and volunteers shall be listed as additional insured on Contractor’s Commercial General Liability insurance as respects: liability arising out of activities performed by or on behalf of Contractor, including the Contractor’s general supervision of any employees or subcontractors;

products and completed operations of Contractor; premises owned, occupied or used by Contractor; or automobiles owned, leased, hired or borrowed by

Contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.

The applicant shall hold harmless, indemnify and defend the City from any liability claims, losses or damages arising or alleged to arise from the Work covered by any permit, but not including the sole negligence of the City of Orem.

0.4 CONSTRUCTION PLANS Contractor plans must be approved by the City before any

Work begins.

0.4.1 PRECONSTRUCTION MEETINGS between the Contractor(s) involved in the permit for Work shall be held with the City prior to commencement of any Work.

The City’s Private Development Engineer shall schedule the appropriate time.

0.5 TIMELY COMPLIANCE WITH THE ISSUED PERMIT The Contractor shall perform the Work in accordance with the terms of the permit and the CS&S in effect at the date of the permit. The Work shall be done in a timely manner. Time limits may be a condition of the permit and may be shortened because of safety and weather concerns.

Permits may be suspended if compliance is not met. The Contractor’s bond may be forfeited and the Contractor may incur liability to the City when the City repairs sub-standard restoration, see sections 0.2.3.2 and 0.2.1.

0.6 SAFETY No Contractor shall leave any Work in an unsafe condition. All persons working on any street, sidewalk, sewer line, water line, etc., shall comply with all applicable federal, state, and local safety regulations.

0.7 INSPECTIONS All Work covered by a permit shall be inspected by the City, prior to the following:

1) Backfilling and compacting

2) Placing concrete and asphalt

3) Placing any underground piping

4) Making any connection into a City utility line

5) Any other Work done in a public ROW

6) The release of the Contractor’s bond following the annual final inspection of the restoration Work

City Project Managers/Inspectors shall also be notified prior to starting any work.

0.7.1 TIMELY NOTIFICATION OF NEEDED INSPECTIONS

0.7.1.1 Inspections performed during regular Working hours require at least two (2) hours notification.

0.8 AS-BUILTS An electronic file or a series of original 24" x 36" as-built drawings shall be completed and filed with the City for each separate site plan or subdivision development which adds any infrastructure to the City ROW. Any changes to public or private storm water, water, and sewer utilities will also require as-built drawings. Each file or drawing shall show the dimensions of the various infrastructure systems. As-builts shall label each object and indicate the true location and grade and/or elevation to an accuracy of 0.1'.

Refer to the City of Orem’s drawing standards for proper labels and notations. These files or drawings are intended to modify and improve the original permitted plans. The electronic file or drawings shall be Professionally Certified and presented to the City in an

Initial Plan Submittal and a Final Plan Submittal.

0.8.1 ELECTRONIC FILES The as-built information should be submitted in a format which is CAD compatible. The Contractor shall provide the City with electronic, as-built information on all new infrastructure pertaining to the project. The data shall contain northings, eastings, and elevations in accordance with the NAD 27 datum. The most recent publicized control data from the office of the Utah County

Surveyor shall be used with grid distances. This information shall be in an

AutoCAD-compatible file format or a comma-delimited ASCII text file in the following format: point number, northing, easting, elevation, and description. Any questions should be referred to the ENGINEER.

0.8.2 CERTIFICATION As-built files or drawings shall be certified by the seal of a professional engineer, land surveyor or architect either by a certified letter accompanying an electronic file or as a professional stamp applied in ink, directly on the original drawings.

0.8.3 INITIAL PLAN SUBMITTAL The Initial Plan Submittal shall be completed prior to permitting any surface improvements such as concrete curb, gutter and sidewalk, concrete flatwork, road base or asphalt. The initial submittal shall include buried infrastructure and utilities such as sanitary sewer, storm sewer, water, irrigation, fiber optics, phone, cable T.V., electrical distribution, gas, and traffic control wiring. Each manhole, valve, fire hydrant, pipe bend, water meter and lateral stub will have x, y and z coordinates established within 0.1'.

0.8.4 SUBMITTALS The submittals shall be reviewed and approved by Project

Manager/Private Development Engineer prior to permitting any surface improvements in City ROW such as concrete curb, gutter and sidewalk, concrete flatwork cut sheets, road base and asphalt etc. The submittals shall also include buried infrastructure and utilities such as sanitary sewer, storm sewer, water, irrigation, fiber optics, electrical distribution, and traffic control plans.

0.8.5 FINAL PLAN SUBMITTAL The Final Plan Submittal shall be completed before the Work may be considered finished and shall be completed at least one year prior to release of the bond. The final submittal shall include all permanent surface improvements such as concrete curb, gutter and sidewalk, concrete flatwork, road base, asphalt, lighting, and above ground utilities. All surface improvements shall be located and verified. Each road segment will have a width and length dimensioned. The type and thickness of sub-base, base asphalt pavement and concrete Work shall be indicated. All underground storm water injection or storage chambers require a letter from a representative of the manufacturer verifying volume, and that the installation was done in accordance with the manufacturer’s specifications. All retention/detention basins require a letter from an engineering firm verifying the volume and cross section.

0.9 MATERIALS TESTING The City may require the Contractor to provide material or soil tests when in the judgment of the City there is sufficient basis to require such tests. The

City will specify in writing to the Contractor the reasons for the required testing and the extent of the required testing. The Contractor must pay for all tests on materials or workmanship found to be sub-standard or not in compliance with the CS&S.

0.10 TRAFFIC CONTROL Work site traffic control is a great concern to the City. The

Contractor should fully understand the requirements of section 01 55 26 - Traffic Control.

The Contractor shall comply with the strict time requirements for Work within busy streets.

0.11 CONFLICTS These Construction Standards and Specifications are the minimum requirements of the City of Orem. In the event that any provisions herein conflict with general industrial standards, or with other requirements specified by the City, State, or

Federal Regulations, the more stringent of the standards will apply.

DIVISION 01

GENERAL

REQUIREMENTS

SECTION 01 55 26 TRAFFIC CONTROL

This specification changes a portion of APWA Standard Specification Section 01 55 26. All other provisions of the section remain in full force and effect.

Section 01 55 26 Page 123

1.2 REFERENCES

F. STREET DESIGNATION AND GOVERNING AGENCY

1. Roads owned by State Agencies within the City of Orem

College Drive ................................................................... UVU

State Street .................................................................... UDOT

800 North ...................................................................... UDOT

University Parkway ....................................................... UDOT

Geneva Road ................................................................. UDOT

I-15, and the On and Off Ramps of I-15 ....................... UDOT

1600 North (West of State Street) ................................. UDOT

For an updated list of road classifications within the City of Orem, refer to the most current Transportation Master Plan (https://orem.org/engineering/).

2. LOCAL AND SUB-LOCAL STREETS within the City of Orem. All public streets within the City that are not classified as a collector or arterial are considered local or sub-local streets and are not typically identified in the Transportation

Master Plan. Some local or sub-local roads may be privately owned by individuals or HOA’s and are also not identified in transportation planning documents.

1.3 SUBMITTALS

C. Traffic Control Plan (TCP) Required. The required TCP may range in complexity from a simple plan to a detailed site plan displaying signing, barricading, material delivery areas, construction office, utility poles, staging areas, and construction phasing.

In all cases, the TCP must address satisfactorily all of the requirements of the most current MUTCD for the project. Exceptions to the requirements of the MUTCD must be requested in writing by the applicant and be approved by the City Engineer and shall be added to the TCP. All permits and TCPs must be kept on the job site.

D. PERMISSION TO RESTRICT CITY STREETS. All Contractors must obtain a permit from the City for a partial or complete closure of any public right-of-way, street, or sidewalk within the City of Orem. All requests to restrict right-of-way will be directed to the City. Requests that require partial or complete closure of any City street or sidewalk, detouring or rerouting of pedestrian traffic, or other similar public impacts shall https://orem.org/engineering/ include a TCP that must be reviewed by the city. The City may require a TCP for any project that impacts a City street, right-of-way, sidewalk, or trail.

E. Advance approval. Advance approval from the City is required in writing for all projects in city ROW as set forth below. Closures of any type will not be permitted without the required advanced notice, except during emergency conditions.

1. Five (5) workdays for complete closure of ARTERIAL streets (see current TMP).

2. Forty-eight (48) hours for partial closures of ARTERIAL streets and 48 hours for partial or complete closures of URBAN COLLECTOR streets

3. Forty-eight (48) hours for complete closure of LOCAL AND SUB-LOCAL streets.

1.7 NOTIFICATION

A. When the Contractor encounters an unforeseeable emergency, the Contractor shall immediately notify all organizations that may be affected by the partial or complete closure. The Contractor shall notify each of the following organizations forty-eight (48) hours in advance for partial or complete street closures (all numbers may be obtained from the Department of Development Services):

1. Orem Department of Public Safety

2. Alpine School District Bus Transportation

3. The principal at the school of schools affected

4. Utah Transit Authority (UTA) Dispatch

5. Waste Management

6. Post Office

1.8 DENIAL OF PERMIT

A. The City reserves the right to deny any street closure permits at any time, when in the

City’s judgment, the traffic restriction could result in unacceptable traffic congestion or unnecessary accident potential or other safety risks.

1.9 GENERAL TRAFFIC REGULATIONS

A. PEAK HOUR LANE CLOSURE. During the peak traffic hours of 7 a.m. to 9 a.m., and 4 p.m. to 6 p.m. on weekdays and 11 a.m. to 3.p.m. on Saturdays, TRAFFIC LANE

CLOSURES ARE NOT PERMITTED at signalized intersections of ARTERIALS and

URBAN COLLECTOR streets. In rare situations the Contractor can apply to the City for an exception.

B. OFF PEAK HOUR LANE CLOSURE. During OFF PEAK HOURS when one or more traffic lanes are restricted along ARTERIAL and URBAN COLLECTOR streets, or one traffic lane is restricted at a signalized intersection with left-turn channels, channelization shall be used to provide through lanes. Lane restrictions that do not allow enough room for channelization shall require flaggers and/or other traffic control devices.

C. FULL STREET CLOSURES. The full closure of ARTERIALS, URBAN

COLLECTORS, LOCAL and SUB-LOCAL streets that are single access to a neighborhood area is NOT PERMITTED within the City. In rare situations the

Contractor can apply to the City for an exception. The City may require the Contractor to do the Work during limited hours or on Sundays.

D. TRAFFIC LANES. A traffic lane shall not be considered as satisfactorily open to traffic unless it is at least 11' wide and is paved.

1. The resurfacing of ARTERIALS shall be done on the same day as the Work.

2. The resurfacing of URBAN COLLECTOR streets shall be done within 48 hours.

3. The resurfacing of LOCAL and SUB-LOCAL streets shall be done within 7 days.

E. UNIFORMED OFF-DUTY LAW ENFORCEMENT OFFICER. Whenever a

Contractor interferes with the function of a signalized intersection, the Contractor shall provide a uniformed off-duty law enforcement officer at all times during the period of interference to assist with traffic control. The Contractor shall coordinate with the City to determine the time and duration of the interference with the signalized intersection.

F. LOCAL ACCESS. Local access shall be maintained to all properties on all streets whenever possible. When local access cannot be maintained, the Contractor shall notify and work with the affected property owners, residents or tenants a minimum of

24 hours in advance. The Contractor shall be responsible to restore access as soon as possible.

G. ACCESS. Access to fire stations, police stations, hospitals and schools shall be maintained at all times. When access restrictions are necessary, the Contractor shall coordinate such access restrictions with the responsible person in charge of the affected fire station, police station, hospital, or school.

H. NON-ESSENTIAL VEHICLES. Non-essential vehicles not used to do the Work shall not park in the Work area that is protected by traffic control devices. Vehicles required in the Work area shall park downstream from the immediate Work area.

Parking of private vehicles shall be out of the Work area and in conformance with parking regulations in the surrounding area. At no time shall the traffic lane adjacent to the Work site be impeded by Contractor vehicles or equipment.

3.2 TRAFFIC CONTROL DEVICES

D. EXISTING TRAFFIC CONTROL DEVICES. Throughout construction and maintenance operations it is important that all existing traffic control devices be kept concurrent with the TCP. In some cases, the traffic control devices will remain applicable to traffic and shall be maintained. In others the devices must be covered, relocated or removed.

1. Traffic Control Signs. The Contractor shall maintain all devices erect, clean, and in full view of intended traffic. Signs and devices need to follow the Federal

Highway Administrations (FHWA) retroreflectivity guidelines for signs in-place during night work. The Contractor shall not relocate or remove any traffic control sign without approval from the City’s Sign Specialist (229-7519). Existing signs which are not applicable shall be removed or covered by the Contractor without damage. Any removed sign shall be salvaged in a secured area within the Work site or returned to the City (Traffic Section) at 1450 W 550 North.

a. The Contractor is responsible for final installation of signs. Signs shall be located according to the MUTCD and the City. Before the project is completed the job site will be inspected for damaged or missing signs. The Contractor shall be given 7 calendar days to replace missing City signs. After 7 days the

City shall replace the missing signs at the expense of the Contractor.

2. Traffic Signals. The Contractor shall not interfere with or disrupt the operation of existing traffic signal equipment. The Contractor shall notify the City’s Traffic

Operations Manager (801-229-7502) 72 hours prior to the start of construction within 300' of any signalized intersection. Most traffic signals within the City of

Orem have been connected with a fiber optic communication line. The City shall, upon a blue stake request, provide the approximate location of all underground traffic signal equipment under City jurisdiction. The exact location of underground equipment shall be determined by the Contractor during excavation.

a. The Contractor shall report any damage immediately as follows:

Weekdays 7:00 am to 5:00 pm contact City’s Traffic Operations Manager 229-7502.

Weekdays 5:00 pm to 7:00 am contact Orem Public Safety 229-7070.

Weekends All hours contact Orem Public Safety 229-7070.

b. The City will determine the necessary repairs to immediately restore traffic signal operation. The damaging Contractor will be billed for the cost of the inspection and repair.

c. When the existing traffic signal equipment cannot be maintained as provided for in the CS&S, the project permit, or approved traffic control plan, the Contractor shall at their expense have a qualified Signal Contractor relocate the equipment to a temporary location such that all functions and displays on the existing signal equipment are maintained and in full view of the intended traffic at all times. The location and type of all temporary signal equipment shall be approved by the City.

d. All signal equipment relocation and/or installation shall be coordinated with the

City’s Traffic Operations Manager at (229-7502). All Work shall be inspected and approved by the City.

e. The Contractor shall provide for an off-duty Law Enforcement Officer to be present at the site at any time the City deems it necessary for public protection.

When temporary equipment or new equipment is installed to replace existing equipment, the signal shall be fully operational prior to removal of the old equipment.

3. Pavement Markings. Existing pavement markings that conflict with the vehicle path indicated by barricades and channelization devices and cause driver confusion shall be removed or obliterated by the Contractor as directed by the City.

a. The Contractor shall properly perform any necessary pavement marking removal or obliteration to leave only a minimal amount of pavement scars and to completely remove or cover existing markings. Sandblasting, grinding, or slurry seal may be used to remove existing markings. When used, slurry seal shall be applied in strips at least 24 inches wide over existing markings.

Markings that become exposed shall be recovered. Painting over existing markings with black paint or asphalt material is not acceptable. In emergency conditions, temporary painting over of markings is to be immediately followed by permanent removal.

b. The Contractor shall be responsible to pay for restoration of all pavement markings which are removed or become illegible due to construction Work.

City crews or their representatives will do the repainting and the Contractor will be billed for the Work.

4. Street Lighting. Construction that involves the removal of street lighting shall require the installation of temporary lights to maintain the lighting levels. The

Contractor shall coordinate the location and type of lighting with the City. All costs associated with the removal of existing lighting and the installation of temporary lighting are the responsibility of the Contractor.

SECTION 01 66 00 PRODUCT STORAGE AND PROTECTION

This specification changes a portion of APWA Standard Specification Section 01 66 00. All

Section 01 66 00 Page 131

1.8 PROTECTION OF LAWNS AND LANDSCAPING

B. Protect trees and tree roots of existing trees that are to remain.

1. To protect existing trees and roots, a Tree Protection Zone (TPZ) must be established.

a. The method of establishing a TPZ is to calculate a circular area above and below ground with a radius equivalent to the greater of 10 feet or 1.5 feet for every inch in trunk diameter measured 4.5 feet above the ground (for example, the TPZ of a tree twelve inches in diameter has an eighteen-foot radius). The area within the radius is the TPZ.

2. Tree fencing shall be made of wood or wire and erected before demolition, grading or construction begins and remain in place until final inspection of the project.

3. No excavation, trenching, grading, root pruning, dumping, or storage of material, topsoil, vehicles, and equipment, or any other activity, shall be permitted within the

TPZ.

4. The TPZ shall remain free of chemically injurious materials and liquids such as paints, thinners, cleaning solutions, petroleum products, and concrete or dry wall excess, construction debris, or run-off.

5. If an underground line must go near a tree, tunneling or augering must begin and end outside of the TPZ and be a minimum of 24" deep.

6. No soil disturbance is permitted within the TPZ. Trees to be retained shall be irrigated.

C. Any damage to existing trees will be evaluated by the ENGINEER or an appointed representative. Dollar value of damage will be determined using the most current edition of Guide for Plant Appraisal. Remediation for value lost and appropriate compensation will be determined by the ENGINEER, City Forester, or an appointed representative.

DIVISION 03

CONCRETE

SECTION 03 30 04 CONCRETE

This specification changes a portion of APWA Standard Specification Section 03 30 04. All

Section 03 30 04 Page 185

2.4 ADDITIVES

A. Calcium Chloride: Calcium chloride may be used only upon approval by the

ENGINEER. No more than 2% (by weight) of calcium chloride can be used. No calcium chloride shall be used when metal is to be embedded into or in constant contact with the concrete, including but not limited to the following situations:

1. cross gutters

2. sidewalks reinforced with rebar

3. light post footings with embedded anchor bolts

4. slabs with mesh

5. openings in walls with angle iron headers

6. steel base plates mounted or embedded in the concrete surface

7. or any other concrete improvement with non-coated reinforcing steel

SECTION 03 30 10 CONCRETE PLACEMENT

This specification changes a portion of APWA Standard Specification Section 03 30 10. All

Section 03 30 10 Page 201

3.9 PROTECTION AND REPAIR

B. Repair

1. Modify or replace concrete not conforming to required levels, lines, details, and elevations.

a. Any section of curb, gutter or walk, improperly installed or damaged prior to its official acceptance, shall be repaired or replaced by the CONTRACTOR at the CONTRACTOR’S sole expense. When specified tolerances are not met or any damage to adjoining walk occurs, it shall be cause for rejection. The City will determine the required extent of removal, replacement, or repair. No less than a 5' section of concrete sidewalk shall be replaced.

b. At the time of construction, the CITY may determine based on professional experience and judgement and at its sole discretion, the need for the Owner/Developer to pay for, remove, and replace any existing substandard improvements such as curbs, gutters, sidewalks, drive approaches, driveways, decorative concrete, ADA wheelchair ramps, etc., or any unused drive approaches.

SECTION 03 35 00 CONCRETE FINISHING

This specification changes a portion of APWA Standard Specification Section 03 35 00. All

Section 03 35 00 Page 207

3.2 FINISHING HORIZONTAL SLABS

F. Broom or Belt Finish: Sweep surface with brushes, rakes, tines or burlap belt before final set.

1. Concrete shall be accurately screed, levelled and bull floated.

2. After water sheen has disappeared, edging, striking, floating and minimal troweling

(if required), are performed.

3. Horsehair or concrete broom is used to sweep surface before the final set.

DIVISION 26

ELECTRICAL

SECTION 26 56 19 ROADWAY LIGHTING

This specification changes a portion of APWA Standard Specification Section 26 56 19. All

Section 26 56 19 Page 365

PART 4 PROCEDURES

A. The City Street Lighting Engineer will design the street lighting system. This will be at a time when the Developer is ready to go to construction and Utah Power has designed the location of power services for the project. The Developer will bond for their street lighting based upon bids from responsible contractors or use the City’s estimate.

B. The Developer has an option by written agreement to have the City install the street lights. The City will share with the Developer what their costs would be to install the street light. The Developer can review the costs and decide whether to have its own contractor or the City to install all or part of the improvements. The Developer and the

City will put their verbal agreements into a written agreement.

C. NUMBERING AND MAPPING. The developer and installation contractor shall coordinate with the City in preparing shop drawings showing the location of poles, numbering of poles and date installed. The City will survey the location of poles, conduit and buried cable and prepare a GIS map.

PART 5 INSTALLATION

A. RESIDENTIAL. The residential acorn style post top lighting fixture, 60 watt LED lamp, 120-277 volts, on 16 foot fluted aluminum poles shall be installed on the property line on approximately 200 feet staggered spacing, 400 feet on one side of the street, 200 feet on alternate side of the street as laid out by the design engineer in advance of construction.

1. The street light shall be set back 2 feet from the back of sidewalk/curb.

2. The cable installation:

Option A. Underground power access at rear property line.

Areas with back lot line pad mounted transformers and secondary pedestals.

Place street light junction box 3’ to 10’ away from power source. In 2” conduit between power source and junction box. The cable in conduit, 3 #10 RHW-2 in

1" conduit, shall be installed from the street light junction box at the rear property line by trenching, plowing or directional boring to the pole location on the front lot line, the depth should be 24" below ground level. Power runs with

3 #10 RHW to additional light poles may be run along the street either along the back of the sidewalk, curb or in the asphalt about 2 feet off the lip of gutter.

Option B. Overhead power access at rear property line.

Areas with overhead distribution in the back lot lines or where there is a fence or built up areas on the property line, Install 3 #2 RHW-2, connected to UP&L

Co. Secondary conductors, in a 2" conduit on a terminal pole to a street light pull box at the base of the pole, ground the neutral and ground conductor to a

5/8" x 8' copper clad ground rod in the pull box. The cable in conduit, 3 #10

RHW-2 in 1" conduit, shall be installed from the street light junction box at the rear property line by trenching, plowing or directional boring to the pole location on the front lot line, the depth should be 24" below ground level.

Power runs with 3 #10 RHW to additional light poles may be run along the street either along the back of the sidewalk, curb or in the asphalt about 2 feet off the lip of gutter.

Option C. Underground power along the street.

Areas with front lot line pad mounted transformers and secondary pedestals.

Place street light junction box 3’ to 10’ away from power source. In 2” conduit between power source and junction box. The cable in conduit, 3 #10 RHW-2 in

1" conduit, shall be installed from the street light junction box to the street light.

The depth should be 24" below finish grade level.

B. CABLE INSTALLATION AT THE SOURCE

1. The phase leg of the 120 volt service to the street light should be fused at street light junction box near the transformer or service pedestal, in “3-A” above, with an in line watertight fuse holder fused at 10 amps. This fuse holder should be a Bussman catalog number HEB-JJ single fuse holder, or approved equal. The neutral conductor shall be connected to the neutral bus and in the transformer or service pedestal and also connected to the ground rod in the transformer or service pedestal.

The green ground will be connected to the ground bus or ground rod in the street light junction box.

2. The phase leg of the 120 volt service to the street lights should be fused in the pull box of the terminal pole, in “3-B” above, with an in line watertight fuse holder fused at the amperage as outlined by the street light designer on the drawings. This fuse holder should be Bussman catalog number HEB-JJ single fuse holder, or approved. The neutral conductor shall be connected to the neutral bus in the pull box. The green ground will be connected to the ground rod in the street light junction box.

C. POLE GROUNDING AND FUSING

1. The aluminum pole, as in “3-A” above, will be grounded with the ground and neutral conductors. The phase leg of the 120 volt service should be fused at 10 amps with an in line watertight fuse holder, Bussman catalog number HEB-JJ single fuse holder, or approved equal. The neutral conductor shall be connected to the neutral conductor at the pole and grounded to the pole. The ground conductor shall be connected directly to the pole.

2. The aluminum pole, as in “3-B” above, will be grounded with the ground and neutral conductors. The phase leg of the 120 volt service fused at 10 amps with a watertight Bussman catalog number HEB-JJ or approved equal. The neutral conductor will be connected to the neutral at the pole and grounded to the pole. The green ground conductor will be connected to the ground lug on the pole.

D. INDUSTRIAL AREAS. The Industrial areas shall refer to Residential Street Lights.

E. STREET CORRIDOR LIGHTS (800 North, State Street, Center Street, University Parkway)

1. The commercial fixture, 160 watt LED teardrop style fixture at 120-277 volts and will be mounted at 21 feet on a steel fluted anchor based pole.

2. The steel poles shall be set back 2 feet from the back of the sidewalk/curb and installed on a screw foundation, preferred method, or a concrete pole base depending upon the existing soil conditions, see detail attached. There will be a street light pull box located adjacent to the pole base for the fuse connections and grounding with a 5/8" x 8’ copper clad ground rod in the pull box.

3. The poles hall be spaced on the street by the street light design engineer so that the street lights will have an average maintained horizontal illuminance of 1.6 foot candles with a uniformity ratio of 3:1, (Avg/Min.).

4. The underground feed to these steel poles will be in 2" PVC conduit, behind the back of the sidewalk/curb. Utah State right-of-ways do not allow any street lighting conduit in the asphalt portion of roadway areas. The conduit shall be buried 24" below the surface with three conductors, two phase conductors for 240 volt service and a green ground sized by the street light engineer to maintain less than a 3% voltage drop. The underground feeder will come from an underground terminal pole with three conductors up the pole, sized by the street light engineer, in a 2" rigid galvanized conduit with a 2" weather-head at the top. The conductors will be connected to the UP&L Co. Service conductors at the top of the pole and terminate in a pull box at the base of the pole with a 5/8" x 8' ground rod, and the phase conductors will be fused, sized by the street light engineer with two Bussman catalog HEB-JJ fused or approved equal. Connect the green ground to the ground rod in the pull box.

DIVISION 31

EARTHWORK

SECTION 31 11 00 SITE CLEARING

This specification changes a portion of APWA Standard Specification Section 31 11 00. All

Section 31 11 00 Page 405

1.2 REFERENCES

C. ANSI A300 Tree Pruning Standards.

1.3 QUALITY ASSURANCE

B. The ENGINEER, City Forester, or an appointed representative shall be present during tree pruning operations.

1.4 SITE CONDITIONS

B. Any damage to existing trees will be evaluated by the ENGINEER, City Forester, or an appointed representative. Dollar value of damage will be determined using the most current edition of Guide for Plant Appraisal. Remediation for value lost and appropriate compensation will be determined by the ENGINEER, City Forester, or an appointed representative.

1.5 PROTECTION

A. Protect roots and branches of trees to remain.

1. See Section 01 66 00 for PROTECTION OF LAWNS AND LANDSCAPING, SECTION 1.8.

3.1 EXAMINATION

C. Tree root inspection:

3. The ENGINEER, City Forester, or an appointed representative will be present to inspect tree roots when existing surface is altered.

3.4 TREE REMOVAL

C. For stumps larger than six (6) inches caliper remove and treat as follows:

5. Grind stumps 12" below final grade if they cannot be removed.

SECTION 31 23 16 EXCAVATION

This specification changes a portion of APWA Standard Specification Section 31 23 16. All

Section 31 23 16 Page 407

3.2 PROTECTION

F. Protect trees and tree roots of existing trees that are to remain.

1. See Section 01 66 00 for PROTECTION OF LAWNS AND LANDSCAPING, SECTION 1.8

3.9 TRENCH EXCAVATION

F. Limit width of Trench excavations to the dimensions suitable for worker access per pipe manufacturer’s recommendation. Provide enough space for compaction equipment. Notify the ENGINEER if excavation operations exceed any indicated line and grade limits.

1. The shape of the trench shall be a simple rectangle. The minimum width shall be

24", unless otherwise approved by the City.

G. In public thoroughfares and regardless of Trench depth, limit length of open Trenches to 200 lineal feet day or night. Provide barricading, Section 01 55 26. Protect Trenches overnight.

1. When trenching comes within 24" of a curb and gutter the removal of the surface layers must be extended all the way to the lip of gutter.

2. The Contractor shall be responsible for maintaining a road surface suitable for travel by the public from the time of excavation until the surface has been restored.

3. The Contractor shall be responsible for all dust control and all claims and damages resulting from failure to maintain a suitable surface

H. Cutting of the asphalt shall be made by sawing a full depth vertical joint on each side of the trench, see section 02 41 14 PAVEMENT REMOVAL.

1. The saw cut is required just prior to placing asphalt to trim off deteriorated asphalt edges and areas of side slope undermining. The cut shall be a simple rectangular shape that removes enough asphalt to reveal a minimum 12" bearing shelf of undisturbed soil around all sides of the excavation.

I. Rotomilling off the asphalt layer of a trench shall only be done with the approval of the

City.

1. The Contractor shall be responsible for repairing the damage and deterioration of the asphalt adjacent to the trench.

2. Cuts shall be vertical and smooth; areas of crumbling asphalt will have to be milled or cut back to structurally sound asphalt.

SECTION 31 23 17 ROCK REMOVAL

This specification changes a portion of APWA Standard Specification Section 31 23 17. All

Section 31 23 17 Page 411

3.4 Rock Removal – Explosive Method

F. If substantial rock is impeding the progress of the project, work with the Engineer to mitigate the issue. Disintegration Blasting will be the last resort.

SECTION 31 23 23 BACKFILLING FOR STRUCTURES

This specification changes a portion of APWA Standard Specification Section 31 23 23. All

Section 31 23 23 Page 413

3.2 PROTECTION

A. Protect existing trees, shrubs, lawns, existing structures, fences, reads, sidewalks, pavings, curb and gutter and other features.

1. Protect trees and tree roots of existing trees that are to remain, See Section 01 66 00 for PROTECTION OF LAWNS AND LANDSCAPING, SECTION 1.8.

SECTION 31 25 00 EROSION AND SEDIMENTATION CONTROL

This specification changes a portion of APWA Standard Specification Section 31 25 00. All

Section 31 25 00 Page 421

0.1 DEFINITIONS

A. Best Management Practices (BMPs) - Schedules of activities, prohibitions of practice, maintenance procedures, and other management practices to prevent or reduce the pollution of Waters of the State. BMPs also include treatment requirements, operating procedures, and practices to control site runoff, spillage or leaks, waste disposal, or drainage from material storage.

B. Erosion - The wearing away of the land surface by water, wind, ice or other geological agents, including the detachment and movement of soil or rock fragments by water, wind, ice, gravity, or any combination thereof.

C. Municipal Separate Storm Sewer System - A conveyance or system of conveyances

(including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains), designed or used for collection or conveying stormwater.

D. Orem City Stormwater Inspector - Assigned City representative responsible for inspecting grading/construction activities for compliance with Erosion and

Sedimentation Control Plan.

E. Sedimentation - A process by which solid materials, inorganic (mineral) and organic, come to rest on the earth’s surface either above or below sea level.

F. Sediment - Particulate solid material, either inorganic or organic, that will settle or be deposited in a liquid under the force of gravity.

G. Orem Land Disturbance Permit (LDP) - will need to be acquired if the area of disturbance is over 500 square feet.

H. Storm Water Pollution Prevention Plan (SWPPP) Template - must be submitted to

Orem City on or before pre-construction. SWPPP templates can be found at https://deq.utah.gov/water-quality/storm-water-permits-updes-permits. If area of disturbance is over ONE acre, then a Utah Pollution Discharge Elimination System

(UPDES) Permit number will need to be acquired with a Notice of Intent submittal that can be obtained on the web link.

https://deq.utah.gov/water-quality/storm-water-permits-updes-permits

I. Waters of the State - Any and all surface and subsurface waters which are contained in or flow through the State of Utah; does not include waters in sewage systems, waters in treatment works of disposal systems, waters in potable water distribution systems, and all water withdrawn for use until use and treatment have been completed.

0.2 GENERAL

C. Erosion and Sediment Control for Construction Activity.

1. This specification governs the SWPPP that is required for all construction activities that will disturb 500 square feet of soil or larger. All earth disturbance activities in the City of Orem are regulated by the requirements of UPDES regulations.

2. All earth disturbance activities, including those that disturb more than 1 acre, must implement and maintain BMPs to control erosion and sediment pollution. SWPPP is a principal requirement of the stormwater UPDES permit. A SWPPP: Identifies all potential sources of pollution, which may reasonably be expected to affect the quality of stormwater discharges from the construction site; describes practices to be used to reduce pollutants in stormwater discharges from the construction site;

and assures compliance with the terms and conditions of the issued permit.

3. State and Federal law requires a SWPPP for all construction activity exceeding one acre. Orem City requires the SWPPP be formatted on standard 24”x36” sheets so that it can be integrated into the construction plan set. Construction activities of less than one acre will still be required to take appropriate measures to prevent sediment from entering the storm water utility system and to prevent the tracking of mud and debris onto City streets. If the area of disturbance is less the one acre, then a LDP will be required.

D. Erosion Control. Erosion controls are surface treatments that stabilize soil exposed by excavation or grading. Erosion control measures, or BMPs, provide the best means of managing sediment from disturbed lands by preventing soil movement. These BMPs are variously referred to as source controls, vegetative controls, or nonstructural controls. Some typical BMPs used to control erosion are as follows:

1. Surface Roughening – Provides temporary stabilization of disturbed areas by creating depressions in the soil surface. The depressions reduce the quantity of stormwater runoff by increasing infiltration. Surface roughening also reduces runoff velocity and provides for sediment trapping.

2. Mulching – Temporarily stabilizes soils by securely applying materials such as grass, hay, woodchips or wood fibers to the soil’s surface. Mulching protects the soil from raindrop impact and reduces the velocity of overland runoff. Mulch also aids in the growth of temporary seeding by holding seeds and topsoil in place, retaining moisture, and insulating against extreme temperatures.

3. Temporary Revegetation – The use of quickly germinating vegetative cover on disturbed areas to stabilize soils and control erosion in the short term.

4. Permanent Revegetation – The use of perennial vegetation on disturbed areas to provide long term stabilization of soils and erosion control.

5. Erosion Control Blankets – Installation of geotextiles that are used to stabilize soils, steep slopes, and drainage channels.