Summary

This is a bid package and contract document issued by the City of Erie, Pennsylvania Department of Public Works, Bureau of Engineering for the 2026 Proposed Milling and Asphalt Resurfacing of Various City Streets - 1 (Bid #1846-26). The project involves milling and asphalt resurfacing work on multiple city streets totaling approximately 345,097 square feet across 28 different street segments. The scope includes supplying all labor, equipment, materials, and transportation necessary to complete the work, with the contractor responsible for traffic control, project safety, cleanup, and restoration. The bid opening is scheduled for Monday, June 1, 2026, at 2:00 p.m. prevailing local time via the PennBid platform. The anticipated City Council award date is June 17, 2026, with a Notice to Proceed expected on June 23, 2026. The project has a strict default completion date of September 25, 2026, with no extensions permitted; liquidated damages are assessed at $500 per calendar day for each street not joint sealed within 15 calendar days of milling, and $1,000 per calendar day after the default date for failure to complete all work.

The contract requires all asphalt work to comply with Superpave mix design specifications with a maximum 15% recycled asphalt pavement (RAP) content and 3.5% voids, along with Pennsylvania Department of Transportation Publication 408 standards. Bid items include 2-inch and 4-inch milling (36,100 and 2,300 square yards respectively), Superpave asphalt mixtures for scratch course (1,900 tons) and wearing course (3,600 tons), and 14 ADA ramps requiring design-build construction. Each bid must be accompanied by a bid bond or certified check equal to 10% of the total bid amount. Performance and payment bonds equal to 100% of the contract price are required from the successful bidder. The project is subject to Davis-Bacon and related acts wage requirements, with prevailing wage determinations applicable to Erie County and surrounding Pennsylvania counties. Contractors must comply with the City of Erie's Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) policies, with initial participation goals of 15% MBE and 5% WBE for contracts exceeding $25,000. The Public Works Employment Verification Act (PA Act 127 of 2013) requires all contractors and subcontractors to utilize the Department of Homeland Security E-Verify Program to confirm employee work eligibility.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Erie Pennsylvania

CONTRACT DOCUMENTS

Department of Public Works Bureau of Engineering Bid Number 1846 – 26

PROPOSED MILLING & ASPHALT RESURFACING

OF VARIOUS CITY STREETS - 1

Proposal from:

Office of Purchasing

DEPARTMENT OF ADMINISTRATION AND FINANCE

Daria S. Devlin, Mayor

LEGAL NOTICE

Proposals for the following item for the City of Erie will be received via PennBid (https://pennbid.net/) until 2:00 pm prevailing local time on Monday, June 1, 2026:

Bid # 1846-26 – 2026 Proposed Milling and Asphalt Resurfacing of Various

City Streets – 1

These projects are subject to coverage under the Davis-Bacon and related acts. Contractors bidding shall comply with the City of Erie’s MBE and WBE

Policy.

Bids shall be made upon the official proposal forms attached to the specifications.

Each proposal must be accompanied by a bid bond in the form of a Corporate

Surety Bond, Certified Check, Cashiers Check or Certificate of Deposit in the sum of ten percent (10%) of the total amount of the bid.

By: City of Erie, Bureau of Engineering

Advertise: May 20 and May 27, 2026

TABLE OF CONTENTS

2026 Proposed Milling & Asphalt Resurfacing Of Various City Streets- 1

BID NO. 1846-26

ITEM PAGE

Scope of Work/ Special Provisions S1-5.06 Wage Determination 1-16 Street List Pavement Markings/ Loops Invitation to Bid 1 Information for Bidders 2 - 3 Bid/ Proposal 4 - 4g Public Works Employment Verification Form Bid Bond 5 Agreement 6 Payment Bond 8 Performance Bond 10 Contractor’s Section 3 Documents General Conditions 1 - 31 Technical Specifications Specifications for Street Construction Ramp Location Index Hot Thermoplastic

INDEX OF DRAWINGS: Contract Location Map

2026 PROPOSED MILLING AND ASPHALT RESURFACING

BID NO. 1846-26

SCOPE OF WORK

This work is the milling and asphalt resurfacing of various city streets. The Contractor is responsible for traffic control, project safety, clean-up and restoration. The Contractor shall provide all transportation, labor, equipment and materials necessary to complete all work in accordance with the contract documents. Any additional work must have advance written approval from the City Engineer prior to construction. The Contractor is responsible for physically inspecting the work site and for being familiar with all contract requirements before bidding and starting work. Clarifications of contract requirements must be obtained before submitting a bid.

LOCATION OF WORK

The proposed work is located at the various streets and intersections as shown in the list included in the contract documents.

SPECIAL PROVISIONS - I

1. This project shall comply with Superpave mix design specifications (Standard Construction) and all applicable specifications of the Pennsylvania Department of Transportation, including but not limited to Publication 408, Section 409, SUPERPAVE

MIXTURE DESIGN.

2. Asphalt mix shall contain a maximum of 15% RAP.

3. Publication 408, Section 110.04, Price Adjustment of Bituminous Materials, is not applicable to this contract.

4. Asphalt pavement mix design % voids shall be 3.5%. Submit JMF Report for approval prior to work.

5. Contractor responsible for the design and construction of ADA ramps impacted by resurfacing of roads. Ramps must be in compliance with PennDOT RC Standards 64M and 67M. Curb ramp designs must be submitted to the City before construction for final design approval. Sawcutting and removal/disposal of existing concrete (if applicable), asphalt roadway for form work, grading and placement of Topsoil, Formula B Seed and Straw Mulch, Detectable Warning System (DWS), color must be approved by the City, and installation of Concrete Curb ALL considered incidental to Design/Build Item. ADA Ramp construction must be completed prior to placement of wearing course. Any asphalt base or binder required to be placed in front of newly constructed ramp is considered incidental.

6. TIME IS OF THE ESSENCE on this Contract. The Contractor must have fully completed all work and have submitted a final invoice, including retainage, by the default date. The Default Date cannot be extended for any reason. Liquidated damages will be assessed.

Important dates are as follows:

Bid Opening:

JUNE 1, 2026

Anticipated City Council Award:

JUNE 17, 2026

Anticipated Notice to Proceed: JUNE 23, 2026

Default Date: SEPTEMBER 25, 2026

2026 PROPOSED MILLING AND ASPHALT RESURFACING

SPECIAL PROVISIONS- II

1. Paving requirements at proposed ramp locations. This contract involves locations where curb ramps are required but not included in this contract. These locations will be provided and marked in the field prior to paving (Refer to tabulation of locations in the attached paving list).

Grades and drainage at these locations are critical. At these locations the Contractor shall pave with regard to positive drainage first and provide the “flat landing (2% max slope in the direction of positive drainage)” or legal counter slope in the cart way, to the dimensions and slopes as required, by ADA specifications. The roadway shall be constructed so that the curb ramps may be constructed at a later date without the need for reconstruction of the roadway. Primary consideration shall be given to positive drainage and pavement dimensions and slopes and not to existing concrete curbs, sidewalks or ramps. Paving areas not installed correctly will be removed and replaced at the Contractors expense. It is desired to install these areas correctly on the first attempt to avoid excessive patching in front of the ramp locations. Positive drainage and ADA compliance is of the essence. Humps in the pavement and ponding water will not be accepted.

2. Schedule:

Contractor to provide an anticipated work schedule outlining the entire contract to the Project Engineer before the start of the project. Contractor shall provide the Project Engineer with an updated schedule at the end of each work week for the following week of work. Project Engineer to share anticipated locations for the upcoming week with City of Erie’s Media Strategist to release as public information.

Milled areas shall be covered with both leveling course and binder course; and joint seal shall be in place within 15 calendar days. Bidder agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter for each listed street that is not joint sealed.

Leveling course not covered immediately with wearing course shall be covered with tack applied per Pub 408 immediately prior to placement of wearing course.

Contractor shall provide a log daily to the Project Engineer by 9 a.m. the following day for all work performed detailing locations and limits of milling, leveling and wearing courses performed each day. The log may be submitted by email. Days of documented inclement weather will not be counted toward calendar days for calculating liquidated damages.

All excessive irregularities in pavement surface following milling operations, including but limited to potholes, gouges, uneven pavement, utility appurtenances, must be leveled daily satisfactorily for the safety of the traveling public. Leveling must be removed and graded properly immediately prior to final leveling and wearing courses application.

Contractor shall close the road once for the milling operation and once for the paving operation.

During paving operation streets must have both leveling course and wearing course lifts in place before the street can be opened up to traffic. Roadways with only leveling course on them shall not be opened to traffic.

3. Roadway closures:

Street closings shall be called into the City of Erie Engineering Office by 3:00pm the day before (Friday for Monday closings) the milling and/or paving operation of each street. Contractor to call 814-870-1371 for street closings.

Contractor is responsible for posting “No Parking” signs on each street where operation will be taking place. “No Parking” signs must be posted 72 hours in advance. The City of Erie will provide the contractor with “No Parking” signs with the Notice to Proceed. It is the Contractor’s responsibility to provide tape / paint to change dates and times on the “No Parking” signs.

Contractor responsible for providing stakes to hang “No Parking” signs where utility pole is not in area.

Removing cars from the street is the Contractor’s responsibility. In the event there is no Field Supervisor on the site during operation the Contractor is to call the Erie City Police Department non-emergency number 814-870-1125 to have cars towed.

4. Utilities. Utility appurtenances shall be located and marked prior to milling and marking of locations shall be maintained until wearing course is complete. All appurtenances shall be grade adjusted to be in the same plane as the completed wearing course. Those adjusted or not adjusted prior to paving and found to be at incorrect grade after the completion of the paving shall be adjusted as directed by the Engineer at the Contractor’s expense. Contractor shall be responsible for coordination and scheduling of the utility appurtenance location and marking.

Contractor may consider using the PA one call system. Utility appurtenances located and paved over shall be uncovered at the Contractor’s expense. Adjustment rings will be provided by the City of Erie and installation by the Contractor is incidental to the paving operation. All other needed sewer adjustments to be completed by the City of Erie Sewer Department.

5. Lane Marking. Contractor to layout traffic lanes after sealing of asphalt. The Contractor shall submit drawings as an inventory to the City of Erie before the milling operation begins.

Contractor is responsible for marking the lanes how they were in place before milling of the street; unless given drawings by the City Engineer for new layout. Contractor to mark all centerlines, travel lane lines, passing lane lines, and parking lines. It is the contractor’s responsibility to note, video, and or measure lanes off of the curb for replacement of lane painting. Contractor to mark lines with a dot (yellow for center lines + white for all other lines) every 20ft for straight stretches and every 5ft for channelized lanes. Contractor to paint a “T” or perpendicular line at the end of each line to mark the end of line painting. Contractor is responsible for providing paint, string, and measuring devices for the lane painting operation.

Contractor to notify Project Engineer following lane marking. The City of Erie is to paint final lane markings. This section to be paid as a lump sum.

6. Material Testing. At any time during the duration of the project the City Engineer or City Representative may request a product sample by the following methods: box sample, core sample, and/or density testing. During construction, the City Engineer or City Representative may request a sample at any time and there is no limit to the amount of times the City Engineer or City Representative can request a sample. The City Engineer or City Representative will take the sample for lab testing. This section will be incidental to the rest of the project.

X__________________________________________________ Acknowledge and include with bid submittal

-S-II-1-

(5-06) SPECIAL PROVISIONS TO CONTRACT ( Attachment 1-A )

City of Erie, 2026 Proposed Milling and Asphalt resurfacing of Various City Streets- 1

Traffic Control and Safety Devices to be provided by the Contractor.

Delivery tickets for all materials.

CS-4171 Certificate of Compliance and/ or TR-465 Daily Bituminous Mixture Certification required for all materials.

five working days prior to start of project.

Roadway to be power broomed by Contractor prior to start of paving each day.

Excess material to be removed by Contractor.

Municipality to inspect project.

Need Bill of Lading for each shipment of bituminous material per Section 702.1(c) of Specifications 408.

Tack Coat required per Section 460, or 409 for superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.

Bituminous Seal on all abutting pavement and curbs required.

Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.

Scratch/ Leveling Courses to be placed at the discretion of appointed inspector(s).

Municipality reserves the right to limit work completed.

Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.

Incidental Preparation and clean up required. ( Project Construction Materials )

The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.

Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.

Contractor responsible for defects that occur within one year of applications.

Contractor required to review proposed project with Municipality’s Representative prior to bidding.

Complete all testing in accordance with Specification Form 408 Section 409 except for superpave volumetric testing.

Notice to Proceed will be the date of Contract acceptance.

Final Completion Certificate & Notice of Completion required.

Future award of Contract will be based on quality of work as determined by the municipality.

Contractor to notify all residents of pending work to be performed.

My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.

Date

CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR

The Prime Contractor and subcontractors must comply with all of the following provisions.

( Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)

Notify the Municipality

Contractor's Representative

Company

"General Decision Number: PA20260002 01/30/2026

Superseded General Decision Number: PA20250002

State: Pennsylvania

Construction Types: Heavy and Highway

Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and Westmoreland Counties in Pennsylvania.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)

Modification Number Publication Date 0 01/02/2026 1 01/09/2026 2 01/23/2026 3 01/30/2026

BOIL0013-005 01/01/2025

CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND

MIFFLIN COUNTIES

Rates Fringes

BOILERMAKER......................$ 55.00 35.48

BOIL0154-004 01/01/2025

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA,

CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST,

GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES

Rates Fringes

BOILERMAKER......................$ 48.28 33.17

BOIL0744-003 07/01/2008

ERIE COUNTY

Rates Fringes

BOILERMAKER......................$ 35.34 18.48

BRPA0005-033 05/01/2022

MIFFLIN COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 32.66 21.58

BRPA0005-046 05/03/2020

FRANKLIN COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 33.99 16.87

BRPA0005-071 05/03/2020

CLINTON COUNTY

Rates Fringes

BRICKLAYER.......................$ 34.17 17.20

BRPA0009-004 12/01/2022

BEDFORD, BLAIR,CAMBRIA, CENTRE COUNTY (Halfmoon, Houston, Patton, Rush,Taylor and Worth Townships),FULTON, HUNTINGDON, and SOMERSET COUNTIES

Rates Fringes

Bricklayer, Stonemason & Marble Setter....................$ 34.14 22.00

BRPA0009-006 12/01/2022

CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION (Except Brady, Madison, Perry, Porter, Redbank, and Toby Townships)

COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 34.14 22.77 Marble mason.....................$ 34.14 22.77

BRPA0009-023 12/01/2022

BEAVER COUNTY

Rates Fringes

BRICKLAYER.......................$ 35.28 24.49

BRPA0009-025 12/01/2022

BUTLER, LAWRENCE, AND MERCER COUNTIES

Rates Fringes

BRICKLAYER.......................$ 34.73 24.14

BRPA0009-032 06/01/2017

FAYETTE (Jefferson & Washington Twps), GREENE (Except Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Rostraver Twp) COUNTIES

BRICKLAYER.......................$ 31.00 20.66

BRPA0009-033 12/01/2022

ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp) COUNTIES

Rates Fringes

BRICKLAYER.......................$ 36.55 24.46

BRPA0009-034 11/01/2019

ERIE COUNTY

Rates Fringes

BRICKLAYER.......................$ 28.64 21.86

BRPA0009-058 06/01/2020

ALLEGHENY, WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps)

COUNTIES

Rates Fringes

BRICKLAYER.......................$ 34.05 22.81

BRPA0009-059 12/01/2022

CAMERON, ELK, McKEAN, POTTER AND WARREN COUNTIES

Rates Fringes

BRICKLAYER.......................$ 31.62 22.81

* CARP0274-001 01/01/2026

Rates Fringes

PILEDRIVERMAN

Piledriverman (welder)......$ 44.63 23.42 Piledriverman...............$ 43.13 23.42

* CARP0274-002 01/01/2026

Rates Fringes

Diver............................$ 64.70 23.42 Tender...........................$ 43.13 23.42

CARP0443-004 06/01/2024

Rates Fringes

MILLWRIGHT.......................$ 43.00 23.44

* CARP2274-001 01/01/2026

CARPENTER (ALLEGHENY,

ARMSTRONG, BEAVER, BUTLER,

ERIE, FAYETTE, GREENE,

LAWRENCE, MERCER, WASHINGTON,

AND WESTMORELAND COUNTIES)

Carpenters (Welders)........$ 44.10 22.84 Carpenters..................$ 42.60 22.84

CARPENTER (BEDFORD, BLAIR,

CAMBRIA, CAMERON, CENTRE,

CLARION, CLINTON, CLEARFIELD,

CRAWFORD, ELK, FOREST,

FRANKLIN, FULTON, HUNTINGDON,

INDIANA, JEFFERSON, MCKEAN,

MIFFLIN, POTTER, SOMERSET,

VENANGO, AND WARREN COUNTIES)

Carpenters (Welders)........$ 43.85 22.84 Carpenters..................$ 42.35 22.84

ELEC0005-006 12/26/2025

ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON,

CENTRE (Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES

Rates Fringes

ELECTRICIAN......................$ 49.11 36.79

ELEC0056-004 06/01/2025

ERIE, FOREST AND WARREN COUNTIES

Rates Fringes

ELECTRICIAN......................$ 43.25 26.56

ELEC0126-005 06/03/2024

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE,

CLARION, CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON,

INDIANA, JEFFERSON, SOMERSET, WASHINGTON AND WESTMORELAND

Rates Fringes

Line Construction:

Cable Splicer...............$ 54.38 34.25%+11.50 Groundman...................$ 32.63 34.25%+11.50 Lineman.....................$ 54.38 34.25%+11.50 Truck Driver................$ 35.35 34.25%+11.50 Winch Truck Operator........$ 38.07 34.25%+11.50

ELEC0126-007 06/03/2024

FRANKLIN AND MIFFLIN COUNTIES

Rates Fringes

Line Construction:

Cable Splicer...............$ 53.20 34.25%+11.50 Groundman...................$ 31.92 34.25%+11.50

Lineman.....................$ 53.20 34.25%+11.50 Truck Driver................$ 34.58 34.25%+11.50 Winch Truck Operator........$ 37.24 34.25%+11.50

ELEC0143-007 06/01/2025

FRANKLIN and MIFFLIN COUNTIES

Rates Fringes

ELECTRICIAN......................$ 40.00 27.42

ELEC0712-003 12/29/2025

CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 51.45 29.77

ELEC0812-008 06/01/2025

CLINTON COUNTY

Rates Fringes

ELECTRICIAN......................$ 40.47 26.51

ELEC0812-009 06/01/2025

POTTER COUNTY

Rates Fringes

ELECTRICIAN......................$ 41.48 26.54

ELEC0812-011 06/01/2025

CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)

Rates Fringes

ELECTRICIAN......................$ 40.47 26.51

ELEC1319-004 09/01/2025

BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST,

LAWRENCE, MCKEAN, MERCER, VENANGO, WARREN AND POTTER COUNTIES

Rates Fringes

Line Construction:

Equipment Operator..........$ 68.06 31.43 Groundmen...................$ 42.20 16.02 Linemen.....................$ 68.06 31.43 Truck Driver................$ 44.24 16.21

* ENGI0066-016 01/01/2026

Power equipment operators:

(ALLEGHENY, ARMSTRONG,

BEAVER, BLAIR, BUTLER,

CAMBRIA, CENTRE, CLARION,

CLEARFIELD, CRAWFORD, ERIE,

ELK, FAYETTE, GREENE,

INDIANA, JEFFERSON, LAWRENCE,

MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON,

AND WESTMORELAND COUNTIES)

GROUP 1.....................$ 41.96 24.66

GROUP 1-A...................$ 44.96 24.66

GROUP 1-B...................$ 43.96 24.66

GROUP 2.....................$ 41.70 24.66

GROUP 3.....................$ 38.05 24.66

GROUP 4.....................$ 37.59 24.66

GROUP 5.....................$ 37.34 24.66

Power equipment operators:

(BEDFORD, CAMERON, CLINTON,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, MIFFLIN, AND

POTTER COUNTIES)

GROUP 1.....................$ 41.67 24.66

GROUP 1-A...................$ 44.67 24.66

GROUP 1-B...................$ 43.67 24.66

GROUP 2.....................$ 41.39 24.66

GROUP 3.....................$ 37.75 24.66

GROUP 4.....................$ 37.26 24.66

GROUP 5.....................$ 37.05 24.66

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1 - Asphalt Paving Machine (Spreader), Autograde (C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill (similar to Hugh Williams), Central Mix Plant; Cooling Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes (Tower Stationary- Climbing Tower Crane); Derrick; Derrick Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;

Dredge Hydraulic; Elevating Grader; Franki Pile Machine;

Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar),Hydraulic Boom Truck (non pivotal cab); Hydro-pneumatic Excavation Equipment (or similar);

(Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;) Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading Attachment), Mucking Machine (tunnel);

Pile Driver Machine; Pipe Extrusion Machine; Prespliter Drill (self contained); Refrigeration Plant (soil Stablization) Rough Terrain Crane (25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain Crane (under 25 ton), Scrapers; Shovel-Power; Slip form Paver (C.M.I. and similar); Trenching Machine (30,000 lbs. and over), Trenching Machine (under 30,000 lb.), Tunnell Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Compactor with blade

GROUP 1-A Backhoes-360 degree swing (above 120,000 lbs. gross weight); Cranes (over 100 tons), Cranes-Rough Terrain (over 100 ton); Tug Boat Pilot (on boats over 800 horsepower)

GROUP 1-B Backhoes-360 degree swing (above 70,000 lbs. to 120,000 lbs. gross weight); Cranes (up to 100 ton), Cranes-Rough Terrain (65 ton-100 ton), Tower Crane

GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger (truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; Directional drill over 3,000 lbs thrust; concrete batch plant (electronically synchronized); concrete belt placer (C.M.I. and similar);

concrete finishing machine and spreader, concrete mixer (over 1 cy.) concrete pump (stationary); core drill (truck or skid mtd. - similar to penn drill), dozer (25,000 lbs or less); Ditch Witch Saw, force feedloader; fork lift (lull or similar); grader - power; grease unit opertor (head);

guard rail post driver (truck mounted) guard rail post driver (skid type); hilift (under 4 cy.); skid steer loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage);

minor equipment operator (accumulative four units); mucking machine; multi-head saw (groover); overhead crane; roller -power- asphalt; ross carrier; side boom or tractor mounted boom; shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator; bidwell concrete finishing machine (or similar).

GROUP 3: Broom Finisher (C.M.I. or similar);

Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker (self-propelled or ridden); Soil Stablizer Machine; Tire Repairman; Tractor (snaking and hauling); Well Driller and Horizontal: Winch or ""A"" Frame Truck (when hoisting and lowering).

GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1

cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line Machine; Generator; Groute Pump; Heater (Machinical); Hoist (single Drum); Ladavator, Light Plant; Mulching Machine;

Personnel Boat (Powered), Pulverizer, Pumps, Seeding Machine, spray Cure Machine (powered Driven); Subgrader;

Tie Puller; Tugger; Welding Machine (Gas or Diesel).

GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;

Power Broom; Side Delivery Shoulder Spreader (attachment);

IRON0003-001 06/01/2023

ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG,

BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES

Rates Fringes

IRONWORKER.......................$ 38.89 34.54

IRON0003-007 06/01/2023

BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,

MCKEAN, AND POTTER COUNTIES

IRONWORKER.......................$ 32.29 32.41

IRON0003-011 06/01/2023

CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES

Rates Fringes

IRONWORKER.......................$ 33.57 32.23

IRON0207-002 06/01/2025

LAWRENCE, MERCER, AND VENANGO COUNTIES

Rates Fringes

IRONWORKER.......................$ 36.26 28.16

IRON0404-008 07/01/2024

FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN

COUNTIES

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 37.26 32.63

IRON0549-002 12/01/2022

GREENE COUNTY

Rates Fringes

IRONWORKER.......................$ 35.19 25.66

IRON0568-004 05/01/2025

BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western

2/3), AND SOMERSET COUNTIES

Rates Fringes

IRONWORKER

Structural, Ornamental, Reinforcing, Machinery Mover, Rigger & Machinery Erector, Welder, Fence Erector.....................$ 31.65 24.50

* LABO1058-001 01/01/2026

Rates Fringes

LABORER (BEDFORD, CAMERON,

CENTRE, CLINTON, CRAWFORD,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, JEFFERSON,

MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 34.60 27.00

GROUP 2.....................$ 34.76 27.00

GROUP 3.....................$ 35.25 27.00

GROUP 4.....................$ 35.70 27.00

GROUP 5.....................$ 36.11 27.00

GROUP 6.....................$ 32.95 27.00

GROUP 7.....................$ 34.60 26.00

GROUP 8.....................$ 36.10 26.00

Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND

COUNTIES)

GROUP 1.....................$ 34.70 27.00

GROUP 2.....................$ 34.86 27.00

GROUP 3.....................$ 35.25 27.00

GROUP 4.....................$ 35.70 27.00

GROUP 5.....................$ 36.11 27.00

GROUP 6.....................$ 32.95 27.00

GROUP 7.....................$ 34.70 26.00

GROUP 8.....................$ 36.20 26.00

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman (weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction (Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;

Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street Sweeper, and Wood Chipper; water boy

GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper (tunnel) Fork Lift, (walk behind), Form Setter (Road Forms Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron (Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, All RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING: adzing machine, ballast Router, Bolting Machine, Power Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike Drivers (Manually or hand held tool) Spike Pullers Tamping Machine, Thermitweld

GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;

concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers (including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);

Walk behind ditching machine (trencher or similar);crown screed adjuster and welder

GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)

GROUP 5:High Burner, (Any burning not done from deck), Welder (Pipeline)

GROUP 6: Uniformed Flagperson, Watchman

GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D

GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B

PAIN0021-019 05/01/2021

CLINTON COUNTY

Rates Fringes

Painters:

Bridge......................$ 36.67 18.80 Brush & Roller..............$ 29.02 21.14 Spray.......................$ 30.02 21.14

PAIN0021-024 05/01/2021

FRANKLIN COUNTY

Rates Fringes

PAINTER

Brush.......................$ 25.84 16.30

PAIN0057-014 06/01/2023

ALLEGHENY, FAYETTE, GREENE, WASHINGTON COUNTIES

Rates Fringes

Painters:

Bridge......................$ 38.33 23.72 Brush & Roller..............$ 30.56 23.72 Spray.......................$ 30.56 23.72

PAIN0057-015 06/01/2023

ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE,

CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA,

JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND

WESTMORELAND COUNTIES

Painters:

Bridge......................$ 38.33 23.72 Brush and Roller............$ 30.56 23.72 Spray.......................$ 30.56 23.72

PAIN0057-022 05/01/2024

Rates Fringes

Painters: (ERIE, McKEAN, AND WARREN (Including Columbus and Freehold twps) COUNTIES) Bridges,Stacks,Towers.......$ 28.87 24.89 Brush and Roller............$ 26.37 24.89 Spray and Sandblasting......$ 27.12 24.89

PAIN0057-027 06/01/2023

CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and Freehold twps)

Rates Fringes

PAINTER

Brush and Roller............$ 30.56 23.72

* PLAS0526-002 01/01/2026

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 37.44 28.00

PLUM0027-001 06/01/2023

ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, CLARION, GREENE (Except extreme Eastern portion), LAWRENCE, WASHINGTON (Except extreme Eastern portion) and WESTMORELAND (City of Arnold and City of New Kensington Only) COUNTIES

Rates Fringes

Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 48.65 25.47

PLUM0027-009 06/01/2023

CRAWFORD, ERIE, FOREST, MCKEAN, MERCER, VENANGO and WARREN

COUNTIES

Rates Fringes

Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 46.98 25.47

PLUM0354-005 06/01/2012

BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE,

GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND

WESTMORELAND COUNTIES

Rates Fringes

Plumbers and Pipefitters (Bridge Drain Pipe)..............$ 35.54 19.97

TEAM0040-006 01/01/2026

Rates Fringes

TRUCK DRIVER (ALLEGHENY,

ARMSTRONG, BEAVER, BLAIR,

BUTLER, CAMBRIA, CENTRE,

CLARFIELD, CRAWFORD, ERIE,

FAYETTE, GREENE, INDIANA,

JEFFERSON, LAWRENCE, MCKEAN,

MERCER, SOMERSET, VENANGO,

WARREN, WASHINGTON, AND

WESTMORELAND)

GROUP 1.....................$ 37.93 23.71

GROUP 2.....................$ 38.39 24.02

Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 37.79 23.63

GROUP 2.....................$ 38.25 23.93

FOOTNOTES: A. Hazardous/toxic waste material/work level A & B receive additional $2.50 per hour above classification rate

B. Hazardous/toxic waste materials/Work level C & D receive $1.00 per hour above classification

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Single Axle (2 axles including steering axle);

Includes partsman and warehoueman. Tandem - Tri-Axle - Semi-Tractor Trailer (combination) (3 axles or more including steering axle)

GROUP 2 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);

Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

Street From To Notes Depth Width Length SF

# EWW

Conflicts Ramp Impact

CHERRY STREET SL W ARLINGTON RD NL HILLTOP RD 2 30 340 10,200 0 NRI

E 28TH ST WL BIRD DR DEADEND 2 26 270 7,020 0 NRI

E 29TH STREET EL BRANDES ST WL BURTON AVE 2 30 333 9,990 4 (P3) 3 @ Brandes

E 30TH STREET EL FRENCH ST WL HOLLAND ST 2 27 705 19,035 0 NRI

E 31ST STREET EL WAYNE ST WL PERRY ST 2 40 653 26,120 6 (3&4) NRI

E 33RD STREET EL PARADE ST WL WALLACE ST 2 29 820 23,780 8 (P3) 1,2,7,8 @ Wallace

EAST AVENUE SL 26TH ST NL 27TH ST 2 29 315 9,135 7 (P3) NRI

GERMAN STREET SL 31ST ST NL 32ND ST 2 29 330 9,570 0 NRI

GLENDALE AVENUE EL E LAWN PKWY WL BIRD DR 2 23 532 12,236 0 NRI

HAZEL STREET SL W 26TH ST NL W 29TH ST 2 28 955 26,740 0 NRI

HOLLAND STREET SL E 28TH ST NL E 29TH ST 2 29 303 8,787 0 NRI

JUNE STREET SL PROSPECT AVE FAIRMONT PKWY 2 25 352 8,800 0 NRI

JUNE STREET FAIRMONT PKWY NL GLENDALE AVE 3 25 325 8,125 0 NRI

MAPLE STREET SL W 26TH ST NL W 29TH ST 2 27 955 25,785 0 NRI

MEADE AVENUE EL RILLING AVENUE WL ZOAR AVENUE 2 26 240 6,240 0 NRI

MOOREHEAD STREET EL PEACH ST WL GLENWOOD PARK AVE 2 30 590 17,700 1 (P4) 1,4,5,8 @ KELLOG SASSAFRASS STREET SL W 19TH ST NL W 21ST ST Cutbacks on 20th, heavy erosion on E side 2 31 630 19,530 0 NRI

STATE STREET 2 60 175 10,500 0 NRI

STATE ST SL 30TH STREET NL 31ST STREET 2 18,756 0 NRI

USONIA AVENUE E of driveway at 304 Usonia Dr E of driveway at 319 Usonia Dr 2 27 204 5,508 0 4,5,6 @ Southgate | 1,8 @ Longacre

W 30TH STREET EL GLENWOOD PARK AVENUE WL STATE STREET 2 30 663 19,890 0 NRI

W 32ND ST EL STOUGH AVENUE WL GARDEN AVENUE 2 31 680 21,080 0 NRI

WARSAW AVENUE SL E 40TH ST NL E 41ST ST 3 25 498 12,450 0 NRI

WAYNE STREET SL E 30TH ST NL E 31ST ST 2 28 290 8,120 8 (3&4) NRI

345,097

2026 Paving I (Mill & Resurface)

UNDERPASS BTW 14TH AND 16TH

From: To: Signals

N Leg E Leg W Leg N Leg E Leg W Leg Double Yellow White

W ARLINGTON RD HILLTOP RD L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ W ARLINGTON - - - - - -

@ HILLTOP - - - - - -

BIRD DR DEAD END L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ BIRD DR - - - - - - - -

@ DEAD END - - - - - - - -

BRANDES ST BURTON AVE L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ BRANDES - - - - - - - -

@ BURTON - - - - - - - -

FRENCH ST HOLLAND ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ FRENCH - - - - - - -

@ HOLLAND - - - - - - -

WAYNE ST PERRY ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ WAYNE - 106' - - 60' C - -

@ PERRY - - 106' - - 20' SB & 60' C -

PARADE ST WALLACE ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ PARADE - - - - - - - -

@ HOLMES - - - - - - - -

@ WALLACE - - - - - - - -

E 26TH ST E 27TH ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ E 26TH - - - - - - -

@ E 27TH 60' - - - - - -

E 31ST ST E 32ND ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ 31ST - - - - - - - -

@ 32ND - - - - - - - -

E LAWN PKWY BIRD DR L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ E LAWN - - - - - - - -

@ BIRD - - - - - - -

W 29TH ST W 26TH ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ W 29TH - - - - - - - -

@ W 26TH - - - - - - - -

E 28TH ST E 29TH ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ E 28TH - - - - - - - -

@ E 29TH - - - - - - -

PROSPECT AVE FAIRMOUNT PKWY L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ PROSPECT - - - - - - -

@ FAIRMOUNT - - - - - - -

FAIRMOUNT PKWY GLENDALE AVE L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ FAIRMOUNT - - - - - - - -

@ LINWOOD - - - - - - - -

@ GLENDALE - - - - - - - -

W 26TH ST W 29TH ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ W 26TH - - - - - - - -

@ W 29TH - - - - - - - -

RILLING AVE ZOAR AVE L SL S SR R L SL S SR R L SL S SR R L SL S SR R

E Leg W LegS Leg S Leg N Leg S Leg

Target Street Crosswalks (6 in.) Stop Bars (SB) & Crosswalk Keys (C) (24 in.) Lane Markings Arrows

2026 Non-CDBG Paving List

E 29TH ST

CHERRY ST

E 28TH ST

E 31ST ST

E 30TH ST

EAST AVE

E 33RD ST

GLENDALE AVE

72' 15' SB

GERMAN ST

HOLLAND ST

HAZEL ST

JUNE ST

JUNE ST

MAPLE ST

MEADE AVE

262' 262'

@ RILLING AVE - - - - - - - -

@ ZOAR AVE - - - - - - - -

PEACH ST GLENWOOD PARK L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ PEACH ST ✔ - 56' - - - - 165' -

@ GLENWOOD PARK ✔ - - 56' - - 16' SB - -

W 19TH ST W 21ST ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ W 19TH - - - - - - - -

@ W 20TH - - - - - - - -

@ W 21ST ✔ 66' - - 30' SB - - - 320'

UNDERPASS L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ UNDERPASS - - - - - - 150' 150'

30TH ST 31ST ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ 30TH ST - - - - - - - 84' 1 1

@ 31ST ST - - - - - - -

E OF DW AT 304 E OF DW AT 319 L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ EAST OF 304 - - - - - - - -

@ EAST OF 319 - - - - - - - - -

ELMWOOD AVE RASPBERRY ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ ELMWOOD - - - - - - - -

@ RASPBERRY - - - - - - - -

GLENWOOD PARK STATE ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ GLENWOOD PARK ✔ - 64' - - 15' SB - - -

@ ERIE ST - - - - - - - -

@ STATE ST - - 58' - - 14' SB - -

STOUGH AVE GARDEN AVE L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ STOUGH - - - - - - 210' -

@ RUDOLPH 115'

@ HAMPTON - - - - - 295' -

@ GARDEN 150'

E 40TH ST E 41ST ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ E 40TH - - - - - - - -

@ E 41ST - - - - - - -

E 30TH ST E 31ST ST L SL S SR R L SL S SR R L SL S SR R L SL S SR R

@ E 30TH - - - - - - - -

@ E 31ST 64' - - 15' SB - - - -

MOOREHEAD ST

SASSAFRAS ST

STATE ST

W 28TH ST

USONIA AVE

WAYNE ST

Lane markings are marked by contractor, painted by others 6" 850'

24" 280'

Totals

LEFT ARROWS 1

RIGHT ARROWS 1

W 30TH ST

W 32ND ST

WHITE LANE LINES 816'

DOUBLE YELLOW 1347'

WARSAW AVE

STATE ST

142' 35' SB

INVITATION TO BID

OWNER: The City of Erie, Pennsylvania Municipal Building - 626 State Street Erie, PA 16501-1128

Separate sealed BIDS for the construction of

2026 Proposed Milling & Asphalt Resurfacing of Various City Streets - 1 will be received by the The City Purchasing Agent via PennBid (https://pennbid.net/) until Monday, June 1, 2026, 2:00 p.m..

The Contractor submitting the bid must have obtained the Contract Document in his name.

A Bid Security in the amount of ten (10%) percent of the Bid shall accompany each Bid. The successful Bidder shall be required to post Performance and Payment Bonds.

For any questions concerning E.E.O. requirements, please contact:

Ms. Veronica M. Fields, Asst. Grant Administrator/Labor Compliance, 626 State Street - Room 404, Erie, PA 16501-1128, Phone (814) 870-1263.

Questions related to City Bid Requirements can be directed to:

Ms. Jeanne Ardillo, City Purchasing Agent, 626 State Street - Room 305, Erie, PA 16501-1128, Phone (814) 870-1282.

Technical questions concerning Bid Specifications can be directed to:

Mr. Brian McNamara, P.E., Project Engineer, 626 State Street - Room 400, Erie, PA 16501-1128, Phone (814) 870-1373.

The City has the right to reject any bid which does not contain the completed, properly executed documents related to “Affirmative Action Plan for Utilization of Minority Business”, in compliance with Executive Order 11625.

The City also reserves the right to reject any and all bids and to waive defects in the form of the bid, also, to select the bid which best meets the requirements of the City.

- 1 -alindquist Rectangle

Rectangle

INFORMATION FOR BIDDERS

Bids will be received by the City of Erie, Pennsylvania (herein called the Owner), at the City of Erie Purchasing Office, 1:00 p.m. Prevailing Local Time, Monday, June 1, 2026, and then at said Office publicly opened and read aloud. Each Bid must be submitted on PennBid (https://pennbid.net/).

All bids must be made on the required bid form. All blank spaces, for bid prices, must be filled in, in ink or typewritten, and the bid form must be fully complete and executed when submitted. Only one (1) copy of the bid form is required.

All unit prices shall be submitted in both words and figures as indicated in the bid.

This is the start of the file's text. The full file is on GovTribe.